Teaching pack · UAT 453
A 15-week teaching plan, 15 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.
Coverage of the course description
The lessons fully teach 12 of 12 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.
| Description topic | Modules | Where it is taught | Status |
|---|---|---|---|
| Inspection of buildings, bridges and communication towers | M1M2M3M5 | Module 1: Drones support inspectors, not replace them · Common defects in concrete · Planning inspection of towers and tall structures · Module 2: Inspecting a bridge and its underside · Module 3: 3D models of structures · Module 5: The defect register | Covered |
| Inspection of electrical systems, energy facilities and utilities | M6M7M8M9M10 | Module 6: Assets and what drones can inspect · Module 7: Planning a line-inspection route · Module 8: Comparing with similar components · Module 9: Thermal inspection of solar farms · Wind turbines · Pipelines | Covered |
| Inspection of industrial plants | M11M12M13M14M15 | Module 11: Risk-based inspection · When drones pay off · Module 12: Choosing sensors by damage type · Module 13: Thermal images of conveyor idlers · Rusted area and ASTM D610 grades · Modules 14-15: Severity grading and reporting | Covered |
| Inspection mission planning | M1M6M7M11 | Module 1: From defect size to GSD and distance · Planning inspection at two levels · Module 6: Ranking by risk · Module 7: Planning a line-inspection route · Module 11: Risk-based inspection | Covered |
| Selection of aircraft | M7 | Module 7: Choosing the aircraft for the inspection job (Example 3 screens three models by payload and hover time) and caged drones for confined spaces in Module 11: Flying safely in a plant | Covered |
| Selection of sensors, cameras and payloads | M3M7M12 | Module 3: RGB images for inspection · Thermal images of structures · Module 7: Choosing sensors for what you seek · Zoom cameras and safe distance · Module 12: Choosing sensors by damage type | Covered |
| Image and data acquisition (visual and thermal) | M3M7M8M9M12 | Module 3: RGB images for inspection · Module 7: A standard sequence at each tower · Module 8: Suitable conditions for electrical thermography · Module 9: Thermal inspection of solar farms · Module 12: Standoff and image count | Covered |
| Basic detection of cracks, damage, thermal anomalies and defects | M3M4M8M9M13M14 | Module 4: Measuring crack width from images · AI to triage images · Module 8: Comparing with similar components · Module 13: What is an anomaly? · Thermal images of conveyor idlers · Rusted area and ASTM D610 grades · Module 14: Severity grading | Covered |
| Geolocation | M1M5M12 | Module 12: An asset-based reference system · From pixels to world coordinates (Example 3 position error budget) · Module 1: Before flying (reference system) · Module 5: The defect register | Covered |
| Inspection reporting | M5M10M15 | Module 5: Report contents · Delivering data with hashes · Module 10: Maintenance work orders · Module 15: Report structure · Traceability chain | Covered |
| Risk assessment | M2M6M11 | Module 2: Risk assessment and stop criteria · Module 6: Ranking by risk · Module 11: Risk-based inspection | Covered |
| Safe operations in infrastructure environments | M2M6M8M9M11 | Module 2: Hazards near structures · Minimum stand-off from a wall · Module 6: Hazards specific to energy work · Module 9: Wind turbines (stop and lock the rotor) · Module 11: Flying safely in a plant · Confined spaces | Covered |
Weekly teaching plan
| Week | Topic | Pre-class | Lecture | Lab | Evidence |
|---|---|---|---|---|---|
| 1 M1 | From defect size to GSD and distance | Read the GSD and distance section; run Example 1 | A 1 mm crack over 4 pixels and lens choice | Worksheet 1 part B: agree the smallest crack with the lecturer; compute GSD and stand-off for available lenses | GSD and stand-off per lens table |
| 2 M2 | Minimum stand-off and camera angle | Read the stand-off and camera angle sections; run Examples 1–2 | GNSS versus vision positioning; a 1 mm crack at different angles | Worksheet 2 part B: estimate σ_pos, compute minimum stand-off and photograph a sample crack at 0°, 30°, 45° | Computed stand-off and pixels-by-angle table |
| 3 M3 | Thermal images of structures | Read the thermal section; run Example 1 | Thermal pixel size, timing and telling stains from damage | Worksheet 3 part B: thermal images of the sun-facing wall in the afternoon; mark abnormal areas | Thermal images with notes on anomalies |
| 4 M4 | AI to triage images | Read 'AI to triage images' | TP, FP, FN, precision, recall and the confidence threshold | Worksheet 4 part B: run the lecturer's crack detector on a labelled test set; compute precision and recall at several thresholds | Precision and recall by threshold table |
| 5 M5 | Report contents and data delivery | Read the report and delivery sections; run Example 2; take the module 5 quiz | The six report sections, separating observations from engineering conclusions, and hash manifests | Worksheet 5 part B: write the short report, organise the delivery with a SHA-256 manifest and have another group check it | Short report, delivery set and quiz result |
| 6 M6 | Risk ranking and inspection intervals | Read 'Ranking by risk'; run Example 1 | Likelihood times consequence and setting intervals by risk | Worksheet 6 part B: score likelihood and consequence with facilities staff; rank and set intervals with Example 1 | Risk ranking and interval table |
| 7 M7 | Zoom cameras and safe distance | Read 'Zoom cameras and safe distance'; run Example 1 | Focal length, pixel size and the distance at which a 5 mm pin is still visible | Worksheet 7 part B: compute stand-off at several focal lengths and choose one that is both clear and safe | Focal length against stand-off table |
| 8 M8 | The effect of electrical load | Read 'The effect of electrical load'; run Example 2 | Scaling ΔT from measured load to full load, and the risk of measuring at low load | Worksheet 8 part B: compute ΔT and rate with Example 1; obtain the load and estimate full-load ΔT | Connection ratings at actual and full load |
| 9 M9 | Classifying anomalies and estimating losses | Read 'Estimating losses'; run Example 2 | Failed bypass diodes, hot spots, droppings and shading, and the energy lost | Worksheet 9 part B: capture thermal images above 600 W/m² with paired RGB, classify anomalies and estimate lost energy | Anomaly table with paired images and energy lost |
| 10 M10 | Trends, work orders and asset management | Read 'Trends across inspections', 'Maintenance work orders' and 'Linking with asset management'; run Example 2; take the module 10 quiz | ΔT rising each round, work-order headings and the asset code as key | Worksheet 10 part B: analyse a trend with Example 2, write two work orders and design the asset-management data table | Two work orders and data table, and quiz result |
| 11 M11 | When drones pay off | Read 'When drones pay off'; run Example 2 | Drone, person, contact tool or a mix against shutdown time | Worksheet 11 part B: choose a method per asset and compare time with the shutdown | Method and time table |
| 12 M12 | Standoff and image count | Read the standoff section; run Example 1 | GSD, standoff, overlap and the image grid around a tank | Worksheet 12 part B: compute standoff and the grid; fly it and name files by column and row | Grid image set with file names |
| 13 M13 | Rusted area and ASTM D610 grades | Read the rust section; run Example 2 | Colour-threshold segmentation and converting percent area to grade | Worksheet 13 part B: find anomalies with median and mean; photograph a rusty steel plate | Median versus mean comparison |
| 14 M14 | Corrosion rate and remaining life | Read the corrosion-rate section; run Example 1 | Corrosion rate from multi-year thickness, remaining life and inspection interval | Worksheet 14 part B: compute remaining life and intervals for 5 pipe points over 3 years and rank them | Remaining-life table and ranking |
| 15 M15 | Coverage, limitations and the traceability chain | Read the coverage and traceability sections; run Example 2; take the module 15 quiz | Computing coverage, writing limitations and linking findings to source files and hashes | Worksheet 15 part B: compute coverage, write limitations and swap reports to trace 3 findings | Limitations section, traceability results and quiz result |
Worksheets and instructor guide
One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.
