Teaching pack · UAT 464
A 15-week teaching plan, 5 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.
Coverage of the course description
The lessons fully teach 11 of 11 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.
| Description topic | Modules | Where it is taught | Status |
|---|---|---|---|
| Principles and technologies of multi-UAS aerial displays | M1 | Module 1: components of a multi-drone show system (airframe, LED, battery, RTK, radio, ground station, design software, three levels of intervention, store-and-trigger); Example 1 spares, energy per flight and battery sets; Example 2 electricity and charge time for 315 packs | Covered |
| Show sequence and pattern design | M1 | Module 1: designing pictures the audience can read (angular size, oblique viewing), from geometric shapes to points in the sky (Example 4 drones per scene), and storyboard and timing (Example 5 transition times of six scenes) | Covered |
| Positioning and flight-path planning | M2M3 | Module 2: coordinates, units and heading, smooth rest-to-rest trajectories, trajectories through several waypoints, and from animation to a table of sampled points · Module 3: centimetre-level position with RTK (the show error budget) and the pre-flight GNSS gate and spare drones | Covered |
| Coordinated formation and movement | M2M4 | Module 2: assigning drones to target points (grid to ring, numbered order against the best assignment) · Module 4: closest approach of every pair over the move, and choosing the formation spacing and screening with the lower bound | Covered |
| Control of and communication between the aircraft and the control station | M1M3 | Module 1: the three levels of intervention and store-and-trigger (most show drones neither talk to nor avoid each other) · Module 3: time and synchronisation (clock offset, asymmetric delay) and fleet communication (live streaming against upload then trigger for 300 drones, channel load, repeats) | Covered |
| Lighting and visual display systems | M1M3M5 | Module 1: Lighting and visual display: colour codes, the palette and timing of light (RGB/RGBW, sRGB codes against light, Example 6 fades, power and relative luminance of a palette, colour-deficient viewers) and LED hardware and photometry: lumens, candela, lux and the cost in flight time (Example 7 from RGBW datasheet lumens to illuminance at the audience by the inverse-square law, and the effect of LED power on the battery margin) · Module 3: Synchronising lights with music: timecode and latency (Example 5 MIDI time code, the speed of sound and a light offset within the ITU-R BT.1359 window) · Module 5: Brightness of the lights at the audience and colour in the dark (Allard law, the IALA threshold, Example 6) | Covered |
| Site and ground-system preparation | M1M3M5 | Module 5: site preparation and the launch field, the link budget and radio noise on site, and wind and weather criteria · Module 1: Example 2 charging electricity at the field · Module 3: the GNSS gate and the RTK base station | Covered |
| Flight-path simulation and verification | M4 | Module 4: levels of simulation, the minimum separation required, closest approach of every pair over the move, choosing the formation spacing and screening with the lower bound, and random experiments and the limits of evidence | Covered |
| Contingency and emergency planning | M3M5 | Module 5: consequences of a fall, exclusion zones and containment measures (geofence, collective return, the table of faults with automatic and human responses) and the show-day roles in the Thai rules, permission and risk register section · Module 3: spare drones and the pre-flight GNSS gate | Covered |
| Risk management | M5 | Module 5: Thai rules, permission and the risk register (Example 5 the show risk register following ISO 31000, scores before and after mitigation) | Covered |
| Aerial display operations under safety requirements | M5 | Module 5: Thai rules, permission and the risk register (checking the plan against the 2015 MOT notification, the 2026 CAAT notification, GM-UAS-003 and NBTC for the Specific Category), wind and weather criteria, and the show-day roles | Covered |
Weekly teaching plan
| Week | Topic | Pre-class | Lecture | Lab | Evidence |
|---|---|---|---|---|---|
| 1 M1 | Show system components, spares and energy | Read module 1 'Why this matters' and 'Components of a multi-drone show system'; run Examples 1 and 2 | The three parts of a show system, fleet size, energy per flight, battery sets and charging power | Worksheet 1 part A: compute fleet size, energy, battery sets and charging power for an assumed show | Table of fleet size, energy and charging power |
| 2 M1 | Designing pictures the audience can read | Read 'Designing pictures the audience can read'; run Example 3 | Angular size, eye resolution, oblique viewing and merged points, setting the audience area | Worksheet 1 part B: compute the angular size and widest usable viewing angle of the designed picture; propose the audience seating area | Table of viewing angle against merged points and the audience-area sketch |
| 3 M1 | From shapes to points and the storyboard | Read 'From geometric shapes to points in the sky' and 'Storyboard and timing'; run Examples 4 and 5; take the module 1 quiz | Placing points along a path, the drone budget, the storyboard table and the check of transition times | Worksheet 1 part C: design a four-scene storyboard, convert lines to points and check transition times | Worksheet 1 report and module 1 quiz result |
