UAT 303 UAS Inspection and Maintenance

Worksheet 1 Reviewing the maintenance programme with data

Analysis activity 12 hAssesses CLO1

Objective

Use real replacement history to estimate failure patterns, compute economical intervals and choose maintenance strategies with reasons

Equipment and materials

  • Training drone maintenance logbooks
  • Manufacturer's maintenance manual
  • Computer with Python
  • Example code at /downloads/uat-303/

Safety

  • Desk work only; no flying
  • Never extend intervals beyond the manual on your own; proposals go to the lecturer with evidence

Steps

  1. Collect propeller, motor and battery replacement history from the logbooks
  2. Fit Weibulls to components with enough data using Example 1
  3. State which fail randomly and which wear out with age
  4. Find planned and failure costs; compute intervals with Example 2
  5. Choose a strategy for each component with reasons
  6. Compare with the manufacturer's intervals and write an evidence-based proposal where they differ

Record of results

Table 1 Component replacement history from the logbooks
Component and part numberAircraftFlight hours at replacement (h)Failed, planned, or not yet failedNotes
Table 2 Weibull parameters, interval and strategy per component
ComponentData pointsβ and η (h)Economical interval (h) and cost (THB/h)Chosen strategy and reason
Proposal against the manufacturer's intervals, with evidence

Questions

  1. What failure pattern does each component's β show, and why did you choose the strategy written in Table 2?

  2. Using the lesson's Example 2 data, how much does the cost per hour at a 200 h interval differ from the most economical interval, and which interval should the team use in practice? Why?

  3. If the damage from an in-flight motor failure were halved to 15,000 THB, which way would the economical interval move, and is planned replacement still worthwhile? Explain with your code output.

  4. Why must components that have not yet failed stay in the data? If you drop them, which way will the computed interval be wrong?

Check before you hand in

What to hand in

  • Replacement history table
  • Weibull parameters and interpretation
  • Interval and strategy table per component
  • Proposal against the manufacturer's manual

CLO1 Inspect UAS on schedule and record results to standard. (CLOs are a web-team draft; the course owner sets the final ones.)

Instructors: answers and teaching notes for this worksheet are in the teaching pack