UAT 303 UAS Inspection and Maintenance
Worksheet 2 Inspect and review records
Objective
Inspect drones to a checklist, write a conditional inspection list, spot abnormal aircraft in the fleet and make records verifiable
Equipment and materials
- Training drones and the manufacturer's checklist
- Torch, magnifier and basic hand tools
- Defect records for every training drone
- Computer with Python and the module 2 example code
- Multimeter, and a DC electronic load or current-limited supply
Safety
- Remove the battery or propellers before every inspection
- Watch for sharp propeller edges and carbon parts
- Isolate swollen or damaged batteries in a fire-resistant box and tell the lecturer
- Load-test with the propellers removed and the current limited to the connector rating
Steps
- Inspect a training drone against the manufacturer's list; record every item, including normal ones
- With the battery removed, inspect wiring, connectors and the PDB, test continuity and shorts, then measure voltage drop under load and check with Example 3
- Simulate a hard landing and write a conditional inspection list for that model
- Collect the defects of every training drone
- Build a u-chart with Example 1 and identify abnormal aircraft
- Check the programme's records with Example 2 and correct them properly
- Propose a record form with every field the lesson requires
Record of results
| Check item | Criterion from the manual | Result (normal or abnormal) | Finding and location | Inspector and date |
|---|---|---|---|---|
| Joint | Test current (A) | Voltage drop (mV) | Resistance (mΩ) | Heat (W) | Verdict |
|---|---|---|---|---|---|
| Aircraft | Flight hours (h) | Defects | u per 10 h | Lower and upper limits | Result |
|---|---|---|---|---|---|
Questions
If UAV C in Example 1 had flown 120 h instead of 58 h with the same 21 defects, how would the u-chart result change? What does this teach about comparing raw defect counts?
A joint of 1.48 mΩ still beeps on a continuity test. Why must it be repaired? Compute the heat at that joint and at a normal joint (0.40 mΩ) at 40 A in a climb.
Which of the programme's records failed a check like Example 2, why, and how did you correct them without destroying the original evidence?
Which items on your hard-landing inspection list cannot be found by eye alone, and what measurement or data would confirm them?
Check before you hand in
What to hand in
- Completed inspection sheet
- Hard-landing inspection list
- u-chart with interpretation
- Corrected records and proposed form
- Voltage-drop and joint-resistance table