| 4 M2 | Coordinates, units and heading | Read module 2 'Why this matters' and 'Coordinates, units and heading'; run Example 1 | Scene and Earth frames, rotation by azimuth, WGS84 radii of curvature, degE7 units and the bounding-box check | Worksheet 2 part A: convert the start and end pictures to latitude and longitude; check the bounding box and distances between points | Table of converted coordinates and the checks |
| 5 M2 | Assigning drones to target points | Read 'Assigning drones to target points'; run Example 2 | The assignment problem, the Hungarian method, distance versus squared-distance cost and light-show research | Worksheet 2 part B: assign by three methods; record total distance, longest move and closest approach; draw the paths | Table comparing the three methods and a figure of the paths |
| 6 M2 | Smooth trajectories and sampling | Read 'Smooth rest-to-rest trajectories', 'Trajectories through several waypoints' and 'From animation to a table of sampled points'; run Examples 3 to 5; take the module 2 quiz | Quintic and septic polynomials, shortest time from the limits, minimum-snap trajectories and the sampling rate | Worksheet 2 part C: compute the minimum T, build a minimum-snap trajectory, sample at 5 and 25 FPS and export a CSV table | Worksheet 2 report, the CSV table and the module 2 quiz result |
| 7 M3 | RTK position, the error budget and the pre-flight gate | Read module 3 'Why this matters', 'Centimetre-level position with RTK' and 'The pre-flight GNSS gate and spare drones'; run Examples 1 and 2 | CEP and R95, relative error, evening ionospheric scintillation, the gate and binomial spare counts | Worksheet 3 part A: log fix type and accuracy for 30 minutes (including an evening session), then write the gate and compute the spares | The log and the gate results |
| 8 M3 | Time and synchronisation | Read 'Time and synchronisation'; run Example 3 | GPS time and the time pulse, offset from four timestamps, asymmetric delay and clock drift | Worksheet 3 part B: measure round-trip delay between two computers over 200 rounds; estimate the offset and compare averaging with choosing the shortest round trip | Delay data and the table comparing estimates |
| 9 M3 | Fleet communication; midterm | Read 'Fleet communication'; run Example 4; review modules 1 to 3; take the module 3 quiz | Midterm examination (modules 1 to 3) | Worksheet 3 part C: compute channel load and the number of repeats for the start command for an assumed system of 50 to 100 drones | Worksheet 3 report and midterm score |
| 10 M4 | Levels of simulation and the minimum separation | Read module 4 'Why this matters', 'Levels of simulation' and 'The minimum separation required'; run Examples 1 and 2 | Five levels of simulation, closed-loop simulation, per-axis error as a function of wind, spacing from a risk target and the vertical factor | Worksheet 4 part A: simulate the control loop of the chosen platform, find σ(w) and compute the minimum separation | Graph of σ against wind and the table of required separation |
| 11 M4 | Closest approach of every pair over the move | Read 'Closest approach of every pair over the move'; run Example 3 | Start and end checks versus the closed form, the triangle-inequality lower bound and counting every pair | Worksheet 4 part B: write the closed-form and lower-bound tools; compare with sampling at four intervals | Table of pairs caught by each method |
| 12 M4 | Formation spacing and random experiments | Read 'Choosing the formation spacing and screening with the lower bound' and 'Random experiments and the limits of evidence'; run Examples 4 and 5; take the module 4 quiz | Finding the spacing that passes, screening with the lower bound, the upper bound of the failure rate and the runs needed for a proof | Worksheet 4 part C: find the smallest spacing that passes, run the random experiment and write a one-page conflict-check report | Worksheet 4 report and module 4 quiz result |
| 13 M5 | Site preparation, the launch field and the link budget | Read module 5 'Why this matters', 'Site preparation and the launch field' and 'The link budget and radio noise on site'; run Examples 1 and 2 | Operation geometry, the site survey, field size and wave size, the link budget, interference and reflection from water | Worksheet 5 part A: survey an authorised field, scan the 2.4 GHz band, then compute the wave size and the link budget | Field plan, scan results and calculations |
| 14 M5 | Wind criteria, consequences of a fall and containment | Read 'Wind and weather criteria' and 'Consequences of a fall, exclusion zones and containment measures'; run Examples 3 and 4 | The power-law wind profile, three decision criteria, impact energy, drift, the exclusion radius, geofence and collective return | Worksheet 5 part B: measure wind at the field, set the go or no-go criterion, compute the exclusion radius and write the fault-and-response table | Wind criterion, exclusion radius and the fault-and-response table |
| 15 M5 | Thai rules, the risk register and mini-project presentations | Read 'Thai rules, permission and the risk register'; run Example 5; take the module 5 quiz; prepare the site and safety file for the mini-project | The 2015 transport notification, the 2026 CAAT notification, the night guidance, the NBTC, the risk register and the project criteria | Worksheet 5 part C: write the permission-application outline and the risk register, then present the mini-project file to a panel (role-play) and revise from feedback | Mini-project report and presentation scored with the rubric; the practical examination uses the file review against the same criteria |
Worksheets and instructor guide
One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.
