Teaching pack · UAT 454

A 15-week teaching plan, 10 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.

Last updated: · 3(1-4-4) · Per week: lecture 1 h, lab 4 h, self-study 4 h; 75 contact hours per term

Coverage of the course description

The lessons fully teach 11 of 11 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.

Description topicModulesWhere it is taughtStatus
UAS applications to surveillance, monitoring and securityM1M6Module 1: Surveillance, reconnaissance and monitoring · From mission to measurable requirements · Module 6: Deter, detect, delay and respond · Response time against the intruder's time · The drone's role in a security systemCovered
Surveillance area and route planningM1M2Module 1: Revisit time · Time from event to report · Defining the operating area · Module 2: Four surveillance flight patterns · Swath width and sweep timeCovered
Visual and surveillance camerasM3Module 3: EO and thermal cameras · IFOV and ground pixel size · The DORI criteria · Selecting a camera set against requirementsCovered
Real-time video transmissionM4Module 4: Bit rate, bandwidth and latency · KLV metadata · Locating the frame centreCovered
Object and event monitoringM2M8Module 2: Target tracking · Module 8: Event rules · Combining two sensors · Object tracking · Limits of automatic detectionCovered
Surveillance zone designationM1M7M10Module 1: Defining the operating area · Designating zones on the map · Module 7: From alarm zone to coordinates · Module 10: Neighbours' privacyCovered
Operational data recording and managementM4M9Module 4: Recording and managing data · Module 9: Storage and retentionCovered
Coordination with control centres and ground personnelM6M7M8Module 6: Response time against the intruder's time · Module 7: System architecture · Operator workload · Coordinating with the control room and ground teams · Module 8: Handing a track to the ground teamCovered
Situation and risk assessmentM5M6Module 5: Assessing the situation: from images to a decision · Module 6: Assessing the security riskCovered
Privacy and data protectionM5M9M10Module 5: Privacy in surveillance · Module 9: Storage and retention · Cyber threats to systems with drones · Module 10: Neighbours' privacyCovered
Operations in compliance with regulations and safety requirementsM1M2M10Module 1: Defining the operating area · Designating zones on the map · Module 2: Safety limits for the flight: weather, return and landing sites · Module 10: Aviation and communications law · Threats from unknown dronesCovered

Weekly teaching plan

WeekTopicPre-classLectureLabEvidence
1 M1Surveillance, reconnaissance and monitoringRead module 1 up to 'From mission to measurable requirements'Distinguish the three task types and turn the fire mission into questionsWorksheet 1 part A: choose the group's area and write the questions to answerThree questions
2 M1Operating areas, sensitive areas and approvalsRead the operating-area section; take the module 1 quizGeneral CAAT conditions and BVLOS guidanceWorksheet 1 part C: four-layer area map and one-page CONOPSOne-page CONOPS and quiz result
3 M2Orbits, bank angle and camera depressionReview the steady-turn formulaTrade-offs between radius, detail and image stabilityWorksheet 2 part B: loiter command in SITL; compare bank with calculationTable of calculated versus simulated values
4 M3EO and thermal cameras and IFOVRead module 3 to the IFOV sectionGround pixel size with range; detecting sub-pixel firesWorksheet 3 part A: prepare test targets and expected valuesExpected values at 50, 100, 200 m
5 M3Selecting a camera set; midtermReview modules 1–3; take the module 3 quizMidterm examination (modules 1–3)Worksheet 3 part C: compare test results with calculationsWorksheet 3 report and midterm score
6 M4KLV metadata and frame-centre geolocationRead the KLV and geolocation sections; run Example 2Errors from depression angle and uneven groundWorksheet 4 part B: fly over known targets and compute their positionsCoordinate error table
7 M5Mission performance measuresRead module 5 to the measures section; run Examples 1–2Ground truth, Pd, precision and the slowest caseWorksheet 5 part A: compute measures from a simulated season logMeasures against requirements
8 M5Mini-project presentationsPrepare the whole-course mission reportCourse wrap-up and project criteriaPresent to park managers and community representatives (role-play); revise the planMini-project report and presentation, scored with the rubric
9 M6Response time against the intruder's timeRead the response time section; run Example 1Send a guard to look, or the drone firstWorksheet 1 part B: choose two intrusion paths, estimate each step's time and compute response time with and without a droneIntruder and response time table
10 M7System architectureRead module 7 up to 'System architecture'The alarm and video integration system and communication requirementsWorksheet 2 part A: split the group's fence into zones and draw the group's system architectureZone map and architecture diagram
11 M7Operator workloadRead the operator workload section; run Example 2; take the module 7 quizHow much the drone reduces operator loadWorksheet 2 part C: time from zone number to arrival, compare with module 6, and assess workload at different alarm ratesTiming and workload table, and quiz result
12 M8Combining two sensorsRead the sensor combination section; run Example 1OR or AND: effect on detection and false alarmsWorksheet 3 part B: have classmates cross the line, loiter and walk in pairs; record detections and compute OR and ANDDetection results and OR/AND table
13 M9Storage and retentionRead module 9 up to 'Storage and retention'; run Example 1Storage for 30 days of video and retention by purposeWorksheet 4 part A: compute storage for 7, 14 and 30 days and propose a justified retention periodStorage table and retention policy
14 M9NIST CSF 2.0Read the NIST CSF 2.0 section; take the module 9 quizThe six CSF functions for a surveillance systemWorksheet 4 part C: enable MAVLink signing in SITL, try an unsigned command, and write the group's six-function CSF tableUnsigned command result, CSF table and quiz result
15 M10Threats from unknown dronesRead the unknown drones section; run Example 2; take the module 10 quizWhether the response finishes before the unknown drone arrives, and what the law allowsWorksheet 5 part B: write an unknown-drone response plan and compute timings for detection at 500 and 1,000 mResponse plan with timings, and quiz result

Worksheets and instructor guide

One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.

1Worksheet 1 Requirements and CONOPS for a surveillance mission
Analysis activity · About 6 h of class time · CLO1, CLO3

Objective: Turn the group's surveillance mission into measurable requirements, compute revisit and write a CONOPS

Equipment

  • Map or satellite image of the area (Google Earth or QGIS)
  • Computer with Python
  • Example code at /downloads/uat-454/

Safety

  • Desk work only; no flying

Steps

  1. Take the area and mission assigned by the lecturer
  2. Write three questions to answer
  3. Turn them into at least five measurable requirements
  4. Draw and measure the route; compute revisit and worst-case time to report
  5. Map the four area layers and state the approval type
  6. Write a one-page CONOPS

Deliverables

  • Requirements table with numbers
  • Calculations with code
  • Four-layer area map
  • One-page CONOPS

Checklist

  • Table 1 has at least 5 requirements, each with a number, a unit and a check method (Mission design meets requirements)
  • Table 2 uses the worst case including confirmation and reporting time, with runnable code attached (Accuracy of calculations and data)
  • The map shows all four area layers and states the approval type with a reason (Safety, law and privacy)
  • The CONOPS fits one page and names people, equipment, times and data recipients (Communication and reporting)

