Teaching pack · UAT 402

A 15-week teaching plan, 5 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.

Last updated: · 3(1-4-4) · Per week: lecture 1 h, lab 4 h, self-study 4 h; 75 contact hours per term

Coverage of the course description

The lessons fully teach 9 of 9 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.

Description topicModulesWhere it is taughtStatus
Advanced system architecturesM1M2Module 1: the whole BVLOS system architecture (aircraft, control station, C2 link, external services, people and procedures, and Example 3 finding single points of failure with series and parallel calculations) · Module 2: high-reliability navigation and backup systemsCovered
Long-range command and controlM2Module 2: long-range C2 links: link budget, backup links and lost link (FSPL per ITU-R P.525, Fresnel clearance per ITU-R P.530, RLOS and BRLOS links, the ArduPilot GCS failsafe, and Example 4 on a 920 MHz link to the end of the 20 km pipeline) and C2 latency in the avoidance timelineCovered
High-reliability navigationM2Module 2: high-reliability navigation and backup systems, and the example on how much two GNSS receivers helpCovered
Detect-and-avoid functionsM2M5Module 2: the well-clear definition and the avoidance timeline (other aircraft) · Module 5: terrain and ground obstacles along the route (SRTM and Copernicus DEM elevation data, terrain following, ArduPilot and PX4 obstacle avoidance, and Example 3 on a pipeline over a hill and past a high-voltage pylon with the detection range needed to stop in time)Covered
RedundancyM2M5Module 2: redundancy and common-cause failure · Module 5: emergency landing sites, rally points and the battery failsafeCovered
Route and airspace managementM1M3M5Module 1: initial ARC from airspace type and strategic mitigation by height, route and time · Module 3: operational intents · Module 5: emergency landing sites along the routeCovered
UAS traffic management conceptsM3Module 3: operational intents and conflicts, and Remote ID performance requirementsCovered
Risk analysisM1M4Module 1: the traffic-density model and air risk · Module 4: adjacent area, containment, OSOs and evidence gapsCovered
Simulation of BVLOS operationsM2M5Module 2: measuring the system timeline in SITL · Module 5: point of no return and rehearsing a BVLOS mission in SITL with injected eventsCovered