1Worksheet 1 A wall inspection plan
Field/workplace · About 4 h of class time · CLO1
Objective: Turn the smallest defect to see into GSD, stand-off and image counts, then write a one-page wall plan with a location reference
Equipment
- Tape measure or laser rangefinder
- Binoculars
- Camera and lens data for available drones
- Computer with Python and the module 1 example code
Safety
- Ground survey only; no flying
- Stay clear of possible falling material and do not block walkways
Steps
- Pick one wall; measure or estimate width and height
- Agree the smallest crack and pixel count with the lecturer; compute GSD and stand-off per lens with Example 1
- Compute image counts at two resolutions with Example 2
- Survey the wall from the ground by eye or binoculars; mark at least five detail points
- Set a location reference (face, floor, bay) and write a one-page plan
Deliverables
- Wall size and overview
- GSD, stand-off and image count table
- Points of interest
- One-page inspection plan
Checklist
- Table 1 lists every available lens, every value has a unit, and too-close distances are marked
- Table 2 covers both levels using the measured wall size and states the overlap used
- Table 3 has at least five spots, each coded in the location reference system
- The one-page plan states scope, existing information, permissions and notice to building users
Instructor guide
Class timing
- Case briefing, safety at the building and GSD formula review20 min
- Measure the wall and survey it from the ground with binoculars60 min
- Agree crack size with the lecturer; run the Example 1 and 2 code50 min
- Set up the reference system and fill in Table 340 min
- Write the one-page inspection plan50 min
- Short plan presentation, questions and hand-in checklist20 min
Expected results
- Table 1 (if the agreement is a 1 mm crack over 4 pixels with the lesson's 17.3 mm, 5,280-pixel camera): GSD 0.25 mm; the 12.3 mm lens must be 0.94 m away (too close), the 45 mm lens 3.43 m away; both give a 1.32 m × 0.99 m footprint. With another camera or agreement the numbers follow D = GSD·f·Iw/Sw.
- Table 2 (case-study wall 60 × 30 m, 70% overlap): GSD 2.0 mm gives 10.56 × 7.91 m images, 20 × 14 = 280; GSD 0.25 mm gives 1.32 × 0.99 m, 153 × 103 = 15,759. A smaller real wall gives fewer images, but the roughly 50-fold gap between levels remains.
- Table 3: at least five spots such as window corners, joints, water stains, efflorescence, rust stains or spalling, each with a face-floor-bay code and a reason tied to a defect type from the lesson.
- Same GSD and pixel count give the same footprint (1.32 m); what differs is the distance, 0.94 m versus 3.43 m. Choose 45 mm because it stays farther from the wall. A strong answer adds that this distance must still be checked against the module 2 minimum.
- At 0.25 mm GSD and 70% overlap a 2 × 2 m spot needs 7 × 8 = 56 images, five spots 280, plus the 280-image survey makes 560, about 3.6% of 15,759. The risk is cracks too small to show at 2 mm GSD outside the chosen spots, so known risk spots must be added too.
- Contact tasks such as sounding for hollow concrete, measuring steel thickness and coring, and the engineer-inspector's judgement of condition. The plan should say the drone collects images that support the inspectors, not replace them.
- A strong answer gives a code someone can walk to, such as north face, floor 5, bay C3-C4, and notes that a wide image of that bay confirms where each detail image is.
Discussion questions
- If the user asks to 'see every crack on the whole wall', how would you negotiate the scope?
- The pixels across a crack are a project agreement, not an international standard. How does that affect the plan and report?
- Why does notifying building users before flight matter, for both safety and privacy?
Adapting to student background
- Upper secondary (M.6)
- Have them write GSD = w/n and D = GSD·f·Iw/Sw and predict results before running code, and make them the group's unit checker; pair them with a peer confident with measuring tools in the field.
- Vocational certificate
- Start by measuring the real wall and sketching faces, floors and bays, then compute step by step with a fill-in table (mm to m), checking with a calculator alongside the code.
- Diploma
- Extension: plan the 45 m telecom tower of Example 3 with the lab's camera and compare the image count with the wall.
2Worksheet 2 Testing safe distance
Lab · About 4 h of class time · CLO1
Objective: Measure real position wander near a wall, compute minimum stand-off, check camera angle effects and write a risk table with stop criteria
Equipment
- Drone that logs position
- Mock wall or permitted real wall in an open area
- Sample crack or test panel
- Anemometer
- Python and the module 2 example code
Safety
- Fly within CAAT conditions in visual line of sight under lecturer supervision
- Start far (10 m) and close in; stop at once if wander exceeds the limit
- Keep people out from under and around the flight line
- Do not fly when wind exceeds the agreed limit
Steps
- Hover at 10, 6 and 4 m from the wall; record position wander from the log
- Estimate σ_pos and drift speed; compute minimum stand-off with Example 1
- Photograph the sample crack at 0°, 30° and 45°; compare pixel counts with Example 2
- Build the risk table for the teaching-building wall job
- Write at least five stop criteria
Deliverables
- Position wander by distance table
- Computed minimum stand-off
- Pixels by camera angle table
- Risk table and stop criteria
Checklist
- Table 1 has all three distances with wind and any warnings during flight
- Table 2 shows every term of D_min using σ_pos from your own log
- Table 3 has both computed and counted pixels for all three angles
- Table 4 has at least five measurable stop criteria (a number or a clear event)
Instructor guide
Class timing
- Safety briefing, set the cordon and check wind20 min
- Hover at 10, 6 and 4 m and download the log60 min
- Estimate σ_pos and compute the stand-off with Example 140 min
- Photograph the crack at 0°, 30°, 45° and count pixels50 min
- Build the risk table and stop criteria50 min
- Wrap-up, questions and hand-in checklist20 min
Expected results
- Table 1: σ_pos is usually smallest at 10 m and grows near the wall; with GNSS near a wall about 0.3-0.6 m is plausible (the lesson assumes 0.5 m). Real values depend on the drone and site; what matters is the trend and the recorded warnings.
- Table 2 (lesson values r = 0.5 m, k = 3, v = 2.0 m/s, t = 1 s): GNSS σ 0.5 m gives 0.5 + 1.5 + 2.0 = 4.0 m; vision positioning σ 0.1 m gives 2.8 m. Groups substitute σ and v from their log.
- Table 3 (perpendicular GSD 0.25 mm, 1 mm crack): 0° 0.250 mm, 4.0 px; 30° 0.289 mm, 3.5 px; 45° 0.354 mm, 2.8 px. Counted values should be within ±1 px of the computed ones; 45° images should not be used for width.
- Table 4: hazards cover GNSS multipath, compass error near steel, turbulence at corners, sensors blind to glass or thin wires, and people under the flight path. Stop criteria such as gusts above the tested limit, uncommanded drift over 1 m, compass warnings, someone entering the cordon, and anyone may call a stop.
- Usually yes: the wall blocks half the sky and reflected signals (multipath) make positions jump, and rebar disturbs the compass. If not, a strong answer notes the mock wall may lack steel or height.
- With about 4.0 m (GNSS) 3.43 m is not allowed. Options: vision positioning (2.8 m) or a coarser 0.3 mm GSD, which allows 4.12 m with a 1 mm crack spanning about 3.3 px.
- With the lesson's GNSS values: 0.5 + 1.5 + 2.0 × 2 = 6.0 m, 2 m more. Reaction time matters directly; an observer at the side sees the gap better and can call a stop sooner.
- Oblique images suit general survey and 3D models but not crack-width measurement, because at 45° a 1 mm crack spans only 2.8 px, below the level Lee et al. (2026) found unreliable.
Discussion questions
- Why does a pilot standing in front judge distance poorly, and where should the observer stand?
- If stop criteria are agreed but someone hesitates to call a stop in flight, how would you change the team culture?
Adapting to student background
- Upper secondary (M.6)
- Have them explain each term of D_min before flight and compute 1/cos θ by hand before the code; make them the recorder of wind and warnings in flight.
- Vocational certificate
- Focus on the step-by-step approach to the wall and the observer role; give a calculation table where they fill in only σ and v and add the terms one at a time.
- Diploma
- Extension: compare σ_pos in GNSS and non-GNSS modes at 6 m (if the drone supports it and the lecturer allows) and recommend a mode for under bridges.
