UAT 451 UAS Technology for Surveying, Mapping and Photogrammetry

Worksheet 1 A one-page survey requirement

Analysis activity 6 hAssesses CLO1

Objective

Turn a user need into measurable survey requirements, set an error budget and define the coordinate and height systems

Equipment and materials

  • Satellite image or map of the site
  • QGIS
  • Python and example code at /downloads/uat-451/

Safety

  • Desk work only; no flying

Steps

  1. Choose a real site on campus or in the community with one use case
  2. Write the requirement table: products, GSD, horizontal and vertical RMSE, coordinate and height systems, with reasons
  3. Set a vertical error budget with at least three sources; compute the remainder with Example 1
  4. Find the UTM zone; convert corner coordinates with Example 2 and check in QGIS
  5. Find which benchmark and geoid model the site owner uses and record them

Record of results

Table 1 Survey requirements for the chosen site
ItemRequirement (number with unit)How it will be checkedReason from the use
Table 2 Vertical error budget
Error sourceσ (cm)Share of target variance (%)Where the number comes from
Table 3 Site corner coordinates, code versus QGIS
CornerLatitude, longitude (deg)UTM zoneE, N from code (m)E, N from QGIS (m)Difference (cm)

Questions

  1. In your group's budget, which source uses the largest share of the variance, and how much is left for the DTM surface? If the vertical RMSE target were halved, could the job still be done, and why?

  2. How much does your site's scale factor k change 1,000 m on the ground when measured on the grid? Does this matter for the use your group chose?

  3. What happens if you deliver ellipsoidal heights, or use a different geoid model from the site owner's benchmarks? Which case is more dangerous?

  4. Does your site suit a drone survey, or should it be combined with ground surveying? Compare time and data volume following Example 3 and name the real site's limits.

Check before you hand in

What to hand in

  • One-page survey requirement
  • Error budget table
  • Coordinate conversion checked in QGIS

CLO1 Plan surveys and define accuracy criteria. (CLOs are a web-team draft; the course owner sets the final ones.)

Instructors: answers and teaching notes for this worksheet are in the teaching pack