Weekly teaching plan

WeekTopicPre-classLectureLabEvidence
1 M1Initial ARC from airspace typeRead module 1 up to the initial ARC sectionAEC and ARC under SORA, and how BVLOS differs from visual line of sightLab 4 h · Hours 1–2: Worksheet 1 part A, draw the 20 km pipeline on a map or in QGIS · Hours 3–4: check airspace classes and nearby aerodromes in Thailand's AIP and split the pipeline into sections with different airspacePipeline map with airspace classes
2 M1The traffic-density modelRead the traffic-density section; run Example 1The chance of meeting a crop sprayer inside a watch cylinderLab 4 h · Hours 1–2: Worksheet 1 part B, find AEC and initial ARC per section · Hours 3–4: gather low-level traffic data (crop-spraying operators, small airfields, helicopters) with sources and reliability, and run Example 1 on the dataARC by section and traffic data sources
3 M1Strategic mitigation by time of dayRead the strategic mitigation and whole-system BVLOS architecture sections; run Examples 2 and 3; take the module 1 quizFlying only around midday, residual ARC and TMPR · single points of failure in a BVLOS system, in briefLab 4 h · Hours 1–2: Worksheet 1 part C, run Example 2, compare height and time options and summarise residual ARC, TMPR and missing evidence · Hours 3–4: use Example 3 to find the single points of failure for the function "the pilot can command the drone" before and after adding backups, then write the one-page risk summaryOne-page air risk summary, single-point-of-failure table and quiz result
4 M2The well-clear definitionRead module 2 up to 'The well-clear definition'; run Example 1Three aircraft on the display: which one breaks well clearLab 4 h · Hour 1: prepare SITL and the ground station · Hours 2–3: Worksheet 2 part A, inject simulated aircraft over MAVLink and time how long until they appear on the ground station, repeating several times · Hour 4: make the latency table, find the mean and maximum and compare with Example 1Display latency table
5 M2The avoidance timelineRead the avoidance timeline section; run Example 2Required detection range from closing speed and each step's timeLab 4 h · Hours 1–2: Worksheet 2 part B, have each learner decide to avoid when alerted, time them and find the mean and maximum · Hours 3–4: measure the training drone's 90-degree turn time at cruise speed in visual line of sight within CAAT conditions (if weather prevents it, measure in SITL and label the value as simulated)Mean and maximum decision and turn times
6 M2High-reliability navigation and backup systemsRead the high-reliability navigation and long-range C2 link sections; run Examples 3 and 4; take the module 2 quizTwo GNSS receivers and common-cause failure · the C2 link budget and lost link, in briefLab 4 h · Hours 1–2: Worksheet 2 part C, put real values into Example 2, compare with the sensor or ADS-B receiver range and write the DAA limitations · Hour 3: compute the C2 link budget with Example 4 at 5, 10, 15 and 20 km · Hour 4: cut the GCS link in SITL, time how long until the failsafe acts and compare with the configured valueDAA limitations report, C2 link budget table, lost-link test result and quiz result
7 M3Operational intents and conflictsRead module 3 up to operational intents; run Example 1UTM and USS; four operators filing intents for the same morningLab 4 h · Hours 1–2: Worksheet 3 part A, write the pipeline mission's operational intent as area, height and time boxes, as narrow as workable · Hours 3–4: check conflicts against four hypothetical intents with Example 1 and adjust the group's boxesThe group's operational intent
8 M3Resolving intent conflictsReview Example 1 and the operational intent sectionPriority rules and the authority's roleLab 4 h · Hours 1–2: Worksheet 3 part B, have other groups file hypothetical intents and check conflicts · Hours 3–4: agree class priority rules as the authority, resolve the conflicts and file the revised intentConflict table and resolutions
9 M3Remote ID performance requirements; midtermRead the Remote ID section; run Example 2; review modules 1–3; take the module 3 quizMidterm examination (modules 1–3) in the lecture hourLab 4 h (as usual) · Hours 1–2: Worksheet 3 part C, use a broadcast Remote ID receiver app to count messages received in the open and behind a building · Hour 3: compare with Example 2 and summarise real-world limits · Hour 4: gather the results of worksheets 1–3 for the module 4 dossierReceived message table and midterm score
10 M4Adjacent area and containmentRead module 4 up to 'Adjacent area and containment'; run Example 1Adjacent area size, population density and containment levelLab 4 h · Hours 1–2: Worksheet 4 part A, write the dossier's first page as conclusions: SAIL, containment and the mission's limitations · Hours 3–4: compute the training drone's adjacent area with Example 1 and find average population density from open sourcesConclusions page and calculation
11 M4OSOs and evidence gapsRead the OSO section; run Example 2Evidence enough for SAIL III but not for SAIL IVLab 4 h · Hours 1–3: Worksheet 4 part B, build the table of all 17 OSOs, comparing required levels with evidence held and linking source documents · Hour 4: run Example 2 to see which SAIL the evidence supports and where the gaps areOSO table
12 M4A reviewable dossierRead module 4's common mistakes and summary; take the module 4 quizDocument versions, change logs and open issuesLab 4 h · Hours 1–2: Worksheet 4 part C, add versions and change logs to every document and keep a separate open-issues section · Hours 3–4: swap dossiers with another group, time how long the evidence search takes for each conclusion and revise the dossier from the findingsReviewable dossier and quiz result
13 M5Point of no returnRead module 5 up to 'Point of no return'; run Example 1A 6 m/s wind along the pipeline and setting the battery failsafeLab 4 h · Hours 1–2: Worksheet 5 part A, build the pipeline mission in ArduPilot SITL and set the forecast wind · Hours 3–4: compute the point of no return with Example 1 and fly it in SITL to check against the calculationMission file and calculation
14 M5Emergency landing sites along the routeRead the emergency landing section; run Example 2; take the module 5 quizStretches with nowhere to land, and writing contingency proceduresLab 4 h · Hours 1–2: Worksheet 5 part B, add rally points per Example 2 · Hour 3: set the battery failsafe to act before the point of no return and verify it in SITL · Hour 4: write contingency procedures for every anticipated eventMission with rally points, procedures and quiz result
15 M5BVLOS rehearsal and mini-project presentationsPrepare the pipeline mission's dossier and contingency proceduresCourse wrap-up and project criteriaLab 4 h · Hours 1–2: Worksheet 5 part C, rehearse in SITL while the instructor injects events (telemetry loss, fast battery drain, approaching aircraft); the crew follows its written procedures and records times and decisions · Hour 3: debrief after the rehearsal and fix the procedures · Hour 4: mini-project presentationsEvent and decision log, debrief report and presentation, scored with the rubric

Worksheets and instructor guide

One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.

1Worksheet 1 Assessing the pipeline's air risk
Analysis activity · About 12 h of class time · CLO2, CLO1

Objective: Find the initial ARC of each route section, estimate encounter chances, choose strategic mitigations with evidence and find the system's single points of failure

Equipment

  • Map or QGIS
  • Current Thai AIP
  • Python and the module 1 example code

Safety

  • Desk work only; no flying

Steps

  1. Draw the 20 km pipeline and check airspace classes and nearby aerodromes in the AIP
  2. Find the AEC and initial ARC of each section
  3. Ask about or find low-level traffic data, noting source and reliability
  4. Use Examples 1 and 2 to compare height and time-of-day options
  5. Use Example 3 to find the single points of failure for the function "the pilot can command the drone" before and after adding backups
  6. Summarise expected residual ARC, required TMPR and missing evidence

Deliverables

  • Pipeline map with airspace
  • AEC and ARC by section
  • Option comparison
  • Single-point-of-failure table before and after backups
  • One-page summary

Checklist

  • Table 1 covers the whole pipeline from 0 to 20 km with no gaps, and every row names its source (AIP page or section) (Evidence and honesty of the dossier)
  • Every value in Table 2 has a unit, and the edited, runnable code for Examples 1 and 2 is attached (Accuracy of quantitative analysis)
  • Table 3 shows before and after backups as the number of flights in 1,000 that lose command (Accuracy of quantitative analysis)
  • The one-page summary states the expected residual ARC, the required TMPR and a separate list of missing evidence (Evidence and honesty of the dossier)
  • Every traffic data source says who provided it, when, and how reliable it is (Safety and communication)

