Teaching pack · UAT 457

A 15-week teaching plan, 10 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.

Last updated: · 3(1-4-4) · Per week: lecture 1 h, lab 4 h, self-study 4 h; 75 contact hours per term

Coverage of the course description

The lessons fully teach 12 of 12 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.

Description topicModulesWhere it is taughtStatus
Applications of UAS to transportation and deliveryM1Module 1: Why this matters (the Doi Mok case) · When is a drone worthwhile? (Example 1, road versus air time) · Where drone transport is used, and what fits (three application groups, Example 4 screening six cases)Covered
Delivery system componentsM6M9M10Module 6: components of an autonomous delivery system (three layers, Figure 1) · Module 9: docks and charging stations · hand-over at the parcel locker · Module 10: the integration mapCovered
Aircraft and payload selectionM1Module 1: Selecting the aircraft · Must-have criteria before scoring (Example 2, weighted scoring matrix) · Payload equipment (P650 triple packaging, release, winch, parachute) · How long does the box stay cold? (Example 3)Covered
Weight and balance analysisM2Module 2: Mass budget (Example 1, goods mass from MTOM) · Centre of gravity and the conditions that must pass together (Example 1 continued: mass passes but the CG is out of range)Covered
Route and delivery-point planningM3M7Module 3: Parts of a delivery route · Flight altitude and terrain (Example 1) · Wind and the route (Example 2) · When one trip visits several points · Pickup and delivery points (Example 3) · Module 7: the corridor network and shortest routesCovered
Energy and flight-range managementM2M3Module 2: Hover power (Example 2) · Cruise power (Example 3) · Energy budget by mission phase (reserve, longest round trip, Example 4) · Battery safety in delivery work · Module 3: Wind and the route (extra energy in wind)Covered
Mission monitoringM4M8M10Module 4: Mission tracking · Staying in the corridor and estimating arrival (Example 4) · Receipt evidence (Example 5) · Module 8: Monitoring navigation health in flight (Example 2) · Module 10: Service performance indicators · Tracking trends with a control chartCovered
Payload release and receiving systemsM1M4M9Module 1: Payload equipment (release, winch, parachute) · Module 4: Three hand-off methods (Example 1) · Swing of a box on a line (Example 2) · Confirming touchdown before release (Example 3) · Module 9: Hand-over at the parcel locker (one-time password and exceptions)Covered
Basic autonomous operationsM6M7M8M9Module 6: The job life cycle (Example 1) · Levels of autonomy and the role of people · Module 7: The job queue and dispatching rules · Module 8: Three layers of obstacle avoidance · The fastest speed that still stops in time · Module 9: Autonomous take-off from a dock · Precision landingCovered
Abnormal-event managementM3M4M8Module 4: Abnormal events: decide before you fly (table of events, triggers, actions and owners, Example 6 where to land after a battery fault) · Module 3: Parts of a delivery route (emergency landing sites) · Module 8: Monitoring navigation health in flight (Example 2)Covered
Risk assessmentM5Module 5: Safety assessment of the delivery system · Ground risk on the route (Example 3, SAIL of two corridors) · Failure analysis with FMEA (Example 4 and the ISO 31000 process)Covered
Compliance with safety requirements for UAS transportationM1M3M5Module 5: Complying with safety requirements: from rule to evidence (three-group table, Example 5 checking the register before applying) · Module 1: Transport and delivery mission requirements (rules on dropping and suspending objects) · Module 3: Parts of a delivery route (legal height)Covered

Weekly teaching plan

WeekTopicPre-classLectureLabEvidence
1 M1Delivery mission requirementsRead module 1 'Why this matters' and 'Transport and delivery mission requirements'The Doi Mok case, eight aspects of requirements, rules on dropping and suspending objects, and evidence on carrying specimens by droneWorksheet 1 part A: choose a route and write a requirements table covering all eight aspects as checkable numbersMission requirements table
2 M1Payload equipment and the insulated boxRead 'Payload equipment'; run Example 3; take the module 1 quizP650 triple packaging, release, winch, parachute and heat conduction through the box wallWorksheet 1 part C: test a real insulated box with a temperature logger for 2 hours and compare with calculationWorksheet 1 report and module 1 quiz result
3 M2Hover and cruise powerRead 'Hover power' and 'Cruise power'; run Examples 2 and 3Momentum theory, the effect of air density, lift-to-drag ratio and why hover time must be minimisedWorksheet 2 part B: hover 60 s within visual line of sight with and without dummy goods, read power from the log and adjust the efficiencyMeasured versus calculated power
4 M3Route elements and flight altitudeRead module 3 'Parts of a delivery route' and 'Flight altitude and terrain'; run Example 1Corridor, waypoints, geofence, emergency landing sites, legal height, MSL versus AGL and terrain followingWorksheet 3 part A: draw the corridor in a mission planner, extract the terrain profile and find flight altitude and total climbRoute plan and terrain profile
5 M3Pickup and delivery points; midtermRead 'Pickup and delivery points'; run Example 3; review modules 1–3; take the module 3 quizMidterm examination (modules 1–3)Worksheet 3 part C: survey a real delivery point on campus, measure obstacles, check with the code and fly a test landing within visual line of sightWorksheet 3 report and midterm score
6 M4Box swing and touchdown confirmationRead 'Swing of a box on a line'; run Examples 2 and 3Swing period, slowing near the ground, tension-based confirmation logic and cutting a snagged lineWorksheet 4 part B: lower a dummy box from low height within visual line of sight on two line lengths, time the swing and tune the tension threshold if a sensor is availableSwing-period table and tested tension threshold
7 M5Fleet size and maintenance intervalsRead module 5 'Fleet management'; run Examples 1 and 2Fleet-management elements, availability, Little's law, continued airworthiness and staggered maintenanceWorksheet 5 part A: compute aircraft and battery numbers for normal demand and 50% more, and build a three-month maintenance tableFleet-size calculation and maintenance table
8 M5Mini-project presentationsCombine the results of modules 1–5 into one delivery-system design fileCourse wrap-up and project criteriaPresent the delivery-system design file to the hospital network (role-play) and revise from feedbackDesign file and mini-project presentation, scored with the rubric
9 M6The job life cycleRead 'The job life cycle'; run Example 1Finite state machines, statecharts, terminal states and refusing out-of-order eventsWorksheet 6 part B: add a LOADING state and test three valid and three invalid event sequencesState table and test results
10 M7The job queue and dispatching rulesRead module 7 'The job queue and dispatching rules'; run Example 1Lateness, FIFO, EDD, priority classes and the Moore and Hodgson algorithmWorksheet 7 part A: create 10 jobs and compare FIFO with EDDLateness table for both rules
11 M7Corridor network and reschedulingRead 'The corridor network and shortest routes' and 'Rescheduling when things change'; run Example 3; take the module 7 quizCorridor graphs, Dijkstra, A* and rescheduling rulesWorksheet 7 part C: build a corridor graph of at least 10 nodes, route, then close three segmentsCorridor graph, route table, rescheduling rules and quiz result
12 M8Navigation health monitorRead 'Monitoring navigation health in flight'; run Example 2Grace periods, action ladders and the relation to flight-controller failsafesWorksheet 8 part B: adapt Example 2 to the group's real log and count slow-downs and diversionsLog analysis results
13 M9Autonomous take-off and precision landingRead module 9 'Autonomous take-off from a dock' and 'Precision landing'; run Example 1Go/no-go checks, PX4 landing modes, ArduPilot PLND parameters and ArUco markersWorksheet 9 part A: compute the marker size, print an ArUco marker with a nested marker, and set up precision landing in SITLMarker-size calculation and SITL settings
14 M9Hand-over at the parcel lockerRead 'Hand-over at the parcel locker'; run Example 4; take the module 9 quizProof of delivery, TOTP per RFC 6238 and exceptionsWorksheet 9 part C: build a mock locker with a microcontroller board and the TOTP codeWorking mock locker and quiz result
15 M10MQTT, indicators and control chartsRead 'MQTT for field equipment', 'Service performance indicators' and 'Tracking trends with a control chart'; run Examples 2 to 4; take the module 10 quizTopics, retained and will messages, message expiry, QoS, per-device permissions, SLI, SLO and p chartsWorksheet 10 part B: set up a Mosquitto broker, run the mock system for at least an hour, and compute SLIs and a p chartBroker configuration, draft KPI report and quiz result