1Worksheet 1 Design a four-scene storyboard for a small show
Analysis activity · About 12 h of class time · CLO1
Objective: Compute fleet size, energy and charging power, design a readable picture, convert it to points and check the storyboard transition times
Equipment
- Computer with Python and the example code at /downloads/uat-464/
- Datasheet of a real or assumed drone (mass, battery, hover time)
- Design software (for example the community edition of Skybrush Studio for Blender, if available)
Safety
- Computer work with no drone flight
- If real batteries or chargers are used for measurements, follow the laboratory rules and never charge unattended
Steps
- Choose a show theme, 60 to 120 drones, the audience distance and the spare fraction, then compute the fleet size
- Compute energy per flight, margin, battery sets and charging power as in Examples 1 and 2
- Draw four scenes and convert the lines to points as in Example 4; check the count against the budget
- Compute the angular size and widest viewing angle as in Example 3 and propose the audience seating area
- Write the storyboard with times; check the transition times as in Example 5 and correct scenes that are too fast
- If design software is available, build two scenes and compare its safety check with your own numbers
Deliverables
- Table of fleet size, energy and charging power
- Table of points per scene against the drone budget
- Viewing-angle table and the audience-area proposal
- Corrected storyboard with its timetable
Checklist
- Every row of Table 1 has a unit and says which values are assumed, and the energy per flight includes the manoeuvre factor and LED power
- Runnable code for converting lines to points is attached, and no scene uses more points than the drone budget
- Every scene in Table 2 has a real spacing of at least 1.5 m, and the text scene has every vowel and tone mark checked
- Table 3 has the minimum t of every scene, and every scene that was too fast is corrected with the new total time
- The one-page report separates values from a real datasheet from assumed values
Instructor guide
Class timing
- Brief, choose the show theme and review Examples 1 to 560 min
- Compute fleet size, energy, battery sets and charging (Table 1)150 min
- Draw four scenes, write the line-to-point code and check the budget210 min
- Compute angular size and viewing angle, then propose the audience area120 min
- Write the storyboard, check transition times and try the design software if available120 min
- Wrap-up, questions and hand-in checklist60 min
Expected results
- Table 1 (numbers depend on the group's data; with the Example 1 drone, 3S 3500 mAh at 11.1 V, 80% usable, 130 W hover, factor 1.15, 3 W LED, and an assumed show of 100 drones, 10% spares, 360 s plus 180 s): 110 drones, 31.08 Wh usable, 22.73 Wh per flight, margin 8.36 Wh (about 201 s of extra hover). A rehearsal at 19:30 and the show at 21:00 need 2 sets, 220 packs, because the first set is ready again only at 21:09 (9 min of flight plus 90 min turnaround). Charging at 1C takes about 50 min at 51.9 W per pack, 5.71 kW in all or 24.8 A at 230 V (1 circuit of 32 A); at 0.5C it takes about 85 min, longer than the 75 min charge window of the example. Accept rounding differences in the last digit.
- Table 2: lines are converted with n = round(L/s) and Δs = L/n. For example a 15 m radius ring at a set spacing of 2.0 m gives 47 points at a real spacing of 2.005 m, which is 34.5 arcmin at a 200 m audience distance (27.6 arcmin at 250 m), far above 1 arcmin. This ring has no merged points up to 60 degrees (criterion of at most 10% merged, 1 m light blob), while the 60-point ring of Example 3 reaches 51 degrees. Every scene must keep a real spacing of at least 1.5 m and a total point count within the budget, and a Thai reader must check the text scene.
- Table 3 (example four-scene storyboard, 6 m/s speed limit, k_peak = 2): a scene moving 30 m in 15 s needs at least 10.0 s and passes; the text scene moving 45 m in 12 s needs a peak of 7.5 m/s and at least 15.0 s, so it is too fast and is corrected to 15 s; the final scene moving 24 m in 10 s needs 8.0 s and passes. The show grows from 182 s to 185 s. The rule is t_min = 2d/v_max for every scene.
- A margin of 8.36 Wh is about 201 s of extra hover. Running the show 60 s longer raises the energy needed to 25.27 Wh and leaves a margin of 5.81 Wh. A strong answer compares the remaining margin with the launch-wave waiting time of Module 5 and states the minimum margin the group set before saying yes, rather than accepting because the margin is still positive.
- Depends on the group's picture: for example the 47-point ring reads up to about 60 degrees and the 60-point ring of Example 3 up to 51 degrees. The seating area must lie within that angle of the direction square to the picture plane. A strong answer offers at least one fix, such as turning the picture toward the audience, enlarging it, adding drones or accepting that some viewpoints will not read it fully, and explains that merging happens because horizontal spacing shrinks with cos φ.
- A 15 m radius ring would go from 47 drones (2.0 m) to 63 drones (real spacing 1.496 m), and 79 drones at 1.2 m: the count scales inversely with the spacing. In Example 4 the lotus scene goes from 273 to 454 drones at 1.2 m, above the 300 budget. Squeezing also cuts the safety distance between drones (spacing is measured between centres, and the body size still has to be subtracted). The right fix is to simplify or shrink the picture.
- Depends on the group's storyboard. In the example above the text scene was too fast and the fix added 3 s; in Example 5 the burst scene had to be stretched from 12 s to 20 s, taking the show from 472 s to 480 s. A strong answer says the check does not yet cover acceleration (Module 2) or the distance between drones during transitions (Module 4), and that k_peak = 2 is a slightly safe estimate compared with 1.875 for the quintic.
Discussion questions
- Why do most show drones have no collision avoidance between each other, so that safety must come from a checked plan?
- If the group had to choose between more spare drones and more battery sets on the same budget, what data would decide it?
- Which kinds of picture read well from far away, and why is Thai lettering riskier than English lettering?
Adapting to student background
- Upper secondary (M.6)
- Have them write N = ⌈N_show(1+r)⌉ and θ = s/D by hand before running code and explain why horizontal spacing shrinks with cos φ using a top-view sketch, then pair them with a peer confident with the design software.
- Vocational certificate
- Give a ready-made fill-in table for Table 1, one step at a time (Wh from V × Ah, times 80%, minus energy used), and start with simple shapes on graph paper, counting points by hand before using code.
- Diploma
- Extension: weigh a real training drone and read its hover time and battery from the datasheet (no flight needed), compare the implied hover power with the assumed 130 W, and build two scenes in the design software to compare its safety check.