Instructor guide

Class timing 720 min

  1. Brief the 20 km pipeline case and review AEC, ARC and TMPR60 min
  2. Draw the pipeline, check the AIP and fill in Table 1180 min
  3. Find or ask for low-level traffic data90 min
  4. Run Examples 1 and 2 on the group's options and fill in Table 2150 min
  5. Run Example 3, fill in Table 3 and find single points of failure150 min
  6. Write the one-page summary, answer questions and run the hand-in checklist90 min

Expected results

  1. Record: Table 1 AEC and initial ARC by pipeline sectionTable 1: rural rice-field sections below 500 ft in uncontrolled airspace give ARC-b, sections over villages or urban areas below 500 ft give ARC-c, and any section inside an aerodrome environment in class B, C or D airspace gives ARC-d. A strong table splits sections from the real map and cites the AIP for each one, never applying the lowest section's ARC to the whole route.
  2. Record: Table 2 Comparing height and time-of-day optionsTable 2 (with the lesson's example values: 10,000 km² area, 0-150 m band, 500 m radius ±100 m cylinder, 60 m/s relative speed): 0.5 aircraft gives 0.0144 encounters per flight hour, one every 69 h, 99% chance in 300 h; flying all day 06-18 h gives 0.0235 per hour (every 43 h, 99.9%); flying only 11-14 h gives 0.0077 per hour (every 130 h, 90%), about 3.1 times lower. With the group's own traffic data the numbers change, but the order of the options should not.
  3. Record: Table 3 Single points of failure for "the pilot can command the drone"Table 3 (Example 3's assumed values): before backups every item is in series, P = 0.9632, so 36.8 flights in 1,000 lose command; the computer, generator, C2 radio and the drone's link port are all single points of failure. After adding the UPS in parallel with the generator (0.99995) and LTE in parallel with the radio (0.9985), P = 0.9965, so 3.5 flights in 1,000. The computer and link port remain single points of failure, together about 2.0 flights in 1,000.
  4. Question 1: Does your Table 1 have sections with different initial ARCs? If so, which ARC applies to the whole mission, and how could you plan so the high-ARC section does not raise the whole mission?The mission takes the ARC of its highest section, because the mission's risk is set by its most dangerous part, not the average. Fixes are to reroute or change height in that section, split it into a separate flight with extra mitigation, or restrict flight times there. A strong answer cites rows of the group's own Table 1.
  5. Question 2: Even flying only 11-14 h as in Example 2, what is the chance of at least one crop-sprayer encounter in 300 flight hours? What does that say about the need for tactical mitigation?P = 1 - e^(-0.0077 × 300) ≈ 0.90, about 90%, still very high. Strategic mitigation lowers the chance but never to zero, and BVLOS has no pilot's eyes as a tactical mitigation, so a way to detect and avoid (Module 2) is still needed to meet the TMPR of the residual ARC.
  6. Question 3: Can the comparison in Table 2 be used to lower the ARC straight away? What else is needed before a reviewer will accept it as evidence?Not straight away. The model is for comparing options, not an absolute safety figure. It needs traffic data from a verifiable source (for example named local crop-spraying operators with dates), and the time restriction must be written as a condition in the operations manual, not just an intention.
  7. Question 4: After adding the UPS and LTE link in Table 3, which items are still single points of failure, and if the radio and LTE share a power source or antenna, can you still trust the result? Why?The single ground station computer and the drone's link port remain single points of failure. The calculation assumes independent failures; if the radio and LTE share power or an antenna, common-cause failure greatly reduces the benefit of redundancy (adding LTE but keeping a single generator with no UPS gives about 8.5 flights in 1,000). However good the design, the link can still drop, so lost-link behaviour on board must always be defined.

Discussion questions

  • If local crop-spraying operators will not share data, where else could the group find low-level traffic evidence, and how should the dossier state the uncertainty?
  • Is adding a backup to every part always worth it? Which part should get one first, and which number decides?
  • Once a time restriction is written in the manual, how can anyone check the team really follows it every day?

Adapting to student background

Upper secondary (M.6)
Have them derive P = 1 - e^(-λT) from the Poisson distribution and write the series and parallel formulas by hand before running the code; pair them with a peer who is quick with maps or QGIS.
Vocational certificate
Start by drawing the pipeline and colouring each section by airspace class, then change code values one line at a time from a fill-in table the instructor provides; explain series and parallel with a torch circuit and two bulbs.
Diploma
Extension: add a common-cause beta between the radio and LTE (the Module 2 formula) into Example 3 and find the beta at which the backup barely helps.

Common student mistakes: Common mistakes in the module 1 lesson

2Worksheet 2 Measuring the real system timeline
Lab · About 12 h of class time · CLO1

Objective: Measure each avoidance step on the team's real system, compute the required detection range, assess the C2 link budget and lost link, and assess DAA limitations

Equipment

  • SITL and a ground station
  • Training drone
  • Stopwatch
  • ADS-B receiver or available sensor (if any)
  • The team's C2 radio data (transmit power, antennas, receiver sensitivity)
  • Python and the module 2 example code

Safety

  • Fly the turn measurement within CAAT conditions in visual line of sight; keep people clear
  • Check batteries before flight and store them in fire-safe containers
  • Cut links in SITL only, never on the real drone

