Teaching pack · UAT 304

A 15-week teaching plan, 5 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.

Last updated: · 3(3-0-6) · Per week: lecture 3 h, lab 0 h, self-study 6 h; 45 contact hours per term

Coverage of the course description

The lessons fully teach 10 of 10 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.

Description topicModulesWhere it is taughtStatus
Mission requirements analysisM1Module 1: the mission concept and its five questions (deliverable, area, time, system, people)Covered
Definition of operating areas and flight pathsM1M2M3Module 1: site assessment · Module 2: the 9 km aerodrome distance · Module 3: ordering the inspection points and splitting into sortiesCovered
Autonomous waypoints, altitude and speedM2M3Module 2: vertical and time limits · Module 3: setting waypoints (altitude reference, speed, actions at each point)Covered
Sensor and payload selectionM1Module 1: Choosing sensors and payloads (three questions: sensor type and NETD, GSD and motion blur, mass the system can carry), with Example 3 choosing a camera to inspect drain grates and step 5 of the labCovered
Terrain informationM3Module 3: Setting waypoints (altitude type) and Using terrain data (DEM, DTM versus DSM, Copernicus DEM, ArduPilot terrain following, the 100 m SRTM grid), with Example 3 on height above ground along the leg H to P5 and step 4 of the labCovered
Weather informationM1M2Module 1: the flight window and deciding from several weather sources · Module 2: reading a METARCovered
GeofencingM3Module 3: Geofencing (FENCE_ENABLE, FENCE_TYPE, FENCE_RADIUS, FENCE_ALT_MAX, FENCE_MARGIN, FENCE_ACTION, the 20 m backup fence and stopping distance), with Example 4 choosing the fence radius and ceiling and steps 6–7 of the lab; polygon fences continue in UAT 305 Module 5Covered
Contingency planningM1M4M5Module 1: site assessment (emergency landing points) · Module 4: ArduPilot failsafes · Module 5: roles and communication (emergency call-outs and who may terminate)Covered
Mission simulationM3M4M5Module 3: SITL flight in the lab · Module 4: training progression and failsafe tests in SITL · Module 5: simulated mission with a debriefCovered
Autonomous flight evaluationM4M5Module 4: comparing flight time with the plan · Module 5: ordering events from several logs and after-action reviewCovered

Weekly teaching plan

WeekTopicPre-classLectureLabEvidence
1 M1The mission conceptRead module 1 up to 'The mission concept'The five mission-concept questions and naming what is not readyIn class: crews draft a one-page mission concept for a campus point-inspection job by answering the lesson's five questions · Self-study: Worksheet 1 part A, finish the one-page mission conceptOne-page mission concept
2 M1The flight window and several weather sourcesRead the flight-window and weather-decision sections; run Examples 1–2Sunrise and sunset, wind and rain limits, proceed or postponeIn class: compute the job-day window with Example 1, schedule sorties and decide from three weather sources with Example 2 · Self-study: Worksheet 1 part B, walk the campus site, photograph it and record the minimum listSortie schedule and decision record
3 M1Site assessment; choosing sensors and payloadsRead the site-assessment and sensor-selection sections; run Example 3; take the module 1 quizThe site-assessment minimum list, and choosing sensors from GSD, motion blur and massIn class: choose a camera for the inspection job with Example 3 from the real data of the lab cameras and present the mission file for a readiness decision · Self-study: Worksheet 1 part C, write the fix list and update the mission fileMission concept file, ready/not-ready decision and quiz result
4 M2Reading METAR and TAFRead module 2 on METAR; run Example 1Report groups: wind, visibility, cloud and pressureIn class: fetch the nearest aerodrome's METAR and TAF and decode with Example 1 and by hand · Self-study: Worksheet 2 part A, decode at least two more reports by both methods and make the results matchMatching decodes by both methods
5 M2The 9 km aerodrome distanceRead the 9 km section; run Example 2Aerodrome distance conditions and measuring from the runway centre lineIn class: measure the distance from the site to the runway centre line on a map and check the 9 km condition with Example 2 · Self-study: Worksheet 2 part B, compare METAR with wind measured at the site with a handheld anemometer (if available) or a second wind source and explain the differenceWind comparison and 9 km check
6 M2Vertical and time limitsRead the vertical and time limits section; take the module 2 quizHeight ceilings, permitted hours and checking CAAT area noticesIn class: check the latest CAAT area notices and discuss height ceilings and permitted hours · Self-study: Worksheet 2 part C, record notice numbers and dates and add the results to the mission fileNotice numbers and dates checked, quiz result
7 M3Ordering the inspection pointsRead module 3 on ordering points; run Example 1Converting coordinates to metres from take-off and ordering for a short routeIn class: choose 8–12 points, convert coordinates to metres from take-off and order them with Example 1 · Self-study: Worksheet 3 part A, compare with the team's by-eye order and make the coordinate table and two route lengthsCoordinate table and two route lengths
8 M3Splitting into sorties; using terrain dataRead the sortie-splitting section; run Example 2Range per sortie after energy reserves · DEM, DTM versus DSM, and terrain following (Example 3)In class: split into sorties with Example 2 using the training drone's range data after reserves and check ground clearance with a DEM as in Example 3 · Self-study: Worksheet 3 part B, make the sortie plan and the ground-clearance table along the routeSortie plan with distances and reserves
9 M3Setting waypoints and geofencing; midtermRead the waypoint-settings and geofencing sections; run Example 4; review modules 1–3; take the module 3 quizMidterm examination (modules 1–3)The midterm takes the class period, so there is no in-class practice · Self-study: Worksheet 3 part C, plan in QGroundControl, set the geofence with Example 4, save .plan, fly it in SITL and run one fence-breach test.plan file, simulated versus calculated table, midterm score
10 M4Training progression and comparing flight time with the planRead module 4 on progression and timing; run Example 1Four stages from SITL to full mission; finding unusually long legsIn class: upload the module 3 mission in SITL, log it and compare times with Example 1 · Self-study: Worksheet 4 part A, make the per-leg time table against the plan and find unusually long legsPer-leg time against plan
11 M4ArduPilot failsafesRead the failsafe section; run Example 2RC loss, GCS link loss, battery and EKF failsafesIn class: test four cases in SITL: cut the GCS link, turn off RC, lower the simulated battery voltage and simulate GPS loss · Self-study: Worksheet 4 part B, compare with the team's model as in Example 2 and correct it from the SITL resultsFour-case failsafe results table
12 M4Training stage 2: preparing the real flight and rehearsing in SITLReview the progression and pre-flight checklist; take the module 4 quizPre-flight briefing and take-over conditionsIn class: prepare the stage 2 pre-flight briefing and checklist with take-over conditions, then rehearse stage 2 in SITL · Self-study: Worksheet 4 part C, review the rehearsal log and write the criteria for whether to move to the full missionStage 2 SITL rehearsal log, pre-flight checklist, review notes and quiz result
13 M5Roles and communication; PAVE and 3PRead module 5 on roles and PAVE/3P; run Example 1Remote pilot in command, GCS operator, observer, read-back and risk assessmentIn class: assign roles, rehearse call-outs and read-back and complete a PAVE worksheet with Example 1 · Self-study: Worksheet 5 part A, refine the PAVE worksheet and complete the risk-reduction recordsPAVE worksheet with risk reductions
14 M5Ordering events from several logs and after-action reviewRead the timeline and review sections; run Example 2; take the module 5 quizMerging SITL, GCS and crew logs into one timelineIn class: a simulated SITL mission in which the instructor injects pressure and the crew decides with 3P and records reasons · Self-study: Worksheet 5 part B, merge the SITL, GCS and crew logs into one timeline with Example 2Decision record, event timeline and quiz result
15 M5Mini-project presentations or practical examAssemble the whole-course mission fileCourse wrap-up and assessment criteriaThe class period is used for the debrief, presenting the mission file and corrective actions, or a practical exam planning and flying a mission in SITL · Self-study: Worksheet 5 part C, write corrective actions with owners and closing evidenceMission file and mini-project presentation or practical exam, scored with the rubric