3Worksheet 3 Three kinds of data for one building
Lab · About 4 h of class time · CLO2
Objective: Collect detailed RGB, thermal images and a 3D model of one building and check the quality of each
Equipment
- Drone with RGB and thermal cameras
- 2 m scale bar
- 3D reconstruction software
- Python and the module 3 example code
Safety
- Fly within CAAT conditions in visual line of sight under lecturer supervision, using the worksheet 2 stand-off
- Go on the roof to place the scale bar only with permission and guard rails
- Do not photograph into occupied rooms; delete identifiable images of people
Steps
- Capture detailed RGB of one wall bay per the module 1 plan, plus locating overviews
- Compute thermal pixel size with Example 1; take thermal images of the sun-facing wall in the afternoon
- Mark abnormal temperature areas and check whether they are stains, paint or damage needing follow-up
- Orbit the building at two heights and build a 3D model with the scale bar on the roof
- Check the scale with Example 2 and record it
Deliverables
- RGB set named by the location reference
- Thermal images with interpretation
- 3D model
- Scale check result
Checklist
- Every detail image has a wide image of the same bay and a file name in the reference system
- Table 2 records the real distance, time and weather of the thermal images
- Every anomalous area has an interpretation and a confirmation method, not a damage conclusion from thermal alone
- Table 3 has the true bar length and the signed percentage error
Instructor guide
Class timing
- Safety briefing, stand-off from worksheet 2 and flight plan20 min
- Capture detailed and wide RGB images50 min
- Compute thermal pixel size and capture afternoon thermal images50 min
- Fly two orbits and place the scale bar50 min
- Build the model, check scale and interpret thermal images50 min
- Wrap-up, questions and hand-in checklist20 min
Expected results
- Table 1: at least 8 images, each detail image paired with a wide one, file names giving face, floor and bay; images sharp from a fast shutter; shaded faces may need higher ISO.
- Table 2 (with the Example 1 thermal camera, 12 µm pixels and 13 mm lens): IFOV 0.923 mrad; at 5 m 4.6 mm per pixel, smallest area about 1.4 cm; 10 m 9.2 mm, 2.8 cm; 30 m 27.7 mm, 8.3 cm. Other cameras use s = (p/f)·D.
- Table 3 (if the 2.000 m bar measures 1.987 m as in Example 2): -0.65%; a 30 m feature reads 29.805 m (-19.5 cm), the 60 m wall -39.0 cm. Group values may differ but must be signed and applied to real building sizes.
- No. At 5 m one pixel is 4.6 mm, so a 1 mm crack is about 0.22 of a pixel, and a visible area must be about 3 × 3 px (1.4 cm). Thermal cameras find sized anomalous regions, not thin cracks.
- A strong answer compares the thermal image with the RGB image of the same spot; if it matches oil, paint or dirt, it may be an emissivity difference. Remaining suspect areas must be confirmed by sounding or another suitable method, never called delamination from thermal alone.
- Use L × e, for example -0.65% gives -19.5 cm. Likely causes are missing control distances or too few oblique and roof images; fix the processing before measuring from the model.
- Delaminated concrete has a thin air gap that blocks heat, so it warms faster in sunshine; there must be sun or a large enough temperature swing. After rain the wet surface reduces contrast, so you might wrongly conclude there is no delamination.
Discussion questions
- How do RGB, thermal and 3D data answer different questions? If you could afford only one for the teaching building, which would you pick?
- Why can ASTM D4788 not be applied to drones directly, and what extra justification is needed?
Adapting to student background
- Upper secondary (M.6)
- Have them compute IFOV and s = IFOV·D by hand and explain delamination with heat-transfer physics; pair them with a confident pilot.
- Vocational certificate
- Give them field tasks such as placing the scale bar and naming files, and a calculation form with units printed in every cell.
- Diploma
- Extension: add a second taped control distance between building corners, reprocess with and without oblique images, and compare scale errors.
4Worksheet 4 Measuring cracks and evaluating AI
Lab · About 4 h of class time · CLO2
Objective: Measure crack width from images with uncertainty, compare with on-site measurement and evaluate a detector with precision and recall
Equipment
- Detail images from worksheet 3
- Crack gauge or scaled magnifier
- Crack detection model and labelled test set from the lecturer
- Python and the module 4 example code
Safety
- Analysis is desk work
- On-site measurement only from the ground or safely reachable points; no climbing on the structure
Steps
- Pick five cracks in the detail images; count spanning pixels; compute width and uncertainty with Example 1
- Measure the same cracks on site with the gauge and compare
- Run the detector on the labelled set; count TP, FP and FN; compute precision and recall
- Estimate inspector workload with Example 2
- Vary the confidence threshold and record how precision and recall change
Deliverables
- Image widths with uncertainty versus on-site
- TP, FP, FN, precision and recall table
- Plot or table by threshold
- Recommended threshold with workload
Checklist
- Every Table 1 row gives width as a range with units and uses GSD/cos θ for tilted images
- All five cracks were also gauged on site from safely reachable spots
- Table 2 has at least two thresholds with TP, FP and FN counted on the labelled set
- The threshold proposal records the model version and threshold for comparison next time
Instructor guide
Class timing
- Review the width and precision/recall formulas; on-site safety briefing20 min
- Count crack pixels at five cracks and compute widths with Example 150 min
- Measure the same cracks on site with the gauge50 min
- Run the detector on the test set and count TP, FP, FN at several thresholds60 min
- Estimate workload with Example 2 and write the threshold proposal40 min
- Wrap-up, questions and hand-in checklist20 min
Expected results
- Table 1 (perpendicular images, GSD 0.25 mm): 3 px = 0.75 mm, range 0.50-1.00 mm (33%); 4 px = 1.00 mm, 0.75-1.25 mm (25%); 8 px = 2.00 mm, 1.75-2.25 mm (12%). For 30° images as in Example 1: 3 px = 0.87 ± 0.29 mm, 5 px = 1.44 ± 0.29 mm, 8 px = 2.31 ± 0.29 mm. Most gauge values should fall inside the ranges.
- Table 2 depends on the lecturer's test set. For example, with 60 real cracks, threshold 0.5 gives TP 54, FP 18, FN 6: precision 0.75, recall 0.90; threshold 0.8 gives TP 42, FP 6, FN 18: precision 0.88, recall 0.70. The pattern to see: a higher threshold raises precision and lowers recall.
- Workload (Example 2 values: 3,000 images, 450 flags, precision 0.60, recall 0.90, 20 s per flag): 270 true, 180 false alarms, about 300 real defects, about 30 missed, 2.5 h to confirm. A strong proposal picks a high-recall threshold and states the review time it accepts.
- The crack spanning fewest pixels, for example 3 px, has about 1/3 or 33% uncertainty; report it as a range such as 0.50-1.00 mm, and if near a severity threshold re-image closer and more perpendicular or have the inspector gauge it on site.
- Most should be inside. If not, likely causes are tilted images without GSD correction, measuring a different point on the crack, blur, or a real GSD different from plan because the flying distance drifted.
- A high threshold gives high precision but low recall, a low one the reverse. Structural work should pick the high-recall threshold, because missing a real defect may endanger users while a false alarm only costs review time.
- About 300 - 270 = 30. Reduce the risk by sampling unflagged images, reviewing every image of critical areas defined by the engineer, and lowering the threshold or retraining if more are missed than expected.
Discussion questions
- Who should decide the results delivered to users, the model or the inspector, and what should be recorded?
- Why is reporting only precision misleading to users?
Adapting to student background
- Upper secondary (M.6)
- Have them show Δw/w ≈ 1/n_px and compute precision and recall from the TP/FP/FN table by hand before the code.
- Vocational certificate
- Make them the on-site gauge readers and pixel counters on a zoomed screen; use a table that builds the range step by step (pixels - 1 and + 1).
- Diploma
- Extension: build a precision/recall table for at least five thresholds, plot it, and choose the threshold with recall at least 0.90, stating the review time.
