UAT 454 UAS for Surveillance, Monitoring and Security

Worksheet 7 Linking alarms to drone missions in a simulator

Lab 6 hAssesses CLO5

Objective

Turn zone alarms into automatic drone missions, measure real system time and assess operator workload

Equipment and materials

  • Site plan from worksheet 6
  • ArduPilot or PX4 SITL and a ground station
  • Python with a MAVLink library and the module 7 example code

Safety

  • Simulation only; no real flights

Steps

  1. Split the fence into zones and build a zone-to-coordinate table with Example 1
  2. Write a script that takes a zone number and sends a fly-to mission to the SITL drone over MAVLink
  3. Time the interval from zone number to arrival
  4. Compare with the response time computed in module 6
  5. Assess operator workload with Example 2 under different alarm rates

Record of results

Table 1 Zone-to-coordinate table
ZoneZone midpoint along the fence (m)x (m)y (m)Latitude and longitude sent to the drone
Table 2 Measured time from zone number to arrival
Trial and zoneDistance from take-off (m)Measured time (s)Time computed in module 6 (s)Difference and reason
Table 3 Operator workload
CaseAlarms per hourHandling time per alarm (s)Workload (%)

Questions

  1. Why is the time measured in SITL usually longer than the calculated t_launch + d/v? Name the steps the formula leaves out.

  2. From Table 3, on a windy night with 30 alarms per hour, what workload does the operator carry when finding views by hand and with automatic drone verification? What does this tell you?

  3. Why must the zone-to-coordinate table be checked on the real site after sensors are installed, and how?

  4. If the main network fails while the drone is flying to a zone, how should your system behave at the dock and on the drone?

Check before you hand in

What to hand in

  • Zone-to-coordinate table
  • Working script
  • Timing compared with module 6
  • Workload assessment

CLO5 Integrate UAS with cameras, sensors, communications and control centres to detect events and track objects. (CLOs are a web-team draft; the course owner sets the final ones.)

Instructors: answers and teaching notes for this worksheet are in the teaching pack