UAT 304 UAS Mission Planning and Autonomous Flight
Worksheet 5 A simulated mission with a debrief
Objective
Run a simulated mission as a crew, assess risk with PAVE, decide with 3P and debrief from an event timeline
Equipment and materials
- ArduPilot SITL and QGroundControl
- PAVE worksheet and crew log forms
- Python and module 5 example code
- Pressure-scenario cards from the instructor
Safety
- Simulation only; no real flights
Steps
- In class: assign crew roles and rehearse call-outs and read-back
- In class: complete a PAVE worksheet with Example 1 and record risk reductions
- In class: run the simulated mission; the instructor injects pressure and the crew decides with 3P, recording reasons
- Self-study: merge SITL, GCS and crew logs into one timeline with Example 2
- Self-study: debrief and write corrective actions with owners and closing evidence
Record of results
| Area | Item | Score before (0-3) | Risk reduction | Score after (0-3) |
|---|---|---|---|---|
| Source | Time on that clock | Clock offset (s) | Corrected time | Event |
|---|---|---|---|---|
| Finding (event) | Cause (human, machine, environment, organisation) | Action | Owner | Closing evidence |
|---|---|---|---|---|
Questions
Which PAVE area scored highest for your team? Which risk reduction really removed risk, and which was just be more careful?
When the instructor injected pressure, what did the crew perceive, how did it process the impact, and what did it perform (3P)? Was external pressure involved?
In the corrected timeline, where was the longest delay? How would raw times have led to the wrong lesson?
Did read-back work in your crew? Give one example where it caught a misunderstanding or where one slipped through.
Check before you hand in
What to hand in
- PAVE worksheet
- 3P decision record
- Event timeline
- Post-debrief corrective actions