UAT 308 Automation and Robotics Technology

Worksheet 5 A joint UGV and drone mission

Lab 12 hAssesses CLO3, CLO2

Objective

Allocate tasks to several vehicles by auction, compute drone–vehicle rendezvous and test behaviour when communication drops

Equipment and materials

  • Two training robot vehicles
  • ArduPilot SITL and a mission planner
  • Cones for 8 checkpoints
  • ROS 2 and the module 5 example code

Safety

  • The drone part runs in SITL only; no real flights
  • Vehicles run in a fenced area with an emergency stop for each
  • Set the link-loss behaviour to stop or return to the rally point before cutting the link

Steps

  1. Set 8 checkpoints; two vehicles bid as in Example 1; compare total distance with a manual split
  2. Add a new task mid-mission and auction only that task; record re-routing
  3. In SITL, return the drone to land on a target on a slow-moving vehicle; compute the rendezvous with Example 2
  4. Cut one vehicle's link mid-mission and check it continues or returns to the rally point as designed
  5. Write a report on system architecture, problems found and improvements

Record of results

Table 1 Auction against a manual split
VehicleCheckpoints in order (auction)Distance (auction) (m)Checkpoints in order (manual)Distance (manual) (m)
Table 2 Drone and vehicle rendezvous in SITL
QuantityCalculatedSITL logDifferenceUnit
Table 3 Communication-loss test
Time or eventVehicle stateDesigned behaviourObserved behaviourPass/fail

Questions

  1. From Table 1, by what percentage is the auction better or worse than your group's manual split? Why does a sequential single-item auction not guarantee the best answer?

  2. When a new task was added mid-mission, which vehicle won it, and what was the bid based on? Why auction only the new task instead of recomputing everything?

  3. From Table 2, how much time does flying to the rendezvous point save compared with chasing the vehicle's current position? What happens if the vehicle changes speed on the way, and what backup is needed?

  4. From Table 3, did the vehicle follow its designed behaviour when the link dropped? What should the control centre show with that vehicle's latest data, and how must resent messages be handled when the link returns?

Check before you hand in

What to hand in

  • Auction versus manual split table
  • SITL log and rendezvous calculation
  • Communication-loss test record
  • System architecture report

CLO3 Integrate ground robots with UAS. CLO2 Develop robotic systems with ROS 2. (CLOs are a web-team draft; the course owner sets the final ones.)

Instructors: answers and teaching notes for this worksheet are in the teaching pack