Instructor guide

Class timing 360 min

  1. Brief the case and assign each group an area and mission30 min
  2. Write the questions and turn them into measurable requirements75 min
  3. Draw and measure the route; run Examples 1 and 290 min
  4. Map the four area layers and state the approval type75 min
  5. Write the one-page CONOPS60 min
  6. Short presentations, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Questions to answer and measurable requirementsTable 1: at least 5 items, compared with the lesson table, for example detect a fire of 2 m or larger, revisit no more than 30 minutes between 11:00 and 17:00, ignition to report within 30 minutes, coordinates within 50 m, and the data delivered. A requirement with no number, such as detect quickly, does not pass.
  2. Record: Table 2 Revisit time and worst-case time to reportTable 2 (numbers depend on the group's route; with the lesson's 30 km ridge route at 18 m/s): one circuit 27.8 min, 72 usable minutes per flight (2 full circuits); one aircraft worst case 27.8 + 3 + 2 = 32.8 min fails, two aircraft 13.9 + 5 = 18.9 min meets, three aircraft 14.3 min. Accept rounding within ±0.1 min.
  3. Record: Box 3 Four area layers on the map, approval type and short CONOPSBox 3: target area, operating area (including transit from take-off), prohibited or restricted areas, and privacy-sensitive areas (villages, trail). A route beyond visual line of sight needs specific BVLOS approval under CAAT-GM-UAS-PDRA101; flying within sight, by day, no higher than 90 m falls under the general conditions. The CONOPS names people, equipment, times and data recipients.
  4. Question 1: From Table 2, how many aircraft does the group's mission need, at minimum, to meet the time-to-report requirement? Show the working from the time left after confirmation and reporting.The time left to wait is 30 - 3 - 2 = 25 min, so n ≥ 27.8 / 25 = 1.11, rounded up to 2 aircraft (lesson route figures). A strong answer also offers alternatives, such as shortening the route to the high-risk ridges or adding fixed lookouts.
  5. Question 2: If you used the average revisit instead of the worst case, how would the verdicts in Table 2 change, and why is that dangerous?The average wait is half a circuit, so one aircraft gives 13.9 + 5 = 18.9 min and appears to pass, but a fire starting just after the drone passes waits 32.8 min. The requirement applies to every event, so the average underestimates the time and leads to buying too few aircraft.
  6. Question 3: Where are the privacy-sensitive areas on your group's map, and what restrictions did the group set at the design stage?A strong answer points to real places on the map (villages, the trail used to gather forest products) and sets restrictions from the start: no zooming or detailed recording without need, lowering height or moving the line so villages fall outside the buffer (in the lesson, at 90 m the outer limit is 213.2 m and village B at 200 m is inside; at 60 m it is 183.2 m, so it is outside), and drawing an exclusion fence in the autopilot.
  7. Question 4: Why can VIIRS satellite hotspots serve as a cue but not replace 30-minute surveillance?VIIRS has 375 m pixels, passes only a few times a day, near-real-time data arrive within about 3 hours, and cloud, smoke or canopy can hide a fire. It suits telling the drone where to check. A strong answer adds that no hotspot does not mean no fire and that the source data time must be recorded.

Discussion questions

  • If the budget buys only one drone, how would the group change the requirements or the plan, and who should decide?
  • Which of your requirements is hardest to measure in the field, and how would you collect evidence?
  • How is defining sensitive areas at the start different from fixing things after a complaint?

Adapting to student background

Upper secondary (M.6)
Have them derive T = L/(nv) and why the worst case equals a full circuit before running the code, then measure the route on the real map themselves for hands-on practice.
Vocational certificate
Start by drawing and measuring the route on the map, then compute step by step with a fill-in table (km to m, divide by speed, divide by 60), checking with a calculator alongside the code.
Diploma
Extension: compute the buffer outer limit as in Example 3 for communities near the group's route and propose leg-by-leg flight heights with their effect on swath.

Common student mistakes: Common mistakes in the module 1 lesson

2Worksheet 2 Flight patterns and tracking in simulation
Lab · About 6 h of class time · CLO1, CLO2

Objective: Plan flight patterns, test orbits in SITL and experiment with an alpha-beta filter

Equipment

  • ArduPilot SITL and a planner (Mission Planner or QGroundControl)
  • Python and the module 2 example code

Safety

  • Simulation only; no real flights

Steps

  1. Choose main and backup patterns with reasons
  2. Compute swath and flight time against requirements
  3. Build a route mission and loiter command in SITL
  4. Record bank angle and height from the log; compare with calculations
  5. Try three α/β settings in Example 2; record the reacquisition residual

Deliverables

  • Mission files
  • Calculated versus simulated table
  • Short report on the α/β trade-off

Checklist

  • Table 1 includes swath, sweep time, bank, period, depression and slant range, all with units (Accuracy of calculations and data)
  • Table 2 has all 3 settings (0.5/0.2, 0.8/0.5, 0.2/0.05) with the reappearance residual for each (Accuracy of calculations and data)
  • The main and backup patterns cite at least one requirement from worksheet 1 (Mission design meets requirements)
  • The mission file stays inside the approved area, with screenshots of the route and loiter command (Safety, law and privacy)
  • The α/β report ends with a one-sentence conclusion on which setting to use (Communication and reporting)

Instructor guide

Class timing 360 min

  1. Objectives; review swath and orbit formulas30 min
  2. Choose patterns and compute with Example 175 min
  3. Build the route mission and loiter command in SITL105 min
  4. Read the log and compare with calculations60 min
  5. Vary α/β in Example 2 and write the short report60 min
  6. Wrap-up, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Calculated flight-pattern values against the simulatorTable 1 (with the lesson's 640-pixel, 12 µm, 13 mm thermal camera at 120 m and 18 m/s over an 8 × 5 km area with 20% overlap): HFOV 32.9°, swath 70.9 m, 89 lines, 712 km, 11.0 h; a 300 m orbit needs 6.3° bank, 104.7 s period, 21.8° depression, 323.1 m slant range. Accept SITL bank within about ±2° of the calculation and height swinging a few metres, because of simulated wind and control.
  2. Record: Table 2 Alpha-beta filter settingsTable 2 (Example 2 fire-truck data): 0.5/0.2 speed at t = 5 s about 7.95 m/s, prediction 69.9 m, residual 2.5 m; 0.8/0.5 about 8.11 m/s, prediction 72.7 m, residual -0.3 m; 0.2/0.05 about 4.14 m/s, prediction 39.8 m, residual 32.6 m. Accept rounding within ±0.1.
  3. Record: Box 3 Main and backup patterns with reasonsBox 3: the main pattern should be route or perimeter patrol for a large area, switching to an orbit on finding a hotspot. The backup has a reason, such as use in strong wind or when one aircraft is down. Every pattern change stays inside the approved area.
  4. Question 1: From Table 1, does a full sweep meet your group's revisit requirement? If not, how does your chosen pattern solve the problem?No. A full sweep takes about 11 h against a 30 min requirement (lesson figures). A strong answer flies the risk lines and tilts the camera to look far, or splits the area among several aircraft, and notes that tilting enlarges far-edge pixels.
  5. Question 2: If the orbit radius drops from 300 m to 150 m at 18 m/s, what are the bank and camera depression angles, and how does that affect the image?At 150 m: bank 12.4° (from 6.3°), period 52.4 s, depression 38.7°, slant range 192.1 m. The view is closer and clearer, but the image swings more, the gimbal must compensate more, noise for people below increases and the target is more easily lost.
  6. Question 3: From Table 2, which α/β setting suits tracking a briefly hidden vehicle? Explain the trade-off between keeping up and a steady image.0.5/0.2 is the balance: a 2.5 m residual is small enough to keep the same truck. 0.8/0.5 keeps up fastest (residual -0.3 m) but follows noise and shakes the camera. 0.2/0.05 is smooth but slow, estimating only about 4 m/s, so its prediction at reappearance is 32.6 m off and it may lock onto the wrong vehicle. A strong answer quotes the group's own numbers.
  7. Question 4: Why do the bank angle or height in the SITL log not match every calculated value? Give at least two possible reasons.Acceptable reasons: simulated wind, the autopilot not flying exactly the set radius, actual speed differing from the setting, the entry and exit of the orbit, different height references (home or sea level) and the log rate.

