Checking accuracy and troubleshooting maps

Practise calculating checkpoint RMSE separately for the horizontal and vertical components, check for bias and analyse the causes of distorted maps

Last updated:

An officer checking a coordinate notebook and survey targets on a test field
AI-generated conceptual illustration

A sharp map may be shifted from the true position as a whole, or look correctly positioned in the centre but be warped towards the edges. Exercise M03 therefore checks the imagery, the numbers and the distribution of errors before deciding which work the map is suitable for.

Prepare the evidence used for checking

You should already have completed coordinates and heights and GCPs and checkpoints . Prepare the map outputs, a table of points withheld from model adjustment and a description of how the reference coordinates were measured. Checkpoints must be clearly visible and must share the same CRS, units and vertical reference.

GCP residual indicates the agreement at the points used to adjust the model, whereas checkpoint error compares against independent points that were not used to adjust the results. Bringing back points that were just used to correct the model and calling them checkpoints makes the assessment no longer independent. The WebODM documentation describes how to designate checkpoints separately from control points, but check the file format for the version you are using before importing. WebODM Ground Control Points

Reading 3D error without confusing it with GSD

Reference points compared with points on the map output, separating the easting, northing and height differences before combining them into the RMSE of independent checkpoints

For each point, define eE = E(map) − E(reference), eN = N(map) − N(reference) and eZ = Z(map) − Z(reference) , where E, N and Z are all in metres. A positive sign indicates direction; it does not mean the point is better than a negative value.

With n checkpoints, compute the following

RMSE_E = sqrt(sum(eE²) / n)
RMSE_N = sqrt(sum(eN²) / n)
RMSE_H = sqrt(sum(eE² + eN²) / n)
RMSE_Z = sqrt(sum(eZ²) / n)
bias_Z = sum(eZ) / n

RMSE_H combines the two horizontal axes, RMSE_Z is vertical, and bias helps reveal systematic shifts. GSD gives the ground size per pixel and therefore cannot substitute for these figures. Do not convert RMSE into a confidence level or claim compliance with a standard by applying a multiplier without supporting assumptions and requirements.

F21: how bias differs from the spread of errors

bias = Σei / n

RMSE = √(Σei2 / n)

RMSEH = √(RMSEE2 + RMSEN2)

Variable Meaning and unit Range and source of values
e_i map output minus the reference coordinate of point i, m finite real number; from independent CPs in the same CRS/datum
n number of CPs with complete values, points integer ≥ 1 for the formula; not a number of pixels
bias mean residual, m may be positive/negative/zero; computed per axis
RMSE_E, RMSE_N, RMSE_Z overall error magnitude per axis, m ≥ 0; do not remove bias before computing the raw result
RMSE_H two-axis horizontal error, m ≥ 0; E/N use the same set of points and the same n

Errors of minus three and plus three centimetres at two points cancel out in the bias, but the RMSE is still three centimetres

Single-axis example e = +0.03, −0.03 m: bias = (0.03−0.03)/2 = 0 m; each squared value = 0.0009 m²; RMSE = √((0.0009+0.0009)/2) = 0.03 m The figure therefore shows arrows in opposite directions that do not disappear when the mean is zero.

RMSE is not the sample standard deviation: for n > 1, if s² = Σ(e_i−bias)²/(n−1), then RMSE² = bias² + ((n−1)/n)s². Reporting only precision or spread can hide systematic bias. Read test statistics alongside this.

CPs have their own survey uncertainty, so you should report the method/time/uncertainty of the reference and how positions were read on the product. Do not call the reference an error-free truth, and do not subtract variance without a model of the correlation. Report the extent of the area, heights, terrain and number of CPs separately; results from clustered points do not certify the whole area.

Exercise F21

Change the residuals of the two points to 0.06 and 0 m by adding an offset of 0.03 m to both. Compute the bias and RMSE.

Answer F21

bias = (0.06+0)/2 = 0.03 m; RMSE = √((0.0036+0)/2) = 0.0424264 m. A tolerance of ±0.000001 m is accepted. The spread around the mean is unchanged, but the RMSE increases because of the bias. Do not subtract an offset derived from the CPs and then report the same set as still independent.

The definitions of the differences and RMSE are consistent with ESA Navipedia: Positioning Error (S14); the separation of GCPs/CPs follows WebODM: Ground Control Points (S20) , checked 26 September B.E. 2569 (2026). This two-point example teaches arithmetic; it is not a sufficient number of points for certifying against a standard. Use the earlier CP calculator to check further examples.

M03 worked example with synthetic data

This table was created for calculation practice only. It is not Mygla survey data or an accuracy result for any drone. It has only four points so it can be checked easily by hand; this number is not a criterion for the number of points needed to certify a project.

