Teaching pack · UAT 454
A 15-week teaching plan, 10 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.
Coverage of the course description
The lessons fully teach 11 of 11 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.
| Description topic | Modules | Where it is taught | Status |
|---|---|---|---|
| UAS applications to surveillance, monitoring and security | M1M6 | Module 1: Surveillance, reconnaissance and monitoring · From mission to measurable requirements · Module 6: Deter, detect, delay and respond · Response time against the intruder's time · The drone's role in a security system | Covered |
| Surveillance area and route planning | M1M2 | Module 1: Revisit time · Time from event to report · Defining the operating area · Module 2: Four surveillance flight patterns · Swath width and sweep time | Covered |
| Visual and surveillance cameras | M3 | Module 3: EO and thermal cameras · IFOV and ground pixel size · The DORI criteria · Selecting a camera set against requirements | Covered |
| Real-time video transmission | M4 | Module 4: Bit rate, bandwidth and latency · KLV metadata · Locating the frame centre | Covered |
| Object and event monitoring | M2M8 | Module 2: Target tracking · Module 8: Event rules · Combining two sensors · Object tracking · Limits of automatic detection | Covered |
| Surveillance zone designation | M1M7M10 | Module 1: Defining the operating area · Designating zones on the map · Module 7: From alarm zone to coordinates · Module 10: Neighbours' privacy | Covered |
| Operational data recording and management | M4M9 | Module 4: Recording and managing data · Module 9: Storage and retention | Covered |
| Coordination with control centres and ground personnel | M6M7M8 | Module 6: Response time against the intruder's time · Module 7: System architecture · Operator workload · Coordinating with the control room and ground teams · Module 8: Handing a track to the ground team | Covered |
| Situation and risk assessment | M5M6 | Module 5: Assessing the situation: from images to a decision · Module 6: Assessing the security risk | Covered |
| Privacy and data protection | M5M9M10 | Module 5: Privacy in surveillance · Module 9: Storage and retention · Cyber threats to systems with drones · Module 10: Neighbours' privacy | Covered |
| Operations in compliance with regulations and safety requirements | M1M2M10 | Module 1: Defining the operating area · Designating zones on the map · Module 2: Safety limits for the flight: weather, return and landing sites · Module 10: Aviation and communications law · Threats from unknown drones | Covered |
Weekly teaching plan
| Week | Topic | Pre-class | Lecture | Lab | Evidence |
|---|---|---|---|---|---|
| 1 M1 | Surveillance, reconnaissance and monitoring | Read module 1 up to 'From mission to measurable requirements' | Distinguish the three task types and turn the fire mission into questions | Worksheet 1 part A: choose the group's area and write the questions to answer | Three questions |
| 2 M1 | Operating areas, sensitive areas and approvals | Read the operating-area section; take the module 1 quiz | General CAAT conditions and BVLOS guidance | Worksheet 1 part C: four-layer area map and one-page CONOPS | One-page CONOPS and quiz result |
| 3 M2 | Orbits, bank angle and camera depression | Review the steady-turn formula | Trade-offs between radius, detail and image stability | Worksheet 2 part B: loiter command in SITL; compare bank with calculation | Table of calculated versus simulated values |
| 4 M3 | EO and thermal cameras and IFOV | Read module 3 to the IFOV section | Ground pixel size with range; detecting sub-pixel fires | Worksheet 3 part A: prepare test targets and expected values | Expected values at 50, 100, 200 m |
| 5 M3 | Selecting a camera set; midterm | Review modules 1–3; take the module 3 quiz | Midterm examination (modules 1–3) | Worksheet 3 part C: compare test results with calculations | Worksheet 3 report and midterm score |
| 6 M4 | KLV metadata and frame-centre geolocation | Read the KLV and geolocation sections; run Example 2 | Errors from depression angle and uneven ground | Worksheet 4 part B: fly over known targets and compute their positions | Coordinate error table |
| 7 M5 | Mission performance measures | Read module 5 to the measures section; run Examples 1–2 | Ground truth, Pd, precision and the slowest case | Worksheet 5 part A: compute measures from a simulated season log | Measures against requirements |
| 8 M5 | Mini-project presentations | Prepare the whole-course mission report | Course wrap-up and project criteria | Present to park managers and community representatives (role-play); revise the plan | Mini-project report and presentation, scored with the rubric |
| 9 M6 | Response time against the intruder's time | Read the response time section; run Example 1 | Send a guard to look, or the drone first | Worksheet 1 part B: choose two intrusion paths, estimate each step's time and compute response time with and without a drone | Intruder and response time table |
| 10 M7 | System architecture | Read module 7 up to 'System architecture' | The alarm and video integration system and communication requirements | Worksheet 2 part A: split the group's fence into zones and draw the group's system architecture | Zone map and architecture diagram |
| 11 M7 | Operator workload | Read the operator workload section; run Example 2; take the module 7 quiz | How much the drone reduces operator load | Worksheet 2 part C: time from zone number to arrival, compare with module 6, and assess workload at different alarm rates | Timing and workload table, and quiz result |
| 12 M8 | Combining two sensors | Read the sensor combination section; run Example 1 | OR or AND: effect on detection and false alarms | Worksheet 3 part B: have classmates cross the line, loiter and walk in pairs; record detections and compute OR and AND | Detection results and OR/AND table |
| 13 M9 | Storage and retention | Read module 9 up to 'Storage and retention'; run Example 1 | Storage for 30 days of video and retention by purpose | Worksheet 4 part A: compute storage for 7, 14 and 30 days and propose a justified retention period | Storage table and retention policy |
| 14 M9 | NIST CSF 2.0 | Read the NIST CSF 2.0 section; take the module 9 quiz | The six CSF functions for a surveillance system | Worksheet 4 part C: enable MAVLink signing in SITL, try an unsigned command, and write the group's six-function CSF table | Unsigned command result, CSF table and quiz result |
| 15 M10 | Threats from unknown drones | Read the unknown drones section; run Example 2; take the module 10 quiz | Whether the response finishes before the unknown drone arrives, and what the law allows | Worksheet 5 part B: write an unknown-drone response plan and compute timings for detection at 500 and 1,000 m | Response plan with timings, and quiz result |
Worksheets and instructor guide
One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.