Discussion questions

  • Between a close view, a steady image and noise for people below, how would the group choose the orbit radius?
  • Who should decide which target to track, and why should the software not choose?
  • Is the maximum wind the guidance permits always safe for our aircraft? (See Example 3.)

Adapting to student background

Upper secondary (M.6)
Have them step the alpha-beta filter by hand for the first two steps before running the code and explain how tan φ = v²/(gR) comes from the force balance, then let them drive SITL themselves for hands-on experience.
Vocational certificate
Focus on building the SITL mission first, then fill Table 1 row by row from the code output; explain α/β with a plot of measured against predicted position rather than equations.
Diploma
Extension: compute the largest headwind that still allows a return within the reserve, as in Example 3, for the group's route, and set the return-to-launch parameters in SITL to match.

Common student mistakes: Common mistakes in the module 2 lesson

3Worksheet 3 Working-range test of EO and thermal cameras
Lab · About 6 h of class time · CLO1

Objective: Measure real pixel density on targets against calculations and conclude each camera's detection range

Equipment

  • Drone or tripod with EO and thermal cameras
  • 1 m target board
  • Tray of hot charcoal or a controlled heat source
  • Tape measure or GNSS
  • Fire extinguisher

Safety

  • The lecturer supervises the heat source; extinguisher ready
  • Fly within CAAT conditions in visual line of sight; keep people clear
  • Do not capture outsiders at identification level

Steps

  1. Compute IFOV and pixels on target at 50, 100, 200 m
  2. Set up targets and measure distances
  3. Record EO and thermal images at each distance
  4. Count pixels on targets in the real images
  5. Compare with calculations and conclude detection ranges

Deliverables

  • Calculated versus measured table
  • Test images labelled by distance
  • Conclusions and reasons for differences

Checklist

  • Table 1 covers 50, 100 and 200 m with units, with code attached (Accuracy of calculations and data)
  • Table 2 has EO and thermal at every range, and every test image is labelled with its range (Accuracy of calculations and data)
  • The conclusion selects cameras by the sufficient level of detail, not the highest resolution (Mission design meets requirements)
  • A safety record covers the heat source and extinguisher, and no outsider appears at identification level (Safety, law and privacy)

Instructor guide

Class timing 360 min

  1. Safety briefing; set up the heat source and extinguisher30 min
  2. Compute IFOV and pixels on target with Examples 1 and 260 min
  3. Set targets, measure ranges and record EO and thermal images at each range120 min
  4. Count pixels on targets and fill in Table 275 min
  5. Conclude detection ranges, explain differences and pack up45 min
  6. Questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Calculations before the testTable 1 (with the lesson's 640-pixel, 12 µm, 13 mm thermal camera and 60°, 1,920-pixel wide EO camera): IFOV 0.923 mrad; at 50 m the ground pixel is 0.046 m, a 1 m target covers 21.7 pixels, EO 33.3 px/m (detect); at 100 m 0.092 m, 10.8 pixels, EO 16.6 px/m; at 200 m 0.185 m, 5.4 pixels, EO 8.3 px/m (below detect). If the lab's cameras differ, compute from their own specifications.
  2. Record: Table 2 Measured from real images against calculationsTable 2: counts should be close to the calculation; accept about 10-30% fewer (focus, shake, compression, blurred target edges). The charcoal should still show in the thermal image at every range, while sign detail in the wide EO image fades with range. If the difference exceeds 50%, check that slant range and the camera values are correct.
  3. Record: Box 3 Detection-range conclusions and reasons for differencesBox 3: states the range at which the charcoal is still detected and at which the sign still shows detail, with at least two reasons for differences from the calculation, and proposes a camera set from the task (thermal to find, EO zoom to confirm).
  4. Question 1: Why are counted pixels usually fewer than calculated? Name the causes found in your group's test.Causes: soft focus, shake from wind or the gimbal, video compression, target edges only partly filling pixels, using horizontal distance instead of slant range, the sign not facing the camera squarely, and a real focal length different from the stated one.
  5. Question 2: If the camera is on a drone 60 m high and 100 m horizontally from the target, which range should be used, and how much does the pixel count change?Use the slant range √(60² + 100²) = 116.6 m, so the thermal camera gives 9.3 pixels on a 1 m target instead of the 10.8 pixels from the 100 m horizontal distance. Using horizontal distance overestimates resolution.
  6. Question 3: Why can hot charcoal still be detected by the thermal camera when it covers few pixels, while the sign needs many more pixels to show detail?Fire or charcoal is much hotter than the background, so a pixel only partly filled is still clearly brighter than its neighbours; detection relies on temperature contrast. Seeing detail on the sign depends on pixels on target, which is why DORI does not apply to fire.
  7. Question 4: If the mission only needs to know whether anyone is near the fire, which DORI level should be the target, and to what range can the wide EO camera achieve it?Detect, 25 px/m, is enough; nothing higher is needed. The 60°, 1,920-pixel wide EO camera reaches this to about 66.5 m (1,920 / (25 × 2 × tan 30°)); beyond that the EO zoom is needed. Not aiming for identification also reduces the privacy burden.

Discussion questions

  • If flights are needed at dawn in thick haze, which camera would the group make primary, and what would it give up?
  • What privacy cost comes with choosing the highest-resolution camera just in case?
  • Long zoom lenses are sensitive to shake; how would you check that the calculated resolution holds on the drone?

Adapting to student background

Upper secondary (M.6)
Have them explain how IFOV = p/f relates to the full field of view and compute the range for each DORI level themselves, then take charge of setting targets and measuring distances in the field.
Vocational certificate
Start with taking real images and counting pixels on screen, then compare with the code output; use a worksheet with the formulas laid out for step-by-step substitution.
Diploma
Extension: add tests at two flight heights, compare slant against horizontal range, and measure how zoom affects image shake.