2Worksheet 2 Build the trajectory table of one transition
Analysis activity · About 12 h of class time · CLO1, CLO2
Objective: Convert coordinates, assign drones to targets, compute the minimum time and a minimum-snap trajectory, and choose the sampling rate from an error budget
Equipment
- Computer with Python (NumPy, SciPy) and the example code at /downloads/uat-464/
- The start and end pictures from Worksheet 1
- Speed and acceleration limits of the chosen platform
Safety
- Computer work with no drone flight
- Check units and the bounding box every time before exporting a file that could later be used with real drones
Steps
- Set the coordinate frame and azimuth; convert every point to latitude and longitude as in Example 1; check the bounding box and distances
- Assign drones to points by three methods as in Example 2; record total distance, longest move and closest approach; draw the paths
- Compute the minimum T for the quintic and septic as in Example 3 and choose the scene time with a reason
- Add one intermediate waypoint and build the minimum-snap trajectory as in Example 4; compare with stopping there
- Sample at 5 and 25 FPS as in Example 5; compute the error and file size; propose a rate for a 1 cm budget
- Export a CSV table (time, drone number, position, colour) and write a one-page report
Deliverables
- Table of converted coordinates and the checks
- Table comparing the three assignments and a figure of the paths
- Table of minimum times and the reason for the chosen time
- Table of error and file size, and the CSV file
Checklist
- Table 1 shows a distance between two points that is equal before and after rotation, and the bounding-box result of the exported file
- Table 2 has all three methods and states the distance criterion used to count pairs, with its unit
- Table 3 has T for both the quintic and the septic and says which limit binds
- The CSV file has time, drone number, position and colour columns, in metres and seconds
- The one-page report says what each step has checked and what it has not
Instructor guide
Class timing
- Brief, review the coordinate frame and Example 160 min
- Convert coordinates and check units and bounding box (Table 1)120 min
- Run the three assignments, draw the paths and fill Table 2150 min
- Compute the minimum T and build the minimum-snap trajectory through a waypoint180 min
- Sample, compute error and file size, export the CSV150 min
- Wrap-up, questions and hand-in checklist60 min
Expected results
- Table 1 (with the Example 1 values: origin 15.0000°, 102.0000°, azimuth 20°): (30, 0, 30) gives E 28.19 m, N −10.26 m, latitude 14.9999073, longitude 102.0002621; (−30, 25, 60) gives E −19.64, N 33.75, 15.0003050, 101.9998174; (58, −29, 98) gives E 44.58, N −47.09, 14.9995744, 102.0004145. The distance between points 2 and 3 is 65.000 m before and after rotation. The 10⁻⁷ degree unit resolves about 1.11 cm north-south and 1.08 cm east-west. Read as centimetres, the largest coordinate becomes 9,800 and falls outside the box. Accept differences in the last digit.
- Table 2 (with the 10 × 6 grid to the 60-point ring of Example 2 and a 1.0 m criterion): numbered order, total 1,050.7 m, longest 30.4 m, closest 0.00 m, 128 pairs below the criterion; minimum total distance 365.1 m, 13.3 m, 1.36 m, 0 pairs; minimum squared distance 374.9 m, 13.3 m, 1.42 m, 0 pairs. The group's own pictures should show the same pattern, with numbered order clearly the worst.
- Table 3 (limits 6 m/s and 1 m/s², 60 m move): quintic T_v = 18.75 s, T_a = 18.61 s, so T = 18.75 s (speed limited); septic 21.88 s. For a 40 m move with the same limits the quintic needs T = 15.20 s (acceleration limited) and the septic 17.34 s. The minimum-snap trajectory of Example 4 peaks at 5.20 m/s and 1.53 m/s² against 6.56 m/s and 3.61 m/s² when stopping at every point. A 25 m ring rotating at 0.2 rad/s has a straight-line error of 0.50 cm at 5 FPS (file for 300 drones over 480 s: 8.64 MB) and 0.02 cm at 25 FPS (43.20 MB).
- Centimetres make every coordinate 100 times larger, so a point 98 m up becomes 9,800 and falls outside the show-volume box at once. Checking the distances between points after rotation catches a wrong rotation, a left-right flip or swapped axes, where the coordinates can still sit inside the box. A strong answer says both checks are needed every time before export.
- No. Minimum total distance removes most path crossings, but in Example 2, with start positions jittered by ±0.8 m, this method's closest approach fell to 0.94 m, below the 1.0 m criterion, while the squared method gave 1.22 m. A guarantee must come from checking every pair over the whole move, in Module 4.
- For 60 m at 6 m/s and 1 m/s² speed binds (18.75 s against 18.61 s), but for 40 m acceleration binds (15.20 s against 12.50 s), so both must always be computed. With one T for all drones the peak speed is 1.875 d/T, proportional to the move: at T = 18.75 s a 30 m move peaks at 3.00 m/s and a 10 m move at 1.00 m/s, and every drone arrives at the new picture together.
- The straight-line error is about a_c Δt²/8; for the rotating ring of Example 5 (a_c = 1 m/s²) it is 0.50 cm at 5 FPS and 0.02 cm at 25 FPS. Both meet the 1 cm budget (at least about 3.5 FPS, a sample every 0.283 s, is needed). The files for 300 drones over 480 s differ by a factor of 5 (8.64 against 43.20 MB), so 5 FPS is enough. A strong answer links this to the advice that the animation rate should divide evenly into the export rate (25 and 5) and notes that storing velocity allows even wider sampling.
Discussion questions
- Why does the best assignment by distance remove most path crossings, yet still not guarantee safety?
- When should the septic be chosen even though it takes about 17% longer than the quintic?
