UAT 457 UAS for Transportation and Autonomous Delivery
Worksheet 9 Precision landing, dock sizing and a mock locker
Objective
Design a landing marker, prove landing accuracy and lost-target behaviour, size the dock bank, and build a locker that verifies recipients with TOTP
Equipment and materials
- Drone supporting precision landing with a downward camera or IR-LOCK
- ArUco marker printed at the computed size with a nested marker
- Microcontroller board, keypad and a mock solenoid lock
- Computer with SITL and Python
Safety
- Fly within CAAT conditions in visual line of sight; keep people clear
- Check batteries and propellers before every flight; store lithium batteries in fire-resistant bags or boxes
- Test landings in open ground with nobody near the marker during descent
- Power the mock locker from low voltage; do not connect 230 V mains directly to the test circuit
Steps
- Compute the marker size with Example 1 for the department's camera and print an ArUco marker with a nested marker
- Set up precision landing in SITL, then land on the marker at least 20 times in the field; measure offsets and analyse with Example 2
- Test with the marker half covered and missing; record whether the drone follows PLND_STRICT or required mode
- Size the dock bank for the site with Example 3 for both charge-in-dock and battery swap
- Build a mock locker that checks TOTP codes as in Example 4 and test valid, expired and wrong codes
Record of results
| Landing | dx (cm) | dy (cm) | Landing | dx (cm) | dy (cm) |
|---|---|---|---|---|---|
| Test case | Setting used | Expected behaviour | What happened | Pass? |
|---|---|---|---|---|
| Option | Slot time per sortie (min) | Average busy slots | Slots needed | Batteries on bench chargers |
|---|---|---|---|---|
Questions
From Table 1, what are the mean, maximum and 95th percentile offsets? Does a good-looking mean tell the whole story?
With the marker half covered or missing, did the drone follow its setting? Why should a delivery system not fall back to a normal landing?
From Table 3, what is traded between charging in the dock and swapping batteries? Which would you choose for the group's site?
A code generated at second 100 is entered at second 155. Does the locker open? Explain with the 30 s step and the accepted window.
Why should the system not mark a job DELIVERED as soon as the drone reports it has released the box?
Check before you hand in
What to hand in
- Marker-size calculation and the marker used
- Offset table and landing-accuracy summary
- Dock-count calculation for both options
- Working mock locker and code test results