Common student mistakes: Common mistakes in the module 3 lesson

4Worksheet 4 Streaming, geolocation and data management
Lab · About 6 h of class time · CLO2, CLO3

Objective: Measure latency, locate targets from metadata and manage data traceably

Equipment

  • Drone or training rig streaming to a ground station
  • On-screen stopwatch
  • Targets surveyed with GNSS
  • Computer with a SHA-256 tool

Safety

  • Fly within CAAT conditions in visual line of sight
  • Do not share images showing outsiders

Steps

  1. Film the stopwatch and compare with the screen to measure latency
  2. Try three bit rates and observe quality
  3. Fly over known targets; compute positions from the log and camera angles
  4. Measure the error
  5. Organise folders as in the lesson; compute and check SHA-256

Deliverables

  • Latency and bit-rate table
  • Coordinate error table
  • Data folder with hash file

Checklist

  • Table 1 has at least 5 latency trials and all 3 bit rates, with units (Accuracy of calculations and data)
  • Table 2 computes coordinates with Example 2, and every target's error is in metres (Accuracy of calculations and data)
  • Originals are separate from working copies, named as in the lesson, with a hash file (Communication and reporting)
  • No outsiders appear in submitted files, and the flight stayed within CAAT conditions in visual line of sight (Safety, law and privacy)

Instructor guide

Class timing 360 min

  1. Briefing on flight safety and handling images of people30 min
  2. Measure latency with the stopwatch and try three bit rates75 min
  3. Fly over the surveyed targets90 min
  4. Compute positions from the log and measure the error75 min
  5. Organise folders; compute and check SHA-25660 min
  6. Wrap-up, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Latency and bit rateTable 1: latency depends on the real equipment; compare with the lesson's 350 ms budget. Measurement precision is limited by the frame interval (about 33.3 ms at 30 fps), so take several trials and use the median. Data per 10 min: 2 Mb/s 0.15 GB, 4 Mb/s 0.30 GB, 6 Mb/s 0.45 GB (a full 72 min flight 1.08, 2.16, 3.24 GB). At low bit rates the image breaks into blocks on fast pans.
  2. Record: Table 2 Target coordinate errorTable 2: the lesson example (18.90° N 98.80° E, 120 m, depression 21.8°, azimuth 45°) gives 300.0 m, 212.1 m north, 212.1 m east, at 18.901906, 98.802014. If the class flies at 60 m with 30° depression, the distance is 103.9 m and a 1° depression error moves it about 4 m. Measured errors of about 5-20 m are reasonable (including the drone's GNSS error and timing), and should be within the 50 m requirement.
  3. Record: Box 3 Folder structure, file names and SHA-256 check before and after copyingBox 3: file names as date_sortie_camera, such as 2026-03-14_S2_EO.mp4; originals separate from working copies; log and metadata included. SHA-256 before and after copying must match character for character.
  4. Question 1: Is the latency you measured good enough for watching, and for using live video to avoid obstacles? Compare with the 350 ms budget in the lesson.A 350 ms budget is fine for watching but not for using live video to avoid obstacles, which needs much lower latency. A strong answer quotes the group's measured value and treats the two uses separately.
  5. Question 2: If the camera depression is off by 1°, what coordinate error should your test show, and why does looking far (small depression) give more error?At 120 m and 21.8° depression the error is +15.9 m or -14.6 m; at 60 m and 30°, about ±4 m. Because d = h/tan δ, tan changes quickly with angle when δ is small: at 5° depression from 120 m (about 1,372 m away) a 1° error moves the point about 230-345 m. On mountains a terrain elevation model is also needed.
  6. Question 3: If the metadata time lags the video by 1 s while the drone flies at 18 m/s, how far off are the coordinates even with every angle correct?About 18 × 1 = 18 m along the flight direction (0.2 s gives about 3.6 m). Every value can be correct and the coordinates still wrong if the times do not match, so metadata must be synchronised with the video frames.
  7. Question 4: What does a matching SHA-256 before and after copying tell you, and what must you do if they do not match?Matching hashes show the copy is identical to the original byte for byte, which later shows the files in a report were not altered. If they differ, treat the copy as damaged or altered, copy again from the original, record what happened, and never edit the original.

Discussion questions

  • If the mobile network in the forest drops in and out, how should the mission keep working?
  • Who should be allowed to open zoomed imagery that may show people, and how is access recorded?
  • How short should retention be for imagery with no incident, and who decides?

Adapting to student background

Upper secondary (M.6)
Have them convert Δφ = d cos ψ / R_E to degrees themselves and explain why longitude divides by cos φ₀, then let them set the targets and survey them with GNSS in the field.
Vocational certificate
Focus first on connecting the camera, measuring latency and organising folders; use Example 2 by changing only the numbers at the top of the file, and sketch the side view of height and depression before computing.
Diploma
Extension: test sending still images with coordinates at intervals when the signal is weak, and measure how many seconds they take to reach the ground station.

Common student mistakes: Common mistakes in the module 4 lesson

5Worksheet 5 Mission results report and privacy impact assessment
Analysis activity · About 6 h of class time · CLO2, CLO3

Objective: Evaluate the mission against requirements and assess privacy impact

Equipment

  • Simulated fire-season log from the lecturer
  • Python and the module 5 example code

Safety

  • Desk work only; no flying

Steps

  1. Compute Pd, precision, false-alarm rate and time to report
  2. Compare with worksheet 1 requirements and check the slowest case
  3. Write a one-page privacy impact assessment
  4. Present in the roles of park managers and community representatives; revise the plan

Deliverables

  • Mission results report
  • Privacy impact assessment
  • Presentation slides

Checklist

  • Table 1 has Pd, precision, false-alarm rate and time to report, each with formula and unit (Accuracy of calculations and data)
  • Table 2 marks every case over the requirement with a reason, not just the average (Mission design meets requirements)
  • The privacy assessment states who might be recorded, the highest detail, retention and access (Safety, law and privacy)
  • The slides answer park managers' and community representatives' questions and list the plan changes (Communication and reporting)

Instructor guide

Class timing 360 min

  1. Brief the simulated log and the presentation roles25 min
  2. Compute the measures with Examples 1 and 275 min
  3. Compare with requirements and analyse the slowest cases60 min
  4. Write the privacy impact assessment80 min
  5. Present to park managers and community representatives75 min
  6. Revise the plan, answer questions and run the hand-in checklist45 min