Worksheets and instructor guide

One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.

1Worksheet 1 Mission requirements and aircraft selection
Lab · About 6 h of class time · CLO1

Objective: Write delivery mission requirements as checkable numbers, compare road and air time, select an aircraft with must-have criteria and weighted scores, and test an insulated box

Equipment

  • Online map and distance tool
  • Specification sheets for at least three aircraft
  • Foam box with ice pack and temperature logger
  • Computer with Python and the example code at /downloads/uat-457/

Safety

  • Mostly desk work; no flying
  • Use ice packs as the maker directs; no dry ice in closed rooms
  • Do not use real patient specimens to test the box

Steps

  1. Choose a route and write a requirements table covering all eight aspects as checkable numbers
  2. Find road distance, road time and straight-line distance, and compare times with Example 1
  3. Set must-have criteria and weights, agreed with the users (role-play)
  4. Score at least three aircraft with Example 2 and vary the weights to test sensitivity
  5. Leave the insulated box with a logger for 2 hours and compare temperatures with Example 3

Deliverables

  • Mission requirements table
  • Road versus air time table
  • Scoring matrix with sensitivity results
  • Logged temperature plot against calculation

Checklist

  • Table 1 covers all eight aspects and every entry is a number with a unit, not an adjective such as 'fast' (Design of the mission, pickup and delivery points and hand-off)
  • Every row of Table 2 shows flight time from t = d/v + t0 with stated v and t0, and the runnable code is attached (Accuracy of weight, energy and route calculations)
  • Table 3 removes aircraft that fail the must-have before scoring, and the weights sum to 1 (Design of the mission, pickup and delivery points and hand-off)
  • The logger temperature plot is attached with the calculated value and the measured outside temperature (Accuracy of weight, energy and route calculations)
  • The legal aspect names beyond-visual-line-of-sight flight and lowering goods as needing permission (Safety assessment and legal compliance)

Instructor guide

Class timing 360 min

  1. Objectives, the Doi Mok case and ice-pack safety30 min
  2. Choose a route and write the eight-aspect requirements table75 min
  3. Measure road and straight-line distance, then run Example 145 min
  4. Set criteria, score aircraft with Example 2 and test sensitivity90 min
  5. Two-hour insulated-box test against Example 390 min
  6. Wrap-up, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Mission requirements in all eight aspectsTable 1: all eight aspects (goods, distance and route, time, frequency, environment, hand-off, law and permission, evidence). With the Doi Mok case a strong table has blood tubes in triple packaging up to 1.2 kg at 2-8 °C, 14-24 km straight-line, at the lab within 2 hours of collection, 15 trips a day, and times, temperature, sender and recipient logged for every trip. Every row has a check method.
  2. Record: Table 2 Road versus air timeTable 2 (with the Example 1 values: 22 m/s, t0 = 6 min): A flies 21.9 min and saves 43.1 min (66%), B 24.2 min saving 55.8 min (70%), C 16.6 min saving 78.4 min (83%). The group's own route gives different numbers but must follow the formula; accept ±0.1 min from rounding.
  3. Record: Table 3 Aircraft scoring matrix and sensitivity testTable 3 (with the Example 2 values): must-have range 2 × 24 × 1.3 = 62.4 km, the multicopter (18 km) fails, VTOL fixed-wing 4.00, fixed-wing with drop 3.50. With range 0.20 and hand-off 0.35 (others unchanged): VTOL 3.90, fixed-wing with drop 3.20, multicopter 3.65. The ranking of the two passing types does not change.
  4. Question 1: From Table 2, which destination gains most from a drone, and why? How would the result change if the fixed time per trip t0 grew a lot?C gains most (78.4 min or 83% saved) because the winding mountain road is 31 km against 14 km straight (2.21 times) and slow. As t0 grows, the advantage shrinks most on short routes, as in the Example 4 defibrillator case where 6 min of fixed time exceeds the 4.5 min cruise. A strong answer mentions waiting for vehicles and days when rain or wind ground the drone, so a road backup is needed.
  5. Question 2: When the group changed the criterion weights, did the ranking of the aircraft that pass the must-have change? What would happen if failing aircraft were not removed first?With the changed weights the VTOL still wins (3.90 against 3.20), so the result holds. But the multicopter scores 3.65, above the fixed-wing with drop; without filtering first it would rank second although its 18 km cannot reach the destination. If the ranking swaps after a small weight change, the options are close and more data is needed, such as a demonstration flight in the real area.
  6. Question 3: Does the box temperature logged over 2 hours agree with the holding time computed with Example 3? If not, what is the likely cause?With the Example 3 values: heat leak 7.56 W at 35 °C outside, a 0.4 kg ice pack lasts 4.9 h (5.9 h at 30 °C, 4.2 h at 40 °C). After 2 hours about 41% of the ice has melted (34% at 30 °C), so the inside should still be within 2-8 °C. If it warmed faster, likely causes are sunlight, opening the box often, thinner walls than assumed, or heat stored in the box and contents, which the model ignores. Doubling the wall to 50 mm gives about 9.8 h.
  7. Question 4: Which aspect in Table 1 was hardest to write as a number, and how did the group solve it? What permissions does the legal aspect of this route need?Usually environment or evidence. A strong answer turns it into a measurable value, such as wind at flight altitude below a stated limit, or temperature logged on every trip. Legal: beyond-visual-line-of-sight flight needs authorisation under the CAAT 2026 notification, and lowering or dropping goods needs a written enquiry to CAAT under ROA.3115 of Regulation No. 114, as the lesson teaches.