Steps

  1. In SITL, inject simulated aircraft over MAVLink and time their appearance on the ground station, repeating several times
  2. Have each learner decide to avoid when alerted; record mean and maximum times
  3. Measure the training drone's 90-degree turn time at cruise speed (if weather prevents it, measure in SITL and label it simulated)
  4. Put real values into Example 2 and compare with the sensor or ADS-B range
  5. Compute the C2 link budget with Example 4 at 5, 10, 15 and 20 km using the team's radio data
  6. Cut the GCS link in SITL, time how long until the failsafe acts and compare with FS_GCS_TIMEOUT and the FS_GCS_ENABLE action
  7. Write the team's DAA and C2 link limitations honestly

Deliverables

  • Timeline step table
  • Required detection range calculation
  • C2 link budget table by range
  • Lost-link test result in SITL
  • DAA limitations report

Checklist

  • Table 1 lists every step from detection to the manoeuvre taking effect and clearly marks each value as measured, simulated or assumed (Evidence and honesty of the dossier)
  • The required range uses the maximum measured times, not the best, and shows both 60 and 90 m/s closing speeds (Accuracy of quantitative analysis)
  • Table 2 has all four ranges (5, 10, 15, 20 km), every value in dB or dBm, and the source of transmit power, antenna and sensitivity figures (Accuracy of quantitative analysis)
  • The 90-degree turn was flown in visual line of sight within CAAT conditions, links were cut in SITL only, and the pre-flight battery check is recorded (Safety and communication)
  • The DAA and C2 limitations report states plainly at least three things the system cannot do (Evidence and honesty of the dossier)

Instructor guide

Class timing 720 min

  1. Safety briefing, SITL set-up and review of the Example 2 timeline60 min
  2. Inject simulated aircraft over MAVLink and time every learner's decision180 min
  3. Fly the 90-degree turn timing with the training drone (or in SITL if weather prevents it)150 min
  4. Compute the required detection range and C2 link budget with the team's data150 min
  5. Lost-link test in SITL90 min
  6. Write the limitations report, answer questions and run the hand-in checklist90 min

Expected results

  1. Record: Table 1 Time of each avoidance timeline stepTable 1: values depend on the real system; without measurements use Example 2: detect and track 8 s, C2 downlink and display 1.5 s, pilot decides 12 s, C2 uplink 0.5 s, manoeuvre takes effect 8 s, total 30 s, so the required detection range is 3.02 km at 60 m/s and 3.92 km at 90 m/s (DMOD 1,219 m); onboard avoidance at 17 s gives 2.24 and 2.75 km. Learners' decision times usually spread widely, so the maximum should be clearly above the mean.
  2. Record: Table 2 C2 link budget by rangeTable 2 (with Example 4's values: 920 MHz, 20 dBm transmit, 6 dBi and 2 dBi antennas, 2 dB cable loss, -100 dBm sensitivity, 10 dB requirement): 5 km FSPL 105.7 dB, received -79.7 dBm, margin 20.3 dB; 10 km 111.7 dB, -85.7 dBm, 14.3 dB; 15 km 115.2 dB, -89.2 dBm, 10.8 dB; 20 km 117.7 dB, -91.7 dBm, 8.3 dB, which fails. The longest range still giving 10 dB is about 16.5 km. With the team's real radio the numbers shift, but doubling the range always adds about 6 dB of FSPL.
  3. Record: Table 3 Lost-link test results in SITLTable 3: the failsafe acts about 5 s after the cut with the default FS_GCS_TIMEOUT of 5 s (accept 4-7 s given hand timing and when the last heartbeat arrived), and the action matches FS_GCS_ENABLE, for example RTL, SmartRTL or Land. At 16 m/s the drone flies about 16 × 5 = 80 m before the failsafe starts. If the action does not match the setting, check FS_OPTIONS and the flight mode in use.
  4. Question 1: Compare the required detection range from your real values with what your sensor or ADS-B receiver can see. What does that say about pilot-over-C2 versus onboard avoidance, and which aircraft can your system not see at all?With the pilot deciding over C2 the system must see about 3-4 km, but many small-drone sensors cannot see light aircraft that far. Onboard avoidance removes the C2 and human steps and cuts this to 2.2-2.8 km. ADS-B only shows aircraft carrying a transmitter; those without, such as many crop sprayers, need ground radar, observers or Module 1's strategic mitigations. A strong answer uses the group's own numbers and names the aircraft it cannot see.
  5. Question 2: Why use the maximum measured decision time rather than the mean? If the maximum decision time is 20 s instead of 12 s, what does the required detection range become at a 90 m/s closing speed?Avoidance must work every time, not on average; using the mean means about half of real events would be slower than designed. With a 20 s maximum decision time the timeline is 38 s, so at 90 m/s the required range is 90 × 38 + 1,219 ≈ 4.64 km (about 3.50 km at 60 m/s), up from 3.92 km.
  6. Question 3: From Table 2, at what range does the team's link fail the requirement? Does raising the antenna mast fix this, why or why not, and what options does the team have?With Example 4's values the link fails at 20 km (8.3 dB margin). Raising the mast from 10 m to 25 m fixes mid-path Fresnel clearance (19.1 m to 26.6 m against 0.6 F1 = 24.2 m) but adds no fade margin, because FSPL depends on distance. Options are a relay station mid-route, LTE as the primary link for the far section, or two flights from both ends. A higher-gain ground antenna requires checking EIRP against the NBTC limits first.
  7. Question 4: From Table 3, how far does the drone keep flying before the failsafe starts, and where must this distance be used in mission planning?About 80 m at 16 m/s with FS_GCS_TIMEOUT 5 s (use the group's measured value). This distance must be included in the contingency volume (UAT 401 Module 4), and the failsafe action, for example RTL, must not take the drone through areas that were not assessed. A strong answer adds that a backup link keeps heartbeats arriving when one link drops.