Expected results

  1. Record: Table 1 Mission measures against requirementsTable 1 (numbers depend on the lecturer's log; with the lesson's Example 1 data, 40 real fires, 34 found, 6 missed, 16 false alarms, 120 h flown): Pd = 34/40 = 85%, precision 34/50 = 68%, false-alarm rate 16/120 = 0.13 per flight hour (about one every 7.5 h); time to report mean 20.2 min, median 18.5 min, 8 of 10 within 30 min (80%).
  2. Record: Table 2 Ignition-to-report time by eventTable 2 (Example 2 data): the cases over 30 min are 31 and 40 min, both on days when only one drone flew because the other was under repair, matching module 1 where one aircraft's worst case is 32.8 min.
  3. Record: Box 3 Privacy impact assessment (who might be recorded, highest detail allowed, retention, who has access)Box 3: names who might be recorded (hikers, mushroom and forest-product gatherers, people of the two villages); the default is the thermal camera and wide EO, with zoom no higher than recognise (125 px/m) and only to confirm a fire or people's safety, never identify without a legal reason; imagery with no incident deleted on schedule, fire imagery kept as needed; access only for staff with a duty, with every zoom logged; cites the Personal Data Protection Act B.E. 2562 (2019).
  4. Question 1: The mean time to report meets the requirement, but does the mission? Explain with the slowest case in Table 2.No. The requirement applies to every event, and the slowest case of 40 min exceeds 30 min (example data). A strong answer links the cause (one aircraft flying) to module 1 and uses it as evidence for a spare aircraft.
  5. Question 2: What does your false-alarm rate say about staff trust, and how would the group reduce false alarms?0.13 per flight hour, about one every 7.5 h. If it rises, staff stop trusting alarms. Most false alarms came from metal roofs and rocks heated in the afternoon, so add an EO confirmation step before reporting, or record known heat sources.
  6. Question 3: Why use Pd, alarm precision and false-alarm rate instead of overall accuracy in area surveillance?The no-fire, no-alarm cell cannot be counted because area surveillance has no clear counting unit, so overall accuracy has no meaningful value. Pd shows what was missed, precision shows how trustworthy alarms are, and ground truth is needed to know the misses.
  7. Question 4: What is the highest level of detail your group allows, why, and how will you prevent function creep?A strong answer picks the lowest level that answers the question (for example recognise only to confirm), justifies it with purpose limitation, minimisation and proportionality, and prevents function creep by logging who ordered each zoom and why, internal sampling of the log and telling the community in advance.

Discussion questions

  • If community representatives ask that the drone never fly over the forest trail, how would the group negotiate while keeping fire safety?
  • If imagery shows someone lighting a fire, what should the operator do and not do?
  • How should a projection of when the fire reaches the village report its uncertainty? (See Example 3.)

Adapting to student background

Upper secondary (M.6)
Have them build the TP, FP and FN table from raw data before using the code and explain why TN cannot be counted, then play the community representative to see the issue from those affected.
Vocational certificate
Have them tally the log by ticking a printed 2 × 2 table, then substitute into the formulas; write the privacy assessment from a form with 4 guiding questions.
Diploma
Extension: project the fire's arrival at the village as a range, as in Example 3, from the log data, and write a one-page situation report giving the fast case and the decision.

Common student mistakes: Common mistakes in the module 5 lesson

6Worksheet 6 Analysing intrusion paths and response time
Analysis activity · About 6 h of class time · CLO4

Objective: Compare response time with the intruder's time on a real site and find the dock location that adds most margin

Equipment

  • Real plan of a campus building or store
  • Python and the module 6 example code
  • Stopwatch for the site walk

Safety

  • Desk work and site walk only; no flying
  • Get the site owner's permission first and do not share maps of real weaknesses

Steps

  1. Mark assets, fences, doors, cameras and possible dock sites on the plan
  2. Choose two intrusion paths and estimate the intruder's time per step
  3. Compute response time with and without a drone using Example 1
  4. Find the best dock location using Example 2
  5. Propose the one improvement that adds most margin and say whether it is detection, delay or response

Deliverables

  • Annotated site plan
  • Intruder and response time table
  • Dock location with reasons
  • Improvement proposal

Checklist

  • Table 1 has 2 intrusion paths, and every step has a time and the source of its estimate (Accuracy of calculations and data)
  • Table 2 includes dock opening and take-off in response time, with runnable code attached (Accuracy of calculations and data)
  • The improvement is labelled detection, delay or response, with the seconds of margin it adds (Mission design meets requirements)
  • The site owner gave permission before the walk, and the submitted plan does not publish real weaknesses (Safety, law and privacy)

Instructor guide

Class timing 360 min

  1. Brief detect, delay and respond; confirm the site owner's permission30 min
  2. Site walk and timing of intruder steps90 min
  3. Mark elements on the plan and choose intrusion paths60 min
  4. Compute response time and dock location with Examples 1 and 290 min
  5. Write the improvement proposal60 min
  6. Short presentations, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Intruder time per step on two intrusion pathsTable 1: numbers depend on the real site, but each step needs a source, such as a timed walk or the lesson's values (cut fence 60 s, run 150 m 30 s, force door 120 s, total 210 s), and cumulative time starts from the detection point, not from the start of the walk.
  2. Record: Table 2 Response time with and without a drone, and dock locationTable 2 (with Example 1 values): option A, guard walks 400 m at 1.5 m/s (266.7 s), looks 20 s, waits 120 s for backup, total 407 s, 197 s too late; option B, take-off 30 s, flies 300 m at 12 m/s (25 s), assesses 15 s, responds 120 s, total 190 s, in time with 20 s to spare. A central dock on the 600 × 400 m site gives a worst case of 60.0 s, a corner dock 90.1 s.
  3. Record: Box 3 Chosen dock location and one improvementBox 3: picks the location that cuts the worst case and explains real limits (buildings blocking signals, truck lanes, safe take-off and landing). A strong proposal is usually delay at a door or the point with the least margin, with the seconds it adds.
  4. Question 1: From Table 2, which part of the response time does the drone change, and which part still depends on people?The drone changes alarm assessment time, from walking to look to flying to confirm imagery. Stopping the intruder still needs a human response team, and flying from a dock needs specific approval for remote operations.
  5. Question 2: If a steel door raises forcing time from 120 to 300 s, what are the margins of both options, and which function does this improvement serve?The intruder's task becomes 60 + 30 + 300 = 390 s. Option A (407 s) is still 17 s late; option B (190 s) has 200 s to spare. The steel door is delay, and it works because it lies after the detection point.
  6. Question 3: What worst-case time does your chosen dock location give, and what limits on the real site do the numbers not show?In the lesson a central dock reaches the farthest point in 60.0 s and a corner dock in 90.1 s, a 30 s difference that matters when the margin is only 20 s. A strong answer mentions limits the numbers do not show, such as buildings blocking signals and truck lanes, and that the real site must be surveyed before deciding.
  7. Question 4: Why does a fence with no sensor help little under the timely detection principle? Give an example from your plan.The intruder crosses the fence unnoticed, so the time spent cutting it does not help the response team arrive in time; delay before the detection point is wasted. A strong answer points to a real fence section on the group's plan.

Discussion questions

  • A system with dozens of cameras still has its warehouse broken into; which step of detect, delay and respond is failing?
  • If the weather does not allow the drone to launch, what fallback should the system have?
  • For a truck yard where the intruder finishes in 90 s, should the fix be more detection or more delay, and why? (See Example 3.)

Adapting to student background

Upper secondary (M.6)
Have them write t_assess + t_respond < t_task and derive 60.0 s from √(300² + 200²) by hand before running the code, then act as timekeeper on the site walk.
Vocational certificate
Focus on the site walk and real timing first; use a timeline sheet to draw the intruder's bar against the response bar, instead of starting from formulas.
Diploma
Extension: compute risk R = P_A(1 - P_E)C as in Example 3 for the assets on the group's plan and propose the investment that removes the most risk per baht.