Discussion questions

  • If a hospital buys a drone first and then looks for work for it, what problems follow?
  • Who should set the criterion weights, and how should the reasons be recorded?
  • Why are studies showing drone transport does not change test results not enough to use it in our own lab straight away?

Adapting to student background

Upper secondary (M.6)
Have them write t = d/v + t0 and Q = kAΔT/d before running the code and predict the result; then let them assemble the box and fit the logger themselves with a hands-on peer.
Vocational certificate
Start with the real box and logger, give a fill-in table for converting km to m and seconds to minutes, and let them check with a calculator alongside the code.
Diploma
Extension: test two box set-ups (thin and thick wall, or shade and sun) and compare the warming rate with the calculation.

Common student mistakes: Common mistakes in the module 1 lesson

2Worksheet 2 Weighing and measuring real energy
Lab · About 6 h of class time · CLO1

Objective: Build a mass budget, measure real hover power to tune the model, and build an energy budget with reserve for the group's route

Equipment

  • Training drone with power monitor and logs
  • Digital scale
  • Box and dummy goods
  • Computer with Python and the example code at /downloads/uat-457/

Safety

  • Fly within CAAT conditions in visual line of sight in a closed area; keep people clear
  • Check batteries and propellers before every flight; charge in a fire-resistant container under supervision
  • Secure the dummy goods firmly; check the centre of gravity before flight

Steps

  1. Weigh every part and build the mass budget with Example 1
  2. Find the centre of gravity with the box fitted and check it is within the manufacturer's limits
  3. Hover 60 s without and with dummy goods; read average power from the log
  4. Compare measured power with Example 2 and adjust the efficiency
  5. Build the energy budget for the group's route with Example 4 and find the longest round trip with reserve

Deliverables

  • Mass budget and centre-of-gravity position
  • Measured versus calculated hover power
  • Energy budget by mission phase
  • Conclusion on real versus advertised range

Checklist

  • Table 1 weighs every item, including payload equipment not used on that trip, with no blank or zero masses (Accuracy of weight, energy and route calculations)
  • The manufacturer's CG window is stated and shown to pass or fail with numbers (Accuracy of weight, energy and route calculations)
  • Table 2 has both the no-goods and dummy-goods cases, with the log files used for the averages (Safe practice, records and presentation)
  • Table 3 covers every mission phase and uses usable energy E = Ebat u (1 - r), not the label energy (Accuracy of weight, energy and route calculations)
  • Battery, propeller and area-clearing checks are recorded before every flight (Safe practice, records and presentation)

Instructor guide

Class timing 360 min

  1. Flight and battery safety briefing; review the power formulas30 min
  2. Weigh parts, build the mass budget and find the CG75 min
  3. Hover 60 s without and with dummy goods; download logs90 min
  4. Compare power with Example 2 and adjust η45 min
  5. Build the route energy budget with Example 490 min
  6. Wrap-up, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Mass budget and centre of gravityTable 1 (numbers depend on the training drone; with the Example 1 values): items that fly every trip 16.4 kg, MTOM 18.5 kg, so 2.1 kg of goods allowed, 1.6 kg planned, 0.5 kg margin, take-off mass 18.0 kg (97% of MTOM). CG -0.005 m, inside ±0.015 m. Goods moved to x = 0.40 m give +0.021 m, which fails; goods may sit no further forward than x = +0.329 m.
  2. Record: Table 2 Measured versus calculated hover powerTable 2: for the lesson's aircraft (18.0 kg, four 0.66 m lift rotors, η 0.52) the calculation gives 2,464 W at sea level, 2,515 W at 420 m and 2,587 W at 1,000 m; without goods 2,143 W at sea level. The department's training drone gives much lower numbers; use the same formula with its real mass and rotor size. New η = 0.52 × calculated power ÷ measured power; for example 2,700 W measured at sea level gives η = 0.475. Power grows as mass to the 3/2 power (10% more mass, about 15% more power).
  3. Record: Table 3 Energy budget by mission phaseTable 3 (with the Example 4 values, route H to C): take-off and transition 28.2 Wh, climb 87.4 Wh, cruise 277.5 Wh, winch hand-off 75.5 Wh, landing 38.4 Wh, total 507 Wh of the 623 Wh available (977 Wh × 0.85 × 0.75), margin 116 Wh. A flat site with a landing hand-off can be at most about 24.9 km each way.
  4. Question 1: From Table 1, what percentage of MTOM does the aircraft use, and how many kg of goods margin are left? If the group's route needs no winch, what should be done?97% of MTOM with a 0.5 kg margin, so nothing may be added beyond the plan; goods are only 2.1 kg, about 11% of MTOM. If the route allows landing, remove the 0.9 kg winch and release and use that mass for goods or a bigger battery, then check the CG again.
  5. Question 2: If the goods box moves further forward, total mass may still pass while the CG fails. Explain with the group's numbers, and say why 0 must never stand in for an item not yet weighed.Moving 1.6 kg another 0.30 m forward shifts the CG by 1.6 × 0.30 ÷ 18.0 ≈ 0.027 m, from -0.005 to +0.021 m, outside ±0.015 m, although total mass is still 18.0 kg. Mass, CG and energy must all pass and cannot stand in for one another. Putting 0 for an unweighed item makes the figures look complete but wrong; the correct result is that total mass and CG are unknown.
  6. Question 3: Was the measured power higher or lower than calculated? After adjusting η, how did the energy budget and the longest round trip change?Real power is usually higher than calculated because the model omits some losses and wind, so the fitted η is below 0.52. With η 0.475 in Example 4 the hover phases grow (take-off 30.9, winch 82.7, landing 42.1 Wh), the total becomes 521 Wh, the margin 102 Wh, and the flat-site range falls from 24.9 to 24.3 km. A strong answer says planning must use the adjusted value, not the starting one.
  7. Question 4: How does the group's longest round trip compare with the manufacturer's advertised range, and what flying rule should the group set for a route that only just passes?The real range with full load and reserve is about 24.9 km each way, far from the advertised 80 km. Route B at 24.0 km only just passes, and only in calm air. A good rule: fly route B only when the headwind is below a computed limit, or with less load, or with a bigger battery, and set the battery failsafe to match the reserve in the plan.