Worksheets and instructor guide

One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.

1Worksheet 1 A mission concept file
Analysis activity · About 3 h of class time · CLO1

Objective: Analyse a campus point-inspection mission, find the flight window, decide from weather data and assess the real site

Equipment

  • Campus map
  • Computer with Python and example code at /downloads/uat-304/
  • At least three weather sources
  • Camera or phone for site photos
  • Site survey form

Safety

  • Desk work and a walking site survey (outside class time); no flying
  • Watch for traffic and stay in permitted areas during the survey
  • Do not photograph outsiders at identification level

Steps

  1. In class: write a one-page mission concept answering the lesson's five questions
  2. In class: compute the job-day flight window with Example 1 and schedule the sorties inside it
  3. In class: collect weather from three or more sources, decide with Example 2 and record reasons
  4. Self-study: visit the site, photograph it and record the minimum list
  5. In class: choose a camera for the inspection job with Example 3 from the real data of the lab cameras and record the usable flight height
  6. In class: present to the instructor for a ready or not-ready decision
  7. Self-study: write the fix list and update the mission file

Deliverables

  • One-page mission concept
  • Sortie schedule
  • Weather decision record
  • Site survey with photos
  • Fix list
  • Camera selection table (GSD, blur, mass)

Checklist

  • The mission concept answers all five questions (deliverable, area, time, system, crew) and lists what is not yet ready (Quality of the mission plan)
  • Table 1 lists every sortie with battery-swap time between sorties, and every sortie ends before the window closes (Quality of the mission plan)
  • Table 2 has at least three sources, all values converted to m/s and km, limits set before looking at the data, and the reasons recorded (Weather, airspace and safety)
  • The site survey records the take-off and landing point, an emergency landing point, the tallest obstacle, power lines and landowners to ask, with photos that do not identify outsiders (Weather, airspace and safety)
  • Table 3 uses the real lab camera data with units in every cell, and the usable flight height is written into the system part of the mission concept (Quality of the mission plan)

Instructor guide

Class timing 180 min

  1. Brief the case and write the five-question mission concept30 min
  2. Compute the flight window and schedule sorties (Table 1)35 min
  3. Collect weather and decide (Table 2)35 min
  4. Choose a camera from real data (Table 3)35 min
  5. Present the mission file; instructor decides ready or not ready35 min
  6. Wrap-up, questions and hand-in checklist10 min