5Worksheet 5 A short inspection report
Analysis activity · About 4 h of class time · CLO3
Objective: Compile a defect register, summarise by element, write a report separating observations from conclusions and deliver verifiable data
Equipment
- Data and results from worksheets 3–4
- Computer with a SHA-256 tool
- Python and the module 5 example code
Safety
- Desk work only; no flying
- No identifiable images of people in the report or delivery
Steps
- Register each defect with ID, location, type, size with uncertainty, rating and image
- Summarise by element with Example 1 and list urgent items
- Count coverage by target with Example 2, mark each incomplete target as to be re-imaged or unknown, then write the short report in six sections, separating observations from engineering conclusions
- Organise the delivery folder and make a SHA-256 manifest as in Example 3
- Have another group verify the hashes and read the report; record questions it cannot answer
Deliverables
- Defect register
- Element summary and urgent items
- Short report
- Delivery set with hash manifest
- Peer questions and revisions
Checklist
- Every register row has a code, location, size as a range, level and both images
- Level-4 urgent items are flagged separately, not held for the full report
- Table 2 marks incomplete targets as 're-image' or 'unknown', never 'no damage found'
- The report has all six sections and separates observations from engineering conclusions
- The SHA-256 manifest covers every file and was checked by another group
Instructor guide
Class timing
- Review report contents and coverage counting20 min
- Enter defects from worksheets 3-4 in the register50 min
- Summarise by element with Example 1 and count coverage with Example 240 min
- Write the six-section short report60 min
- Organise the delivery folder and make the hash manifest as in Example 330 min
- Swap with another group, check hashes, read, fix and run the hand-in checklist40 min
Expected results
- Table 1: every defect from worksheets 3-4 has a unique code, a reference-system location, a size range such as a crack 0.6-1.2 mm wide and 80 cm long, a level 1-4 and both images.
- Table 2 (with the lesson's example data): deck soffit 3 defects, worst level 4 (D02 urgent); pier P1 2 defects, level 3; railing 1 defect, level 1. 15 images average 2.5 per target, yet only 4/6 = 66.7% have a pair; the mid-span soffit needs re-imaging and the pier cap is unknown.
- Table 3: every file matches; a SHA-256 value is 64 hexadecimal characters. If a file does not match, find who edited it and resend with a new manifest; original images must never be edited.
- Typical questions: which parts were not inspected and why, where on the bridge a crack is, how a size was measured. Good fixes add to the scope, method or limitations sections.
- Depends on the group's data; in the lesson the deck soffit is level 4 from spalling exposing rebar. One severe defect matters more than many minor ones, and averaging would hide the dangerous spot.
- In the lesson example 66.7%. Targets with no images must be written as 'not yet inspected' with the reason and who will inspect next, never 'no damage found'.
- Observation: 'a 0.6-1.2 mm crack on the north face of pier P1'. Engineering conclusion: 'the structure remains serviceable', which only a qualified engineer-inspector may write; pilots and analysts report what they see and measure.
- It proves the file matches the manifest and was not altered after handover, but not that the content is correct; a wrongly measured crack width still has a matching hash.
Discussion questions
- If a level-4 defect is found during flight, who should be told, when, and with what information?
- How can many images make users believe coverage is complete, and how does counting by target fix that?
Adapting to student background
- Upper secondary (M.6)
- Have them write the scope and limitations sections and explain how a hash changes when one byte changes.
- Vocational certificate
- Have them organise folders, name files and run the hash command; give a report template with headings and example sentences.
- Diploma
- Extension: write a script that checks the whole folder against the manifest and reports missing or extra files.
6Worksheet 6 A risk-based inspection plan
Field/workplace · About 4 h of class time · CLO4, CLO6
Objective: Survey campus energy assets, rank risk and set intervals, compute conductor sag and identify hazards with controls
Equipment
- Campus map or satellite image
- Tape measure or laser range finder
- Computer with Python
- Example code at /downloads/uat-453/
- Assumed conductor values from the lecturer
Safety
- Ground survey only; no flying
- Keep clear of lines, transformers and panels; never open panels or climb poles
- Coordinate with facilities staff before entering areas
Steps
- Survey energy assets and list at least five
- Score likelihood and consequence with facilities staff
- Rank and set intervals with Example 1
- Measure or estimate one span
- Compute sag with Example 2 using the lecturer's assumed values
- List each asset's specific hazards and controls
Deliverables
- Asset list with photos
- Risk and interval table
- Sag calculation
- Hazard and control table
Checklist
- Table 1 has at least five assets, with reasons for P and C agreed with facilities staff
- Suggested intervals use the Example 1 rule and say the table is reviewed every year
- Every value in Table 2 has a unit and w and T are marked as the lecturer's assumed values
- Table 3 covers electric fields, thin wires, crash consequences and control-centre coordination
Instructor guide
Class timing
- Case briefing, safety around electrical equipment and staff coordination20 min
- Survey campus energy assets and photograph them60 min
- Score with facilities staff and run the Example 1 code50 min
- Measure or estimate a span and compute sag with Example 240 min
- Write the hazard and control table50 min
- Wrap-up, questions and hand-in checklist20 min
Expected results
- Table 1: at least five assets such as rooftop solar panels, transformers, distribution lines, switchboards or water pipes. The Example 1 rule: R ≥ 12 every 6 months, 6-11 every 12 months, lower every 24 months (lesson: line over farmland R 12 from 12 to 6 months; raw-water pipeline R 6 from 24 to 12 months).
- Table 2 (if the lecturer gives w = 12 N/m and T = 20,000 N as in practice question 2): a 40 m span gives s = 0.12 m, 200 m gives 3.0 m; with Example 2's w = 15 N/m and T = 25,000 N: 250 m 4.69 m, 300 m 6.75 m, 350 m 9.19 m. Mid-span height is the attachment height minus s.
- Table 3: electric and magnetic fields disturbing compass and links (test distances first, keep the owner's clearances), thin wires that cannot be seen, a crash causing a wide outage, hazardous areas in fuel systems, and coordination with the owner's control centre under the current CAAT notification.
- Depends on the group's scores. A strong answer shows high-risk assets get shorter intervals and low-risk ones longer, instead of one interval for everything.
- Sag becomes four times larger because s varies with L² (for example 200 m 3.0 m becomes 400 m 12.0 m with the same w and T). The conductor is lowest at mid-span, so tree clearance is measured there first, not at the tower tops.
- It sags more, because the hot conductor expands and its tension falls. The flight plan must allow for the conductor being lower than computed and never fly under it or close at mid-span.
- A drone falling on a transformer or line may cause a wide outage that affects many users, not just a lost drone. A strong answer names a real asset, such as the transformer feeding a teaching building.
Discussion questions
- Who should score P and C, and why must the table be updated from actual findings every year?
- If the owner allows no flight near the lines at all, what can drone inspection still offer?
Adapting to student background
- Upper secondary (M.6)
- Have them explain s = wL²/(8T) from the parabola shape and predict the effect of a longer span before running the code.
- Vocational certificate
- Let them lead the field survey, photograph and measure spans with the rangefinder; use a P × C grid they can fill in on the spot.
- Diploma
- Extension: add the lesson's case-study assets to the same table and propose how the interval rule should change if more real defects are found than expected.
7Worksheet 7 A line inspection plan
Analysis activity · About 4 h of class time · CLO4
Objective: Plan a distribution-line inspection that resolves the smallest required part at a safe distance, with time, batteries, flight sequence and coordination
Equipment
- Map or satellite image of the line
- Lab zoom camera data
- Computer with Python and the module 7 example code
- Flight plan form
Safety
- Desk planning; no flights near real lines
- Chosen take-off points must be clear of lines and safely accessible
- Real flights always need utility coordination and CAAT approval first
Steps
- Take the assigned line and measure it on the map
- Agree the smallest part to be seen
- Compute stand-off at several focal lengths with Example 1
- Choose safe, accessible take-off points; compute time and batteries with Example 2
- Write a standard sequence for one tower and a file-naming scheme
- List the organisations to coordinate with before real flights
Deliverables
- Line map with take-off points
- Focal length against stand-off table
- Time and battery calculation
- Tower sequence, file naming and coordination list
Checklist
- Table 1 has at least three focal lengths and states the clearance rule used to judge them
- Table 2 uses the line length measured from the map and counts batteries at 20 usable minutes each
- The sequence covers two overall views, zoom on every phase, thermal and the tower base
- The file-naming scheme has tower and phase, and the organisations to coordinate with are listed
Instructor guide
Class timing
- Review GSD, distance and sensor choice by target20 min
- Measure the line on the map and agree the smallest part40 min
- Compute distances at several focal lengths with Example 140 min
- Choose take-off points and compute time and batteries with Example 260 min
- Write the flight sequence, file names and organisation list60 min
- Present the plan, questions and hand-in checklist20 min
Expected results
- Table 1 (5 mm pin over 4 px, zoom camera 6.4 mm sensor and 4,000 px as in Example 1): GSD 1.25 mm; 10 mm zoom allows 7.8 m, 25 mm 19.5 m, 50 mm 39.1 m. If company rules require 30 m from conductors (the lesson's assumed value), only 50 mm works.