Discussion questions

  • Why is cutting the reserve to make a plan pass more dangerous than reducing load or splitting trips?
  • Besides energy, how does thin air at a mountain hand-off point affect real operations?
  • If measured power varies a lot between flights, which value should the group plan with?

Adapting to student background

Upper secondary (M.6)
Have them compute the CG and hover power by hand before running the code, then do the weighing and box fitting with a mechanically skilled peer.
Vocational certificate
Use a fill-in table for the moments m·x, row by row; let them prepare the drone and run the pre-flight checks, then use the power code with the teacher explaining the 3/2 power.
Diploma
Extension: hover with three dummy-goods masses and plot power against mass to check whether it follows mass to the 3/2 power.

Common student mistakes: Common mistakes in the module 2 lesson

3Worksheet 3 Route planning and delivery-point survey
Lab · About 6 h of class time · CLO2

Objective: Plan a corridor that avoids risky areas, choose altitude from the terrain profile, account for wind, and survey a real delivery point

Equipment

  • Mission planner such as Mission Planner
  • Digital elevation data and forecast wind
  • Tape or laser rangefinder
  • Training drone for test landings

Safety

  • Fly within CAAT conditions in visual line of sight in a closed area; keep people clear
  • Check batteries and propellers before every flight; charge in a fire-resistant container under supervision
  • Survey without blocking footpaths or roads; wear high-visibility vests

Steps

  1. Draw the corridor, waypoints bypassing villages, a geofence and at least two emergency landing sites
  2. Extract the terrain profile and find flight altitude and total climb with Example 1
  3. Use forecast wind at flight altitude to find time and energy per leg with Example 2, and the highest flyable wind
  4. Measure obstacle heights and distances around a real delivery point and check them with Example 3
  5. Fly a test landing within visual line of sight at a point that passes, and record landing position error

Deliverables

  • Route plan file and corridor image
  • Terrain profile and altitude table
  • Time and energy table in wind
  • Delivery-point survey with obstacle check

Checklist

  • Table 1 keeps MSL and AGL apart in every row and states the authorised ceiling used (Accuracy of weight, energy and route calculations)
  • Table 2 uses forecast wind at flight altitude, with source and forecast time (Accuracy of weight, energy and route calculations)
  • The route plan has a geofence, at least two emergency landing sites, and bypasses villages (Design of the mission, pickup and delivery points and hand-off)
  • Table 3 states the group's slope criterion and radius with reasons, and every obstacle has a verdict (Design of the mission, pickup and delivery points and hand-off)
  • The test landing within visual line of sight is logged, including pre-flight checks and area clearing (Safe practice, records and presentation)

Instructor guide

Class timing 360 min

  1. Route elements, height rules and field safety briefing30 min
  2. Draw the corridor, geofence and emergency sites in the mission planner75 min
  3. Extract the terrain profile and run Example 145 min
  4. Compute time and energy in wind with Example 260 min
  5. Survey a real delivery point and fly test landings120 min
  6. Wrap-up, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Terrain profile and flight altitudeTable 1 (with the Example 1 profile): constant altitude 1,280 m MSL is 860 m above the ground at the base and above the 120 m AGL ceiling everywhere except the summit (100 m AGL at km 8). Terrain following at 100 m AGL stays within the ceiling everywhere, with 760 m of climb outbound and 220 m on the return.
  2. Record: Table 2 Time and energy per leg in windTable 2 (with the Example 2 values: wind from 070° at 8 m/s, airspeed 22 m/s, 785 W): out on 058°, heading 62.3°, ground speed 14.1 m/s, 16.5 min; back on 238°, heading 233.7°, 29.8 m/s, 7.8 min; total 24.4 min against 21.2 min calm (+15%); cruise energy 319 Wh against 278 Wh.
  3. Record: Table 3 Obstacles around the delivery pointTable 3 (with the Example 3 values: 5.0 m radius, 1:1 slope): tree 18 m at 30 m allows 25.0 m, passes; building 9 m at 22 m allows 17.0 m, passes; pole 8 m at 12 m allows 7.0 m, move; fence 2 m at 6 m allows 1.0 m, move. The 8:1 slope allows only 3.1, 2.1, 0.9 and 0.1 m.
  4. Question 1: From Table 1, why did the group choose terrain following or constant altitude, what is the trade-off, and what is missing from the terrain data used?Constant altitude is simple but exceeds the authorised height along almost the whole route. Terrain following stays within it but climbs 760 m, which costs 87.4 Wh in the Module 2 budget. Terrain data excludes trees, masts and power lines, so a clearance margin is needed, and 2 km spacing is far too coarse: use a finer elevation model and the highest point across the full corridor width.
  5. Question 2: From Table 2, does the tailwind home cancel the headwind out? Why?No. The drone spends longer in the headwind (16.5 min) than in the tailwind (7.8 min), so total time rises 15% and energy rises 41 Wh, shrinking the 116 Wh margin from Module 2 to 75 Wh.
  6. Question 3: What is the highest flyable wind for the group's route, and how will the group use that number to decide before flight?With the lesson values, a wind from 070° of about 12 m/s uses up the whole 116 Wh margin (cruise energy only; wind effects on hover and climb not included). The group's real limit must be lower to keep the reserve. A strong answer sets it as a go/no-go rule before flight, such as cancelling when forecast wind at flight altitude exceeds the stated value, not deciding halfway.
  7. Question 4: Which obstacles fail, how did the group fix it, and why not apply the 8:1 heliport slope directly?The pole and fence fail the 1:1 criterion; fix by moving the delivery point away, or to the yard behind the building, and checking again. The 8:1 slope is for helicopters approaching at an angle, so everything around the site fails, which is unrealistic for a drone descending almost vertically. The team must set its own criterion from tests and risk assessment and record the reasoning in the operations manual.
  8. Question 5: How does the landing position error measured in the test compare with the value used to set the obstacle-free radius? Does the radius need changing?Example 3 allows 2.0 m for position error. If the largest measured landing error is below 2.0 m the radius holds; if some landings exceed it, enlarge the radius or change the landing method and recheck obstacles. A strong answer uses the maximum or 95% value, not the mean.