Expected results

  1. Record: Table 1 Flight window and sortie schedule for the job dayTable 1 (with the job day 15 October 2026 and Bangkok coordinates 13.75 N 100.50 E from Example 1): sunrise 06:08, sunset 17:59, window 06:23-17:44 (11.3 h). For a campus north of Bangkok at about 13.96 N 100.59 E the window is 06:23-17:43, a difference of 1-2 minutes at most. With the four Module 3 sorties at 8 m/s, a 1 min hover per point and 15 min battery swaps: sortie 1 08:00-08:10 (9.6 min), sortie 2 08:25-08:33 (8.6 min), sortie 3 08:48-08:58 (9.4 min), sortie 4 09:13-09:19 (6.4 min), finished by 09:19, inside the window. A different day or point set changes the numbers, but every gap must include a battery swap.
  2. Record: Table 2 Weather from several sources and the decisionTable 2 (Example 2's hypothetical data if the group has no real data): METAR 08:00 wind 6.2 m/s, gust 11.3 m/s, visibility 10 km, no thunderstorm; site anemometer 08:10 wind 6.5 m/s, gust 11.8 m/s; forecast 14:00 wind 5.6 m/s, gust 13.9 m/s, visibility 6 km, thunderstorm. Limits: mean wind up to 10 m/s, gust up to 12 m/s, visibility at least 5 km, no thunderstorm. Result: morning GO (worst gust 11.8 m/s, close to the limit), afternoon NO-GO (gust 13.9 m/s and thunderstorm). Real data will differ, but the worst value must be used and units converted correctly.
  3. Record: Table 3 Camera selection tableTable 3 (Example 3's assumed cameras at 40 m, required GSD at most 1.17 cm/px): RGB 1-inch 20 MP GSD 1.10 cm/px, max 42.6 m, blur 0.73 px, 0.35 kg, PASS; RGB small 12 MP 1.37 cm/px, max 34.0 m, fail; thermal 640 3.69 cm/px, max 12.6 m, fail; RGB + thermal pack 1.10 cm/px but 1.45 kg over the 1.2 kg limit, fail. Real lab cameras give other values; check with GSD = Sw x H x 100 / (Fr x imW) and accept rounding differences of 0.01 cm/px.
  4. Question 1: In your flight window, what sets the start and the end (sunrise or sunset plus the buffer, or the team's 06:00-18:00 limit)? Why should the team still schedule the sorties in the morning when the window covers most of the day?In Example 1 the start is set by sunrise plus 15 min (06:23 is later than 06:00) and the end by sunset minus 15 min (17:44 is before 18:00), so the team's own limit does not bind on that day. A strong answer says that rainy-season thunderstorms often build in the afternoon (matching the 14:00 forecast in Table 2), so the team flies in the morning and keeps spare time in case it must postpone.
  5. Question 2: In Table 2, which source gave the worst values? If you had used only the single easiest source to pass, would the decision change? Explain with your group's numbers.In the example the worst morning gust comes from the site anemometer (11.8 m/s), not the METAR (11.3 m/s). Using only the METAR still passes, but hides how close the site is to the limit, and using only the morning data without the forecast misses that the afternoon must stop. A strong answer names picking only passing sources as a common mistake and quotes the group's own numbers.
  6. Question 3: How high can your chosen camera fly and still show the required detail? Compare this with the tallest obstacle from your site survey. Is the margin enough?The 1-inch RGB camera in the example can fly no higher than 42.6 m. If obstacles force a higher flight the detail is not enough (at 50 m the GSD is 1.37 cm/px, so a 3.5 cm grate opening spans only about 2.6 px, below 3 px). A strong answer compares with the tallest obstacle actually surveyed and proposes a fix, such as approaching the point from an open side or changing the lens, never lowering the detail requirement.
  7. Question 4: If you had to switch to a heavier camera pack, what else in the plan must be checked, and how would it affect the schedule in Table 1?Check the total mass against the maker's limit, the mounting and camera control on the aircraft, and the shorter flight time, which means re-splitting the sorties in Module 3, possibly into more sorties. Table 1 gets longer and may run into late morning or afternoon storm risk. A strong answer links all three sensor-selection questions.

Discussion questions

  • Why is a good-looking map with no times or boundaries still not a mission concept?
  • Should the team's wind limits be stricter than the manufacturer's figures? Why?
  • If the client asks to fly in the afternoon because it is more convenient, how would the team answer with the data in the mission file?

Adapting to student background

Upper secondary (M.6)
Have them explain the hour angle and derive the GSD formula from similar triangles before running the code, then pair them with a vocational peer on the site walk to practise spotting real obstacles and power lines.
Vocational certificate
Give a fill-in table for unit conversion (kt times 0.5144, km/h divided by 3.6) and step-by-step GSD on a calculator before the code; start from the site survey they are good at, then turn what they saw into the mission concept.
Diploma
Extension: take the real sensor size and focal length of a lab camera, photograph a real grate from different safe heights (a building or mast), and count pixels against the computed GSD.