1Worksheet 1 Requirements and CONOPS for a surveillance mission
Analysis activity · About 6 h of class time · CLO1, CLO3
Objective: Turn the group's surveillance mission into measurable requirements, compute revisit and write a CONOPS
Equipment
- Map or satellite image of the area (Google Earth or QGIS)
- Computer with Python
- Example code at /downloads/uat-454/
Safety
- Desk work only; no flying
Steps
- Take the area and mission assigned by the lecturer
- Write three questions to answer
- Turn them into at least five measurable requirements
- Draw and measure the route; compute revisit and worst-case time to report
- Map the four area layers and state the approval type
- Write a one-page CONOPS
Deliverables
- Requirements table with numbers
- Calculations with code
- Four-layer area map
- One-page CONOPS
Checklist
- Table 1 has at least 5 requirements, each with a number, a unit and a check method
- Table 2 uses the worst case including confirmation and reporting time, with runnable code attached
- The map shows all four area layers and states the approval type with a reason
- The CONOPS fits one page and names people, equipment, times and data recipients
Instructor guide
Class timing
- Brief the case and assign each group an area and mission30 min
- Write the questions and turn them into measurable requirements75 min
- Draw and measure the route; run Examples 1 and 290 min
- Map the four area layers and state the approval type75 min
- Write the one-page CONOPS60 min
- Short presentations, questions and hand-in checklist30 min
Expected results
- Table 1: at least 5 items, compared with the lesson table, for example detect a fire of 2 m or larger, revisit no more than 30 minutes between 11:00 and 17:00, ignition to report within 30 minutes, coordinates within 50 m, and the data delivered. A requirement with no number, such as detect quickly, does not pass.
- Table 2 (numbers depend on the group's route; with the lesson's 30 km ridge route at 18 m/s): one circuit 27.8 min, 72 usable minutes per flight (2 full circuits); one aircraft worst case 27.8 + 3 + 2 = 32.8 min fails, two aircraft 13.9 + 5 = 18.9 min meets, three aircraft 14.3 min. Accept rounding within ±0.1 min.
- Box 3: target area, operating area (including transit from take-off), prohibited or restricted areas, and privacy-sensitive areas (villages, trail). A route beyond visual line of sight needs specific BVLOS approval under CAAT-GM-UAS-PDRA101; flying within sight, by day, no higher than 90 m falls under the general conditions. The CONOPS names people, equipment, times and data recipients.
- The time left to wait is 30 - 3 - 2 = 25 min, so n ≥ 27.8 / 25 = 1.11, rounded up to 2 aircraft (lesson route figures). A strong answer also offers alternatives, such as shortening the route to the high-risk ridges or adding fixed lookouts.
- The average wait is half a circuit, so one aircraft gives 13.9 + 5 = 18.9 min and appears to pass, but a fire starting just after the drone passes waits 32.8 min. The requirement applies to every event, so the average underestimates the time and leads to buying too few aircraft.
- A strong answer points to real places on the map (villages, the trail used to gather forest products) and sets restrictions from the start: no zooming or detailed recording without need, lowering height or moving the line so villages fall outside the buffer (in the lesson, at 90 m the outer limit is 213.2 m and village B at 200 m is inside; at 60 m it is 183.2 m, so it is outside), and drawing an exclusion fence in the autopilot.
- VIIRS has 375 m pixels, passes only a few times a day, near-real-time data arrive within about 3 hours, and cloud, smoke or canopy can hide a fire. It suits telling the drone where to check. A strong answer adds that no hotspot does not mean no fire and that the source data time must be recorded.
Discussion questions
- If the budget buys only one drone, how would the group change the requirements or the plan, and who should decide?
- Which of your requirements is hardest to measure in the field, and how would you collect evidence?
- How is defining sensitive areas at the start different from fixing things after a complaint?
Adapting to student background
- Upper secondary (M.6)
- Have them derive T = L/(nv) and why the worst case equals a full circuit before running the code, then measure the route on the real map themselves for hands-on practice.
- Vocational certificate
- Start by drawing and measuring the route on the map, then compute step by step with a fill-in table (km to m, divide by speed, divide by 60), checking with a calculator alongside the code.
- Diploma
- Extension: compute the buffer outer limit as in Example 3 for communities near the group's route and propose leg-by-leg flight heights with their effect on swath.
2Worksheet 2 Flight patterns and tracking in simulation
Lab · About 6 h of class time · CLO1, CLO2
Objective: Plan flight patterns, test orbits in SITL and experiment with an alpha-beta filter
Equipment
- ArduPilot SITL and a planner (Mission Planner or QGroundControl)
- Python and the module 2 example code
Safety
- Simulation only; no real flights
Steps
- Choose main and backup patterns with reasons
- Compute swath and flight time against requirements
- Build a route mission and loiter command in SITL
- Record bank angle and height from the log; compare with calculations
- Try three α/β settings in Example 2; record the reacquisition residual
Deliverables
- Mission files
- Calculated versus simulated table
- Short report on the α/β trade-off
Checklist
- Table 1 includes swath, sweep time, bank, period, depression and slant range, all with units
- Table 2 has all 3 settings (0.5/0.2, 0.8/0.5, 0.2/0.05) with the reappearance residual for each
- The main and backup patterns cite at least one requirement from worksheet 1
- The mission file stays inside the approved area, with screenshots of the route and loiter command
- The α/β report ends with a one-sentence conclusion on which setting to use
Instructor guide
Class timing
- Objectives; review swath and orbit formulas30 min
- Choose patterns and compute with Example 175 min
- Build the route mission and loiter command in SITL105 min
- Read the log and compare with calculations60 min
- Vary α/β in Example 2 and write the short report60 min
- Wrap-up, questions and hand-in checklist30 min
Expected results
- Table 1 (with the lesson's 640-pixel, 12 µm, 13 mm thermal camera at 120 m and 18 m/s over an 8 × 5 km area with 20% overlap): HFOV 32.9°, swath 70.9 m, 89 lines, 712 km, 11.0 h; a 300 m orbit needs 6.3° bank, 104.7 s period, 21.8° depression, 323.1 m slant range. Accept SITL bank within about ±2° of the calculation and height swinging a few metres, because of simulated wind and control.