- Table 2 (Example 2 values: 0.5 km reach, 5 m/s, 4 towers per km, 60 s per tower): a 12 km line needs 12 points, 10.7 min each, one battery per point, 2.1 h in total; a 2 km campus line needs 2 points, 10.7 min each, about 0.36 h.
- Text: tower sequence (two overall views, zoom on insulators and fittings on every phase from above and the side, thermal of every phase connection, tower base and encroachment), a file name such as L01_T017_PhA_ZOOM_001, and organisations such as the utility owning the line, landowners along the route and permission under CAAT conditions.
- Choose the longest focal length that still gives the GSD, such as 50 mm at 39.1 m. Flying closer adds risk from fields, thin wires and crash consequences, while zoom gives the same detail from a safe distance, needing a fast shutter and light wind.
- GSD 8/4 = 2 mm; distance = 0.002 × 50 × 4,000 / 6.4 = 62.5 m. A larger part allows a greater distance.
- The day is much longer. The code does not count moving vehicles between points, setting up, permission to enter private land and weather, so choosing accessible take-off points matters.
- So every tower's images are complete and comparable with earlier inspections; without tower and phase numbers you cannot compute phase-to-phase ΔT or send technicians to the right place.
Discussion questions
- If a thermal camera is added to the same job, which camera should set the distance?
- What must a drone that passes every condition on paper (Example 3) still prove before real use?
Adapting to student background
- Upper secondary (M.6)
- Have them compute n = ⌈L/2r⌉ and time by hand first, and explain why hover time varies as m^(-3/2) in Example 3.
- Vocational certificate
- Have them draw the line and take-off points on the satellite image and sketch the tower sequence step by step.
- Diploma
- Extension: screen aircraft with the Example 3 code for the lab's zoom camera and propose the test flights needed.
8Worksheet 8 Thermal images of an electrical panel
Lab · About 4 h of class time · CLO5
Objective: Safely thermally image electrical connections, rate them by ΔT, scale to full load and assess environmental effects on the readings
Equipment
- Handheld or ground-based thermal camera
- Load data at measurement time from staff
- Anemometer
- Computer with Python and the module 8 example code
Safety
- Work only under the university electrical staff's supervision
- Image from the distance staff set; never touch or open panels yourself
- Use ground-based cameras; no drone flights near electrical equipment
Steps
- Thermally image a panel or safely reachable connections
- Read the temperature of the same connection type on every phase
- Compute ΔT and rate with Example 1
- Obtain the load and estimate full-load ΔT with Example 2
- Record wind, light and time and explain how they might bias results
Deliverables
- Thermal images labelled by location and phase
- Ratings at actual and full load
- Environmental notes and their effect on error
Checklist
- Every Table 1 row has the image number, phase and a same-type reference phase at similar load
- ΔT and groups computed as in Example 1, with the code output attached
- Table 2 uses the load from the staff and marks full-load values as estimates
- Table 3 records real wind, light and time with the direction of bias
Instructor guide
Class timing
- Electrical safety briefing with staff and camera setup20 min
- Capture thermal images of every phase from the set distance60 min
- Read temperatures and rate with Example 150 min
- Obtain load and estimate full-load ΔT with Example 240 min
- Record conditions and write their effect on error50 min
- Wrap-up, questions and hand-in checklist20 min
Expected results
- Table 1: ANSI/NETA ATS Table 100.18: ΔT 1-3 °C possible deficiency, investigate; 4-15 °C probable deficiency, repair as time permits; over 15 °C major, repair immediately. Lesson examples: 2.5 °C, 0.0 °C, 9.0 °C and 22.0 °C. In a real campus panel most ΔT are below 3 °C.
- Table 2: ΔT_full ≈ ΔT × (1/load)², for example 6 °C at 40% gives about 37.5 °C (Example 2), 4 °C at 50% gives 16 °C, 3 °C at 50% gives 12 °C.
- Table 3: strong wind carries heat away, so ΔT reads low; sun and reflections off shiny metal can read high or in the wrong place; low load gives low ΔT; too great a distance, with few pixels on the connection, reads low.
- Depends on the group's data. A strong answer applies the NETA bands correctly, for example 12 °C is in the 4-15 °C group, repair as time permits, and re-images small ΔT (1-3 °C) from another angle before concluding.
- It can, for example 6 °C at 40% is 'repair as time permits' but about 37.5 °C at full load exceeds the immediate threshold. The estimate ignores cooling that changes with temperature and wind, so it is a warning for priority, not a reported figure.
- Errors from emissivity, distance and wind affect all phases alike, so the difference cancels them; absolute camera temperatures are less reliable.
- Wind lowers ΔT; sun and reflections make interpretation hard. Re-measure at high load, in light wind, early morning or after sunset, recording the load every time.
Discussion questions
- If staff have no load data for the measurement, how useful are the thermal results?
- NETA warns that temperature criteria vary by equipment type. How does that affect the report?
Adapting to student background
- Upper secondary (M.6)
- Have them explain P = I²R and why the current ratio is squared, then compute one connection by hand.
- Vocational certificate
- Have them practise camera settings and picking reading points on the image with staff; hand out the NETA bands as a coloured strip.
- Diploma
- Extension: image the same connection at two distances, compare ΔT and explain the effect of pixels on the connection.
9Worksheet 9 Thermal imaging of solar panels
Lab · About 4 h of class time · CLO5, CLO4
Objective: Image solar panels thermally under correct conditions, classify anomalies, estimate lost energy and prioritise repairs
Equipment
- Drone or mast with thermal and RGB cameras
- Irradiance meter (pyranometer or reference cell)
- Real module power data
- Computer with Python and the module 9 example code
Safety
- Work under the lecturer's and building owner's supervision
- If flying, do so within CAAT conditions in visual line of sight with people clear
- Beware roof edges and sun heat; drink water and wear a hat
- Never touch the modules or solar wiring
Steps
- Compute the maximum height for the thermal camera and cell size with Example 1
- Measure plane-of-array irradiance
- Capture thermal images above 600 W/m² with paired RGB images
- Classify anomalies by the lesson's patterns and find causes from RGB
- Estimate lost energy with Example 2
- Recommend which modules to repair first, with reasons
Deliverables
- Height calculation and irradiance readings
- Paired thermal and RGB images labelled by module
- Anomaly and energy-loss table
- Repair priority recommendation
Checklist
- Table 1 shows the maximum height from the 3 cm per pixel limit and irradiance measured in the plane of the array
- Every thermal image was taken above 600 W/m² with a paired RGB image naming the panel
- Table 2 uses the real module power and states the specific yield used
- The repair proposal says faults must be confirmed electrically before replacement
Instructor guide
Class timing
- Roof and heat safety briefing; compute height with Example 130 min
- Measure irradiance and wait until it exceeds 600 W/m²20 min
- Capture paired thermal and RGB images70 min
- Classify anomalies and find causes50 min
- Estimate lost energy with Example 2 and write the repair order50 min
- Wrap-up, questions and hand-in checklist20 min
Expected results
- Table 1 (Example 1 thermal camera, 12 µm, 13 mm, 640 px): maximum GSD 30 mm, maximum height 32.5 m, ground footprint 19.2 m; 450 W/m² fails, 650 and 900 W/m² pass. Other cameras use H = GSD·f/p.
- Table 2: possible patterns are a single hot cell, a hot substring stripe (bypass diode), a whole hot module or a whole hot string. A failed bypass diode loses one third. Lesson: 60 modules of 550 W lose 11.0 kW, 15,400 kWh/yr, about 53,900 baht/yr; 20 modules of 500 W lose 3.33 kW, about 4,667 kWh/yr (yield 1,400 kWh/kWp/yr, 3.5 baht gives about 16,333 baht/yr).
- Text: a good order ranks by energy lost and overheating risk, for example whole strings or modules first, then diode stripes, then soiling hot cells fixed by cleaning; every item needs technician confirmation by voltage or I-V curve.
- It should be below 32.5 m (for the example camera). Flying higher makes one pixel cover more than 3 cm of the module, so small hot cells are averaged into the background and disappear.