Common student mistakes: Common mistakes in the module 1 lesson

2Worksheet 2 Checking the weather and airspace for the job day
Analysis activity · About 3 h of class time · CLO1

Objective: Decode aviation weather reports, compare them with on-site measurements and check airspace conditions and area notices

Equipment

  • METAR and TAF of the aerodrome nearest campus
  • Handheld anemometer (if available) or a second wind source near the site
  • Map or Google Earth for distances
  • Python and module 2 example code
  • Latest CAAT area notices

Safety

  • Desk work and ground wind measurement; no flying

Steps

  1. In class: fetch the nearest aerodrome's METAR and TAF; decode with Example 1 and by hand to compare
  2. Self-study: decode at least two more reports by both methods until they match
  3. In class: measure the distance from the site to the runway centre line on a map and check the 9 km condition with Example 2
  4. Self-study: measure wind on site, compare with METAR and explain differences
  5. In class: check the latest CAAT area notices and discuss height ceilings and permitted hours
  6. Self-study: record the notice numbers and dates and add the results to the module 1 mission file

Deliverables

  • METAR and TAF decodes
  • Wind comparison table
  • 9 km check result
  • List of notices checked

Checklist

  • Table 1 decodes every group of at least one METAR, converts kt to m/s and Z to Thai time, and the hand decode matches the program (Weather, airspace and safety)
  • At least two more METAR or TAF reports are decoded, with the raw report text and its source attached (Weather, airspace and safety)
  • Table 2 has wind measured on site or from a second source near the site, with times, and every difference is explained (Weather, airspace and safety)
  • Table 3 measures to the nearest point of the runway centre line (not the terminal) and states the height ceiling for every point (Quality of the mission plan)
  • The CAAT notice list has numbers and dates, and the results are added to the Module 1 mission file (Quality of the mission plan)

Instructor guide

Class timing 180 min

  1. Review METAR structure and UTC time20 min
  2. Fetch and decode METAR and TAF by hand and by program (Table 1)50 min
  3. Measure distances on the map and check the 9 km conditions (Table 3)45 min
  4. Check the latest area notices and discuss ceilings and hours30 min
  5. Plan the site wind measurement (Table 2) and how to compare20 min
  6. Wrap-up, questions and hand-in checklist15 min

Expected results

  1. Record: Table 1 Decoding a METAR group by groupTable 1 (with the example report METAR VTBD 150100Z 21012G22KT 9999 FEW020 SCT100 30/24 Q1008 NOSIG): station VTBD, day 15 at 01:00Z = 08:00 Thai time, wind from 210 degrees at 12 kt = 6.2 m/s gusting 22 kt = 11.3 m/s, visibility 9999 = 10 km or more, cloud FEW at 2,000 ft and SCT at 10,000 ft, temperature 30 C, dew point 24 C, spread 6 C, QNH 1008 hPa. The afternoon report 150700Z = 14:00: wind 9.3 m/s gusting 16.5 m/s, visibility 4.0 km, TSRA with CB, spread 2 C. Real reports differ, but unit conversions must be right and the hand decode must match the program.
  2. Record: Table 2 METAR wind compared with site windTable 2: no fixed answer; it depends on the day. Accept it when both sources have close times (within about 30 minutes), all values are in m/s, and differences are explained by causes such as distance from the aerodrome, measuring height (a handheld meter is low), buildings or trees sheltering the wind, and different times. Differences of 1-3 m/s are normal.
  3. Record: Table 3 Checking work points against the 9 km conditions and area noticesTable 3 (with Example 2's hypothetical aerodrome, 3,000 m runway on 030/210): A 1.79 km, 1,715 m off axis, 40 m, needs permission, ceiling 45 m, ok; B 1.72 km but only 14 m off axis, in the approach path, not allowed; C 5.14 km, ceiling 90 m, 80 m, ok with permission; D 10.25 km, outside 9 km but the general 90 m ceiling still applies, so the planned 110 m is too high and must change. For the real site the result depends on the measured distance; check that it is measured to the runway centre line and that the 1, 1-4 and 4-9 km band is chosen correctly.
  4. Question 1: How much does the site wind differ from the METAR in Table 2? Give at least two reasons and say which value the team should use to decide.The difference comes from the group's table. A strong answer gives at least two causes (the METAR is measured at the aerodrome some distance away, terrain and measuring height differ, buildings shelter the wind, times differ) and concludes that the decision uses the worst value across all sources, as in Module 1, not the better one.
  5. Question 2: At what Z time was the METAR you decoded issued, and what Thai time is that? How would reading it directly as Thai time break the flight plan?METAR times are UTC; add 7 hours, so 150100Z = 08:00 and 150300Z = 10:00 Thai time. Reading them directly as Thai time makes a 01:00Z report look like pre-dawn data, or makes the 07:00Z afternoon report (14:00) look like a morning one, so the team picks the wrong window and may fly into a storm.
  6. Question 3: Which distance band from the runway centre line is your work site in, what is the height ceiling, and what must change if the original plan said 60 m?From the lesson: no flight in the approach path or within 1 km, at most 45 m at 1-4 km and 90 m at 4-9 km, with the aerodrome owner's permission within 9 km. If the site is at 1-4 km, a 60 m plan must drop to 45 m or less, and the Module 1 camera must be rechecked for the required GSD. A strong answer also says permission is needed first, not just a lower height.
  7. Question 4: What does the temperature-dew point spread in your decoded METAR tell you about the air that day?A wide spread (6 C in the morning report) means the air is not near saturation. A narrow spread (2 C in the afternoon report, or 26/25 in the practice question) means humid air near saturation, with a risk of fog or low cloud. A strong answer links it to visibility and other weather in the same report.
  8. Question 5: Why record the numbers and dates of the notices you checked in the mission file, instead of just writing checked?Notices change with circumstances: for example Announcement No. 15/2569 was replaced by No. 16 on 25 June 2026, and some areas apply only at certain heights or times. Recording numbers and dates shows which notice the decision was based on and when it must be checked again.

Discussion questions

  • If the METAR passes but the site anemometer is close to the limit, what should the team do?
  • How can judging only by colour on an airspace map go wrong?
  • Why must the team confirm the approach path with the real aerodrome instead of using its assumed 1 km strip?

