UAT 459 UAS, Internet of Things and Smart Warehouse Systems
Worksheet 5 End-to-end mock counting system and evaluation report
Objective
Connect count results safely to a mock WMS and evaluate mission efficiency, value and safety with quantitative evidence
Equipment and materials
- Computer with the module 5 example code
- Mock WMS data for at least 100 locations and count results from the worksheet 3 mock rack
- Cost sources the group has found, such as equipment prices and labour rates
Safety
- Desk work, no flying
- Use simulated data, not a company's real stock or personal data
Steps
- Design the JSON count-result message and data flow, stating which steps need approval and how the audit trail is kept
- Run the reconciliation of Example 1 and check every recount task by hand
- Compute accuracy with a Wilson confidence interval as in Example 2
- Compute cost and NPV as in Example 3 with sourced figures and run a sensitivity analysis on at least two variables
- Build the risk matrix as in Example 4 and summarise everything in a report to warehouse management of no more than five pages
Record of results
| Location | WMS SSCC | Drone result | Outcome | Recount task or action |
|---|---|---|---|---|
| Item | Value | Formula or source | Conclusion |
|---|---|---|---|
| Hazard | L × S before | Band before | Main controls | L × S after | Band after |
|---|---|---|---|---|---|
Questions
Why is pallet-level IRA computed only from locations that were read? If unread locations were counted as errors or as matches, what would the group's result become?
Was the group's acceptance-test sample large enough? Explain with the lower bound of the Wilson interval, and say how many locations would be needed at the same accuracy.
From the sensitivity analysis, which variable decides whether NPV is positive or negative, and what data must the group collect during a trial to test that assumption?
Which hazard still has high severity after controls, and how will the group check that the controls really work rather than lowering scores on paper?
In the data flow the group designed, which steps need human approval, and why must the drone never adjust WMS stock itself?
Check before you hand in
What to hand in
- Data-flow diagram and sample JSON message
- Reconciliation results and recount task list
- Acceptance test, NPV and sensitivity analysis
- Risk matrix and management report