- Table 2 (Example 2 fire-truck data): 0.5/0.2 speed at t = 5 s about 7.95 m/s, prediction 69.9 m, residual 2.5 m; 0.8/0.5 about 8.11 m/s, prediction 72.7 m, residual -0.3 m; 0.2/0.05 about 4.14 m/s, prediction 39.8 m, residual 32.6 m. Accept rounding within ±0.1.
- Box 3: the main pattern should be route or perimeter patrol for a large area, switching to an orbit on finding a hotspot. The backup has a reason, such as use in strong wind or when one aircraft is down. Every pattern change stays inside the approved area.
- No. A full sweep takes about 11 h against a 30 min requirement (lesson figures). A strong answer flies the risk lines and tilts the camera to look far, or splits the area among several aircraft, and notes that tilting enlarges far-edge pixels.
- At 150 m: bank 12.4° (from 6.3°), period 52.4 s, depression 38.7°, slant range 192.1 m. The view is closer and clearer, but the image swings more, the gimbal must compensate more, noise for people below increases and the target is more easily lost.
- 0.5/0.2 is the balance: a 2.5 m residual is small enough to keep the same truck. 0.8/0.5 keeps up fastest (residual -0.3 m) but follows noise and shakes the camera. 0.2/0.05 is smooth but slow, estimating only about 4 m/s, so its prediction at reappearance is 32.6 m off and it may lock onto the wrong vehicle. A strong answer quotes the group's own numbers.
- Acceptable reasons: simulated wind, the autopilot not flying exactly the set radius, actual speed differing from the setting, the entry and exit of the orbit, different height references (home or sea level) and the log rate.
Discussion questions
- Between a close view, a steady image and noise for people below, how would the group choose the orbit radius?
- Who should decide which target to track, and why should the software not choose?
- Is the maximum wind the guidance permits always safe for our aircraft? (See Example 3.)
Adapting to student background
- Upper secondary (M.6)
- Have them step the alpha-beta filter by hand for the first two steps before running the code and explain how tan φ = v²/(gR) comes from the force balance, then let them drive SITL themselves for hands-on experience.
- Vocational certificate
- Focus on building the SITL mission first, then fill Table 1 row by row from the code output; explain α/β with a plot of measured against predicted position rather than equations.
- Diploma
- Extension: compute the largest headwind that still allows a return within the reserve, as in Example 3, for the group's route, and set the return-to-launch parameters in SITL to match.
3Worksheet 3 Working-range test of EO and thermal cameras
Lab · About 6 h of class time · CLO1
Objective: Measure real pixel density on targets against calculations and conclude each camera's detection range
Equipment
- Drone or tripod with EO and thermal cameras
- 1 m target board
- Tray of hot charcoal or a controlled heat source
- Tape measure or GNSS
- Fire extinguisher
Safety
- The lecturer supervises the heat source; extinguisher ready
- Fly within CAAT conditions in visual line of sight; keep people clear
- Do not capture outsiders at identification level
Steps
- Compute IFOV and pixels on target at 50, 100, 200 m
- Set up targets and measure distances
- Record EO and thermal images at each distance
- Count pixels on targets in the real images
- Compare with calculations and conclude detection ranges
Deliverables
- Calculated versus measured table
- Test images labelled by distance
- Conclusions and reasons for differences
Checklist
- Table 1 covers 50, 100 and 200 m with units, with code attached
- Table 2 has EO and thermal at every range, and every test image is labelled with its range
- The conclusion selects cameras by the sufficient level of detail, not the highest resolution
- A safety record covers the heat source and extinguisher, and no outsider appears at identification level
Instructor guide
Class timing
- Safety briefing; set up the heat source and extinguisher30 min
- Compute IFOV and pixels on target with Examples 1 and 260 min
- Set targets, measure ranges and record EO and thermal images at each range120 min
- Count pixels on targets and fill in Table 275 min
- Conclude detection ranges, explain differences and pack up45 min
- Questions and hand-in checklist30 min
Expected results
- Table 1 (with the lesson's 640-pixel, 12 µm, 13 mm thermal camera and 60°, 1,920-pixel wide EO camera): IFOV 0.923 mrad; at 50 m the ground pixel is 0.046 m, a 1 m target covers 21.7 pixels, EO 33.3 px/m (detect); at 100 m 0.092 m, 10.8 pixels, EO 16.6 px/m; at 200 m 0.185 m, 5.4 pixels, EO 8.3 px/m (below detect). If the lab's cameras differ, compute from their own specifications.
- Table 2: counts should be close to the calculation; accept about 10-30% fewer (focus, shake, compression, blurred target edges). The charcoal should still show in the thermal image at every range, while sign detail in the wide EO image fades with range. If the difference exceeds 50%, check that slant range and the camera values are correct.
- Box 3: states the range at which the charcoal is still detected and at which the sign still shows detail, with at least two reasons for differences from the calculation, and proposes a camera set from the task (thermal to find, EO zoom to confirm).
- Causes: soft focus, shake from wind or the gimbal, video compression, target edges only partly filling pixels, using horizontal distance instead of slant range, the sign not facing the camera squarely, and a real focal length different from the stated one.
- Use the slant range √(60² + 100²) = 116.6 m, so the thermal camera gives 9.3 pixels on a 1 m target instead of the 10.8 pixels from the 100 m horizontal distance. Using horizontal distance overestimates resolution.
- Fire or charcoal is much hotter than the background, so a pixel only partly filled is still clearly brighter than its neighbours; detection relies on temperature contrast. Seeing detail on the sign depends on pixels on target, which is why DORI does not apply to fire.
- Detect, 25 px/m, is enough; nothing higher is needed. The 60°, 1,920-pixel wide EO camera reaches this to about 66.5 m (1,920 / (25 × 2 × tan 30°)); beyond that the EO zoom is needed. Not aiming for identification also reduces the privacy burden.
Discussion questions
- If flights are needed at dawn in thick haze, which camera would the group make primary, and what would it give up?
- What privacy cost comes with choosing the highest-resolution camera just in case?
- Long zoom lenses are sensitive to shake; how would you check that the calculated resolution holds on the drone?