Adapting to student background

Upper secondary (M.6)
Have them decode every group by hand before seeing the program output and explain the centre-line distance formula by drawing the vectors on paper, then measure real wind with a hands-on peer.
Vocational certificate
Give a METAR code card and a ready unit-conversion table; measure distances with a ruler or the Google Earth measuring tool instead of vector maths, and let them lead the site wind measurement.
Diploma
Extension: measure site wind at two heights (ground level and a safe roof or mast) at three METAR times, then summarise any trend in the differences.

Common student mistakes: Common mistakes in the module 2 lesson

3Worksheet 3 Planning a campus point-inspection route
Lab · About 3 h of class time · CLO1, CLO2

Objective: Order inspection points, split sorties by energy, check ground clearance with a DEM, set waypoints and geofences, and check the plan by simulated flight

Equipment

  • Campus map
  • QGroundControl
  • ArduPilot SITL
  • Python and module 3 example code
  • Training drone's range data supplied by the lecturer
  • Terrain elevation data (DEM) for the area

Safety

  • Simulation only; no real flights
  • Check the plan against no-fly areas and obstacles before saving

Steps

  1. In class: choose 8–12 points, read coordinates and convert to metres from take-off
  2. In class: order them with Example 1
  3. Self-study: compare with the team's by-eye order and make the coordinate table and two route lengths
  4. In class: split sorties with Example 2 using the range after reserves
  5. In class: extract ground heights along the route from the DEM, check clearance with Example 3 and choose the altitude type
  6. Self-study: make the sortie plan and the ground-clearance table along the route
  7. Self-study: plan in QGroundControl with altitude, speed and actions at each point and save the .plan file
  8. Self-study: compute FENCE_RADIUS and FENCE_ALT_MAX with Example 4 and set the fence in SITL
  9. Self-study: fly in SITL, compare time and distance with calculations, then fly out of the fence once and record where it stops and what it does

Deliverables

  • Coordinate and order table
  • Sortie plan
  • .plan files
  • Simulated versus calculated table
  • Ground-clearance table along the route
  • Fence values with reasons and the breach test result

Checklist

  • Table 1 has 8-12 points in metres from take-off and shows both route lengths (Quality of the mission plan)
  • Every sortie in Table 2 starts and ends at take-off and stays within the training drone's range after reserves (Quality of the mission plan)
  • Table 2 gives the lowest DEM ground clearance for every sortie and states whether the DEM is a DTM or DSM (Weather, airspace and safety)
  • FENCE_RADIUS and FENCE_ALT_MAX sit between the route and the permitted edge with the stopping-distance calculation, and FENCE_ACTION is not 0 (Weather, airspace and safety)
  • Table 3 compares SITL time and distance with calculations for every sortie, the .plan files are attached and the breach result is recorded (Simulation and flight evaluation)

Instructor guide

Class timing 180 min

  1. Brief the task and simulation safety; choose points and convert coordinates30 min
  2. Order points and split sorties (Tables 1 and 2)40 min
  3. Check ground clearance with the DEM and choose the altitude type35 min
  4. Plan the mission in QGroundControl and compute the fence40 min
  5. Fly in SITL and test the fence breach (Table 3)25 min
  6. Wrap-up, questions and hand-in checklist10 min

Expected results

  1. Record: Table 1 Inspection point coordinates and flight orderTable 1 (with the 10 points of Example 1): nearest neighbour gives 8,078 m, H-P1-P2-P3-P4-P5-P6-P7-P8-P9-P10-H; after 2-opt 7,916 m, H-P1-P2-P10-P3-P4-P5-P6-P7-P8-P9-H, 162 m (2.0%) shorter. Real campus points give other values; check that coordinates are in metres and that 2-opt is not longer than nearest neighbour.
  2. Record: Table 2 Sortie plan and ground clearanceTable 2 (with Example 2's 3,500 m range after reserves): sortie 1 H-P1-P2-P10-H 3,189 m, sortie 2 H-P3-P4-H 3,144 m, sortie 3 H-P5-P6-P7-H 3,055 m, sortie 4 H-P8-P9-H 2,130 m, total 11,518 m. Leg H-P5 at 40 m above take-off has a lowest clearance of 14.0 m at 750 m from H and is below 30 m for about 700 m, so terrain following at 40 m above ground is needed (40-66 m above take-off). If the instructor supplies the training drone's real range the numbers change.
  3. Record: Table 3 Calculated versus SITL values and the fence testTable 3 (calculated values from the examples; SITL values depend on the run): sortie 1 at 8 m/s with a 60 s hover per point takes about 579 s (9.6 min) over 3,189 m; a SITL difference of up to about 10-20% is normal (acceleration and slowing at waypoints). FENCE_RADIUS range 1,431-1,574 m, choose 1,500 m; FENCE_ALT_MAX range 74.6-81.4 m, choose 78 m; stopping distance 20.8 m horizontal and 5.6 m vertical. On a breach the aircraft should stop no further past the fence than about the stopping distance, then perform the FENCE_ACTION (for example 1 = RTL or Land).
  4. Question 1: How many metres longer or shorter is the team's by-eye order than the Example 1 order? Where does the route cross itself or double back?Depends on the team's order. In the example, ordering by point number (which here equals nearest neighbour) is 162 m longer than after 2-opt, because P10 is left until last with a long flight home. A strong answer points to where the route crosses or doubles back on the map and accepts that neither method guarantees the best answer.
  5. Question 2: How much longer is the total after splitting into sorties than the single route, and why? Is the number of sorties more than the minimum from dividing the distance?In the example 11,518 m against 7,916 m is about 46% longer, because every sortie must return to take-off. The minimum from 7,916/3,500 rounded up is 3 sorties, but 4 are needed in practice. A strong answer says the in-order split is simple but not optimal.
  6. Question 3: In Table 2, which leg has the lowest ground clearance, which altitude type did the group choose, and how does that choice change FENCE_ALT_MAX?In the example leg H-P5 is lowest, 14.0 m over the earth mound, and 15 m trees on the mound would be about 1 m above the flight path, so terrain following at 40 m above ground is chosen. This raises the altitude above take-off to 66 m, so FENCE_ALT_MAX must sit in the narrow 74.6-81.4 m range (keeping 40 m above take-off would allow a lower fence, but hits obstacles).
  7. Question 4: In the SITL fence breach test, how far past the fence did the aircraft stop and what did it do? Compare with the calculated stopping distance. Are the chosen fence values safe enough?Acceptable: the aircraft stops past the fence by about the calculated stopping distance (about 20 m at 8 m/s), then performs the FENCE_ACTION. Going more than about 20 m past meets the backup fence ArduPilot sets 20 m further out, and more than 100 m switches to Land. 1,500 m still leaves 100 m to the permitted edge, which is enough. A strong answer compares the real SITL number with the calculation and says that if it is not enough the plan changes, never the fence moving beyond the permitted area.
  8. Question 5: If you used terrain data spaced every 100 m instead of 30 m, what could you miss, and how would you compensate?A coarse grid misses mounds or obstacles narrower than one cell. In the example the 120 m grid shows the highest ground as 19.0 m instead of 28.0 m. ArduPilot's SRTM data at 100 m spacing carries the same risk, so survey the real site, keep a clearance margin, and tell a DTM from a DSM.