Discussion questions

  • Does a video feed that still arrives show that the C2 link is sound and the DAA system works? Why?
  • Between cutting human decision time by training and moving avoidance onto the drone, which is more trustworthy for the 20 km pipeline, and what evidence would each need?
  • DO-365 well-clear values were set for larger unmanned aircraft. What goes wrong if the team applies them to its small drone without checking the applicable standard?

Adapting to student background

Upper secondary (M.6)
Have them write R = v × T + DMOD and the FSPL formula, work one row by hand before running the code and predict how much FSPL grows when range doubles; give them the stopwatch and log during the flight to build field experience.
Vocational certificate
Give them the hands-on tasks such as setting up SITL, checking batteries and flying the 90-degree turn under supervision; for calculations use a step-by-step fill-in table and explain dB as adding and subtracting instead of multiplying and dividing.
Diploma
Extension: set up two links in SITL (for example two MAVLink ports), cut them one at a time and show that the failsafe triggers only when both are lost.

Common student mistakes: Common mistakes in the module 2 lesson

3Worksheet 3 Intents and identification in the field
Lab · About 12 h of class time · CLO2, CLO1

Objective: Write operational intents and resolve conflicts, and measure broadcast Remote ID performance in the field

Equipment

  • Pipeline map from worksheet 1
  • Python and the module 3 example code
  • Phone with a broadcast Remote ID receiver app
  • Drone or device broadcasting Remote ID

Safety

  • Fly within CAAT conditions in visual line of sight; keep people clear
  • Do not record or share other operators' Remote ID data received by chance

Steps

  1. Write the pipeline mission's intent as area, height and time boxes, as narrow as workable
  2. Have other groups file hypothetical intents and check conflicts with Example 1
  3. Agree class priority rules as the authority, resolve conflicts and file the revised intent
  4. Count Remote ID messages received in the open and behind a building
  5. Compare with Example 2 and summarise real-world limits
  6. Gather the results of worksheets 1–3 for the dossier

Deliverables

  • Operational intent
  • Conflict and resolution table
  • Remote ID reception table
  • Summary of limits

Checklist

  • Table 1 checks every pair in area, height and time, not just on the map (Accuracy of quantitative analysis)
  • Every resolution cites the priority rule the class agreed, and the revised intent is attached (Evidence and honesty of the dossier)
  • Table 2 has both open and behind-building positions, with the listening window in seconds and the fraction missed computed in every row (Accuracy of quantitative analysis)
  • The flight followed CAAT conditions in visual line of sight, and no other operator's Remote ID data appears in records or screenshots handed in (Safety and communication)

Instructor guide

Class timing 720 min

  1. Brief UTM, operational intents, Remote ID and field safety60 min
  2. Write the pipeline intent, exchange intents with other groups and check with Example 1180 min
  3. Agree priority rules, resolve conflicts and file revised intents120 min
  4. Field session: fly the broadcasting drone and count messages in the open and behind a building210 min
  5. Compare results with Example 2 and write the limits90 min
  6. Gather worksheets 1-3, answer questions and run the hand-in checklist60 min

Expected results

  1. Record: Table 1 Operational intent conflicts and resolutionsTable 1 (with Example 1's data): 6 pairs. OP-A and OP-B conflict at minutes 30-40 and 60-90 m; equal priority, so the authority's rule applies (in class, the agreed rule). OP-A and OP-C conflict at minutes 35-40 and 0-90 m; OP-A has lower priority and must replan. The other 4 pairs are clear because they do not overlap in x or y, even though they overlap in height and time. Groups using their own intents get different pairs, but every pair must be checked in all four dimensions.
  2. Record: Table 2 Remote ID messages receivedTable 2: the minimum expected messages equal the seconds listened (at least 1 per second). In the open few are missed; at 20% loss the 3 s chance is 1 - 0.2³ ≈ 0.992. Behind buildings or trees loss can reach 80%, giving ≈ 0.488 in 3 s and ≈ 0.893 in 10 s; at 50% loss, 0.875 and 0.999. Real values depend on the device and site; if the app counts more than 1 message per second, use the open-air count as the baseline and say so.
  3. Record: Record 3 Real-world limits and results carried into the dossierRecord 3: at least three limits, such as obstacles sharply reducing reception, the need to listen longer behind buildings, a received position that can be about 50 m off at 20 m/s, and that the comparison requirements are American; plus what goes into the dossier: the revised intent, the conflict table and the Remote ID results with the results of worksheets 1 and 2.
  4. Question 1: How did your group narrow its revised intent, and how many conflicts did that remove? If OP-A in Example 1 finishes before minute 30, how many conflicts remain?A strong answer states how much area, height or time was cut and counts conflicts before and after. In Example 1, if OP-A finishes before minute 30 (time 0-30) it no longer overlaps OP-B (30-45) or OP-C (35-60), so conflicts drop from 2 to 0. Intents wider than needed cause more conflicts with others.
  5. Question 2: From the fraction missed behind the building that you measured, what is the chance an officer gets at least one message in 3 s and in 10 s, and how long should the officer listen?Use P = 1 - (fraction missed)^n with n = seconds listened. At 80% loss that is 0.488 in 3 s and 0.893 in 10 s, so the officer must listen longer than 10 s or move into the open. For at least 0.95 in 3 s, loss must stay below about 37%. A strong answer uses the group's own measurement.
  6. Question 3: With the drone at 20 m/s, about how far can the received position be from the true one? What can this data be used for, and what should it not be used for?About 20 × 1.0 + 30.5 ≈ 50 m (1.0 s latency plus 100 ft accuracy). It can identify which drone is over an area and help reach its operator, but should not be used to navigate precisely to the drone or as a substitute for separation between aircraft.
  7. Question 4: The Remote ID requirements used here come from US 14 CFR 89.310. Can your group write them in a Thai dossier as binding requirements? How should they be written?No. US requirements are not Thai requirements. Write them as a reference benchmark for assessing performance, and check the CAAT rules in force on the filing date separately; if no Thai requirement is found, list it as an open issue.