Adapting to student background
- Upper secondary (M.6)
- Have them explain how IFOV = p/f relates to the full field of view and compute the range for each DORI level themselves, then take charge of setting targets and measuring distances in the field.
- Vocational certificate
- Start with taking real images and counting pixels on screen, then compare with the code output; use a worksheet with the formulas laid out for step-by-step substitution.
- Diploma
- Extension: add tests at two flight heights, compare slant against horizontal range, and measure how zoom affects image shake.
4Worksheet 4 Streaming, geolocation and data management
Lab · About 6 h of class time · CLO2, CLO3
Objective: Measure latency, locate targets from metadata and manage data traceably
Equipment
- Drone or training rig streaming to a ground station
- On-screen stopwatch
- Targets surveyed with GNSS
- Computer with a SHA-256 tool
Safety
- Fly within CAAT conditions in visual line of sight
- Do not share images showing outsiders
Steps
- Film the stopwatch and compare with the screen to measure latency
- Try three bit rates and observe quality
- Fly over known targets; compute positions from the log and camera angles
- Measure the error
- Organise folders as in the lesson; compute and check SHA-256
Deliverables
- Latency and bit-rate table
- Coordinate error table
- Data folder with hash file
Checklist
- Table 1 has at least 5 latency trials and all 3 bit rates, with units
- Table 2 computes coordinates with Example 2, and every target's error is in metres
- Originals are separate from working copies, named as in the lesson, with a hash file
- No outsiders appear in submitted files, and the flight stayed within CAAT conditions in visual line of sight
Instructor guide
Class timing
- Briefing on flight safety and handling images of people30 min
- Measure latency with the stopwatch and try three bit rates75 min
- Fly over the surveyed targets90 min
- Compute positions from the log and measure the error75 min
- Organise folders; compute and check SHA-25660 min
- Wrap-up, questions and hand-in checklist30 min
Expected results
- Table 1: latency depends on the real equipment; compare with the lesson's 350 ms budget. Measurement precision is limited by the frame interval (about 33.3 ms at 30 fps), so take several trials and use the median. Data per 10 min: 2 Mb/s 0.15 GB, 4 Mb/s 0.30 GB, 6 Mb/s 0.45 GB (a full 72 min flight 1.08, 2.16, 3.24 GB). At low bit rates the image breaks into blocks on fast pans.
- Table 2: the lesson example (18.90° N 98.80° E, 120 m, depression 21.8°, azimuth 45°) gives 300.0 m, 212.1 m north, 212.1 m east, at 18.901906, 98.802014. If the class flies at 60 m with 30° depression, the distance is 103.9 m and a 1° depression error moves it about 4 m. Measured errors of about 5-20 m are reasonable (including the drone's GNSS error and timing), and should be within the 50 m requirement.
- Box 3: file names as date_sortie_camera, such as 2026-03-14_S2_EO.mp4; originals separate from working copies; log and metadata included. SHA-256 before and after copying must match character for character.
- A 350 ms budget is fine for watching but not for using live video to avoid obstacles, which needs much lower latency. A strong answer quotes the group's measured value and treats the two uses separately.
- At 120 m and 21.8° depression the error is +15.9 m or -14.6 m; at 60 m and 30°, about ±4 m. Because d = h/tan δ, tan changes quickly with angle when δ is small: at 5° depression from 120 m (about 1,372 m away) a 1° error moves the point about 230-345 m. On mountains a terrain elevation model is also needed.
- About 18 × 1 = 18 m along the flight direction (0.2 s gives about 3.6 m). Every value can be correct and the coordinates still wrong if the times do not match, so metadata must be synchronised with the video frames.
- Matching hashes show the copy is identical to the original byte for byte, which later shows the files in a report were not altered. If they differ, treat the copy as damaged or altered, copy again from the original, record what happened, and never edit the original.
Discussion questions
- If the mobile network in the forest drops in and out, how should the mission keep working?
- Who should be allowed to open zoomed imagery that may show people, and how is access recorded?
- How short should retention be for imagery with no incident, and who decides?
Adapting to student background
- Upper secondary (M.6)
- Have them convert Δφ = d cos ψ / R_E to degrees themselves and explain why longitude divides by cos φ₀, then let them set the targets and survey them with GNSS in the field.
- Vocational certificate
- Focus first on connecting the camera, measuring latency and organising folders; use Example 2 by changing only the numbers at the top of the file, and sketch the side view of height and depression before computing.
- Diploma
- Extension: test sending still images with coordinates at intervals when the signal is weak, and measure how many seconds they take to reach the ground station.
5Worksheet 5 Mission results report and privacy impact assessment
Analysis activity · About 6 h of class time · CLO2, CLO3
Objective: Evaluate the mission against requirements and assess privacy impact
Equipment
- Simulated fire-season log from the lecturer
- Python and the module 5 example code
Safety
- Desk work only; no flying
Steps
- Compute Pd, precision, false-alarm rate and time to report
- Compare with worksheet 1 requirements and check the slowest case
- Write a one-page privacy impact assessment
- Present in the roles of park managers and community representatives; revise the plan
Deliverables
- Mission results report
- Privacy impact assessment
- Presentation slides
Checklist
- Table 1 has Pd, precision, false-alarm rate and time to report, each with formula and unit
- Table 2 marks every case over the requirement with a reason, not just the average
- The privacy assessment states who might be recorded, the highest detail, retention and access
- The slides answer park managers' and community representatives' questions and list the plan changes
Instructor guide
Class timing
- Brief the simulated log and the presentation roles25 min
- Compute the measures with Examples 1 and 275 min
- Compare with requirements and analyse the slowest cases60 min
- Write the privacy impact assessment80 min
- Present to park managers and community representatives75 min
- Revise the plan, answer questions and run the hand-in checklist45 min
Expected results
- Table 1 (numbers depend on the lecturer's log; with the lesson's Example 1 data, 40 real fires, 34 found, 6 missed, 16 false alarms, 120 h flown): Pd = 34/40 = 85%, precision 34/50 = 68%, false-alarm rate 16/120 = 0.13 per flight hour (about one every 7.5 h); time to report mean 20.2 min, median 18.5 min, 8 of 10 within 30 min (80%).