Discussion questions

  • When is altitude relative to take-off acceptable, and when is terrain following required?
  • If the fence window is empty (NO ROOM), what options does the team have other than moving the fence?
  • Why is SITL time usually longer than distance divided by speed, and how should the team use the difference?

Adapting to student background

Upper secondary (M.6)
Have them order points by hand before running code and explain why 2-opt removes crossings, focus on deriving the stopping-distance formula, then let them drive QGroundControl with a hands-on peer.
Vocational certificate
Start with placing waypoints in QGroundControl, which suits them, then read distances on screen against the code; use a fill-in sheet for v x t + v^2/(2a) term by term on a calculator.
Diploma
Extension: draw an inclusion polygon fence along the real permitted edge instead of a circle, or set a fence per sortie, then test breaches at two speeds against the stopping distance.

Common student mistakes: Common mistakes in the module 3 lesson

4Worksheet 4 From SITL to preparing the real flight
Lab · About 3 h of class time · CLO2

Objective: Check the mission and failsafes in SITL, prepare the stage 2 briefing and pre-flight checklist, rehearse stage 2 in SITL and review the log before the full mission

Equipment

  • ArduPilot SITL and QGroundControl
  • Mission file from module 3
  • Pre-flight checklist

Safety

  • Simulation only; the course has no lab hours, so real flight is not included
  • Test every failsafe in SITL only; never cut links on a real drone
  • If the programme arranges a real stage 2 flight outside this course, fly within CAAT conditions in visual line of sight, in open ground with an observer and people kept clear, using this worksheet as the pre-flight plan

Steps

  1. In class: upload the module 3 mission in SITL, log it and compare times with Example 1
  2. Self-study: make the per-leg time table against the plan and find unusually long legs
  3. In class: in SITL cut the GCS link, turn off RC, lower simulated voltage and simulate GPS loss; record each result
  4. Self-study: compare with the Example 2 model; if different, trust SITL and fix the team's model
  5. In class: prepare the stage 2 briefing and pre-flight checklist with take-over conditions, then rehearse stage 2 in SITL
  6. Self-study: review the rehearsal log and write the criteria for whether to move to the full mission

Deliverables

  • Per-leg timing table
  • Four-case failsafe table and corrected model
  • Signed stage 2 pre-flight checklist
  • Stage 2 SITL rehearsal log and review notes

Checklist

  • Table 1 covers every leg, planned times include hover time, differences are in percent, and legs over 20% are explained from the log (Simulation and flight evaluation)
  • Table 2 has all four cases (GCS link loss, RC off, low battery, GPS loss), naming parameters and values for the firmware version used (Weather, airspace and safety)
  • The corrected team model follows the SITL results, not guesses (Simulation and flight evaluation)
  • The stage 2 briefing and pre-flight checklist state the take-over conditions and are signed (Crew work and debrief)
  • Record 3 has at least three measurable criteria citing data from the rehearsal log (Simulation and flight evaluation)

Instructor guide

Class timing 180 min

  1. Brief the training progression and safety; upload the mission in SITL25 min
  2. Fly the simulation, read the log and build the per-leg table (Table 1)40 min
  3. Test the four failsafe cases in SITL (Table 2)50 min
  4. Prepare the stage 2 briefing and checklist, then rehearse in SITL40 min
  5. Review the rehearsal log and write the criteria (Record 3)15 min
  6. Wrap-up, questions and hand-in checklist10 min