Discussion questions

  • Why are emergency landing sites along the route safer than always returning to base?
  • If recipients want the delivery point at a busy building entrance, how would you negotiate?
  • Who should decide that today's wind is too strong, and when?

Adapting to student background

Upper secondary (M.6)
Have them draw the wind triangle and compute the WCA for one leg by hand before running the code, and give them the rangefinder role in the survey.
Vocational certificate
Start with the real delivery-point survey using a fill-in form, explain the wind formula with arrow drawings, and use the code without editing the formula.
Diploma
Extension: fly 10 test landings in two wind levels and compare the errors to propose a maximum wind for hand-off.

Common student mistakes: Common mistakes in the module 3 lesson

4Worksheet 4 Hand-off testing and mission tracking
Lab · About 6 h of class time · CLO2, CLO3

Objective: Test lowering or releasing goods in SITL and in the field, measure swing, tune touchdown confirmation and track a mission from logs

Equipment

  • Computer with ArduPilot SITL
  • Training drone with a gripper or small winch
  • Dummy box and lines of two lengths
  • Tension sensor (if available) and a stopwatch

Safety

  • Fly within CAAT conditions in visual line of sight in a closed area; keep people clear
  • Lower from low height only; nobody under the box
  • Approach the box or drone only after it has disarmed

Steps

  1. Configure a winch or gripper in SITL, write a mission with DO_WINCH or DO_GRIPPER and record each step's time
  2. Lower the dummy box on two line lengths and time the swing against Example 2
  3. Log tension while lowering onto grass and concrete, then tune the threshold in Example 3
  4. Take positions from the log and compute cross-track error and arrival time with Example 4
  5. Write a chain-of-custody record for one box from packing to the recipient's confirmation

Deliverables

  • SITL mission file and time table
  • Measured versus calculated swing periods
  • Tested tension threshold
  • Cross-track results, arrival time and chain-of-custody record

Checklist

  • Table 1 has two line lengths timed over 10 swings, with the period calculation and units (Accuracy of weight, energy and route calculations)
  • Table 2 tests both grass and concrete and states a final threshold that works on both (Design of the mission, pickup and delivery points and hand-off)
  • Every point in Table 3 has a signed cross-track error, and the estimated arrival time is computed (Accuracy of weight, energy and route calculations)
  • The chain-of-custody record runs from packing to the recipient checking count and condition (Safe practice, records and presentation)
  • The record shows nobody stood under the box and the drone was approached only after disarming, every time (Safety assessment and legal compliance)

Instructor guide

Class timing 360 min

  1. Three hand-off methods and lowering safety briefing30 min
  2. Configure the winch or gripper and a DO_WINCH or DO_GRIPPER mission in SITL75 min
  3. Lower the dummy box on two line lengths and time the swing75 min
  4. Log tension on grass and concrete and tune the threshold60 min
  5. Analyse cross-track error and write the chain-of-custody record90 min
  6. Wrap-up, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Measured versus calculated swing periodTable 1: calculated period 2.01 s on a 1 m line, 2.84 s on 2 m, 4.49 s on 5 m (Example 2 gives 6.34 s on 10 m and 12.69 s on 40 m). Measured periods should be within about 10% if the suspension point is still and the swing angle small.
  2. Record: Table 2 Line tension and touchdown thresholdTable 2 (with the Example 3 values: 2.3 kg box = 22.6 N, threshold 30% = 6.8 N, three consecutive samples, every 0.25 s): touchdown confirmed at 3.25 s (sample 13), although tension starts falling at 2 s. A good threshold gives no false release on either surface. If no tension sensor is available, use the lesson's sample data and say so in the report.
  3. Record: Table 3 Cross-track error from the logTable 3 (with the Example 4 values: C at (11.87, 7.42) km, corridor 150 m each side): along-track 2.51, 5.03, 7.28, 9.63 km; cross-track +37, +58, +244 (alert), +64 m; latest ground speed 19.7 m/s with 4.37 km to go, arrival in about 3.7 min.
  4. Question 1: How far did the measured period differ from the formula, what is the likely cause, and on a 40 m line how long must the box be left to settle?Differences come from the box not being a point mass, line stretch, the suspension point on the drone moving, and swing angles that are not small. A 40 m line has a 12.69 s period, so the 15 s wait in Example 1 is only about one swing. Lower slowly near the ground, hold the drone still, set a maximum wind for lowering, and stop if the box swings beyond the 5 m obstacle-free radius.
  5. Question 2: Why wait for several consecutive tension values below the threshold before releasing the hook, and how did grass and concrete differ?A brief low value may come from a gust lifting the box or a jerk; releasing at once could drop the box from height. Waiting for three consecutive values (0.75 s) prevents this. Soft grass lets tension fall more slowly than concrete and may hover near the threshold, so the threshold must be tested on several surfaces, and there must be a way out if the line snags: cut or release the line.
  6. Question 3: If the log shows a point outside the corridor that came back by itself, what must the operator do, and why must it still be logged and reported?The operator must be alerted and check the cause at once, such as a stronger crosswind than forecast or a navigation problem. Coming back by itself does not mean it was safe, so every excursion is logged and reported, to find the cause and check whether the corridor is wide enough. In Example 4 the 360 s point is 244 m out, beyond the 150 m edge.
  7. Question 4: In the chain-of-custody record, which event can close the delivery, and why can neither an acknowledgement nor adding every count report close it?Only a complete count against the waybill together with a report that the condition is intact closes the delivery. An acknowledgement only says the recipient saw the message. Counts are cumulative, so a new report replaces the old one; adding every report in Example 5 gives 3 boxes, more than the 2 on the waybill. With no condition report yet the job stays open and someone follows up.
  8. Question 5: Compare landing, winch lowering and parachute drop for the group's delivery point. Which suits it, and why?With the lesson's Example 1 values: landing 120 s, 68.4 Wh; winch 105 s, 75.5 Wh; parachute drop 60 s, 13.1 Wh, but the box descends at 4.89 m/s and drifts about 61 m in a 5 m/s wind. A strong answer chooses by site and goods: no pad means the winch, a pad that can be cordoned off means landing, never drop patient specimens or fragile goods by parachute, and lowering or dropping needs an enquiry to CAAT.