- Table 2 (Example 2 data): the cases over 30 min are 31 and 40 min, both on days when only one drone flew because the other was under repair, matching module 1 where one aircraft's worst case is 32.8 min.
- Box 3: names who might be recorded (hikers, mushroom and forest-product gatherers, people of the two villages); the default is the thermal camera and wide EO, with zoom no higher than recognise (125 px/m) and only to confirm a fire or people's safety, never identify without a legal reason; imagery with no incident deleted on schedule, fire imagery kept as needed; access only for staff with a duty, with every zoom logged; cites the Personal Data Protection Act B.E. 2562 (2019).
- No. The requirement applies to every event, and the slowest case of 40 min exceeds 30 min (example data). A strong answer links the cause (one aircraft flying) to module 1 and uses it as evidence for a spare aircraft.
- 0.13 per flight hour, about one every 7.5 h. If it rises, staff stop trusting alarms. Most false alarms came from metal roofs and rocks heated in the afternoon, so add an EO confirmation step before reporting, or record known heat sources.
- The no-fire, no-alarm cell cannot be counted because area surveillance has no clear counting unit, so overall accuracy has no meaningful value. Pd shows what was missed, precision shows how trustworthy alarms are, and ground truth is needed to know the misses.
- A strong answer picks the lowest level that answers the question (for example recognise only to confirm), justifies it with purpose limitation, minimisation and proportionality, and prevents function creep by logging who ordered each zoom and why, internal sampling of the log and telling the community in advance.
Discussion questions
- If community representatives ask that the drone never fly over the forest trail, how would the group negotiate while keeping fire safety?
- If imagery shows someone lighting a fire, what should the operator do and not do?
- How should a projection of when the fire reaches the village report its uncertainty? (See Example 3.)
Adapting to student background
- Upper secondary (M.6)
- Have them build the TP, FP and FN table from raw data before using the code and explain why TN cannot be counted, then play the community representative to see the issue from those affected.
- Vocational certificate
- Have them tally the log by ticking a printed 2 × 2 table, then substitute into the formulas; write the privacy assessment from a form with 4 guiding questions.
- Diploma
- Extension: project the fire's arrival at the village as a range, as in Example 3, from the log data, and write a one-page situation report giving the fast case and the decision.
6Worksheet 6 Analysing intrusion paths and response time
Analysis activity · About 6 h of class time · CLO4
Objective: Compare response time with the intruder's time on a real site and find the dock location that adds most margin
Equipment
- Real plan of a campus building or store
- Python and the module 6 example code
- Stopwatch for the site walk
Safety
- Desk work and site walk only; no flying
- Get the site owner's permission first and do not share maps of real weaknesses
Steps
- Mark assets, fences, doors, cameras and possible dock sites on the plan
- Choose two intrusion paths and estimate the intruder's time per step
- Compute response time with and without a drone using Example 1
- Find the best dock location using Example 2
- Propose the one improvement that adds most margin and say whether it is detection, delay or response
Deliverables
- Annotated site plan
- Intruder and response time table
- Dock location with reasons
- Improvement proposal
Checklist
- Table 1 has 2 intrusion paths, and every step has a time and the source of its estimate
- Table 2 includes dock opening and take-off in response time, with runnable code attached
- The improvement is labelled detection, delay or response, with the seconds of margin it adds
- The site owner gave permission before the walk, and the submitted plan does not publish real weaknesses
Instructor guide
Class timing
- Brief detect, delay and respond; confirm the site owner's permission30 min
- Site walk and timing of intruder steps90 min
- Mark elements on the plan and choose intrusion paths60 min
- Compute response time and dock location with Examples 1 and 290 min
- Write the improvement proposal60 min
- Short presentations, questions and hand-in checklist30 min
Expected results
- Table 1: numbers depend on the real site, but each step needs a source, such as a timed walk or the lesson's values (cut fence 60 s, run 150 m 30 s, force door 120 s, total 210 s), and cumulative time starts from the detection point, not from the start of the walk.
- Table 2 (with Example 1 values): option A, guard walks 400 m at 1.5 m/s (266.7 s), looks 20 s, waits 120 s for backup, total 407 s, 197 s too late; option B, take-off 30 s, flies 300 m at 12 m/s (25 s), assesses 15 s, responds 120 s, total 190 s, in time with 20 s to spare. A central dock on the 600 × 400 m site gives a worst case of 60.0 s, a corner dock 90.1 s.
- Box 3: picks the location that cuts the worst case and explains real limits (buildings blocking signals, truck lanes, safe take-off and landing). A strong proposal is usually delay at a door or the point with the least margin, with the seconds it adds.
- The drone changes alarm assessment time, from walking to look to flying to confirm imagery. Stopping the intruder still needs a human response team, and flying from a dock needs specific approval for remote operations.
- The intruder's task becomes 60 + 30 + 300 = 390 s. Option A (407 s) is still 17 s late; option B (190 s) has 200 s to spare. The steel door is delay, and it works because it lies after the detection point.
- In the lesson a central dock reaches the farthest point in 60.0 s and a corner dock in 90.1 s, a 30 s difference that matters when the margin is only 20 s. A strong answer mentions limits the numbers do not show, such as buildings blocking signals and truck lanes, and that the real site must be surveyed before deciding.
- The intruder crosses the fence unnoticed, so the time spent cutting it does not help the response team arrive in time; delay before the detection point is wasted. A strong answer points to a real fence section on the group's plan.
Discussion questions
- A system with dozens of cameras still has its warehouse broken into; which step of detect, delay and respond is failing?
- If the weather does not allow the drone to launch, what fallback should the system have?
- For a truck yard where the intruder finishes in 90 s, should the fix be more detection or more delay, and why? (See Example 3.)
Adapting to student background
- Upper secondary (M.6)
- Have them write t_assess + t_respond < t_task and derive 60.0 s from √(300² + 200²) by hand before running the code, then act as timekeeper on the site walk.
- Vocational certificate
- Focus on the site walk and real timing first; use a timeline sheet to draw the intruder's bar against the response bar, instead of starting from formulas.
- Diploma
- Extension: compute risk R = P_A(1 - P_E)C as in Example 3 for the assets on the group's plan and propose the investment that removes the most risk per baht.