- If each software package uses different axes, what should a team always agree on and check before handing files to each other?
Adapting to student background
- Upper secondary (M.6)
- Have them prove by hand that s = 10τ³ − 15τ⁴ + 6τ⁵ has zero speed and acceleration at both ends and find the 1.875 peak at τ = 0.5 before running code, then practise the SciPy assignment function with a computer-confident peer.
- Vocational certificate
- Start with the 3-drone, 3-point assignment of self-check question 3 by hand, then run the 60-drone code; provide a CSV template with headers ready and let them draw paths on graph paper to compare with the plotted figure.
- Diploma
- Extension: load the exported CSV into the design software or a 3D viewer, check units and directions by eye, and make the segment times of the minimum-snap trajectory unbalanced to see the overshoot past the straight line.
3Worksheet 3 Measure position, time and communication load of a small system
Lab · About 12 h of class time · CLO2
Objective: Log RTK data and compute accuracy and the gate, estimate clock offset from four timestamps, and compute communication-channel load
Equipment
- RTK GNSS receiver with a correction source, or the university service
- Two computers on the same network
- Computer with Python and the example code at /downloads/uat-464/
Safety
- This lab involves no flight; use only receivers and computers
- If you transmit radio, use only authorised equipment on bands the law allows and do not interfere with others
- Do field work only where permitted and handle equipment safely at night
Steps
- Set up the receiver in the open and near a building or water; log fix type, accuracy, satellites and data age every second for 30 minutes, including an evening session
- Compute CEP and R95 and compare with the datasheet; report the difference
- Write the gate of Example 2 and run it on the log; compute the pass rate and spares for 50 drones
- Measure round-trip delay over 200 rounds; estimate the offset as in Example 3; compare averaging with the shortest round trip
- Compute channel load as in Example 4 for an assumed 50 to 100 drone system and choose a method with reasons
- Submit a one-page report stating which numbers were measured and which were assumed
Deliverables
- Log data and a fix-type graph
- Table of CEP, R95 and gate results
- Table of estimated offsets
- Table of channel load and the reason for the chosen method
Checklist
- The log has at least 30 minutes per session, including at least one evening session, and the fix-type graph is attached
- Table 1 converts CEP to R95 with the factor 2.079 and states the baseline length used with the datasheet value
- In Table 2 the fleet needed is computed from the binomial distribution with the measured pass rate, not guessed
- Table 3 has both the averaged offset and the shortest-round-trip offset, from at least 200 rounds
- The report separates every measured number from every assumed number
Instructor guide
Class timing
- Safety and radio-use briefing, set up the receiver at two positions60 min
- Log RTK data in daytime (open sky and near a building or water)150 min
- Log an evening session after sunset90 min
- Compute CEP and R95 and run the gate on the data150 min
- Measure 200 round trips and estimate the offset120 min
- Compute channel load, write the report and run the hand-in checklist150 min
Expected results
- Table 1 (numbers depend on the real receiver and site): the Example 1 datasheet value (ZED-F9P, 0.01 m + 1 ppm) gives CEP 1.05 cm, R95 2.18 cm at a 0.5 km baseline and CEP 1.20 cm, R95 2.49 cm at 2 km (R95 = 2.079 × CEP). In the open in daytime the receiver should be RTK fixed almost all the time with a centimetre-level CEP; near a building or water and in the evening expect periods of float or lost fix and a wider spread. Measured values can exceed the datasheet because it was measured in good conditions (1 km baseline, antenna with a good ground plane).
- Table 2 (the Example 2 gate: RTK fixed, accuracy at most 2 cm, data age at most 1 s): the fleet needed to be 99% sure that at least 50 pass is 53 drones at a pass rate of 0.99, 55 at 0.97, 57 at 0.95, 62 at 0.90 and 73 at 0.80. Satellite count alone usually passes more than the real gate (in Example 2 all 315 drones against 307 for the gate).
- Table 3 (depends on the real network): on the room's Wi-Fi the round trip is usually a few milliseconds with some unusually long rounds, and the shortest round trip should give a steadier offset than the average. With the Example 3 values (uplink 3 ms, downlink 9 ms) one round gives 9.0 ms against the true 12.0 ms, an error of −3.0 ms; the average of 40 rounds is off by −2.65 ms, while the shortest round trip is off by only −0.01 ms. If both computers already sync to the same time source, the offset should be near zero, and students should say so.
- Measured values are usually larger than the datasheet, because the datasheet uses a 1 km baseline and an antenna with a good ground plane and excludes antenna phase-centre error. Near buildings or water there is multipath, and in the evening at low latitudes ionospheric scintillation may occur. A strong answer uses the group's own numbers and concludes that the status of every drone must be monitored throughout the show, not the average or the datasheet value.
- Expect periods with more than 18 satellites that are still float or using old corrections, so a satellite-count gate overstates readiness. A good gate checks fix type (RTK fixed), the accuracy the receiver reports and the data age together, and a lower pass rate sharply increases the spares needed (57 drones at 0.95 for 50 needed, 62 at 0.90).
- The difference depends on the real data, but the principle is that asymmetric delay biases the offset by −(d_down − d_up)/2, a systematic error that does not average away (Example 3: −2.65 ms after averaging 40 rounds). The shortest round trip is the one where the channel was quiet and both legs were similar, so its error is small (−0.01 ms). A strong answer concludes that a real show should tie time to each drone's GPS clock, because a 20 ppm crystal drifts 9.60 ms in 480 s, which is 5.76 cm at 6 m/s.