- It must be at least 600 W/m² so modules carry enough current for anomalies to show. If cloud drops it, pause and wait, and record irradiance with every image set.
- A strong answer checks the same spot in RGB: bird droppings, shading or dust are external causes fixed by cleaning or removing shade; sun or drone reflections on the glass are avoided by tilting the camera slightly.
- Thermal images point to suspects, but wind, cloud and reflections can mislead; technicians must confirm by voltage or I-V curve measurement before replacement.
Discussion questions
- How does lost energy in baht help managers decide, and what risk does it leave out?
- How do wind-turbine blade and solar-panel inspections differ in pre-flight safety?
Adapting to student background
- Upper secondary (M.6)
- Have them explain why high current (600 W/m²) is needed from solar-cell physics, and compute H = GSD·f/p by hand.
- Vocational certificate
- Have them measure irradiance and pair thermal with RGB by panel row; hand out printed examples of anomaly patterns to compare.
- Diploma
- Extension: plan a pipeline patrol with the Example 4 code for a real nearby water main and check the height against the current CAAT notification.
10Worksheet 10 From findings to work orders
Analysis activity · About 4 h of class time · CLO6
Objective: Prioritise findings, analyse trends, write maintenance work orders, design asset-management data and present a three-month plan
Equipment
- Findings from worksheets 8 and 9
- Multi-round inspection data from the lecturer
- Computer with Python and the module 10 example code
- Work-order form
Safety
- Desk work; no flying
- Do not share university asset data outside the class
Steps
- Gather findings from modules 8 and 9; score severity and consequence
- Rank them with Example 1
- Pick an item with several rounds and analyse its trend with Example 2
- Write two complete work orders for the most urgent items
- Design the asset-management data table with the asset code as key
- Present a three-month maintenance plan to a classmate playing the manager
Deliverables
- Priority table
- Trend graph and conclusion
- Two work orders
- Data table and three-month plan slides
Checklist
- Table 1 combines findings from worksheets 8 and 9 and uses the Example 1 time-frame rule
- Table 2 uses rounds at similar load and states the trend's limits
- Each work order has asset code and location, finding, action, urgency, safety and post-repair verification
- The data table has the asset code as key, with survey date and load at measurement
Instructor guide
Class timing
- Review the priority matrix and work-order headings20 min
- Gather findings, score them and rank with Example 150 min
- Analyse the trend with Example 240 min
- Write the two work orders50 min
- Design the data table and prepare the three-month plan slides50 min
- Present to the manager, questions and hand-in checklist30 min
Expected results
- Table 1 (lesson example): F01 tower 31 connection ΔT 22 °C scores 9, within 24 h; F03 blade leading-edge erosion and F04 tower 23 connection score 6, within 1 month; F02 60 modules with failed diodes scores 4, within 3 months; F05 missing pipeline marker scores 1, next inspection. The owner must approve the rules before use.
- Table 2: Example 2 ΔT 3, 6, 10 °C at months 0, 6, 12 gives 0.583 °C/month, reaching 15 °C about month 20.9; the practice data 4, 7, 10 °C give 0.5 °C/month, month 22. With the lecturer's data, check that loads are similar every round.
- Text: a good order, for example 115 kV line, tower 31, phase A with coordinates, thermal and zoom images, ΔT 22 °C, load, date and time, inspect and re-torque or replace the clamp within 24 h, needs an outage or bucket truck, re-image after repair. The data table has asset code, date, finding type, value, load, grade and work-order status.
- The top item is severe with high consequence, such as F01. By severity alone, blade erosion (s 2) would tie with the failed diodes (s 2) despite different consequences; multiplying by consequence separates them.
- Schedule the repair in a planned outage before the month it reaches 15 °C (about month 21 for Example 2). With only three points and degradation that often accelerates when hot, a linear trend may overestimate the time left; inspect more often as the threshold nears.
- Often missing: coordinates, load at measurement, safety requirements and post-repair verification. Without them technicians must come back to ask, losing time and possibly bringing the wrong equipment.
- Every inspection must enter the system under the same code to build a continuous history, measure repair outcomes and adjust intervals by risk as in module 6.
Discussion questions
- If the budget allows only one repair this month, how do you choose between the eroded blade and the tower 23 connection?
- How does comparing ΔT across inspections at very different loads distort the trend?
Adapting to student background
- Upper secondary (M.6)
- Have them compute the least-squares slope by hand for one data set and explain the limits of forecasting from three points.
- Vocational certificate
- Have them write work orders on a form with all headings and plot the trend on graph paper before the code.
- Diploma
- Extension: build the data table as a real CSV with three rounds and write code that lists items due within three months.
11Worksheet 11 Drafting a shutdown inspection plan
Analysis activity · About 4 h of class time · CLO7
Objective: Rank assets by risk, choose methods that fit the shutdown, and list permits, hazards and controls
Equipment
- 6–8 assets with repair history from the lecturer
- Computer with Python and example code at /downloads/uat-453/
- Layout of the fictional or partner plant
Safety
- Desk work only; no flying
- On a partner-plant visit, follow the plant's safety rules and wear the required PPE
- Never enter confined spaces
Steps
- Receive the asset list and repair history
- Score P and C with reasons
- Rank with the code in Example 1
- Choose a method per asset (drone, person, contact tool or mix)
- Compare time with the shutdown using Example 2
- List permits, area-specific hazards and controls
Deliverables
- Asset score and ranking table
- Method and time table
- Permits, hazards and controls list
- Shutdown inspection plan
Checklist
- Every Table 1 score has a reason from repair history or consequences for people, environment and production
- Table 2 uses a mixed method where images show only the surface and thickness must be measured
- Table 3 covers the permit to work, energy isolation, vapour or dust hazardous areas and confined spaces
- The plan totals all days and confirms they fit the 21-day shutdown
Instructor guide
Class timing
- Sugar-mill case briefing and RBI principles20 min
- Receive the asset list and score P and C with reasons50 min
- Rank with Example 1 and choose methods50 min
- Compare time with the shutdown using Example 240 min
- Write permits, hazards and controls, then assemble the plan60 min
- Present, questions and hand-in checklist20 min
Expected results
- Table 1 (with the lesson's five assets, bands high ≥ 12, medium 8-11, low < 8): boiler stack 15 high; molasses tank 12 high; boiler drum 10 medium; conveyor idlers 8 medium; warehouse roof 6 low. Extra assets from the lecturer use the same bands.
- Table 2 (60 m stack, Example 2): scaffold and rope access 12 days, 57% of the shutdown, 72 person-days at height, 850 kbaht; drone with targeted rope 2 days, 10%, 4 person-days, 180 kbaht; 68 person-days at height avoided.
- Table 3: a permit to work from the area owner every time, energy isolation or machinery stop, flammable vapour or sugar-dust areas (ordinary drones are not designed against ignition), steel disturbing compass and GNSS, heat and updraught from a recently stopped stack, and confined spaces needing a permit, atmospheric testing and a rescuer at the entrance.
- Conveyor idlers: P 4 but C 2 gives 8, medium, because they are quick to replace and pose little risk to people, so they suit frequent but light inspection.
- Person-days at height avoided matter most, because they reduce risk to people directly, and the shutdown time saved goes to repairing findings; the lower price is a bonus.
- Images show only the surface; UT thickness needs contact with the metal, such as tank walls and pipes. Sweep with the drone for suspect areas, then send people or contact tools only to those spots.
- Opening the access, retrieving a crashed drone and later repair entries still need a written permit, atmospheric testing before entry and a rescuer stationed at the entrance throughout.
Discussion questions
- Who should own RBI decisions, and why does API RP 580 stress a clearly responsible person?
- What risk arises if low-band assets go uninspected for several cycles?
Adapting to student background
- Upper secondary (M.6)
- Have them link R = P × C to probability and consequence and write clear reasons for each score.
- Vocational certificate
- Have them score P from real maintenance experience and use a coloured risk grid on the wall.
- Diploma
- Extension: write a day-by-day schedule for the 21-day shutdown, including the boiler-drum confined-space entry.