7Worksheet 7 Linking alarms to drone missions in a simulator
Lab · About 6 h of class time · CLO5
Objective: Turn zone alarms into automatic drone missions, measure real system time and assess operator workload
Equipment
- Site plan from worksheet 6
- ArduPilot or PX4 SITL and a ground station
- Python with a MAVLink library and the module 7 example code
Safety
- Simulation only; no real flights
Steps
- Split the fence into zones and build a zone-to-coordinate table with Example 1
- Write a script that takes a zone number and sends a fly-to mission to the SITL drone over MAVLink
- Time the interval from zone number to arrival
- Compare with the response time computed in module 6
- Assess operator workload with Example 2 under different alarm rates
Deliverables
- Zone-to-coordinate table
- Working script
- Timing compared with module 6
- Workload assessment
Checklist
- Table 1 covers every zone of the group's fence and matches the Example 1 output
- The script takes a zone number and really sends the SITL drone a mission, shown by a screenshot or log
- Table 2 has at least 3 trials, each with its difference from the calculation explained
- Network-failure behaviour is stated for both dock and drone, and all work stayed in the simulator
- The workload assessment concludes whether one operator is enough in each case
Instructor guide
Class timing
- Brief the architecture; check SITL and the MAVLink library30 min
- Split zones and build the coordinate table with Example 160 min
- Write the MAVLink mission script120 min
- Time several runs and compare with module 675 min
- Assess workload with Example 245 min
- Wrap-up, questions and hand-in checklist30 min
Expected results
- Table 1 (with the lesson's 600 × 400 m site, 100 m zones from the south-west corner anticlockwise): 20 zones; zone 1 (50, 0), zone 4 (350, 0), zone 7 (600, 50), zone 10 (600, 350), zone 12 (450, 400), zone 18 (0, 250), zone 20 (0, 50). Every value must match the code.
- Table 2: calculated from a central dock at (300, 200) at 12 m/s with a 30 s take-off: zone 7 is 335.4 m away, 58.0 s; zone 4 is 206.2 m, 47.2 s. Accept SITL times about 10-40 s longer because of mission upload, climb, acceleration and slowing; the SITL speed setting may not be 12 m/s, so compare with the simulator's real speed.
- Table 3 (Example 2 values): fence alarms only 12/h × 90 s = 30%; with drone verification 12/h × 40 s = 13%; with analytics filtering 4/h × 40 s = 4%. Other cases the group assumes, for example 20/h × 60 s = 33%.
- The formula leaves out sending and acknowledging the mission over MAVLink, arming, climbing to the set height, acceleration and slowing, and settling at the point. A strong answer separates each step's time from the log.
- 30/h × 90 s = 75% and 30/h × 40 s = 33%. At 75% the operator tires and starts dismissing alarms without looking. Automatic verification helps a lot, but on windy nights more nuisance filtering or a second operator is needed, and every filter may also discard real events.
- Real fences rarely match the plan, so distance along the fence can be off. Check by triggering each zone's sensor for real, watching that the drone flies to where the alarm occurred, and correcting the table.
- The dock must not launch the drone uncontrolled; a drone in flight needs a lost-link procedure, such as returning to the dock or landing at a safe point; and the security network must be separate from the office network.
Discussion questions
- If the operator has to type coordinates during an incident, what time and error risks does that add?
- How much time does a structured radio report save over a free-form description (see Example 3), and why should it be read back?
- Who should be the single person directing when the drone and ground teams work together?
Adapting to student background
- Upper secondary (M.6)
- Have them explain the distance-to-coordinate function line by line and compute zone 12 by hand before running it, then run SITL and time the flights themselves for hands-on practice.
- Vocational certificate
- Provide a template MAVLink script with blanks for the zone number and coordinates; focus on running and timing first, then draw the zones on a paper plan to check the coordinates.
- Diploma
- Extension: add a check in the script that the drone has received and acknowledged the mission, and test the behaviour when the link is cut mid-flight in SITL.
8Worksheet 8 Testing event rules and tracking
Lab · About 6 h of class time · CLO5, CLO4
Objective: Test event rules and tracking on real scenes and explain the trade-offs of sensor combination and distance gates
Equipment
- Tripod camera or drone with camera
- Video-analytics software with virtual lines and zones
- Python and the module 8 example code
- An open yard
Safety
- Fly within CAAT conditions in visual line of sight; keep bystanders clear
- Film only consenting classmates and delete footage at the end of the course
Steps
- Set up the camera or fly over an open yard; draw a virtual line and restricted zone in the software
- Have classmates cross the line, loiter and walk close together in pairs
- Record detections and track swaps
- Compute OR and AND for the two sensors tested with Example 1
- Try 2, 5 and 10 m gates in Example 2 on the recorded data and explain the trade-off
Deliverables
- Detection results by scenario
- OR and AND results
- Gate results with explanation
Checklist
- Table 1 covers all three scenarios (line crossing, loitering, two people close together) with trial counts
- Table 2 uses Example 1 with the group's values and states the independence assumption
- Table 3 covers 2, 5 and 10 m and explains the trade-off between wrong pairings and new tracks
- Only consenting classmates were filmed, the flight met CAAT conditions, and a deletion date is recorded
Instructor guide
Class timing
- Briefing on safety, consent and event rules30 min
- Set up the camera or fly; draw the virtual line and restricted zone60 min
- Run the three scenarios and record results105 min
- Compute OR and AND with Example 145 min
- Try the gates in Example 2 on the recorded data75 min
- Wrap-up, questions and hand-in checklist45 min
Expected results
- Table 1: depends on the real test. Line crossing should be detected almost every time, loitering once the set time is exceeded, and two people close together usually cause at least one track swap; if none occurs, check that they walked close enough. Misses and false alarms must be recorded separately.
- Table 2 (with Example 1 values: fence 0.90, analytics 0.85, nuisance 8 and 3 per day, 30 s window): OR detects 0.985 with 11.0 nuisance per day; AND detects 0.765 with 0.0167 per day (about one every 60 days). A 60 s window doubles AND nuisance to 0.0333 per day.