- With the MAVLink 2 frame sizes of the lesson and a 125 kbps usable channel: for 50 drones, live targets at 4 Hz use 104.0 kbps (83%), HEARTBEAT at 1 Hz plus position at 1 Hz uses 24.4 kbps (20%) and broadcast RTK corrections use 10.9 kbps; for 100 drones live streaming needs 208.0 kbps (166%), more than the channel, while upload-and-trigger with 1 Hz position and RTK uses 59.7 kbps (48%). A strong answer chooses upload-and-trigger, repeats the broadcast start command several times and states that the channel figures are assumed.
Discussion questions
- If a show starts after sunset in Thailand, what should the team prepare in advance because RTK may degrade without warning?
- Why is the error that really hurts the part two drones do not share, rather than the absolute error?
- Which messages suit MAVLink 2 signing, and which do not?
Adapting to student background
- Upper secondary (M.6)
- Build understanding of CEP and R95 by simulating random points in code first and work the four-timestamp offset by hand from self-check question 3, then have them set up the receiver alongside a peer experienced with field equipment.
- Vocational certificate
- Let them lead the receiver set-up, antenna placement and logging, use an instructor-prepared script for CEP and spares, and explain the results with a fill-in table.
- Diploma
- Extension: set up their own base with the receiver's self-survey, check that it sends RTCM 1077, 1087 and the antenna-position messages named in the lesson, and compare results with the university correction service.
4Worksheet 4 Build a conflict-checking tool and report for one transition
Analysis activity · About 12 h of class time · CLO2, CLO1
Objective: Simulate a control loop for tracking error, compute the minimum separation, check the closest approach of every pair in closed form and report with an upper bound on the failure rate
Equipment
- Computer with Python (NumPy, SciPy) and the example code at /downloads/uat-464/
- One transition from Worksheet 2
- SITL data or logs, if available
Safety
- Computer work with no drone flight
- If real batteries or chargers are used for measurements, follow the laboratory rules and never charge unattended
Steps
- Write a closed-form closest-approach function for every pair as in Example 3 and a lower-bound function per interval
- Check with the three assignments of Worksheet 2; compare the pairs below the required distance and compare sampled checks at four intervals
- Estimate per-axis tracking error from a control-loop simulation as in Example 1, then compute the minimum separation as in Example 2 with an assumed vertical factor and the reason
- Find the smallest formation spacing that passes as in Example 4, with the number of drones the scene needs
- Run the random experiment of Example 5 with at least 100 runs and report the 95% upper bound of the failure rate
- Write a one-page conflict-check report with the 10 closest pairs, the assumptions and what is not yet covered
Deliverables
- Reproducible conflict-checking code
- Table of pairs caught by each method
- Table of required separation and the spacing that passes
- One-page conflict-check report
Checklist
- The closed-form code is reproducible and gives a closest approach of 0.00 m for the two-drone swap of Example 3
- Table 1 has all three assignments and four sampling intervals, each row compared with the closed-form check
- Table 2 states σ, body size, the risk target and the assumed vertical factor with a reason
- Record 3 reports the 95% upper bound of the failure rate, not just that no collision was found
- The report lists what the check does not cover, such as simulation level, real dynamics, wind and rehearsal flights
Instructor guide
Class timing
- Brief, review the five simulation levels and the swap case60 min
- Write and test the closed-form closest-approach and lower-bound functions150 min
- Check the three assignments and compare four sampling intervals (Table 1)120 min
- Simulate the control loop, compute the required separation and find the passing spacing180 min
- Run at least 100 random trials90 min
- Write the conflict-check report and run the hand-in checklist120 min
Expected results
- Table 1 (with the 300-drone test scene of Example 3, 1.48 m criterion, T = 18.75 s): numbered assignment, closed form finds 386 pairs; sampling every 18.75 s (the two end frames) finds 0, every 6.25 s finds 127, every 1.0 s finds 297, every 0.25 s finds 385. The minimum-distance and minimum-squared-distance assignments find 0 pairs with normal measurement (c = 1.0), but with the vertical axis stretched by c = 1.5 the closed form finds 96 and 93 pairs respectively. The group's own scene should show the same pattern: sampling always finds no more than the closed form.
- Table 2 (body size 0.70 m, risk target 10⁻³ per show over 1,000 pairs, so 10⁻⁶ per pair, chi multiplier 5.538): σ 0.05 m needs 1.09 m, σ 0.10 m needs 1.48 m (2.22 m vertically), σ 0.15 m needs 1.87 m, σ 0.25 m needs 2.66 m. For the Example 4 scene at c = 1.5: spacing 2.0 m gives a closest approach of 1.221 m (93 pairs), 2.3 m gives 1.372 m (11), 2.5 m gives 1.457 m (4), 2.6 m gives 1.501 m (0), so 2.6 m is chosen. Keeping the picture size at 2.6 m would use only 231 drones; keeping 300 drones grows the outer ring radius from 30.6 m to 39.7 m.
- Record 3: with no collision in n runs the 95% upper bound is 1 − 0.05^(1/n): 2.95% at 100 runs, 1.49% at 200, 0.99% at 300. In Example 5, at σ 0.10 m no collision is found in 200 runs with a smallest closest approach of 1.11 m, and at σ 0.25 m 4 runs collide (upper bound 4.52%). The list of the 10 closest pairs must give drone numbers, distance and time.