Discussion questions

  • If positions arrive only every 120 s as in the example, what could be missed, and how often should they arrive?
  • Why must the response to abnormal events be decided before flight rather than when they happen?
  • How can automatic return to base on low battery be the worst choice on a route over a ridge?

Adapting to student background

Upper secondary (M.6)
Have them derive the cross-track formula e = x uy - y ux with vectors before using the code, and give them the timing and recording role in the field.
Vocational certificate
Give them the gripper and line set-up and the safety checks, use a fill-in table for the swing period, and explain cross-track error by drawing on a map before the formula.
Diploma
Extension: connect a tension sensor to a microcontroller board, log real data, and find a threshold with no false release on sloping ground.

Common student mistakes: Common mistakes in the module 4 lesson

5Worksheet 5 Fleet size and safety file
Analysis activity · About 6 h of class time · CLO3

Objective: Compute fleet size and maintenance intervals, assess ground risk with SORA, build an FMEA of the delivery system, and combine everything into the mini-project design file

Equipment

  • Computer with Python and the example code at /downloads/uat-457/
  • Maps and public population-density data
  • SORA 2.5 tables and the latest CAAT notification
  • FMEA form

Safety

  • Desk work; no flying
  • Use area-level population data, not personal data
  • Label every assumed value clearly in the file

Steps

  1. Set daily demand and compute aircraft and battery numbers with Example 1 for normal demand and 50% more
  2. Build a three-month table of flight hours, maintenance and battery cycles with Example 2, staggered
  3. Draw the risk footprint of two corridors, find the highest density, and compute iGRC, GRC and SAIL with Example 3
  4. Build an FMEA of at least 8 items, propose measures and rescore with Example 4
  5. Combine modules 1–5 into a delivery-system design file for the week 8 presentation

Deliverables

  • Fleet-size calculation
  • Maintenance and battery table
  • SAIL table for two corridors
  • FMEA tables before and after measures, and the delivery-system design file

Checklist

  • Table 1 has both normal and 50% higher demand, with the operating window and availability used (Accuracy of weight, energy and route calculations)
  • The three-month maintenance table shows no day when every aircraft is down together (Accuracy of weight, energy and route calculations)
  • Table 2 uses the highest footprint density, not the average, and cites the population data source (Safety assessment and legal compliance)
  • Table 3 has at least 8 items covering aircraft, payload equipment, delivery points and tracking, rescored after measures (Safety assessment and legal compliance)
  • Every assumed value in the design file is labelled as assumed (Safe practice, records and presentation)

Instructor guide

Class timing 360 min

  1. Review fleet management, Little's law and the SORA steps30 min
  2. Compute fleet and battery numbers for both cases60 min
  3. Build the three-month maintenance and battery table45 min
  4. Draw risk footprints and find the SAIL of two corridors75 min
  5. Build the FMEA, propose measures and rescore75 min
  6. Assemble the design file, answer questions and run the hand-in checklist75 min

Expected results

  1. Record: Table 1 Fleet size and battery numbersTable 1 (with the Example 1 values: 22 m/s, 6 min fixed, 15 min ground, 10 h window, availability 0.80): normal demand 15 trips, 12.9 h, 1.61 so 2 aircraft, average busy batteries 1.5 × 2.61 = 3.9, allocate 4 per aircraft, 8 in total. With 50% more (A 9, B 8, C 6 = 23 trips): 19.8 h, 2.47 so 3 aircraft, 6.0 batteries busy on average.
  2. Record: Table 2 SAIL for two corridor optionsTable 2 (with the Example 3 values: 3 m / 35 m/s column, ARC-b, parachute M2 medium, minus 1): through town 1,800 people/km², iGRC 6, GRC 5, SAIL IV; around town 350 people/km², iGRC 5, GRC 4, SAIL III.
  3. Record: Table 3 FMEA before and after measuresTable 3 (with the Example 4 items as the first five): line snags on a tree 96, wrong box to wrong site 90, hook opens in the air 84, C2 link lost over the ridge 70, box above 8 °C 48. Example after measures (assumed): lowering points chosen by the Module 3 criteria cut snag O from 4 to 2, giving 48; scanning the box code cuts wrong-box D from 5 to 2, giving 36; a double lock cuts hook O from 2 to 1, giving 42. Real numbers depend on the group's scoring, but S × O × D must be correct.
  4. Question 1: Why must the number of aircraft be rounded up, and why allocate more batteries than the Little's law average?Round up because 1.61 aircraft cannot be used, and rounding down leaves work undone. 3.9 is a whole-day average, but the morning is busier, so 4 per aircraft (8) are allocated. Averages do not show whether morning samples reach the lab within 2 hours; that needs trip-by-trip scheduling (Module 7).
  5. Question 2: In the three-month maintenance table, what happens if all aircraft start together, and how did the group stagger them?With the Example 2 values: each aircraft flies 4.6 h a day, so the 50 h major check falls about every 11 days. If both start together they fall due on the same day and too few aircraft remain, so the second is offset by about half an interval (5-6 days). Each battery does 1.88 cycles a day and reaches 300 cycles in about 160 days, so replacements are budgeted every six months, and packs with abnormally high internal resistance are retired early.
  6. Question 3: Why is a corridor with a lower SAIL better, and what must be checked again once it is chosen?SAIL III needs lighter evidence for the operational safety objectives (OSOs) than SAIL IV, so documents, tests and training cost less. But the bypass is longer, so the energy budgets of Modules 2 and 3 must be checked again, especially with a headwind, and the ground risk buffer recomputed because the parachute changes how the aircraft falls.
  7. Question 4: Does the group's FMEA have an item with a low RPN but high severity? How should it be ranked?Lesson example: S9 O2 D3 and S3 O6 D3 both give RPN 54, but the first is far more severe and needs measures first. IEC 60812 warns that RPN is only a ranking aid and high-severity items always need attention even with a low RPN. A strong answer points to a real item in the group's table, such as the hook opening in the air, and reviews the table whenever the system changes.

