GCPs, RTK and fieldwork
UAT 451 UAS Technology for Surveying, Mapping and Photogrammetry
Lesson
By the end of this module you will be able to
- Distinguish the roles of camera positions, ground control points (GCPs) and independent checkpoints
- Compare RTK with PPK and estimate errors from base distance and timing mismatch
- Plan GCP and checkpoint positions that cover the area, and size targets to be clearly visible in images
- Record fieldwork so it can be traced, and decide on re-flights in the field
- Check a survey flight plan against the legal conditions, ceiling, visual range, batteries and wind
Why this matters
Sharp, well-overlapped images give the map the right shape, but they do not say where on Earth the map sits or how high it is. That comes from camera positions and ground control. Many surveys flown with expensive RTK drones are still offset by several centimetres across the whole map, because people assume “with RTK we need nothing on the ground”. This module shows how to place enough ground evidence both to help build the map and to prove its accuracy.
Three groups of evidence
| Group | Used for | Caution |
|---|---|---|
| Camera positions at exposure | Starting values for image adjustment | Accuracy depends on the drone’s GNSS and timing |
| GCPs (ground control points) | Tie the model to the coordinate system | Used in the adjustment, so they cannot prove accuracy |
| Checkpoints | Test the accuracy of the product | Must not be used in the adjustment, and must be more accurate than the product |
The key rule is that points used to adjust the result cannot be used to test it, just as a student who has seen the exam in advance gets a score that says nothing about real knowledge. The ASPRS standards (Edition 2) require checkpoints to be at least twice as accurate as the product being tested.
RTK and PPK
Both methods use data from a base station at a known position to correct the receiver on the drone or on the ground.
- RTK (real-time kinematic) receives corrections during the work by radio or internet and gives positions immediately, but if the link drops during a flight, images in that stretch get low-quality positions
- PPK (post-processed kinematic) records raw data and computes positions afterwards with base data, so it tolerates link loss better but needs base data with matching times and formats
Manufacturers usually state receiver accuracy as a constant plus parts per million (ppm) of the distance from the base. 1 ppm is 1 mm per km.
Example 1 Errors from base distance, timing and target size
The 8 mm + 1 ppm (horizontal) and 15 mm + 1 ppm (vertical) specification is an example; use the specification of the receiver you actually use.
import math
H_FIX, V_FIX, PPM = 0.008, 0.015, 1e-6 # example RTK receiver spec: 8 mm + 1 ppm (horizontal), 15 mm + 1 ppm (vertical)
for km in (2, 10, 30):
d = km * 1000
print(f"baseline {km:>2} km horizontal {(H_FIX + PPM * d) * 100:.1f} cm vertical {(V_FIX + PPM * d) * 100:.1f} cm")
SPEED = 9.5 # flight speed (m/s) from the module 2 plan
for ms in (1, 5, 20): # mismatch between shutter time and position time
print(f"timing offset {ms:>2} ms -> position error along track {SPEED * ms / 1000 * 100:.1f} cm")
GSD, TARGET = 0.025, 0.60 # m
print(f"target {TARGET * 100:.0f} cm = {TARGET / GSD:.0f} pixels across")
baseline 2 km horizontal 1.0 cm vertical 1.7 cm
baseline 10 km horizontal 1.8 cm vertical 2.5 cm
baseline 30 km horizontal 3.8 cm vertical 4.5 cm
timing offset 1 ms -> position error along track 0.9 cm
timing offset 5 ms -> position error along track 4.8 cm
timing offset 20 ms -> position error along track 19.0 cm
target 60 cm = 24 pixels across
With the base 30 km away, the vertical error from the specification alone is 4.5 cm, more than the 3 cm budgeted for the GCP survey in module 1, so use a base close to the site.
Timing errors are just as serious. If the shutter time and the position time differ by only 20 ms while flying at 9.5 m/s, the camera position is off along the track by about 19 cm, which is why RTK survey drones must synchronise the shutter directly with GNSS.
A 60 cm target at a 2.5 cm GSD is 24 pixels wide in the image, enough to mark its centre precisely.
Placing GCPs and checkpoints
The OpenDroneMap guide suggests that about 5 GCPs work for most jobs and 8–10 for larger projects, spread evenly across the area, covering high and low ground, and placed 10–30 m in from the edge so each point appears in at least 5 images. These numbers are a starting recommendation, not a minimum for every job.
Example 2 Are four corners enough?