Discussion questions

  • ASTM F3548-21 leaves priority rules open. Was the class's rule fair to small operators, and what should an authority consider?
  • If one operator files a very wide intent early to reserve airspace, how should a UTM system handle it?
  • Between broadcast and network Remote ID, which suits a rural pipeline better, and why?

Adapting to student background

Upper secondary (M.6)
Have them apply the interval rule max(a1, b1) < min(a2, b2) by hand to one pair before running the code and argue why all dimensions must overlap; then give them the Remote ID receiver phone in the field.
Vocational certificate
Have them draw intent boxes on graph paper or the real map and build time bars from coloured strips to see overlaps first, then fill in Table 1; put them in charge of preparing the drone and counting messages in the field.
Diploma
Extension: measure Remote ID reception at several distances from the drone (for example three), plot fraction missed against distance and propose where officers should stand along the pipeline.

Common student mistakes: Common mistakes in the module 3 lesson

4Worksheet 4 A reviewable authorisation dossier
Analysis activity · About 12 h of class time · CLO2

Objective: Produce a dossier in which reviewers quickly find the evidence for every conclusion, with evidence gaps stated plainly

Equipment

  • Results from worksheets 1–3
  • Python and the module 4 example code
  • Open population density data
  • The SORA documents cited in the lesson

Safety

  • Desk work only; no flying

Steps

  1. Write the first page as conclusions: SAIL, containment and limitations of the pipeline mission
  2. Compute the training drone's adjacent area with Example 1 and find average population density from open sources
  3. Build the table of all 17 OSOs comparing required levels with evidence, linked to sources, and run Example 2 to see which SAIL the evidence supports
  4. Version every document with a change log and keep a separate open-issues section
  5. Swap dossiers with another group, time how long reviewers take to find each conclusion's evidence and revise the dossier from the findings

Deliverables

  • Dossier with conclusions page
  • OSO table
  • Open issues list
  • Peer review results

Checklist

  • The dossier's first page gives SAIL, containment and limitations, and every conclusion points to evidence by page or document (Evidence and honesty of the dossier)
  • Table 1 shows the 180 × v_max calculation and the 5-35 km clamp, with the population density source (Accuracy of quantitative analysis)
  • The OSO table in the dossier has all 17 items, claims no higher level than held, and every document has a version and change log (Evidence and honesty of the dossier)
  • There is a separate open-issues section, and Table 3 records the reviewer's time for every conclusion (Safety and communication)

Instructor guide

Class timing 720 min

  1. Review SAIL, containment, OSOs and what a reviewable dossier looks like60 min
  2. Write the conclusions page and compute the adjacent area and population density150 min
  3. Build the 17-item OSO table with evidence links and run Example 2240 min
  4. Add versions and change logs and write the open issues90 min
  5. Swap dossiers for peer review and time it120 min
  6. Revise from the findings, answer questions and run the hand-in checklist60 min