- Table 3 (the lesson's Example 2 data): at 2, 5 and 10 m, T1 pairs correctly with detection 0 (1.92 m) and T2 with detection 1 (1.56 m), and detection 2, more than 47 m from every track, starts a new track. This data set does not show the trade-off, because the nearest wrong pair is 17.3 m apart. With the group's close-walking data, a 2 m gate tends to start new tracks when people move fast, and a 10 m gate tends to pair the wrong people.
- OR sends the drone to verify, because detection is high (0.985) and a drone check is cheap. AND dispatches the response team at once without waiting, because nuisance is very low (0.0167 per day). The system gains both benefits, and response decisions still go through the operator.
- A strong answer quotes the group's own results: too wide a gate pairs the wrong person when people walk close together, too narrow a gate loses the track and starts a new one, and real systems solve all pairs at once, for example with the Hungarian method, rather than one track at a time.
- One cause, such as strong wind, shakes the fence and sways trees in the image at the same time, so the sensors are not independent. Collect real statistics for several weeks after installation.
- In Example 3, driving to the reported point arrives in 53.0 s, by which time the intruder has run 265 m. With heading and speed the vehicle meets him about 38 s after setting off, and the structured report (meeting 44.4 s after the sighting) is 11.2 s faster than the free-form description (55.6 s).
Discussion questions
- An intruder who knows the system may move very slowly or hide in blind spots; how should the system cope?
- Why must a human operator always decide on sending people to respond, even when detection is accurate?
- A model trained on fixed-camera images may perform poorly on drone images; how would you check it before real use?
Adapting to student background
- Upper secondary (M.6)
- Have them derive P_OR = 1 - (1 - P₁)(1 - P₂) and where 2τN₁N₂ comes from using probability, then put them in charge of setting up the camera and running the yard test.
- Vocational certificate
- Focus on the yard test and tallying results with ticks, then explain association with gate circles drawn on paper instead of starting from formulas.
- Diploma
- Extension: change Example 2 to assign all pairs at once by the lowest total distance and compare with one-at-a-time association on the close-walking data.
9Worksheet 9 Data policy and security assessment
Lab · About 6 h of class time · CLO6
Objective: Set storage and retention by purpose, preserve video evidence integrity and plan security controls with NIST CSF
Equipment
- Python and the module 9 example code
- A video clip from worksheet 8
- A SHA-256 tool
- SITL with MAVLink signing
Safety
- Desk and simulation work only; no flying
- Keep signing keys out of submitted files
Steps
- Compute the group's storage for 7, 14 and 30 days with Example 1
- Propose a retention period justified by purpose
- Export one clip with its hash and write a chain-of-custody record
- Enable MAVLink signing in SITL, try an unsigned command and record the result
- Write a six-function NIST CSF table with at least one control per function
Deliverables
- Storage table and retention policy
- Clip with hash and chain-of-custody record
- MAVLink signing test result
- CSF table
Checklist
- Table 1 covers 7, 14 and 30 days with correct TB units and code attached
- The exported clip has time, camera, exporter and SHA-256, with a chain-of-custody record
- The CSF table has all six functions, each with at least one control that fits the group's system
- No signing key or password appears in submitted files
Instructor guide
Class timing
- Brief the threats and how to keep signing keys25 min
- Compute storage and propose retention60 min
- Export the clip with its hash and write the custody record75 min
- Enable MAVLink signing in SITL and test an unsigned command90 min
- Write the NIST CSF table75 min
- Wrap-up, questions and hand-in checklist35 min
Expected results
- Table 1 (with the Example 1 system: 30 cameras at 4 Mb/s recording 24 h, drone 6 Mb/s for 3 h a day): 7 days 9.07 + 0.057 = 9.13 TB, 14 days 18.14 + 0.113 = 18.26 TB, 30 days 38.88 + 0.243 = 39.12 TB. Accept rounding within ±0.01 TB. The reason must cite purpose, such as how long it usually takes for incidents to surface and footage to be requested.
- Box 2: file name, time, camera, exporter, SHA-256 and every handover (date, time, from, to, reason). The test should show that with signing enabled the SITL drone ignores the unsigned command; if it still obeys, check that signing is enabled on both sides.
- Table 3: Govern sets ownership, policy and acceptable risk; Identify inventories every device; Protect segments networks, changes default passwords, patches software and enables MAVLink signing; Detect monitors login logs and abnormal GNSS positions; Respond has a procedure for a suspected hijack, such as landing at once or returning to the dock; Recover backs up configuration and reviews after incidents.
- A strong answer cites purpose, such as within how many days most incidents are reported, so footage must be kept long enough to review, and the Personal Data Protection Act B.E. 2562 (2019), which allows keeping only what is necessary for the purpose. Evidence is exported separately and kept for the life of the case. Setting retention by disk keeps personal data longer than needed.
- With signing enabled the command should be rejected. Signing stops forged or replayed commands from anyone without the key, but not jamming, GNSS spoofing or theft of a poorly stored key.
- Speed √(30² + 40²) = 50 m/s exceeds the roughly 20 m/s maximum and is physically impossible. The system should alert the operator and cross-check other sources, such as inertial sensors or camera imagery. This is the Detect function, and a confirmed spoof triggers the Respond procedure.
- A mismatched hash means the file is not what was exported, so nobody can show it was unaltered. The custody record shows who held the file and when, so the step where it changed can be found, and the stored original should be used instead.
Discussion questions
- Who in the organisation should be allowed to export video, and how would that right be audited?
- If a signing key leaks, what must be done, in what order?
- Recording at full rate only on motion saves a lot of storage, but what is lost?
Adapting to student background
- Upper secondary (M.6)
- Have them explain why changing one byte changes the whole hash and convert Mb/s to TB by hand before running the code, then configure signing in SITL themselves for hands-on practice.
- Vocational certificate
- Do the practical steps first (export the clip, compute the hash, test the command in SITL), then compute storage with a fill-in table one unit at a time (Mb/s to bytes per second, times seconds, divided by 10¹²).
- Diploma
- Extension: adapt the Example 2 GNSS check to read a real SITL log and inject a position jump to see whether the system alerts.