Measure the distance from every location in the area (a 50 m grid) to its nearest GCP, then look at the farthest location.
import math
W, L, IN = 1200, 800, 20 # area (m) and a 20 m inset from the edge, as ODM recommends
lo_x, hi_x, lo_y, hi_y = IN, W - IN, IN, L - IN
layouts = { # GCP positions (m) in the area
"4 corners": [(lo_x, lo_y), (hi_x, lo_y), (lo_x, hi_y), (hi_x, hi_y)],
"8 perimeter + centre": [(lo_x, lo_y), (600, lo_y), (hi_x, lo_y), (lo_x, 400), (hi_x, 400),
(lo_x, hi_y), (600, hi_y), (hi_x, hi_y), (600, 400)],
}
grid = [(x, y) for x in range(0, W + 1, 50) for y in range(0, L + 1, 50)]
for name, gcps in layouts.items():
far = max(min(math.dist(p, g) for g in gcps) for p in grid)
print(f"{name:<21} {len(gcps)} GCPs, farthest point from any GCP {far:.0f} m")
4 corners 4 GCPs, farthest point from any GCP 693 m
8 perimeter + centre 9 GCPs, farthest point from any GCP 333 m
With GCPs only at the corners, the centre is almost 700 m from any control, and the model may bend or sag there with nothing to hold it. Using 9 points (8 around the edge and 1 in the centre) cuts the farthest distance to about 333 m. The 6 checkpoints in Figure 2 sit between the GCPs to test the areas farthest from control.
Traceable fieldwork
- Check site access, weather and flight permission before going out
- Give every target a unique code, and photograph each target and its surroundings so the right one is marked in the images
- Survey according to the instrument manual: check the pole is plumb, record the pole height and how it was measured, and record the coordinate system, height system and geoid model used (for example TGM2017)
- Re-survey some points at a different time to see whether the values repeat closely
- Keep GCP and checkpoint files separate from the field onwards, so checkpoints are not used in the adjustment by accident
Decide on re-flights in the field. If a target has been driven over or moved, a line is blurred, or RTK dropped for a long stretch, decide before packing up, because coming back another day means placing and surveying targets again.
Safety in survey flying
Safety has three layers. The first is the law. Commercial surveying counts as use for a purpose other than recreation, so a registered operator under the 2015 (B.E. 2558) Ministry of Transport announcement (clauses 5, 9 and 13) must fly no higher than 90 m above ground, stay 9 km from airports, keep the aircraft in sight at all times, fly only in daylight, keep at least 50 m horizontally from people, vehicles and structures not involved in the operation, not fly over communities, and carry third-party liability insurance of at least 1,000,000 baht per event. A mission that differs is applied for under clause 17, which the 2026 (B.E. 2569) CAAT announcement, effective 17 May 2026, now supports, and CAAT’s own leaflet says flights above 90 m need permission in advance. Check the version in force before every flight.
The second layer is the site. Walk the area to find people, roads, power lines and tall trees, keep the target-laying zone apart from the flight lines, and set the return-to-home height above the obstacles. The third layer is the aircraft and the plan, such as battery reserve, gusts and the distance at which the aircraft can really be seen.
Example 3 Checking the plan for the 1,200 x 800 m site against the ceiling, visual range and wind
The visual range and maximum airspeed are assumed; use values tested with your own drone.
import math
SW, F, IW = 17.3, 12.3, 5280 # camera B from module 2
H = 90.0 # flight height of the module 2 plan, equal to the 90 m ceiling
gsd = H * SW / (F * IW)
spacing = gsd * IW * (1 - 0.70)
print(f"fly at {H:.0f} m: GSD {gsd * 100:.2f} cm, line spacing {spacing:.1f} m, {math.ceil(800 / spacing) + 1} lines")
VLOS = 450 # visual range found in tests (m, assumed)
for n in (1, 2, 3):
far = math.hypot(1200 / n / 2, 800 / 2) # farthest point from the centre of each launch point's strip
print(f"{n} launch point(s): farthest point {far:.0f} m -> {'ok' if far <= VLOS else 'too far'}")
print(f"headwind limit on survey legs: {16.0 - 9.5:.1f} m/s") # assumed maximum airspeed 16 m/s minus ground speed 9.5 m/s
fly at 90 m: GSD 2.40 cm, line spacing 38.0 m, 23 lines
1 launch point(s): farthest point 721 m -> too far
2 launch point(s): farthest point 500 m -> too far
3 launch point(s): farthest point 447 m -> ok
headwind limit on survey legs: 6.5 m/s
The module 2 plan flies at 90 m, the ceiling. That gives a GSD of 2.40 cm, better than 2.5 cm, but each image covers less, so 23 lines 38.0 m apart are needed. With a visual range of 450 m, a pilot in the middle of the site still cannot see the corners (721 m), so three launch points are needed. The headwind the survey legs can take is only 6.1 m/s, because the ground speed must stay at 9.5 m/s for the images to overlap as planned.