Expected results

  1. Record: Table 1 Adjacent area and containment of the training droneTable 1: if the training drone's maximum speed is 18 m/s like the small quad in Example 1, 180 × 18 = 3,240 m is below the minimum, so 5.0 km applies (16 m/s also gives 5.0 km). Average population density must come from a named open source with its year. Below 5,000 people/km² with no outdoor assembly above 40,000, column 3 of Table 9 (3 m aircraft, sheltering) applies, giving Low containment at every SAIL. A drone under 250 g gets Low with no conditions.
  2. Record: Table 2 OSO evidence gap summary (the full 17-item table is in the dossier)Table 2 (Example 2 as the training case): at SAIL III, evidence of OSO#01 M, #05 L, #13 M and #16 M meets all four. At SAIL IV three fall short: OSO#01 needs H, has M; OSO#05 needs M, has L; OSO#13 needs H, has M; OSO#16 needs M and has M, so it is enough. Groups read the other OSOs' levels from SORA 2.5 Table 14 themselves; check that every row names a versioned evidence document and none claims more than its evidence.
  3. Record: Table 3 Peer review of the dossierTable 3: there is no standard time, so compare between groups. In a good dossier the reviewer reaches the evidence for every conclusion straight from the first page. Any conclusion not found, or found much more slowly than in other groups, is a point to fix, and the fix must be logged in the dossier's change log.
  4. Question 1: If the team switched from the training drone to a 30 m/s VTOL, what would the adjacent area become, and what in Table 1 must be reviewed again?180 × 30 = 5,400 m, so 5.4 km. The average population density and outdoor assemblies must be re-checked over the larger area, because new villages or markets may fall inside it, which can change the Table 9 column and the containment level.
  5. Question 2: Why might a low SAIL need high containment? Explain with Table 9 from Example 1 and say which column the group's pipeline mission falls in.A low SAIL carries few other reliability requirements, so it relies more on keeping the drone in its area. In Table 9 column 1 (dense adjacent area) SAIL I-II need High and III needs Medium, while IV and above are Low. A strong answer names the group's column from its real density data; a pipeline through sparsely populated rice fields usually falls in column 3.
  6. Question 3: If a new route raises SAIL from III to IV, which of the four items in Example 2 fall short, and which is likely cheaper: gathering more evidence or redesigning the route to lower the SAIL?OSO#01 (needs H, has M), OSO#05 (needs M, has L) and OSO#13 (needs H, has M) fall short, for example requiring better operator training, system reliability evidence and evidence for external services such as the mobile network used for C2. Redesigning the route to lower the SAIL is often cheaper, but if the team chooses to gather evidence, the gap must be stated plainly as an open issue.
  7. Question 4: From Table 3, which conclusion took the reviewer longest to find, or was not found, why, and how did the group revise the dossier?A strong answer cites a row of Table 3, gives the cause, such as a conclusion not pointing to a page, an unversioned document or evidence scattered across files, and the fix actually made, such as linking from the conclusions page to the source document, recorded in the change log.

Discussion questions

  • What are the long-term risks to an applicant of hiding open issues to make the dossier look complete, compared with disclosing them?
  • Why does CAAT-GM-UAS-PDRA101 ask for an operations manual, training and an emergency response plan rather than just the drone's specifications?
  • If the reviewer and the author disagree on what evidence level M means, how should it be settled?

Adapting to student background

Upper secondary (M.6)
Give them the adjacent area calculation, population density search and the reading of Tables 9 and 14, which are reading and logic tasks, then have them present why a low SAIL may need high containment.
Vocational certificate
Put them in charge of gathering evidence from the team's real work, such as drone inspection photos, flight logs and maintenance records, and matching it to OSOs one by one with a fill-in table; explain NR, L, M and H with real document examples.
Diploma
Extension: write the training drone's maintenance and pre-flight inspection procedure as a versioned document, then show which OSO evidence it raises and what is still missing.

Common student mistakes: Common mistakes in the module 4 lesson

5Worksheet 5 Rehearsing a BVLOS mission in SITL
Lab · About 12 h of class time · CLO3, CLO1

Objective: Set the point of no return and emergency landing sites, configure failsafes and rehearse written contingency procedures under injected events

Equipment

  • ArduPilot SITL and a ground station
  • Python and the module 5 example code
  • Forecast wind data
  • The team's written contingency procedures

Safety

  • Simulation only; no real flights

Steps

  1. Build the pipeline mission in SITL with forecast wind and compute the point of no return with Example 1
  2. Fly it in SITL and check whether the point of no return matches the calculation
  3. Add rally points per Example 2 and set the battery failsafe to act before the point of no return
  4. Write contingency procedures for every anticipated event
  5. The instructor injects events such as telemetry loss, fast battery drain or an approaching aircraft; the team follows its written procedures
  6. Record the time and decision for every event and compare the drone's behaviour with expectations
  7. Debrief: identify procedures to fix and the limits of simulation compared with real flight

Deliverables

  • Mission file and point-of-no-return calculation
  • Failsafe settings
  • Event and decision log
  • Debrief report

Checklist

  • Table 1 shows both the wind and calm-air calculations, uses wind at flight height and names the forecast source (Accuracy of quantitative analysis)
  • Table 2 shows every stretch of the pipeline is within reach of a landing site and the battery failsafe acts before the point of no return (Contingency procedures and decisions)
  • Written contingency procedures exist for every anticipated event before the rehearsal starts (Contingency procedures and decisions)
  • Table 3 records the time and decision for every injected event, and the debrief names at least one procedure to fix (Contingency procedures and decisions)
  • The debrief clearly separates simulation limits from results that apply to real flight (Safety and communication)

Instructor guide

Class timing 720 min

  1. Brief the rehearsal, set up SITL and review Examples 1-360 min
  2. Build the pipeline mission with forecast wind, calculate and fly to check the point of no return150 min
  3. Add rally points, set the battery failsafe and write contingency procedures150 min
  4. Rehearse the mission with instructor-injected events210 min
  5. Debrief, answer questions and run the hand-in checklist150 min

