UAT 455 Sensor, Camera and Thermal Imaging Technology for UAS

Worksheet 10 A 24-hour mission plan and data reliability

Lab 6 hAssesses CLO6

Objective

Plan a day and night mission from sun and weather data, check the reliability of a data set, and simulate a handover

Equipment and materials

  • R-JPEG thermal camera and a metadata reader (ExifTool or the maker's software)
  • Three water containers at different temperatures and a calibrated thermometer
  • Forecast and weather-station data from the Thai Meteorological Department
  • Python and the module 10 example code

Safety

  • Mainly desk and tripod work; no flying
  • If flying at night, hold the permission, have a VO and navigation lights, stay within 90 m and follow the night-flight guidance
  • Use head torches for night work and never work near water alone
  • Never point the lens at the sun or a strong energy source

Steps

  1. Compute sunrise, sunset, twilight and the background time windows for the training area, and write a 24-hour mission timetable
  2. Fetch forecasts, warnings and station data from the Thai Meteorological Department, compute hourly dew points and gaps, and set go or no-go criteria
  3. Calibrate with three water containers, imaging at power-on and after 10 and 20 minutes of warm-up, and compare the error and drift
  4. Collect at least 30 R-JPEG images, compute the SHA-256 of the originals, read the metadata and run the Example 4 checks
  5. Hand the six-item package to another team to audit, compute the probability after each verification step as in Example 5, and present

Record of results

Table 1 24-hour mission timetable and time windows
TimeTaskArea or camera usedReason (time window, dew point, light, law)
Table 2 Hourly dew point and go or no-go criteria
HourAir (°C)RH (%)Dew point (°C)Spread (K)Go / watch / no-go
Table 3 Calibration with three water containers
ContainerThermometer (°C)Camera at power-on (°C)After 10 min warm-up (°C)After 20 min warm-up (°C)

Questions

  1. From your time windows, which areas are searched with thermal imaging and when, which need RGB, boats or the ground team, and how should the order change if cloud is forecast?

  2. When did the air to dew-point spread fall below 2 K, how did the team prepare the camera, and what should be done if the image suddenly blurs?

  3. How many metadata flags did your check raise, how should each be handled, and why keep the originals read-only with SHA-256 values?

  4. Using the sensitivity and specificity you measured in worksheet 9, compute the probability after each confirmation step, and explain why it is not zero when RGB sees nothing.

  5. Why should the handover report rely on differences within an image rather than absolute temperatures, and what uncertainty should it state?

Check before you hand in

What to hand in

  • The 24-hour mission timetable and time-window table
  • Dew-point table and go or no-go criteria
  • Calibration line with error and drift
  • Metadata flag list and hash values
  • The handover package, the other team's audit and the probability table

CLO6 Plan day and night missions with weather data under the legal conditions, and verify the reliability of thermal data before handing it over. (CLOs are a web-team draft; the course owner sets the final ones.)

Instructors: answers and teaching notes for this worksheet are in the teaching pack