Module lab
Lab: place and survey control
- For the area from module 2, plan GCPs and checkpoints with the code in Example 2 so that the farthest distance from a GCP is within the value your lecturer sets
- Compute the target size needed to be at least about 20 pixels wide at the plan’s GSD
- Place targets and survey them with a GNSS receiver under experienced supervision, recording every fieldwork step
- Re-survey at least three points and compare the repeat values
- Write a one-page field note on whether a re-flight is needed, with reasons
Common mistakes
Watch out
- Assuming an RTK drone needs no checkpoints, leaving no independent evidence of accuracy
- Using checkpoints as GCPs, then reporting errors that look better than they are
- Placing GCPs only at the corners or so close to the edge that they appear in few images
- Using a very distant base without computing the ppm error
- Not recording pole height and height system, so vertical errors cannot be traced later
Summary
- Camera positions give a start, GCPs tie the model down, and checkpoints prove accuracy and must not be used in the adjustment
- RTK corrects in real time, PPK afterwards; error grows with base distance,
- A timing mismatch shifts positions by
- Spread GCPs over the area, 10–30 m in from the edge; targets must be tens of pixels wide
- Record fieldwork so it can be traced, and decide on re-flights before leaving the site
Check your understanding
- Why can points used as GCPs not be used to report accuracy?
- A receiver specified at 10 mm + 1 ppm is 15 km from the base. What is its error?
- Flying at 8 m/s with a 10 ms timing mismatch, how far off is the camera position?
- With a 3 cm GSD and a target that must be 20 pixels wide, how wide must the target be?
- Why does the ODM guide suggest placing GCPs in from the edge?
Answers
- The model has already been adjusted to fit those points, so errors there look smaller than they really are; it is not an independent test
- mm, or 2.5 cm
- m, or 8 cm
- cm
- So each point appears in at least 5 images; points close to the edge appear in few images
Key formulas
| RTK error with base distance | |
| Error from timing mismatch | |
| Target size in the image | |
| Maximum headwind |
Key references
- OpenDroneMap Authors. Ground control points. OpenDroneMap documentation (Version 3.6.0). link
- Sampath, A., Shrestha, M., While, M., & Scholl, V. M. (2023). Guidelines for calibration of uncrewed aircraft systems imagery (Open-File Report 2023–1033). U.S. Geological Survey. link
- American Society for Photogrammetry and Remote Sensing. (2024). Positional accuracy standards for digital geospatial data (Edition 2, Version 2). Photogrammetric Engineering & Remote Sensing, 91(5), 247–255. link
- Abdullah, Q. A. (2025). Overview of the ASPRS positional accuracy standards for digital geospatial data. LIDAR Magazine, 15(2). link
- Dumrongchai, P., Srimanee, C., Duangdee, N., & Bairaksa, J. (2021). The determination of Thailand Geoid Model 2017 (TGM2017) from airborne and terrestrial gravimetry. Terrestrial, Atmospheric and Oceanic Sciences, 32, 857–872. link
- Wolf, P. R., DeWitt, B. A., & Wilkinson, B. E. (2014). Elements of photogrammetry with applications in GIS (4th ed.). McGraw-Hill Education. link
- สำนักงานการบินพลเรือนแห่งประเทศไทย. (2569). ประกาศ กพท. เรื่อง หลักเกณฑ์และวิธีการในการอนุญาตให้ผู้บังคับหรือปล่อยอากาศยานซึ่งไม่มีนักบิน ประเภทอากาศยานที่ควบคุมการบินจากภายนอก ที่มีน้ำหนักไม่เกิน 25 กิโลกรัม ปฏิบัติแตกต่างไปจากเงื่อนไขที่กำหนด พ.ศ. 2569 (มีผล 17 พฤษภาคม 2569). link
- กระทรวงคมนาคม. (2558). ประกาศกระทรวงคมนาคม เรื่อง หลักเกณฑ์การขออนุญาตและเงื่อนไขในการบังคับหรือปล่อยอากาศยานซึ่งไม่มีนักบิน ประเภทอากาศยานที่ควบคุมการบินจากภายนอก พ.ศ. 2558. ราชกิจจานุเบกษา, 132(86 ง), 6–12. link
- Civil Aviation Authority of Thailand. (2025). Flying a drone in Thailand [Leaflet]. link
Further reading
Study the assigned knowledge units in advance, review media and take the module quiz
In class / field
Lab or field practice from worksheets with a safety checklist
Learning evidence: Checked worksheets and quiz results