UAT 321 Unmanned Aircraft Systems Installation, Integration, Inspection and Maintenance Laboratory
Worksheet 4 A maintenance programme and a job card repair
Objective
Build a preventive programme from the maker manual, inspect an aircraft systematically, repair under an inspected job card and justify the release decision
Equipment and materials
- Training drone maker manual
- Usage data for lab aircraft
- Spare parts (propellers, motors) and hand tools
- Infrared thermometer, torch and magnifier
- Job card form and maintenance log
- Python and the module 4 example code
Safety
- Disconnect the battery before replacing parts
- Bench-test with propellers off
- Post-repair test hover under lecturer supervision within CAAT conditions in visual line of sight
Steps
- Build a preventive task table from the maker manual with intervals in hours, cycles or days and manual references
- Enter lab usage data in Example 1 to find due items
- Inspect a lab aircraft zone by zone with the lesson's table, including motor temperatures after a supervised hover, and record every finding
- Write a job card for the module 3 defect or an inspection finding, recording part numbers in and out
- Carry out the job card with another group as inspector; bench-test and test-hover
- Decide release or hold with reasons and record it in the maintenance log
Record of results
| Task | Maker manual section | Interval (hours / cycles / days) | Last done | Remaining | Status (ok / DUE) |
|---|---|---|---|---|---|
| Zone | What was checked | Finding (look, feel, move, listen, measure) | Motor temperature and rise (°C) | Action or job card no. |
|---|---|---|---|---|
Questions
From Table 1, which task falls due first, and by which unit? If you tracked only one unit, which task would you miss?
In your inspection, did any motor's temperature rise exceed 1.5 times the median rise of the others (the lesson's practice criterion)? What is the next step?
What evidence supports your release or hold decision? Which missing job card information would force a hold?
Why should the worker and the inspector be different people? What did the inspector from another group question or find in your work?
Check before you hand in
What to hand in
- Preventive task table
- Due items list
- Zone-by-zone condition inspection record
- Job card signed by worker and inspector
- Release decision in the maintenance log