Common student mistakes: Common mistakes in the module 6 lesson

7Worksheet 7 Linking alarms to drone missions in a simulator
Lab · About 6 h of class time · CLO5

Objective: Turn zone alarms into automatic drone missions, measure real system time and assess operator workload

Equipment

  • Site plan from worksheet 6
  • ArduPilot or PX4 SITL and a ground station
  • Python with a MAVLink library and the module 7 example code

Safety

  • Simulation only; no real flights

Steps

  1. Split the fence into zones and build a zone-to-coordinate table with Example 1
  2. Write a script that takes a zone number and sends a fly-to mission to the SITL drone over MAVLink
  3. Time the interval from zone number to arrival
  4. Compare with the response time computed in module 6
  5. Assess operator workload with Example 2 under different alarm rates

Deliverables

  • Zone-to-coordinate table
  • Working script
  • Timing compared with module 6
  • Workload assessment

Checklist

  • Table 1 covers every zone of the group's fence and matches the Example 1 output (Accuracy of calculations and data)
  • The script takes a zone number and really sends the SITL drone a mission, shown by a screenshot or log (Mission design meets requirements)
  • Table 2 has at least 3 trials, each with its difference from the calculation explained (Accuracy of calculations and data)
  • Network-failure behaviour is stated for both dock and drone, and all work stayed in the simulator (Safety, law and privacy)
  • The workload assessment concludes whether one operator is enough in each case (Communication and reporting)

Instructor guide

Class timing 360 min

  1. Brief the architecture; check SITL and the MAVLink library30 min
  2. Split zones and build the coordinate table with Example 160 min
  3. Write the MAVLink mission script120 min
  4. Time several runs and compare with module 675 min
  5. Assess workload with Example 245 min
  6. Wrap-up, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Zone-to-coordinate tableTable 1 (with the lesson's 600 × 400 m site, 100 m zones from the south-west corner anticlockwise): 20 zones; zone 1 (50, 0), zone 4 (350, 0), zone 7 (600, 50), zone 10 (600, 350), zone 12 (450, 400), zone 18 (0, 250), zone 20 (0, 50). Every value must match the code.
  2. Record: Table 2 Measured time from zone number to arrivalTable 2: calculated from a central dock at (300, 200) at 12 m/s with a 30 s take-off: zone 7 is 335.4 m away, 58.0 s; zone 4 is 206.2 m, 47.2 s. Accept SITL times about 10-40 s longer because of mission upload, climb, acceleration and slowing; the SITL speed setting may not be 12 m/s, so compare with the simulator's real speed.
  3. Record: Table 3 Operator workloadTable 3 (Example 2 values): fence alarms only 12/h × 90 s = 30%; with drone verification 12/h × 40 s = 13%; with analytics filtering 4/h × 40 s = 4%. Other cases the group assumes, for example 20/h × 60 s = 33%.
  4. Question 1: Why is the time measured in SITL usually longer than the calculated t_launch + d/v? Name the steps the formula leaves out.The formula leaves out sending and acknowledging the mission over MAVLink, arming, climbing to the set height, acceleration and slowing, and settling at the point. A strong answer separates each step's time from the log.
  5. Question 2: From Table 3, on a windy night with 30 alarms per hour, what workload does the operator carry when finding views by hand and with automatic drone verification? What does this tell you?30/h × 90 s = 75% and 30/h × 40 s = 33%. At 75% the operator tires and starts dismissing alarms without looking. Automatic verification helps a lot, but on windy nights more nuisance filtering or a second operator is needed, and every filter may also discard real events.
  6. Question 3: Why must the zone-to-coordinate table be checked on the real site after sensors are installed, and how?Real fences rarely match the plan, so distance along the fence can be off. Check by triggering each zone's sensor for real, watching that the drone flies to where the alarm occurred, and correcting the table.
  7. Question 4: If the main network fails while the drone is flying to a zone, how should your system behave at the dock and on the drone?The dock must not launch the drone uncontrolled; a drone in flight needs a lost-link procedure, such as returning to the dock or landing at a safe point; and the security network must be separate from the office network.

Discussion questions

  • If the operator has to type coordinates during an incident, what time and error risks does that add?
  • How much time does a structured radio report save over a free-form description (see Example 3), and why should it be read back?
  • Who should be the single person directing when the drone and ground teams work together?

Adapting to student background

Upper secondary (M.6)
Have them explain the distance-to-coordinate function line by line and compute zone 12 by hand before running it, then run SITL and time the flights themselves for hands-on practice.
Vocational certificate
Provide a template MAVLink script with blanks for the zone number and coordinates; focus on running and timing first, then draw the zones on a paper plan to check the coordinates.
Diploma
Extension: add a check in the script that the drone has received and acknowledged the mission, and test the behaviour when the link is cut mid-flight in SITL.

Common student mistakes: Common mistakes in the module 7 lesson

8Worksheet 8 Testing event rules and tracking
Lab · About 6 h of class time · CLO5, CLO4

Objective: Test event rules and tracking on real scenes and explain the trade-offs of sensor combination and distance gates

Equipment

  • Tripod camera or drone with camera
  • Video-analytics software with virtual lines and zones
  • Python and the module 8 example code
  • An open yard

Safety

  • Fly within CAAT conditions in visual line of sight; keep bystanders clear
  • Film only consenting classmates and delete footage at the end of the course

Steps

  1. Set up the camera or fly over an open yard; draw a virtual line and restricted zone in the software
  2. Have classmates cross the line, loiter and walk close together in pairs
  3. Record detections and track swaps
  4. Compute OR and AND for the two sensors tested with Example 1
  5. Try 2, 5 and 10 m gates in Example 2 on the recorded data and explain the trade-off

Deliverables

  • Detection results by scenario
  • OR and AND results
  • Gate results with explanation

Checklist

  • Table 1 covers all three scenarios (line crossing, loitering, two people close together) with trial counts (Accuracy of calculations and data)
  • Table 2 uses Example 1 with the group's values and states the independence assumption (Accuracy of calculations and data)
  • Table 3 covers 2, 5 and 10 m and explains the trade-off between wrong pairings and new tracks (Mission design meets requirements)
  • Only consenting classmates were filmed, the flight met CAAT conditions, and a deletion date is recorded (Safety, law and privacy)

Instructor guide

Class timing 360 min

  1. Briefing on safety, consent and event rules30 min
  2. Set up the camera or fly; draw the virtual line and restricted zone60 min
  3. Run the three scenarios and record results105 min
  4. Compute OR and AND with Example 145 min
  5. Try the gates in Example 2 on the recorded data75 min
  6. Wrap-up, questions and hand-in checklist45 min

