UAT 402 Advanced UAS Technology and BVLOS Operations

Worksheet 2 Measuring the real system timeline

Lab 12 hAssesses CLO1

Objective

Measure each avoidance step on the team's real system, compute the required detection range, assess the C2 link budget and lost link, and assess DAA limitations

Equipment and materials

  • SITL and a ground station
  • Training drone
  • Stopwatch
  • ADS-B receiver or available sensor (if any)
  • The team's C2 radio data (transmit power, antennas, receiver sensitivity)
  • Python and the module 2 example code

Safety

  • Fly the turn measurement within CAAT conditions in visual line of sight; keep people clear
  • Check batteries before flight and store them in fire-safe containers
  • Cut links in SITL only, never on the real drone

Steps

  1. In SITL, inject simulated aircraft over MAVLink and time their appearance on the ground station, repeating several times
  2. Have each learner decide to avoid when alerted; record mean and maximum times
  3. Measure the training drone's 90-degree turn time at cruise speed (if weather prevents it, measure in SITL and label it simulated)
  4. Put real values into Example 2 and compare with the sensor or ADS-B range
  5. Compute the C2 link budget with Example 4 at 5, 10, 15 and 20 km using the team's radio data
  6. Cut the GCS link in SITL, time how long until the failsafe acts and compare with FS_GCS_TIMEOUT and the FS_GCS_ENABLE action
  7. Write the team's DAA and C2 link limitations honestly

Record of results

Table 1 Time of each avoidance timeline step
StepNumber of trialsMean (s)Maximum (s)Measured, simulated or assumed
Table 2 C2 link budget by range
Range (km)FSPL (dB)Received power (dBm)Fade margin (dB)Meets the team's requirement?
Table 3 Lost-link test results in SITL
TrialFS_GCS_TIMEOUT and FS_GCS_ENABLE valuesTime from link cut to failsafe (s)Action observedDistance flown before failsafe (m)

Questions

  1. Compare the required detection range from your real values with what your sensor or ADS-B receiver can see. What does that say about pilot-over-C2 versus onboard avoidance, and which aircraft can your system not see at all?

  2. Why use the maximum measured decision time rather than the mean? If the maximum decision time is 20 s instead of 12 s, what does the required detection range become at a 90 m/s closing speed?

  3. From Table 2, at what range does the team's link fail the requirement? Does raising the antenna mast fix this, why or why not, and what options does the team have?

  4. From Table 3, how far does the drone keep flying before the failsafe starts, and where must this distance be used in mission planning?

Check before you hand in

What to hand in

  • Timeline step table
  • Required detection range calculation
  • C2 link budget table by range
  • Lost-link test result in SITL
  • DAA limitations report

CLO1 Explain the technologies enabling BVLOS operations. (CLOs are a web-team draft; the course owner sets the final ones.)