Point eE (m) eN (m) eZ (m) eE² + eN² (m²)
A 0.03 0.04 0.10 0.0025
B −0.03 0.04 0.00 0.0025
C 0.00 −0.05 −0.10 0.0025
D 0.00 0.05 0.00 0.0025

Therefore RMSE_H = √(0.0100/4) = 0.050 m and RMSE_Z = √(0.0200/4) ≈ 0.071 m , while bias_Z = 0 m. Although bias_Z is zero, each point still has positive and negative errors, so a mean that cancels out is not enough to describe quality.

Try adding 0.20 m to eZ at every point: you get bias_Z = 0.20 m and RMSE_Z ≈ 0.212 m. This example shows how systematic error increases the overall value. Before removing bias from real results, you must find its cause, e.g. the height reference. If these checkpoints have been used to adjust the results, you must prepare a new independent check set.

Checking steps on the computer

  1. Download the GSD, checkpoint and volume exercise kit . Open the README to separate the synthetic data for each activity, then open the checkpoint CSV in a spreadsheet program.
  2. Check the units and meaning of the reference and result columns. Create columns eE, eN and eZ with signs defined to match the formula.
  3. Add squared-error columns, compute the mean and take the square root. Do not automatically use the standard deviation formula in place of RMSE.
  4. Check one row by hand, then compare the total with a calculation by another method. Keep both the formulas and the numerical values in the delivery file.
  5. For real data, import the points into QGIS, display point IDs and errors on the map, and check whether the points are spread to the edges, across high and low areas and over the surface types that will be used.
  6. Report image quality and positional quality separately, stating the number of points with complete values, the number of points excluded with reasons, and the uncertainty of the reference coordinates.

Real data may contain points where Z was unintentionally measured from the DSM instead of the DTM. State the product and the method used to read the check values, e.g. raster interpolation or marked 3D points. Do not combine errors with different meanings into a single RMSE.

Tracing causes from error patterns

Evidence found Hypothesis to check How to isolate the cause
All points shift in roughly the same direction datum, CRS, image position correction Compare metadata and raw coordinates before reprojecting
Horizontal is good, but Z has a constant bias Height reference or offset Check ellipsoidal/orthometric height and units
Error increases away from the centre of the area Geometry of the image network or control points View camera positions, GCPs and checkpoints together
Broken roads or doubled building edges Image motion, matching or occlusion Go back and check the original images of the same area
Some points stand out as outliers from the group Incorrect marking or comparison against a different surface Check the ID and image of that point before removing data

Keep outliers in the original report. Deleting points because it makes the RMSE look better changes the assessment result without supporting evidence. If a point is genuinely wrong, show the reason and report the results before and after exclusion separately.

Write acceptance criteria that can be traced back

Set criteria before seeing the results, e.g. the area extent must be complete, horizontal and vertical results must be within the project requirements, and checkpoints must suit the terrain. Criteria for general monitoring work and for construction setting-out differ, so the word 'pass' must be followed by which criteria were passed and which area is covered.

The report should include the CRS/units/vertical reference, the measurement method and uncertainty of the reference points, the number and a map of checkpoints, per-axis RMSE, bias, outliers and limitations. This lesson teaches basic calculation; it does not declare compliance with ASPRS. If a project cites a standard, use the edition specified in the contract and read the full requirements on point sampling, number of points and reporting methods from ASPRS Standards Committee

Deliverables and pass criteria for the exercise

Submit a CSV with formulas or a calculation sheet, a short report with a point map, and a list of limitations. Learners pass the exercise when they calculate the example correctly, can separate bias from RMSE and can explain which points are independent of the model adjustment. If there are no real checkpoints, what is submitted is a calculation practice report , not a certificate of map accuracy.

Use these check results together with measurement and layout in QGIS and terrain and volume work , which clearly depend on vertical accuracy.

References

Documents checked 8 September B.E. 2569 (2026); formulas and synthetic example sets compiled for learning

Next steps after this lesson

Experiment with formulas and compare results using CPs , with formulas, practice data and the evidence to be submitted

Download the answer-check kit for basic formulas (JSON) · synthetic data with units, for comparing your own calculation results

Used in courses

How to cite this page

Drone Institute, Rangsit University. (2026). Checking accuracy and troubleshooting maps. In UAS Technology Knowledge Hub (B.Tech.). https://rsu-uat.pk-research.work/en/kb/knowledge/drone-mapping/accuracy/

Original from Drone-Hub: https://drone.pk-research.work/knowledge/drone-mapping/accuracy/ · © PK-Research