Expected results

  1. Record: Table 1 Detection results by scenarioTable 1: depends on the real test. Line crossing should be detected almost every time, loitering once the set time is exceeded, and two people close together usually cause at least one track swap; if none occurs, check that they walked close enough. Misses and false alarms must be recorded separately.
  2. Record: Table 2 OR and AND sensor combinationTable 2 (with Example 1 values: fence 0.90, analytics 0.85, nuisance 8 and 3 per day, 30 s window): OR detects 0.985 with 11.0 nuisance per day; AND detects 0.765 with 0.0167 per day (about one every 60 days). A 60 s window doubles AND nuisance to 0.0333 per day.
  3. Record: Table 3 Association gate resultsTable 3 (the lesson's Example 2 data): at 2, 5 and 10 m, T1 pairs correctly with detection 0 (1.92 m) and T2 with detection 1 (1.56 m), and detection 2, more than 47 m from every track, starts a new track. This data set does not show the trade-off, because the nearest wrong pair is 17.3 m apart. With the group's close-walking data, a 2 m gate tends to start new tracks when people move fast, and a 10 m gate tends to pair the wrong people.
  4. Question 1: From Table 2, should OR or AND be used to send the drone to verify, and to dispatch the response team? Why?OR sends the drone to verify, because detection is high (0.985) and a drone check is cheap. AND dispatches the response team at once without waiting, because nuisance is very low (0.0167 per day). The system gains both benefits, and response decisions still go through the operator.
  5. Question 2: Did the two-people-close-together scenario in Table 1 cause a track swap? How did the gates in Table 3 affect it?A strong answer quotes the group's own results: too wide a gate pairs the wrong person when people walk close together, too narrow a gate loses the track and starts a new one, and real systems solve all pairs at once, for example with the Hungarian method, rather than one track at a time.
  6. Question 3: Why might AND nuisance alarms in real tests be higher than calculated?One cause, such as strong wind, shakes the fence and sways trees in the image at the same time, so the sensors are not independent. Collect real statistics for several weeks after installation.
  7. Question 4: Why must the report to the ground team carry heading and speed, not just position? (See Example 3.)In Example 3, driving to the reported point arrives in 53.0 s, by which time the intruder has run 265 m. With heading and speed the vehicle meets him about 38 s after setting off, and the structured report (meeting 44.4 s after the sighting) is 11.2 s faster than the free-form description (55.6 s).

Discussion questions

  • An intruder who knows the system may move very slowly or hide in blind spots; how should the system cope?
  • Why must a human operator always decide on sending people to respond, even when detection is accurate?
  • A model trained on fixed-camera images may perform poorly on drone images; how would you check it before real use?

Adapting to student background

Upper secondary (M.6)
Have them derive P_OR = 1 - (1 - P₁)(1 - P₂) and where 2τN₁N₂ comes from using probability, then put them in charge of setting up the camera and running the yard test.
Vocational certificate
Focus on the yard test and tallying results with ticks, then explain association with gate circles drawn on paper instead of starting from formulas.
Diploma
Extension: change Example 2 to assign all pairs at once by the lowest total distance and compare with one-at-a-time association on the close-walking data.

Common student mistakes: Common mistakes in the module 8 lesson

9Worksheet 9 Data policy and security assessment
Lab · About 6 h of class time · CLO6

Objective: Set storage and retention by purpose, preserve video evidence integrity and plan security controls with NIST CSF

Equipment

  • Python and the module 9 example code
  • A video clip from worksheet 8
  • A SHA-256 tool
  • SITL with MAVLink signing

Safety

  • Desk and simulation work only; no flying
  • Keep signing keys out of submitted files

Steps

  1. Compute the group's storage for 7, 14 and 30 days with Example 1
  2. Propose a retention period justified by purpose
  3. Export one clip with its hash and write a chain-of-custody record
  4. Enable MAVLink signing in SITL, try an unsigned command and record the result
  5. Write a six-function NIST CSF table with at least one control per function

Deliverables

  • Storage table and retention policy
  • Clip with hash and chain-of-custody record
  • MAVLink signing test result
  • CSF table

Checklist

  • Table 1 covers 7, 14 and 30 days with correct TB units and code attached (Accuracy of calculations and data)
  • The exported clip has time, camera, exporter and SHA-256, with a chain-of-custody record (Safety, law and privacy)
  • The CSF table has all six functions, each with at least one control that fits the group's system (Mission design meets requirements)
  • No signing key or password appears in submitted files (Safety, law and privacy)

Instructor guide

Class timing 360 min

  1. Brief the threats and how to keep signing keys25 min
  2. Compute storage and propose retention60 min
  3. Export the clip with its hash and write the custody record75 min
  4. Enable MAVLink signing in SITL and test an unsigned command90 min
  5. Write the NIST CSF table75 min
  6. Wrap-up, questions and hand-in checklist35 min

Expected results

  1. Record: Table 1 Storage by retention periodTable 1 (with the Example 1 system: 30 cameras at 4 Mb/s recording 24 h, drone 6 Mb/s for 3 h a day): 7 days 9.07 + 0.057 = 9.13 TB, 14 days 18.14 + 0.113 = 18.26 TB, 30 days 38.88 + 0.243 = 39.12 TB. Accept rounding within ±0.01 TB. The reason must cite purpose, such as how long it usually takes for incidents to surface and footage to be requested.
  2. Record: Box 2 Clip export, hash, chain-of-custody record and MAVLink signing test resultBox 2: file name, time, camera, exporter, SHA-256 and every handover (date, time, from, to, reason). The test should show that with signing enabled the SITL drone ignores the unsigned command; if it still obeys, check that signing is enabled on both sides.
  3. Record: Table 3 Controls under the six NIST CSF 2.0 functionsTable 3: Govern sets ownership, policy and acceptable risk; Identify inventories every device; Protect segments networks, changes default passwords, patches software and enables MAVLink signing; Detect monitors login logs and abnormal GNSS positions; Respond has a procedure for a suspected hijack, such as landing at once or returning to the dock; Recover backs up configuration and reviews after incidents.
  4. Question 1: What purpose-based reason supports your proposed retention, and why should it not be set by available disk?A strong answer cites purpose, such as within how many days most incidents are reported, so footage must be kept long enough to review, and the Personal Data Protection Act B.E. 2562 (2019), which allows keeping only what is necessary for the purpose. Evidence is exported separately and kept for the life of the case. Setting retention by disk keeps personal data longer than needed.
  5. Question 2: What happened when you sent an unsigned command in SITL? Which threats does MAVLink signing stop, and which does it not?With signing enabled the command should be rejected. Signing stops forged or replayed commands from anyone without the key, but not jamming, GNSS spoofing or theft of a poorly stored key.
  6. Question 3: The drone's position changes from (0, 0) to (30, 40) m in one second. What should the system do, and which CSF function covers it?Speed √(30² + 40²) = 50 m/s exceeds the roughly 20 m/s maximum and is physically impossible. The system should alert the operator and cross-check other sources, such as inertial sensors or camera imagery. This is the Detect function, and a confirmed spoof triggers the Respond procedure.
  7. Question 4: If a clip's hash does not match its record when handed to a court, what is wrong with the evidence, and how does the chain-of-custody record help?A mismatched hash means the file is not what was exported, so nobody can show it was unaltered. The custody record shows who held the file and when, so the step where it changed can be found, and the stored original should be used instead.

Discussion questions

  • Who in the organisation should be allowed to export video, and how would that right be audited?
  • If a signing key leaks, what must be done, in what order?
  • Recording at full rate only on motion saves a lot of storage, but what is lost?

Adapting to student background

Upper secondary (M.6)
Have them explain why changing one byte changes the whole hash and convert Mb/s to TB by hand before running the code, then configure signing in SITL themselves for hands-on practice.
Vocational certificate
Do the practical steps first (export the clip, compute the hash, test the command in SITL), then compute storage with a fill-in table one unit at a time (Mb/s to bytes per second, times seconds, divided by 10¹²).
Diploma
Extension: adapt the Example 2 GNSS check to read a real SITL log and inject a position jump to see whether the system alerts.

