UAT 361 Unmanned Aircraft Systems Technology for Surveying, Mapping and Inspection
Worksheet 2 Point layout and field register
Objective
Plan and survey GCPs and checkpoints, build a traceable point register and decide in the field whether to re-fly
Equipment and materials
- GCP targets and pins
- Survey GNSS receiver with pole and manual
- Lab survey drone
- Camera or phone for point photos
- Python and module 2 example code
- Lab notebook
Safety
- Survey with GNSS under experienced supervision; keep poles away from power lines
- Wear hats and high-visibility vests near roads; drink water and rest in hot weather
- Fly within CAAT conditions in visual line of sight; keep people clear
- Inspect batteries before flight; keep them in fire-safe bags or boxes
Steps
- Plan GCP and checkpoint positions spread to the edges and across heights, with reasons
- Place targets and photograph each location and surroundings
- Survey with GNSS per the manual, recording pole height and whether it was subtracted
- Build the register as in Example 1; leave missing values blank, never zero
- Fly the images, then check images, targets and edges before leaving
- Record the re-fly decision with reasons and submit for the instructor's signature
Record of results
| Point ID and photo numbers | Role (GCP or checkpoint) | E / N (m) | Antenna h and pole height p (m) | Pole already subtracted by receiver? | Orthometric H (m) and N used |
|---|---|---|---|---|---|
| Check | Result (pass / fail) | Evidence (image number or file name) | Follow-up action |
|---|---|---|---|
Questions
Do your group's points cover the edges, the centre and the high and low ground? Which part is least covered, and where will that affect the map?
If the receiver has already subtracted the pole height and the recorder subtracts it again, how wrong will the point's height be and in which direction? How does your register prevent this?
Does a fixed status on the GNSS receiver screen confirm that a point's coordinates are correct? What else does your group record so the work can be traced?
If one checkpoint turns out to be hidden by leaves in the images, what does your group do, and why must the checkpoint coordinates never be moved to match the image?
Check before you hand in
What to hand in
- Point layout with reasons
- Point register
- Image list
- One-page decision signed by the instructor