- Two drones that start apart and end apart can come close in the middle, like the swap that is 2.00 m apart at both ends yet collides at the midpoint. In Example 3 the end frames caught 0 of 386 pairs; denser sampling catches more (385 at 0.25 s) but never guarantees all of them, so a closed-form check or a lower bound that covers the whole interval is needed.
- At σ = 0.15 m the requirement becomes 1.87 m. The 2.6 m scene has a closest approach of 1.501 m (c = 1.5), so it no longer passes. A strong answer says tracking error is the main driver of spacing and that σ must be tied to a wind condition (σ = 0.10 m matches about 3.8 m/s at show height in Example 1), which becomes the wind criterion in Module 5.
- Only that the true failure rate is at most about 2.95% at 95% confidence (about 3/n). It cannot conclude that the show is safe or that the risk is below 10⁻⁶, which would need 2,995,731 runs with no failure. Evidence of a low risk comes from the computed margin, the closed-form check and rehearsal logs together.
- Stretching the vertical axis by c = 1.5 means drones directly above one another need 2.22 m instead of 1.48 m, because the downwash of the upper drone disturbs the lower one; pictures in a vertical plane already stack drones in columns, so they are hit hardest. The price of a wider spacing is a bigger picture (outer ring 30.6 m to 39.7 m, which only just fits the 20 to 100 m height), a longer longest move (37.0 m to 43.6 m), or fewer points if the size is kept.
Discussion questions
- How does the evidence from the five simulation levels build on each other, and which levels cannot replace one another?
- If the start of some drones is delayed to avoid crossings, what must be checked again?
- How should a team write the limits of its evidence in the report so that an approving authority understands them without overstating safety?
Adapting to student background
- Upper secondary (M.6)
- Have them derive u* = −r₀·Δr/‖Δr‖² by differentiating the squared distance with respect to u before coding, work self-check questions 1 and 2 by hand, then pair them with a peer confident at debugging.
- Vocational certificate
- Start with the two-drone swap drawn second by second on graph paper, then use instructor-prepared functions on the full scene, focusing on reading the results and filling Tables 1 and 2 with correct units.
- Diploma
- Extension: run ArduPilot SITL with one drone flying the 60 m quintic, extract the logs to compute the real tracking error, and compare it with σ from the one-axis model of Example 1.
5Worksheet 5 Build the site-preparation and safety file for a fictional show
Field/workplace · About 12 h of class time · CLO3, CLO2
Objective: Survey a site, compute wave size, link budget, wind criterion and exclusion radius, then check the plan against Thai rules and build a risk register
Equipment
- An authorised field or open area with distance-measuring tools
- A Wi-Fi or spectrum scanner and an anemometer
- Computer with Python and the example code at /downloads/uat-464/
- The versions in force of the 2015 transport notification, the 2026 CAAT notification and CAAT-GM-UAS-003
Safety
- This lab involves no drone flight; field surveys need permission from the site manager
- Wear protective equipment suitable for the site and do not disturb others
- Do not transmit interfering radio signals; spectrum scanning is receive-only
Steps
- Survey the field using the list; record photographs and a scaled plan; set fictional positions of the launch field, show area and audience area
- Compute the field size and wave size as in Example 1 for 100 assumed drones, with the minimum-margin condition
- Measure noise in the 2.4 GHz band and compute the link budget as in Example 2
- Measure wind for at least 30 minutes; convert to show height and set the decision criterion as in Example 3
- Compute impact energy, drift and the exclusion radius as in Example 4; draw them on the plan; write the fault table
- Write the permission-application outline following article 21 of the 2026 CAAT notification, check the plan against the conditions as in Example 5 and build a risk register of at least six items
Deliverables
- Field plan and survey results
- Table of wave size and link budget
- Wind criterion and the exclusion radius on the plan
- Permission-application outline and the risk register
Checklist
- The field plan has a scale, north arrow, launch field, show area, audience area and the exclusion radius
- Every row of Table 2 has a formula and unit and says which inputs were measured on site and which were assumed
- The proposed wave size leaves an energy margin no lower than the criterion the team set
- The application outline covers the items of article 21 and cites the version in force with the date it was checked
- The risk register has at least six items, and every item above the criterion has a further measure
Instructor guide
Class timing
- Field-safety briefing, site permission and the survey list60 min
- Survey the field, photograph, draw the plan and set the fictional positions180 min
- Measure 2.4 GHz noise and wind for at least 30 minutes120 min
- Compute wave size, link budget, wind criterion and exclusion radius150 min
- Check the plan against the rules, write the application outline and risk register150 min
- Assemble the file, answer questions and run the hand-in checklist60 min
Expected results
- Table 1: at least the lesson's survey list: boundary and owner, obstacles (trees, power lines, masts), ground surface and dust, sky view for GNSS, water or buildings that reflect signals, the RTK base position, entrances and exits for spectators and emergency vehicles, a battery charging and storage point away from spectators with fire extinguishers, crew lighting and a first-aid point. Every row must cite a photo number and say what it changes in the plan, such as moving the base away from a reflective surface.
- Table 2 (with 100 drones on a 10-column, 3 m grid and the lesson's example values): launch field 27 × 27 m between outer drones, 900 m²; with a 3.27 Wh margin, 149.5 W flying power, 8 s between waves and 60 s of hold already counted, waves of 6 leave 0.45 Wh and fail the 1.0 Wh rule, waves of 7 (15 waves) leave 1.11 Wh and pass, waves of 10 leave 2.77 Wh; the link to a 224 m slant range has a 39.8 dB margin and tolerates a noise rise of up to 24.8 dB before dropping below 15 dB; wind at 100 m is 1.380 times the wind at 10 m, and the 3.94 m/s criterion at show height equals about 2.85 m/s at 10 m; a 0.60 kg drone falling from 100 m in 5 m/s wind drifts 39.6 m with 83 J of impact energy, so the exclusion radius is 1.5 × 39.6 + 10 = 69.3 m.
