UAT 208 Digital Drafting and Prototyping Technology

Worksheet 1 Drawing the camera mount

Analysis activity 12 hAssesses CLO1

Objective

Produce a standard three-view drawing, dimension and tolerance it, check stack-ups and choose screw holes

Equipment and materials

  • Drawing paper or 2D CAD
  • Sample camera mount and vernier caliper
  • Python and example code at /downloads/uat-208/
  • ISO 273 clearance hole sizes from the lesson

Safety

  • Desk work only; no flying and no machines

Steps

  1. Sketch three views in first- and third-angle projection with projection symbols
  2. Dimension to ISO 129-1 and state ISO 2768-m in the title block
  3. Check the stack-up of stacked parts with Example 1
  4. Choose screw hole sizes to ISO 273 and record the reason
  5. Swap drawings with a peer; record points misread or missing

Record of results

Table 1 Key camera mount dimensions and limits
DimensionNominal (mm)Tolerance source (on drawing or ISO 2768-m)Lower limit (mm)Upper limit (mm)
Table 2 Tolerance stack-up of stacked parts
Part or slotNominal (mm)Tolerance ± (mm)Worst-case minimum gap (mm)RSS minimum gap (mm)
Table 3 Results of the peer reading
Reading step (title block, views, sections, sizes, fit)What the peer readCorrect or wrongWhat to fix in the drawing

Questions

  1. In Table 2, do the worst-case and RSS results lead to different conclusions? For printed parts that tend to deviate the same way, which method should you trust, and how would you change the design so the parts always fit?

  2. Which ISO 273 series did your group choose for the M3 holes? If printed holes come out about 0.2 to 0.3 mm smaller than drawn, will the screw still pass through?

  3. In Table 3, at which reading step did your peer misread or miss information most often? Was the cause in your drawing (for example a missing projection symbol or duplicated dimensions) or in the way it was read?

  4. Why must sizes be read from the numbers on the drawing rather than measured off the paper, and what happens to the manufactured part if the drawing has no projection symbol?

Check before you hand in

What to hand in

  • Drawings in both systems with symbols
  • Stack-up calculation with code
  • Screw hole choice with reasons
  • Record of the peer reading

CLO1 Read and produce engineering drawings to standard. (CLOs are a web-team draft; the course owner sets the final ones.)

Instructors: answers and teaching notes for this worksheet are in the teaching pack