Expected results

  1. Record: Table 1 Point of no return: calculation compared with SITLTable 1 (with Example 1's values: 700 Wh usable, 20% reserve leaving 560 Wh, 1,200 W, 16 m/s airspeed): with a 6 m/s wind, ground speed is 22 m/s out and 10 m/s back, giving 11.55 km; in calm air 13.44 km. The SITL value should be close; if it differs by more than about 1 km, check whether SITL's real power differs from 1,200 W or the SITL wind direction is wrong. The 20 km pipeline therefore cannot be flown out and back from one point.
  2. Record: Table 2 Emergency landing sites and failsafe settingsTable 2 (with Example 2: sites at 0, 6, 12 and 20 km, 3 km reach): the 15.1-16.9 km stretch has no landing site, worst distance 4.00 km; adding L3 at 16 km brings it to 3.00 km, exactly the limit with no margin. Settings should include every permitted, inspected rally point, RALLY_LIMIT_KM, RALLY_INCL_HOME, BATT_LOW_VOLT or BATT_LOW_MAH and BATT_FS_LOW_ACT (for example RTL or Land), with the battery threshold set to act before the point of no return.
  3. Record: Table 3 Injected events and decisionsTable 3: after a telemetry cut the GCS failsafe acts after about FS_GCS_TIMEOUT (default 5 s), the drone flying about 80 m at 16 m/s before following FS_GCS_ENABLE; a fast battery drain should show the BATT_FS_LOW_ACT action, and on entering RTL the drone heads to the nearest rally point; for an approaching aircraft the team must decide to avoid within the timeline designed in worksheet 2. Every event needs a time and a decision; a good team follows its written procedures without improvising during the event.
  4. Question 1: If the wind at flight height were 8 m/s instead of 6 m/s, what would Example 1's point of no return be? What does that say about using surface wind instead of wind at flight height?At 8 m/s, ground speeds are 24 and 8 m/s and the point of no return falls to about 10.08 km (from 11.55 km at 6 m/s). Wind at flight height is usually stronger than at the surface, so using surface wind overestimates range and the drone may not make it home; recompute daily with wind at flight height.
  5. Question 2: Why is a fixed-percentage battery failsafe not enough for this pipeline? Explain with your Table 2 and the distance to the nearest landing site.The energy that must remain depends on the distance to the nearest landing site, which changes along the pipeline. A fixed percentage may be enough near home but not where sites are far apart, such as 15.1-16.9 km, up to 4 km away before L3 is added. A strong answer links the battery threshold to the point of no return and the reach in the group's Table 2.
  6. Question 3: If your mission flew a constant 60 m above take-off over the hill in Example 3, what would happen, and what does terrain following on SRTM data still miss?A constant 60 m above take-off hits the treetops on the hill: clearance -8.2 m at km 14, because the ground there is about 56 m above take-off. Terrain following on SRTM clears the hill but leaves only 20.0 m above the pylon at km 9, below the 30 m requirement, because a 100 m grid has no trees, pylons or wires; raise the height there or avoid the power line, and survey the route. A sensor seeing 40 m can stop in time only up to about 13.1 m/s; at 16 m/s it would need about 55.7 m.
  7. Question 4: From Table 3, which event did the team handle most slowly or off-procedure, and which SITL results cannot be trusted until tested in real flight?A strong answer cites a Table 3 row, gives the cause of delay, such as an unclear step, overlapping roles or having to look values up, and the fix. SITL results that cannot yet be trusted include real energy use in gusts, radio reception, human response under real field pressure and detection sensor behaviour.

Discussion questions

  • Between splitting the pipeline into two flights from both ends and launching mid-route by vehicle, which adds which risks?
  • How short should a good contingency procedure be to follow under pressure, and who should have the final say?
  • Why can a landing site that is unpermitted or never inspected be more dangerous than having none at all?

Adapting to student background

Upper secondary (M.6)
Have them write the round-trip energy E(d) and solve for d by hand before running the code, and explain why the round-trip average speed is always below calm air; then give them the pilot role in SITL to practise real decisions.
Vocational certificate
Put them in charge of setting up the mission and parameters in Mission Planner or QGroundControl and following procedures during the rehearsal; for calculations, change the wind value in the code one value at a time and log results; explain head and tailwind with cycling.
Diploma
Extension: enable TERRAIN_ENABLE in SITL, fly the mission over hilly ground, compare height above ground with a constant height above take-off and propose a height for the pylon stretch.

Common student mistakes: Common mistakes in the module 5 lesson

Scoring rubric

For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.

CriterionWeightExcellent (4)Good (3)Fair (2)Needs work (1)
Accuracy of quantitative analysis30%ARC, timeline, adjacent area and point of no return all correct; code reproducibleNearly all correct, method shownSome errors or assumed values in place of measurementsMany errors or no method
Evidence and honesty of the dossier25%Every conclusion has traceable evidence; gaps and limits stated clearlyNearly all backed by evidenceSeveral gaps or hidden limitationsClaims without evidence
Contingency procedures and decisions25%Complete procedures, followed on time for every injected event, with a thorough debriefNearly completeSlow responses or procedures missing some eventsNo usable procedures
Safety and communication20%Real flights meet all conditions; reports and presentation clear and conciseNearly completeSome key points missingIgnores safety or does not communicate

Assessment map: CLOs and how they are assessed Draft

The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.

CLOWorksheetsModule quizzes
CLO1 Explain the technologies enabling BVLOS operationsW 1W 2W 3W 5M1M2M3M5
CLO2 Prepare BVLOS authorisation dossiers and risk assessmentsW 1W 3W 4M1M3M4
CLO3 Conduct simulated BVLOS missions with contingency proceduresW 5M5