- Table 3: at least six items, for example a drone falling toward spectators (5 × 3 = 15, reduced to 5 by the exclusion zone and geofence), GNSS degraded after sunset (12 stays 12, above the criterion of 8, so it needs RTK health monitoring of every drone throughout the show with an abort threshold, or more spares), wind above the limit, early battery depletion, spectators entering the crew area and fleet-wide link loss. Scores are severity times likelihood on 1 to 5, and the acceptance level of 8 is the team's assumed rule. Every item above it must have a further measure.
- With the Example 3 values: sustained wind 60% of 8 m/s = 4.80 m/s, gust 8/1.5 = 5.33 m/s, and the separation criterion 3.94 m/s, the lowest, so it governs, because tracking error grows with wind until the 1.501 m closest approach is no longer enough, before the airframe's limit is reached. A strong answer converts the wind measured at 10 m to show height before comparing (for example 2.5 m/s at 10 m is 3.45 m/s at 100 m and passes, while 3.0 m/s becomes 4.14 m/s and fails).
- The open-air margin in Example 2 is 39.8 dB, and the margin left is 39.8 minus the measured noise rise: a 20 dB rise leaves 19.8 dB and passes, a 30 dB rise leaves 9.8 dB and fails (it fails once the rise exceeds 24.8 dB). Good responses are changing channel, reducing live communication and relying on the plan stored on board, mounting the station antenna high above the water, and measuring again with a real audience present at rehearsal.
- A night show at 100 m where the operators cannot see every drone fails three conditions: flight between sunrise and sunset, keeping the aircraft in sight at all times, and flying no higher than 90 m. It is therefore a medium-risk (Specific Category) operation needing permission from the CAAT Director General before flight (articles 4 and 20). The night-flight form items needing an alternative-means text are red and green navigation lights, an on-board avoidance system, one visual observer per aircraft, controlling no more than one aircraft, and the 90 m height. Students must state when they checked the version in force and that the lesson is not legal advice.
- A radius of 69.3 m (5 m/s wind, from 100 m) against an audience 220 m from the show-area edge in Example 4 leaves 151 m. At 8 m/s, with the same model, the drone drifts 54.4 m, the radius grows to 1.5 × 54.4 + 10 = 91.6 m and the impact energy is about 95 J. A strong answer says the radius must come from the strongest wind in which the show may fly, and that the show's wind criterion (3.94 m/s) is already below 5 m/s, so the 5 m/s value carries a margin.
Discussion questions
- If the launch point is beside the audience, how do a return-to-home and an immediate-landing geofence action differ in their effect on spectators?
- Why must alternative means be written when night-flight guidance written for one aircraft at a time is applied to a show of hundreds of drones?
- What should the team agree before show day so that deciding not to fly is always easy?
Adapting to student background
- Upper secondary (M.6)
- Link the terminal-speed formula v = √(2mg/ρC_dA) to school physics and work self-check questions 1 to 4 by hand first, then let them read and summarise the real notifications, pairing with a field-confident peer during the survey.
- Vocational certificate
- Let them lead the field survey and the wind and noise measurements, use a fill-in sheet for Table 2 one formula at a time, and read the rules together as a group with the instructor, focusing on which items pass and which fail.
- Diploma
- Extension: plan the real positions of the RTK base and control-station antenna on the field, measure noise at two times (few and many people), and draft the fault table with the person responsible for each step.
Scoring rubric
For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.
| Criterion | Weight | Excellent (4) | Good (3) | Fair (2) | Needs work (1) |
|---|---|---|---|---|---|
| Accuracy of calculations and code | 30% | All results correct, code reproducible, units, frames and bounds checked at every step | Nearly all correct, method shown | Some errors or missing steps | Many errors or no method |
| Quality of conflict-check and safety evidence | 30% | Checks every pair over the move, reports upper bounds on risk and states clearly what the evidence does not cover | Complete checks but the limits of the evidence are incompletely stated | Checks only some points or treats a sampled result as a guarantee | No check, or a safety claim with no evidence |
| Design of pictures, storyboard and trajectories within limits | 20% | Picture readable from the audience area; drone budget, energy and transition times within limits with numerical reasons | Mostly appropriate; some reasons incomplete | Several items exceed limits or are unchecked | Platform limits not considered |
| Reporting, citing law from source and honesty about assumptions | 20% | Clear report separating measured from assumed values, citing the law in force and writing alternatives for items that cannot be met | Clear report, but the separation of measured and assumed values or the legal citations are incomplete | Report omits assumptions or cites law from memory | No report, or content that does not match the source |
Assessment map: CLOs and how they are assessed Draft
The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.
| CLO | Worksheets | Module quizzes |
|---|---|---|
| CLO1 Design formations, show sequences and 3D trajectories of a drone fleet within platform limits | W 1W 2W 4 | M1M2M4 |
| CLO2 Calculate, program and simulate positioning, timing, communication and trajectory-conflict checks for a multi-drone show | W 2W 3W 4W 5 | M2M3M4M5 |
| CLO3 Plan site preparation, show safety and permissions under Thai rules | W 5 | M5 |