Discussion questions

  • As demand keeps growing, when should the network add aircraft, and when should it add a base?
  • What evidence does claiming a GRC reduction for a parachute need, and who should run the tests?
  • When should the safety file be reviewed after permission has been granted?

Adapting to student background

Upper secondary (M.6)
Have them explain Little's law and the SORA steps to the group, then interview a real technician or battery keeper to set O and D in the FMEA.
Vocational certificate
Start from the FMEA using their own repair experience, use a printed SORA table and point to each cell step by step, and run the fleet code changing only the trip numbers.
Diploma
Extension: build the maintenance table with one spare aircraft and compare the number of days when serviceable aircraft fall short of demand.

Common student mistakes: Common mistakes in the module 5 lesson

6Worksheet 6 Architecture, life cycle and intake gate
Analysis activity · About 6 h of class time · CLO4

Objective: Design a delivery-system architecture, write the job life cycle, and build an intake gate that refuses infeasible requests with reasons

Equipment

  • Computer with Python and the example code at /downloads/uat-457/
  • Map or aerial image of the group's chosen site
  • Paper or diagramming software

Safety

  • Desk work, no flying
  • Do not use real personal data of staff or recipients in test sets

Steps

  1. Sketch the three-layer architecture for the chosen site with external systems, server services, field equipment and communication links
  2. Write the state table from Example 1 and add LOADING between ASSIGNED and IN_FLIGHT
  3. Test three valid and three invalid event sequences and record results
  4. Extend Example 2 to check box dimensions and propose the earliest feasible time when the deadline fails
  5. Build at least 10 test requests covering every refusal reason, run them and tabulate results

Deliverables

  • Architecture diagram
  • State table and event-sequence test results
  • Extended intake-gate code
  • Results table for 10 test requests

Checklist

  • The architecture diagram has all three layers and every link names its channel (REST or MQTT) (Design of the mission, pickup and delivery points and hand-off)
  • Table 1 has three valid and three invalid sequences, and no event leaves a terminal state (Design of the mission, pickup and delivery points and hand-off)
  • Table 2 has at least 10 requests covering every refusal reason, including a repeat and box size (Accuracy of weight, energy and route calculations)
  • Every refusal gives a reason the requester can act on, and a failed deadline proposes the earliest time (Design of the mission, pickup and delivery points and hand-off)
  • The test set contains no real personal data of staff or recipients (Safe practice, records and presentation)

Instructor guide

Class timing 360 min

  1. Briefing on the three layers, finite state machines and the intake gate30 min
  2. Sketch the architecture for the group's site75 min
  3. Add LOADING to the state table and test event sequences75 min
  4. Extend the intake gate for box size and the earliest time90 min
  5. Build and run the 10 test requests60 min
  6. Wrap-up, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Event-sequence tests of the life cycle with LOADINGTable 1 (if a load event takes ASSIGNED to LOADING and takeoff takes LOADING to IN_FLIGHT): valid sequences such as validate_ok, assign, load, takeoff, arrive, handed_over ending at DELIVERED; validate_ok, assign, load, cancel ending at CANCELLED (if the group allows cancelling while loading); validate_ok, assign, load, takeoff, abort, docked ending at FAILED. Invalid ones: takeoff from ASSIGNED is refused (LOADING must come first), cancel in IN_FLIGHT is refused, abort after DELIVERED is refused.
  2. Record: Table 2 Intake-gate test requestsTable 2 (with the Example 2 values: 12 m/s, 6 min queue, 4 min other time, 2.0 kg limit): J101 to F3 gets 201, ETA 15.0 min; J102 at 2.6 kg gets 422 too heavy; J103 to F9 gets 422 unknown drop point; J104 to F6 due in 12 min gets 422 because the ETA is 16.7 min; J105 lithium battery gets 422 dangerous goods; the repeated r-01 gets 200 returning J101. The group's set must also include an oversize box. ETAs to F1 to F6: 12.9, 14.5, 15.0, 16.7, 15.8, 16.7 min.
  3. Record: Working: computing the earliest feasible time when the deadline failsThe earliest time is the ETA itself: for J104 to F6 propose 16.7 min (6 + 4790/12/60 + 4) and let the requester decide. To meet a 20 min deadline with the same queue and other time, the drone must fly at least 4790/600 = 7.98 m/s. Good work shows t_ETA = t_q + d/v + t_o and states the values used.
  4. Question 1: From Table 1, if the requester presses cancel while the drone is flying, what should the system do and why? Should LOADING accept a cancel?Refuse the cancel and use abort to bring the drone back, because the item is still in the air; marking it CANCELLED would corrupt the history and nobody would recover the item. LOADING may accept cancel because the drone has not taken off, but the item must be unloaded. A strong answer says any event not in the table is refused and logged, not ignored.
  5. Question 2: In what order does the group's intake gate check things? What would happen if time were computed before the destination was checked?Cheap checks first: repeated request, destination, mass and size, goods category, then time. Computing time first would crash on F9, which is not in the distance table. Every refusal must give a reason the requester can fix.
  6. Question 3: What did the repeated request in the test set return? Without request IDs, what would happen to real jobs?The repeat returned 200 with the original job and no new job, because POST is not idempotent. Without request IDs, an ERP that resends after a network glitch would make one spare part fly twice.
  7. Question 4: In the group's architecture diagram, which tasks must run on the drone and which on the server? If the server goes down mid-flight, how does the system stay safe?On the drone: holding attitude and stopping before obstacles, because they must respond within a fraction of a second and the link may drop. On the server: which drone takes which job, because it needs all jobs and drones in view. If the server goes down, the drone finishes its accepted task or returns to a dock on its own; every layer stays safe when another disappears.

Discussion questions

  • Why does the state table matter more than the code for the software team, flight supervisors and customer service?
  • Which decisions should always need human confirmation even in an autonomous system?
  • If a job is accepted and found overweight only at packing, how does that hurt customer trust?

Adapting to student background

Upper secondary (M.6)
Have them write the state table on paper and trace sequences by hand before editing code, and give them the job of designing a test set that covers every reason.
Vocational certificate
Start with state cards and arrows on the desk to walk through real sequences, then edit the code line by line from a teacher's template, with the focus on filling in the test table.
Diploma
Extension: add a WAITING_DOCK state for when the docks are full and test that the earlier sequences still work.