Common student mistakes: Common mistakes in the module 9 lesson

10Worksheet 10 Privacy plan and unknown-drone response plan
Analysis activity · About 6 h of class time · CLO6, CLO3

Objective: Reduce privacy impact on surrounding communities and write a timely, lawful unknown-drone response plan

Equipment

  • The group's site plan and system
  • Python and the module 10 example code
  • Mission simulator
  • Role cards for the tabletop exercise

Safety

  • Desk and simulation work only; no flying
  • The response plan must not jam signals or seize others' drones without legal authority

Steps

  1. Identify sensitive areas around the site and compute the share needing camera restrictions with Example 1
  2. Set the restrictions in the simulator mission
  3. Draft signs and a community notice about drone use and recording
  4. Write an unknown-drone response plan and compute timings with Example 2 at 500 and 1,000 m, name any late step and revise the plan
  5. Run a tabletop exercise with operator, security chief and community representative roles, then revise

Deliverables

  • Sensitive area map and mission settings
  • Draft signs and community notice
  • Response plan with timings
  • Exercise notes and revised plan

Checklist

  • Table 1's total length and share of restricted fence match the Example 1 output (Accuracy of calculations and data)
  • Table 2 covers both 500 and 1,000 m and names any late step with its fix (Accuracy of calculations and data)
  • The response plan has no jamming, shooting or seizing of others' drones, and includes notifying the authorities (Safety, law and privacy)
  • The draft signs and notice state purpose, flight times and a contact channel (Communication and reporting)
  • The revised plan lists at least 2 changes from the exercise (Mission design meets requirements)

Instructor guide

Class timing 360 min

  1. Brief the legal frame and what private operators may do30 min
  2. Identify sensitive areas, compute the share and set restrictions in the simulator90 min
  3. Draft signs and the community notice45 min
  4. Write the response plan and compute timings with Example 275 min
  5. Tabletop exercise in roles75 min
  6. Revise the plan, answer questions and run the hand-in checklist45 min

Expected results

  1. Record: Table 1 Fence sections beside sensitive areas and camera restrictionsTable 1 (with Example 1 values: 2,000 m fence, sections beside homes at 400-700 m and 1,500-1,650 m): 300 + 150 = 450 m, or 22.5%. Restrictions: camera points inward only, privacy masks over the homes, no zooming outside the fence, and flying below the height from which yards are visible.
  2. Record: Table 2 Unknown-drone response timingsTable 2 (Example 2 values: drone approaching at 15 m/s, confirm 20 s, move staff under cover 30 s, notify police 60 s): from 1,000 m the drone arrives in 66.7 s; confirmation done at 20 s and cover at 50 s, in time; police notified at 110 s, after arrival. From 500 m it arrives in 33.3 s; confirmation is in time (20 s) but cover at 50 s is late. Starting cover at once, in parallel with confirmation, finishes at 30 s, in time, with only 3.3 s of margin, which is very thin.
  3. Record: Box 3 Tabletop exercise notes and plan revisionsBox 3: records each role's questions, the gaps found and at least 2 plan changes, such as starting cover at once for close detections, recording the drone and its direction as evidence, and adding a community contact channel.
  4. Question 1: When an unknown drone is detected at 500 m, does the original plan finish in time? How did the group change the order or steps, and does people's safety still come first?No: cover finishes at 50 s, after the drone arrives at 33.3 s. A good fix starts moving people under cover at once, in parallel with on-screen confirmation (done at 30 s), or extends the detection range; to finish the first two steps one after the other before arrival, detection must happen farther than 50 × 15 = 750 m away (at exactly 750 m there is 0 s of margin), while the parallel plan needs at least 30 × 15 = 450 m. Notifying the police still follows once people are safe.
  5. Question 2: Why can a security company not install a jammer itself, and why should it not send its own drone to chase?A jammer is radio equipment whose possession and use need authorisation under section 6 of the Radio Communications Act B.E. 2498 (1955), and it disrupts other communications and navigation around the site. Chasing with your own drone risks a mid-air collision and falling on people or property, and is beyond a private operator's authority. What is possible is to detect, record, protect people and notify the authorities.
  6. Question 3: Why should camera restrictions be set in the automated mission rather than left to the operator's care?Operators can forget or slip during an incident; built into the mission, the restrictions apply on every flight and can be audited. A strong answer cites the Personal Data Protection Act B.E. 2562 (2019) and the 2015 Ministry of Transport notification forbidding flights that violate privacy.
  7. Question 4: In the tabletop exercise, what worried the community representative most, and which measure did the group offer?Depends on the exercise. A common concern is the camera seeing into homes or people being followed outside the fence. A strong answer offers checkable measures: privacy masks, no zooming beyond the fence, not following people outside it except an intruder who has just fled, handed to the police at once, signs and a contact channel.

Discussion questions

  • If an unknown drone circles over the site for a long time doing nothing, what should the team do next, and what evidence should go to the authorities?
  • How does telling the community in advance help the security of the system itself?
  • If a client asks for a jammer, how should the system designer respond?

Adapting to student background

Upper secondary (M.6)
Have them compute the minimum detection range at which every step needed before arrival finishes in time and summarise the cited legal sections, then set the restrictions in the simulator themselves.
Vocational certificate
Focus on setting restrictions in the simulator and the role play first; use a paper timeline to draw the steps against the drone's arrival instead of starting from formulas.
Diploma
Extension: set privacy masks and camera angles in the simulated mission for every fence section beside homes, then fly one simulated circuit to check that no section looks beyond the fence.

Common student mistakes: Common mistakes in the module 10 lesson

Scoring rubric

For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.

CriterionWeightExcellent (4)Good (3)Fair (2)Needs work (1)
Accuracy of calculations and data30%All numbers correct, with reproducible method and code; errors explainedNearly all correct, method shownSome errors or missing stepsMany errors or no method
Mission design meets requirements25%All requirements measurable and met, with reasonsMost requirements measurable and metSome requirements unmeasurable or unmetPlan not linked to requirements
Safety, law and privacy20%Approvals, sensitive areas and controls complete and correctNearly completeSome key points missingNot considered or unlawful
Communication and reporting25%Clear, concise, separates observations from assumptions, correct citationsClear with minor flawsHard to follow or missing partsDoes not communicate results

Assessment map: CLOs and how they are assessed Draft

The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.

CLOWorksheetsModule quizzes
CLO1 Design surveillance missions, define areas and flight patterns, and select cameras to meet requirementsW 1W 2W 3M1M2M3
CLO2 Transmit real-time imagery, record and manage data, track targets and evaluate mission performanceW 2W 4W 5M2M4M5
CLO3 Comply with law and privacy ethics in surveillanceW 1W 4W 5W 10M1M4M5M10
CLO4 Design UAS-based site surveillance and security systems on detect, assess and respond principlesW 6W 8M6M8M10
CLO5 Integrate UAS with cameras, sensors, communications and control centres to detect events and track objectsW 7W 8M7M8
CLO6 Manage data and apply system security principles, law and privacyW 9W 10M9M10