Expected results

  1. Record: Table 1 Per-leg times against the planTable 1 (with sortie 1 and Example 1's simulated times at 8 m/s and a 60 s hover per point): H-P1 446 m, plan 115.7 s, actual 118 s, +2%; P1-P2 594 m, 134.3 s, actual 138 s, +3%; P2-P10 728 m, 151.0 s, actual 170 s, +13%; P10-H 1,421 m, 177.7 s, actual 245 s, +38%, investigate. Total plan 578.7 s, actual 671 s (+16%). The group's SITL values will differ, but normal legs should be within a few percent to about 15%.
  2. Record: Table 2 Results of the four failsafe cases in SITLTable 2 (from the lesson's descriptions; the real answer is what SITL shows for the firmware version used): GCS link loss acts after FS_GCS_TIMEOUT (5 s by default), and with bit 1 of FS_OPTIONS the mission continues in AUTO; RC off with FS_THR_ENABLE = 1 gives RTL (land if there is no GPS) unless bit 0 of FS_OPTIONS lets it continue; low battery with BATT_FS_LOW_ACT = 2 gives RTL; GPS loss usually drives the EKF variances high enough to trigger the EKF failsafe, whose default FS_EKF_ACTION is Land. Accept other results if the group records the parameter values used and corrects its model to SITL.
  3. Record: Record 3 Criteria for moving to the full mission, from the stage 2 rehearsal log reviewRecord 3: no single answer. Good criteria are measurable, for example every leg within 20% of plan or explained, all four failsafes behaving as expected with the real values, no fence breach, battery above the set reserve at landing, the pilot able to take over under the rehearsed conditions, and the log reviewed before every next sortie.
  4. Question 1: Which leg took more than 20% longer than planned? What are the possible causes, and how would you check them in the log before concluding?In the example leg P10-H is 38% slower than planned (an average of about 5.8 m/s instead of 8 m/s). Possible causes are a headwind or RTL using a different speed from the mission speed; check wind direction and speed and the mode and speed in the log before concluding. A strong answer uses the result to refine the energy plan for the next sortie.
  5. Question 2: Did the SITL failsafe results match the Example 2 model in every case? If not, how did the group correct its model?Depends on the group's results. The Example 2 model is a teaching model using the rule that the safer action wins, not ArduPilot's internal logic. A strong answer names the cases that differed, says it trusted SITL and corrected the model, and states the firmware version.
  6. Question 3: If the battery runs low while the aircraft is already in RTL, what does the battery failsafe do? How does that affect the energy reserve in the plan?Nothing: the battery failsafe takes no action if the vehicle is already in RTL or Land, and cannot be reset until reboot. So the energy reserve must cover the return from the farthest point even into a headwind (like the P10-H leg, 38% slower than planned), and the range per sortie after reserves must be set in advance.
  7. Question 4: Why must stage 2 (limited height and range) come before the full mission, and which of the group's criteria matters most?SITL differs from the field in wind, GNSS signals and real links. Stage 2 lowers height and range with the pilot ready to take over, so problems appear in conditions the crew can handle. The most important criterion should be measurable from the log, such as failsafes responding as tested or energy remaining as planned. A strong answer never jumps from SITL straight to the full mission.

Discussion questions

  • If the documentation does not state the order when several failsafes occur together, how should the team prepare?
  • If the aircraft lands in the middle of a flooded area because of an EKF failsafe, what should the team have prepared in advance?
  • Why is using parameter meanings from old firmware versions dangerous?

Adapting to student background

Upper secondary (M.6)
Have them predict each case as an AUTO, RTL, LAND state diagram before testing, compare with SITL, and explain the planned-time and relative-difference formulas themselves.
Vocational certificate
Give a step-by-step failsafe test checklist with the SITL commands and a fill-in table for d/v plus hover time; let them lead the pre-flight checklist.
Diploma
Extension: test two overlapping event sequences in SITL (for example GCS loss then low battery, and GPS loss during RTL) and propose parameter values suited to the flood mission.

Common student mistakes: Common mistakes in the module 4 lesson

5Worksheet 5 A simulated mission with a debrief
Lab · About 3 h of class time · CLO3

Objective: Run a simulated mission as a crew, assess risk with PAVE, decide with 3P and debrief from an event timeline

Equipment

  • ArduPilot SITL and QGroundControl
  • PAVE worksheet and crew log forms
  • Python and module 5 example code
  • Pressure-scenario cards from the instructor

Safety

  • Simulation only; no real flights

Steps

  1. In class: assign crew roles and rehearse call-outs and read-back
  2. In class: complete a PAVE worksheet with Example 1 and record risk reductions
  3. In class: run the simulated mission; the instructor injects pressure and the crew decides with 3P, recording reasons
  4. Self-study: merge SITL, GCS and crew logs into one timeline with Example 2
  5. Self-study: debrief and write corrective actions with owners and closing evidence

Deliverables

  • PAVE worksheet
  • 3P decision record
  • Event timeline
  • Post-debrief corrective actions

Checklist

  • Table 1 covers all four PAVE areas with scores before and after, and the total and per-item limits were set before the mission (Weather, airspace and safety)
  • The 3P record gives reasons and times for every decision and names who may terminate the mission (Crew work and debrief)
  • Table 2 uses the arm event as the reference, shows each source's clock offset and is sorted by corrected time (Simulation and flight evaluation)
  • Every corrective action in Table 3 has an owner, a due date and closing evidence, and targets system causes rather than blame (Crew work and debrief)