10Worksheet 10 Privacy plan and unknown-drone response plan
Analysis activity · About 6 h of class time · CLO6, CLO3
Objective: Reduce privacy impact on surrounding communities and write a timely, lawful unknown-drone response plan
Equipment
- The group's site plan and system
- Python and the module 10 example code
- Mission simulator
- Role cards for the tabletop exercise
Safety
- Desk and simulation work only; no flying
- The response plan must not jam signals or seize others' drones without legal authority
Steps
- Identify sensitive areas around the site and compute the share needing camera restrictions with Example 1
- Set the restrictions in the simulator mission
- Draft signs and a community notice about drone use and recording
- Write an unknown-drone response plan and compute timings with Example 2 at 500 and 1,000 m, name any late step and revise the plan
- Run a tabletop exercise with operator, security chief and community representative roles, then revise
Deliverables
- Sensitive area map and mission settings
- Draft signs and community notice
- Response plan with timings
- Exercise notes and revised plan
Checklist
- Table 1's total length and share of restricted fence match the Example 1 output
- Table 2 covers both 500 and 1,000 m and names any late step with its fix
- The response plan has no jamming, shooting or seizing of others' drones, and includes notifying the authorities
- The draft signs and notice state purpose, flight times and a contact channel
- The revised plan lists at least 2 changes from the exercise
Instructor guide
Class timing
- Brief the legal frame and what private operators may do30 min
- Identify sensitive areas, compute the share and set restrictions in the simulator90 min
- Draft signs and the community notice45 min
- Write the response plan and compute timings with Example 275 min
- Tabletop exercise in roles75 min
- Revise the plan, answer questions and run the hand-in checklist45 min
Expected results
- Table 1 (with Example 1 values: 2,000 m fence, sections beside homes at 400-700 m and 1,500-1,650 m): 300 + 150 = 450 m, or 22.5%. Restrictions: camera points inward only, privacy masks over the homes, no zooming outside the fence, and flying below the height from which yards are visible.
- Table 2 (Example 2 values: drone approaching at 15 m/s, confirm 20 s, move staff under cover 30 s, notify police 60 s): from 1,000 m the drone arrives in 66.7 s; confirmation done at 20 s and cover at 50 s, in time; police notified at 110 s, after arrival. From 500 m it arrives in 33.3 s; confirmation is in time (20 s) but cover at 50 s is late. Starting cover at once, in parallel with confirmation, finishes at 30 s, in time, with only 3.3 s of margin, which is very thin.
- Box 3: records each role's questions, the gaps found and at least 2 plan changes, such as starting cover at once for close detections, recording the drone and its direction as evidence, and adding a community contact channel.
- No: cover finishes at 50 s, after the drone arrives at 33.3 s. A good fix starts moving people under cover at once, in parallel with on-screen confirmation (done at 30 s), or extends the detection range; to finish the first two steps one after the other before arrival, detection must happen farther than 50 × 15 = 750 m away (at exactly 750 m there is 0 s of margin), while the parallel plan needs at least 30 × 15 = 450 m. Notifying the police still follows once people are safe.
- A jammer is radio equipment whose possession and use need authorisation under section 6 of the Radio Communications Act B.E. 2498 (1955), and it disrupts other communications and navigation around the site. Chasing with your own drone risks a mid-air collision and falling on people or property, and is beyond a private operator's authority. What is possible is to detect, record, protect people and notify the authorities.
- Operators can forget or slip during an incident; built into the mission, the restrictions apply on every flight and can be audited. A strong answer cites the Personal Data Protection Act B.E. 2562 (2019) and the 2015 Ministry of Transport notification forbidding flights that violate privacy.
- Depends on the exercise. A common concern is the camera seeing into homes or people being followed outside the fence. A strong answer offers checkable measures: privacy masks, no zooming beyond the fence, not following people outside it except an intruder who has just fled, handed to the police at once, signs and a contact channel.
Discussion questions
- If an unknown drone circles over the site for a long time doing nothing, what should the team do next, and what evidence should go to the authorities?
- How does telling the community in advance help the security of the system itself?
- If a client asks for a jammer, how should the system designer respond?
Adapting to student background
- Upper secondary (M.6)
- Have them compute the minimum detection range at which every step needed before arrival finishes in time and summarise the cited legal sections, then set the restrictions in the simulator themselves.
- Vocational certificate
- Focus on setting restrictions in the simulator and the role play first; use a paper timeline to draw the steps against the drone's arrival instead of starting from formulas.
- Diploma
- Extension: set privacy masks and camera angles in the simulated mission for every fence section beside homes, then fly one simulated circuit to check that no section looks beyond the fence.
Scoring rubric
For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.
| Criterion | Weight | Excellent (4) | Good (3) | Fair (2) | Needs work (1) |
|---|---|---|---|---|---|
| Accuracy of calculations and data | 30% | All numbers correct, with reproducible method and code; errors explained | Nearly all correct, method shown | Some errors or missing steps | Many errors or no method |
| Mission design meets requirements | 25% | All requirements measurable and met, with reasons | Most requirements measurable and met | Some requirements unmeasurable or unmet | Plan not linked to requirements |
| Safety, law and privacy | 20% | Approvals, sensitive areas and controls complete and correct | Nearly complete | Some key points missing | Not considered or unlawful |
| Communication and reporting | 25% | Clear, concise, separates observations from assumptions, correct citations | Clear with minor flaws | Hard to follow or missing parts | Does not communicate results |
Assessment map: CLOs and how they are assessed Draft
The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.
| CLO | Worksheets | Module quizzes |
|---|---|---|
| CLO1 Design surveillance missions, define areas and flight patterns, and select cameras to meet requirements | W 1W 2W 3 | M1M2M3 |
| CLO2 Transmit real-time imagery, record and manage data, track targets and evaluate mission performance | W 2W 4W 5 | M2M4M5 |
| CLO3 Comply with law and privacy ethics in surveillance | W 1W 4W 5W 10 | M1M4M5M10 |
| CLO4 Design UAS-based site surveillance and security systems on detect, assess and respond principles | W 6W 8 | M6M8M10 |
| CLO5 Integrate UAS with cameras, sensors, communications and control centres to detect events and track objects | W 7W 8 | M7M8 |
| CLO6 Manage data and apply system security principles, law and privacy | W 9W 10 | M9M10 |