12Worksheet 12 Grid image capture and locating spots
Lab · About 4 h of class time · CLO8
Objective: Plan an image grid for the target GSD, capture systematically and locate points on the asset with their error
Equipment
- Drone with camera
- Tape measure and 3 small targets
- Python and module 12 example code
- A campus building wall or water tank
Safety
- Fly within CAAT conditions in visual line of sight under supervision; keep the computed standoff from the wall
- Keep people clear of the flight area and beneath the lanes
- Fix targets from the ground or a stable ladder only; no climbing without equipment
- Inspect batteries before flight; keep them in fire-safe bags or boxes
Steps
- Choose a wall or tank, mark a reference and measure it
- Pick the group GSD; compute standoff and grid with Example 1
- Fly the grid and name files by column and row
- Place 3 small targets and measure their true positions
- Compute positions from the images with Example 2
- Compare the errors and explain causes
Deliverables
- Standoff and grid calculations
- Image set named by grid
- Position error table
Checklist
- Table 1 shows standoff, footprint, columns, rows and image count with units
- Every file is named by column and row, and the grid is complete with no gaps
- Table 3 has all three targets with taped true positions
- The reference mark on the asset is recorded so the mission can be repeated next year
Instructor guide
Class timing
- Safety briefing, battery check and reference marking20 min
- Measure the wall or tank and compute the grid with Example 140 min
- Fly the grid and name files70 min
- Fix three targets and measure true positions30 min
- Compute positions from images with Example 2 and compare errors60 min
- Wrap-up, questions and hand-in checklist20 min
Expected results
- Table 1 (45 MP camera 8,192 × 5,460 px, 4.4 µm pixels, 35 mm lens, tank 20 m diameter and 15 m high, 30% overlap, Example 1): GSD 1 mm, standoff 7.95 m, footprint 8.19 × 5.46 m, 11 columns, 4 rows, 44 images, 32.7° apart; with GSD 2 mm standoff 15.91 m, 6 × 2 = 12 images, 60° apart. A flat wall uses its width instead of the circumference.
- Table 2: the number of files equals the computed columns × rows, named like C7-R2, with no gaps thanks to 30% overlap; images blurred by wind are recorded and re-shot.
- Table 3: Example 2 locates the rust spot at 41.99 m of arc, 240.6°, 6.06 m high. Real targets usually miss by centimetres to a few tens of centimetres, because the formula assumes images square to the wall and exactly where planned; above 0.5 m the method must be fixed.
- A 1 mm GSD puts 2-3 pixels on a 2-3 mm spot. At 2 mm a 2 mm spot is one pixel, and defects smaller than a pixel vanish, even though only 12 images are needed.
- Usually images not square to the wall, the drone off its planned position, and picking the spot in the image; reduce with RTK, measured reference points and perpendicular capture.
- GNSS gives the drone's position, not the spot on the wall, and near steel it can be metres off. In Example 3 ordinary GNSS totals 1.50 m, not enough for a 0.5 m target, while RTK gives 0.08 m; so the asset's reference system comes first.
- Use the permanent reference mark (such as 0° on the north side), the same waypoints, RTK, column-row image codes and the same GSD so images match as closely as possible.
Discussion questions
- Inside a boiler with no GNSS, what would you build the reference system from?
- Why does the emissivity of shiny metal matter if thermal images are added to the same mission?
Adapting to student background
- Upper secondary (M.6)
- Have them compute D = GSD·f/p and the Example 2 position by hand first, and explain the root-sum-square in Example 3.
- Vocational certificate
- Have them mark the reference, fix targets and tape distances, and name files from a pre-printed scheme.
- Diploma
- Extension: re-fly the same grid with the same waypoints and measure how many pixels the two sets are offset.
13Worksheet 13 Anomalies in thermal and rust images
Lab · About 4 h of class time · CLO9
Objective: Find thermal anomalies by group comparison, compute rust grades from images and assess automatic-detection errors
Equipment
- Thermal camera or drone with one
- Several identical units, e.g. fan motors or breakers
- Rusty steel plate
- Python and module 13 example code
Safety
- Image electrical panels from a safe distance with the building electrician opening them; never touch live parts
- Beware of hot surfaces and rotating motor parts
- Ground work; flying not required, and if flown follow CAAT conditions in visual line of sight
Steps
- Take thermal images of identical equipment under load
- Read temperatures and find anomalies with Example 1
- Try the mean instead of the median and explain the difference
- Photograph the rusty plate and segment with a simple colour threshold
- Compute the grade with Example 2
- Check the segmentation by eye and record over-counts and misses
Deliverables
- Temperature table and anomalies
- Median versus mean comparison
- Segmented image and rust grade
- Over-count and miss record
Checklist
- Table 1 has at least six identical items imaged under load, with the time recorded
- Levels in Table 1 use ΔT from the median and the plant's 5 °C and 15 °C criteria
- Table 2 gives percent rusted with the grade from the lesson's D610 table
- Table 3 has at least three eye-checked areas with how to fix the colour threshold
Instructor guide
Class timing
- Safety briefing on panels, hot surfaces and moving parts20 min
- Capture thermal images of identical equipment under load50 min
- Find anomalies with median and mean as in Example 140 min
- Photograph the rusty plate and segment by colour threshold50 min
- Compute the grade with Example 2 and check by eye60 min
- Wrap-up, questions and hand-in checklist20 min
Expected results
- Table 1 (Example 1's 12 idlers): median 41.6 °C, mean 43.9 °C; idler 5 is 21.8 °C above the median, replace at shutdown; idler 10 is 7.3 °C above, monitor; against the mean idler 10 is only 5.0 °C above. Real building equipment is mostly within about 1-2 °C of the median.
- Table 2: Example 2 18,000 of 1,000,000 pixels = 1.80%, grade 5; practice 5,000 of 2,000,000 = 0.25%, grade 7. The group's plate takes its grade from the D610 bands (over 1% to 3% = 5, over 0.1% to 0.3% = 7).
- Table 3: over-counts commonly come from stains, shadows, welds and signs; misses from rust under unblistered paint or poorly lit areas. Fix by tuning the threshold, shooting in even light or manual correction by the inspector.
- In the lesson example 2.3 °C apart. The hot item pulls the mean up, so idler 10 looks more normal (5.0 instead of 7.3 °C) and barely reaches the monitor level; the median is not pulled by outliers.
- Heat from a failing bearing comes from friction while turning under load; stopped equipment is not hot, so you would wrongly conclude all are normal. That is why this mission flies before the shutdown.
- If over-counted or missed areas are large enough to cross a band, the grade changes. A strong answer estimates whether the corrected value stays in the same band and says the segmentation must be sampled before trusting it.
- Software shortlists fast but raises false alarms, misses and lacks context; for example rust near the tank's base weld matters more than high on the wall, so an inspector must confirm and decide.
Discussion questions
- If every item in a set degrades together, what does comparing with the set's median miss, and which other baseline should be added?
- ASTM D610 is written for painted steel. What care is needed applying it to drone images?
Adapting to student background
- Upper secondary (M.6)
- Have them explain median versus mean statistically and write the colour threshold as a mathematical condition.
- Vocational certificate
- Have them take thermal images with the technician and eye-check the segmentation by circling errors on a printout.
- Diploma
- Extension: try three colour thresholds, measure percent rusted at each and pick the one that best balances over-counts and misses.
14Worksheet 14 Severity grading and remaining life
Lab · About 4 h of class time · CLO9
Objective: Grade findings, compute remaining life and intervals, and compare data over time critically
Equipment
- Group findings from module 13
- Pipe thickness data for 5 points over 3 years from the lecturer
- Drone with camera and the module 12 wall
- Python and module 14 example code
Safety
- Fly within CAAT conditions in visual line of sight at the same standoff
- Keep people clear
- Inspect batteries before flight; keep them in fire-safe bags or boxes
Steps
- Grade module 13 findings A–D with reasons from condition and location
- Compute pipe remaining life and intervals with Example 1
- Rank the points to inspect first
- Re-photograph the wall at another time with the same distance and angle
- Compare percent rust with Example 2
- Explain whether differences are real change or come from light and collection
Deliverables
- Graded findings table
- Remaining life, interval and ranking table
- Two-time comparison with interpretation
Checklist
- Every finding has an A-D grade with reasons from both condition and location
- Table 2 computes both rates, uses the higher one, and intervals are no more than half the remaining life
- Second images use the same distance, angle and image codes, with time and light recorded
- The interpretation separates real change from measurement error
Instructor guide
Class timing
- Flight safety briefing; review severity grades and API 57020 min
- Grade findings from worksheet 1340 min
- Compute remaining life for five pipe points with Example 1 and rank them50 min
- Re-photograph the same wall at the same distance and angle60 min
- Compare percent rusted with Example 2 and interpret50 min
- Wrap-up, questions and hand-in checklist20 min
Expected results
- Table 1: grades follow the lesson table, for example the idler 21.8 °C above baseline is B, repair in this shutdown; rust grade 5 on the tank wall is C; rust grade 7 is D; the same rust grade near the base weld should be graded higher.