Instructor guide

Class timing 180 min

  1. Assign roles; rehearse call-outs and read-back25 min
  2. Complete the PAVE worksheet and reduce risks (Table 1)30 min
  3. Run the simulated mission; instructor injects pressure; crew decides with 3P55 min
  4. Merge the logs into one timeline (Table 2)30 min
  5. Debrief and write corrective actions (Table 3)30 min
  6. Wrap-up, questions and hand-in checklist10 min

Expected results

  1. Record: Table 1 PAVE worksheet before and after risk reductionTable 1 (with Example 1's data): before, Pilot 3, Aircraft 2, enVironment 3, External pressures 4, total 12 above the limit of 8, with one item at 3 (mayor wants images by 10:00), so do not start as planned. Example after reductions (the after scores are an example of team judgement, not fixed values): a well-rested pilot flies instead, 2 to 0; test-fly the aircraft with the new motor, 2 to 1; cordon off the take-off area, 1 to 0; tell the client in advance that images may be late, 3 to 1. New total 6 with no item at 3, so the mission may start. Check that every reduction is an action that really lowers risk.
  2. Record: Table 2 Event timeline after clock correctionTable 2 (with Example 2's simulated data): arm from the flight controller log, GWk 2440, GMS 354718000, minus 18 s and plus 7 h = 09:31:40 on 15 October 2026. The GCS clock needs -25 s and the pilot's phone +38 s. Corrected timeline: 09:31:40 arm, 09:36:18 gust felt at take-off point, 09:36:25 video freeze, 09:37:38 abort decision, 09:37:47 RTL commanded. The group's real logs differ; check that offsets come from the arm event and the list is sorted by corrected time.
  3. Record: Table 3 3P decisions and corrective actions after the debriefTable 3: no single answer. A good entry separates what happened, why and what to fix, for example: the decision after the video froze took long (73 s in the example); the organisational cause is that no freeze time limit for aborting was agreed in advance; the action is to add that limit to the briefing; the owner is the pilot in command; the closing evidence is the new briefing and a rehearsal that follows it.
  4. Question 1: Which PAVE area scored highest for your team? Which risk reduction really removed risk, and which was just be more careful?In the example External pressures is highest (4). The reductions that work are actions that change the situation, such as changing the pilot, test-flying the aircraft, cordoning the area and telling the client in advance; be more careful lowers no score. A strong answer quotes the team's own before and after scores.
  5. Question 2: When the instructor injected pressure, what did the crew perceive, how did it process the impact, and what did it perform (3P)? Was external pressure involved?Depends on the injected scenario. A strong answer separates the three steps clearly (Perceive the circumstances, Process the impact on safety, Perform the best action) with times and reasons, and says whether external pressure, such as a waiting client or fear of losing face, nearly made the crew accept a risk.
  6. Question 3: In the corrected timeline, where was the longest delay? How would raw times have led to the wrong lesson?In the example the slowest part is from the video freeze (09:36:25) to the abort decision (09:37:38), 73 s, while decision to RTL took only 9 s. With raw times the freeze at 09:36:50 and the decision at 09:37:00 are only 10 s apart, but the decision to RTL at 09:38:12 is 72 s, so the GCS operator looks slow and the lesson lands on the wrong person.
  7. Question 4: Did read-back work in your crew? Give one example where it caught a misunderstanding or where one slipped through.Depends on the crew. A strong answer quotes a real exchange, such as Battery 30 percent and Copy, 30 percent, returning to launch, says whether read-back caught a misunderstanding, and proposes a change to the call-outs if one slipped through.

Discussion questions

  • Why are external pressures the most dangerous of the four PAVE areas when they are not technical?
  • What should the crew agree in advance so that the decision to abort comes faster?
  • How does a debrief that hunts for someone to blame affect reporting next time?

Adapting to student background

Upper secondary (M.6)
Have them write the GPS-to-UTC conversion and compute clock offsets by hand before the code, and take the GCS operator or observer role to practise communicating under pressure.
Vocational certificate
Give ready call-out and 3P cards, a fill-in table for clock offsets (true arm time minus the source's arm time), and the pilot role in the simulated mission.
Diploma
Extension: extract event messages (such as mode changes) from the real SITL log into the timeline with code, and facilitate another team's debrief.

Common student mistakes: Common mistakes in the module 5 lesson

Scoring rubric

For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.

CriterionWeightExcellent (4)Good (3)Fair (2)Needs work (1)
Quality of the mission plan30%Plan meets all requirements; window, route, altitude, speed and reserves correct with reasonsNearly complete, minor flawsKey elements missing or some calculation errorsPlan not linked to requirements
Weather, airspace and safety25%Several weather sources, airspace and latest notices checked, all failsafes tested, and every condition built into the planNearly complete checksSome key checks missingSafety ignored or conditions breached
Simulation and flight evaluation25%Compares simulated results (and real logs if any) with the plan numerically, explains differences and corrects the model from evidenceComparison done; explanation incompletePartial comparison or no explanationNo flight evaluation
Crew work and debrief20%Clear roles, consistent read-back, recorded reasoning, actions with owners and evidenceGood, with minor lapsesUnclear roles or communicationNo crew work or no debrief

Assessment map: CLOs and how they are assessed Draft

The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.

CLOWorksheetsModule quizzes
CLO1 Plan automated missions considering weather and airspaceW 1W 2W 3M1M2M3
CLO2 Execute automated missions in simulation and the fieldW 3W 4M3M4M5
CLO3 Manage crew and in-mission decisionsW 5M5