UAT 453 UAS for Infrastructure, Energy and Utility Inspection

Worksheet 7 A line inspection plan

Analysis activity 4 hAssesses CLO4

Objective

Plan a distribution-line inspection that resolves the smallest required part at a safe distance, with time, batteries, flight sequence and coordination

Equipment and materials

  • Map or satellite image of the line
  • Lab zoom camera data
  • Computer with Python and the module 7 example code
  • Flight plan form

Safety

  • Desk planning; no flights near real lines
  • Chosen take-off points must be clear of lines and safely accessible
  • Real flights always need utility coordination and CAAT approval first

Steps

  1. Take the assigned line and measure it on the map
  2. Agree the smallest part to be seen
  3. Compute stand-off at several focal lengths with Example 1
  4. Choose safe, accessible take-off points; compute time and batteries with Example 2
  5. Write a standard sequence for one tower and a file-naming scheme
  6. List the organisations to coordinate with before real flights

Record of results

Table 1 Focal length and distance
Focal length (mm)Required GSD (mm)Distance (m)Meets the minimum clearance?
Table 2 Take-off points, time and batteries
Line length (km)Reach (km)Take-off pointsMinutes per pointBatteries per pointTotal flying hours
Flight sequence at one tower, file-naming scheme and organisations to coordinate with

Questions

  1. Which focal length did you choose, and why is flying closer for sharper images the wrong choice?

  2. If the smallest part were 8 mm instead of 5 mm, what distance would the 50 mm zoom allow?

  3. How does the computed flying time compare with a real working day, and what does the code not count?

  4. Why have a standard tower sequence and record tower number and phase in the field?

Check before you hand in

What to hand in

  • Line map with take-off points
  • Focal length against stand-off table
  • Time and battery calculation
  • Tower sequence, file naming and coordination list

CLO4 Explain UAS applications in energy and utilities. (CLOs are a web-team draft; the course owner sets the final ones.)

Instructors: answers and teaching notes for this worksheet are in the teaching pack