- Table 2 (minimum 6.0 mm, readings in 2016, 2022, 2026): point 1 as in Example 1 (10.0, 9.1, 8.3 mm) long-term 0.170, short-term 0.200, use 0.200, life 11.5 yr, inspect within 5.75 yr. If the lecturer uses the sample set P2 (10.0, 9.6, 9.3) 44.0 yr, P3 (10.0, 9.4, 8.6) 13.0 yr, P4 (10.0, 9.8, 9.7) 123.3 yr, P5 (10.0, 8.8, 7.4) 4.0 yr, inspect within 2.0 yr; rank P5, P1, P3, P2, P4.
- Table 3 (Example 2): C3-R1 0.20% to 0.25%, grade 7 unchanged, within measurement error; C5-R2 0.40% to 1.80%, grade 6 to 5, worse; C7-R2 unchanged at 0.05%, grade 8; C9-R3 0.90% to 3.40%, grade 6 to 4, about 3.8 times worse, raise to grade B.
- A strong answer names a finding with the same condition but at a highly loaded spot, or one where a leak would do more damage, such as near the base weld, following the RBI principle of module 11.
- Example 1 and P3, P5 in the sample set. A higher short-term rate means corrosion has accelerated recently; use the higher rate for safety and look for the cause, such as a change in boiler feedwater quality.
- With different times and sun angles, shadows can make rust look larger or smaller. A small difference within one grade should be reported as not clearly worse and monitored; a clear grade change with the same light and distance is real change.
- Half the remaining life is 5.75 years, but Class 1 piping has a 5-year maximum in the API 570 interval table; the shorter applies, so within 5 years.
Discussion questions
- Why reprocess old images with the same software version before comparing?
- If the plant owner wants to postpone inspecting point P5 to save money, how would you respond?
Adapting to student background
- Upper secondary (M.6)
- Have them write the corrosion-rate and remaining-life formulas first and explain why half the life sets the interval.
- Vocational certificate
- Have them handle the repeat capture at the same distance and angle, with a fill-in table (subtract, then divide).
- Diploma
- Extension: write code for all five points at once and add the maximum interval by piping class.
15Worksheet 15 Writing a complete inspection report
Analysis activity · About 4 h of class time · CLO9
Objective: Combine the course results into an inspection report that measures detection performance, states coverage and limits, and traces back to source files
Equipment
- Group results from modules 11–14
- Python and module 15 example code
- A hash tool
Safety
- Desk work only; no flying
- Do not share images showing outsiders or partner-plant data
Steps
- Combine modules 11–14 into a report following the lesson structure, executive summary one page or less
- Have another group review the same images
- Compute your group's precision and recall with Example 1
- Compute coverage with Example 2 and write the limitations
- Swap reports, pick 3 findings at random and trace each to its source file and hash
Deliverables
- Complete inspection report
- Precision and recall
- Coverage and limitations
- Traceability check record
Checklist
- The executive summary is one page at most with grade A and B findings, decisions needed, budget and time
- Table 1 has TP, FP, FN from the other group's review and coverage with the unusable image count
- Limitations list areas without images, blurred images and what the method cannot detect, never 'no damage found' for unimaged areas
- All 3 findings traced with hashes and flight logs
- The data appendix records the detector version and settings
Instructor guide
Class timing
- Review the report structure and observations versus assumptions20 min
- Combine modules 11-14 into a draft report and executive summary70 min
- Other group reviews images; compute precision and recall with Example 150 min
- Compute coverage with Example 2 and write the limitations40 min
- Swap reports and trace 3 findings40 min
- Wrap-up, questions and hand-in checklist20 min
Expected results
- Executive summary: one page, A and B findings first, for example idler 5 (B), panel C9-R3 (raised to B), the pipe point with least life left, decisions needed, budget and time frame, with no unexplained jargon.
- Table 1: Example 1 TP 48, FP 12, FN 12 gives precision 80%, recall 80%; practice 40 of 50 gives precision 80% and 40 of 64 recall 62.5%; coverage in Example 2 41/44 = 93.2%, practice 57/60 = 95%. Group numbers depend on the peer review, for example 25 flagged, 20 confirmed and 5 more found gives precision 80%, recall 80%.
- Table 2: a fully traceable finding opens the image, the original file, a SHA-256 matching the manifest and the flight log with time, position and camera settings straight away; any missing step is recorded as untraceable and fixed.
- Recall 80% means about 1 in 5 spots would be missed without review; precision 80% means 1 in 5 flags is false. The report must state that an inspector reviewed every image and record the detector version.
- Example 2: 93.2%. Limitations must list the 2 blurred images and 1 hidden by the stair, propose a visual check from the stair during the shutdown, and state that findings apply to the outer surface only, not the tank floor or inner wall.
- Observation: 'a 1.80% rusted area was found on panel C5-R2'. Assumption: 'probably caused by rainwater collecting at the ring' must be marked unconfirmed, kept apart from observations, with a way to confirm it.
- Often missing: flight logs not kept, or files renamed so the original cannot be found. A matching hash confirms the file is unchanged since recording, not that the interpretation is correct, which comes from transparent methods, qualified inspectors and review.
Discussion questions
- If the plant manager reads only the executive summary, what must be on that page for a sound decision?
- Why does each report version need a version number, date and change log?
Adapting to student background
- Upper secondary (M.6)
- Have them own the limitations section and the precision/recall calculation and explain the numbers to their group.
- Vocational certificate
- Have them own files, hashes and flight logs for traceability, with a report template giving example sentences for observations and assumptions.
- Diploma
- Extension: produce a second report version after the other group's questions, with a change log and new hashes.
Scoring rubric
For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.
| Criterion | Weight | Excellent (4) | Good (3) | Fair (2) | Needs work (1) |
|---|---|---|---|---|---|
| Planning and safety near structures | 25% | Correct GSD, stand-off and angles; stand-off from real data; complete stop criteria applied in practice | Nearly all correct | Some calculations or criteria missing | No plan or unsafe flying |
| Quality of visual, thermal and 3D data | 25% | Images meet planned resolution, named by reference, thermal timed well, scale checked | Usable with minor flaws | Some data missing or below resolution | Data unusable |
| Measurement and anomaly detection | 25% | Crack widths with uncertainty checked on site; AI evaluated with precision and recall; reasoned threshold | Nearly all correct | No uncertainty or no real comparison | Cannot measure or evaluate |
| Reporting and delivery | 25% | All six sections, observations separated from conclusions, traceable register, every hash correct | Complete with minor flaws | Key parts missing or observations mixed with conclusions | No usable report |
Assessment map: CLOs and how they are assessed Draft
The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.
| CLO | Worksheets | Module quizzes |
|---|---|---|
| CLO1 Plan building and infrastructure inspection missions | W 1W 2 | M1M2 |
| CLO2 Acquire and analyse data to detect anomalies | W 3W 4 | M3M4 |
| CLO3 Produce inspection reports to professional standards | W 5 | M5 |
| CLO4 Explain UAS applications in energy and utilities | W 6W 7W 9 | M6M7M9 |
| CLO5 Use thermal and specialised sensors to detect anomalies | W 8W 9 | M7M8M9 |
| CLO6 Propose maintenance support from drone data | W 6W 10 | M6M10 |
| CLO7 Plan risk-based inspection missions for industrial assets and select suitable sensors | W 11 | M11M12 |
| CLO8 Collect quality, traceable visual and positional inspection data | W 12 | M12 |
| CLO9 Detect anomalies, grade severity, compare over time and report inspection results | W 13W 14W 15 | M13M14M15 |