UAT 361 Unmanned Aircraft Systems Technology for Surveying, Mapping and Inspection

Worksheet 5 Quality report and delivery

Analysis activity 12 hAssesses CLO2, CLO3

Objective

Report accuracy from independent checkpoints to standard, trace error causes and assemble a package others can accept

Equipment and materials

  • Products and point register from modules 2–3
  • QGIS
  • Python and module 5 example code
  • A SHA-256 tool

Safety

  • Computer work only; no flying
  • Do not share data showing outsiders beyond the team

Steps

  1. Read module 3 checkpoints, compute bias and RMSE with Example 1 and check one row by hand
  2. Load checkpoints into QGIS, show error arrows, match the pattern to the table and write cause hypotheses
  3. Draw the usable-data boundary, compute completeness and identify gaps
  4. Organise the package as in Figure 2 and create a SHA-256 manifest of every real file
  5. Hand the package to another team to open unaided; they recompute one checkpoint and make a three-state acceptance decision with reasons

Record of results

Table 1 Checkpoint errors (map minus surveyed)
CheckpointeE (m)eN (m)eZ (m)Horizontal eH (m)Checked by hand (yes / no)
Table 2 Accuracy summary to ASPRS Edition 2
ItemHorizontal (H)Vertical (V)Note
Note 3 Completeness, cause hypotheses from the error pattern and the other team's acceptance decision

Questions

  1. Is your group's vertical bias close to zero? If it is near zero but the vertical RMSE is not small, what does that mean, and why must the standard deviation not be used in place of RMSE?

  2. Which row of the cause-tracing table does your error-arrow pattern match? What is your hypothesis, and how will you separate the possible causes?

  3. Your group has fewer than 30 checkpoints. How do you word the accuracy statement so it follows ASPRS and is honest?

  4. What does your group's SHA-256 manifest prove, and what does it not prove?

  5. What did the other team decide about your package? Which state should a job with no checkpoints at all receive, and why?

Check before you hand in

What to hand in

  • Accuracy table in ASPRS wording
  • Error-arrow map and cause hypotheses
  • Completeness result
  • Delivery package with manifest
  • Acceptance decision from the other team

CLO2 Process outputs and assess accuracy. CLO3 Prepare deliverables to specification. (CLOs are a web-team draft; the course owner sets the final ones.)

Instructors: answers and teaching notes for this worksheet are in the teaching pack