Common student mistakes: Common mistakes in the module 6 lesson

7Worksheet 7 Scheduler and route finder
Analysis activity · About 6 h of class time · CLO5

Objective: Compare dispatching rules, estimate fleet size, and route on the group's corridor graph, including when corridors close

Equipment

  • Computer with Python and the example code at /downloads/uat-457/
  • Site map from Worksheet 6

Safety

  • Desk work, no flying
  • Identify hazards from public information only; do not enter restricted areas without permission

Steps

  1. Build a corridor graph of at least 10 nodes, marking areas to avoid and why
  2. Route to every drop point with Example 3, close three segments, and record added distance and unreachable points
  3. Create 10 jobs with deadlines and compare FIFO and EDD with Example 1
  4. Estimate peak fleet size with Example 2
  5. Write at least three rescheduling rules for the group

Deliverables

  • Corridor graph and route table
  • FIFO versus EDD lateness table
  • Fleet-size calculation
  • Rescheduling rules

Checklist

  • The corridor graph has at least 10 nodes and marks areas to avoid with reasons (Design of the mission, pickup and delivery points and hand-off)
  • Table 1 names every drop point that becomes unreachable with closures, with no blank cells (Accuracy of weight, energy and route calculations)
  • Table 2 has all 10 jobs and reports both maximum lateness and the number of late jobs for both rules (Accuracy of weight, energy and route calculations)
  • Table 3 states the highest utilisation the group accepts and why (Accuracy of weight, energy and route calculations)
  • The rescheduling rules have at least three items, including freezing jobs already dispatched (Design of the mission, pickup and delivery points and hand-off)

Instructor guide

Class timing 360 min

  1. Briefing on lateness, dispatching rules, utilisation and corridor graphs30 min
  2. Build the corridor graph for the group's site75 min
  3. Route with Example 3 and close three segments60 min
  4. Create 10 jobs and compare FIFO with EDD75 min
  5. Estimate fleet size and write rescheduling rules90 min
  6. Wrap-up, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Normal routes and routes with three segments closedTable 1 (with the Example 3 graph): F1 2.09 km, F2 3.23, F3 3.59, F4 4.85, F5 4.20, F6 4.79 km. With W3-W5 closed, F6 is 5.09 km via W2-W4-W5 (0.30 km more, about 25 s per one-way flight). With W3-W5, W4-F5 and W2-F1 all closed: F1 unreachable, F4 5.15 km, F5 5.41 km, F6 5.09 km. The group's graph gives other numbers, but each must be the true shortest route.
  2. Record: Table 2 Job lateness under FIFO and EDDTable 2 (starting from the six Example 1 jobs: 12 m/s plus 6 min per job): cycle times F1 11.8, F2 15.0, F3 16.0, F5 17.7, F6 19.3 min. Both rules finish at 91.5 min. FIFO: 4 late jobs, maximum 52.2 min (job E). EDD: 3 late jobs, maximum 14.6 min (job A). The group's 10 jobs must show the same pattern: EDD's maximum lateness no higher than FIFO's.
  3. Record: Table 3 Peak fleet sizeTable 3 (with the Example 2 values: 18 jobs per hour, 16 min per job): offered load 4.80 drones; 4 drones ρ 1.20 not acceptable, 5 drones 0.96 too high, 6 drones 0.80 acceptable, 7 drones 0.69 acceptable. With a 0.85 ceiling, choose 6.
  4. Question 1: From Table 2, how did EDD change the maximum lateness and the number of late jobs? Why is the total finish time unchanged, and which method is needed if the goal is the fewest late jobs?EDD cuts maximum lateness from 52.2 to 14.6 min and late jobs from 4 to 3. The finish time stays 91.5 min because the jobs are the same; ordering does not make the drone fly less, it moves lateness onto jobs that can wait. For the fewest late jobs use the Moore and Hodgson algorithm.
  5. Question 2: From Table 3, why not choose the number of drones that brings utilisation close to 1, even though it looks efficient?Jobs do not arrive evenly. With ρ close to 1 the queue grows long whenever jobs bunch, and with ρ ≥ 1 it grows without limit whatever the rule. Five drones (0.96) work only in theory, so the team chooses six to keep waits short and leave room when one is in maintenance.
  6. Question 3: If the dashboard shows 20 jobs arriving per hour and each job spends 24 minutes in the system on average, how many jobs are in the system on average, and what is that figure useful for?L = λW = 20 × 24/60 = 8 jobs. The value is getting the third quantity from two measured ones without tracking jobs individually; for example last week's 15 jobs per hour and 7.5 jobs in the system give W = 30 min.
  7. Question 4: With three segments closed, which drop points became unreachable or much further away, and how do the group's rescheduling rules handle that?The answer depends on the group's graph; in the example graph F1 becomes unreachable when W2-F1 closes because it is the only link. Good rules: search again whenever the graph changes and send recipients the new arrival time; do not reorder ASSIGNED or IN_FLIGHT jobs unless safety requires it; replan on events and switch only when the gain passes a threshold; the intake gate must refuse unreachable points with a reason.

Discussion questions

  • Should QC samples that stop a production line always get higher priority, and who should decide?
  • What is gained by flying only approved corridors rather than letting the planner invent routes in open space?
  • How often should recipients get a new time before they stop trusting the system?

Adapting to student background

Upper secondary (M.6)
Have them trace Dijkstra by hand on a small 5-node graph before running the code, and show with an example that EDD does not always give the fewest late jobs.
Vocational certificate
Have them build the graph from a walk-around or aerial photo with labels on the map, and sort job cards into FIFO and EDD order on the desk before using the code.
Diploma
Extension: code the Moore and Hodgson algorithm and compare the number of late jobs with EDD on the group's 10 jobs.

Common student mistakes: Common mistakes in the module 7 lesson

8Worksheet 8 Navigation monitor and stopping test
Lab · About 6 h of class time · CLO5

Objective: Measure real position and flight errors, set the positioning level for each corridor, and verify stopping distance before obstacles

Equipment

  • Drone with GNSS, and RTK if available, with logging
  • Computer with SITL and Python
  • Soft obstacle such as a fabric screen or foam balls
  • Measuring tape

Safety

  • Fly within CAAT conditions in visual line of sight; keep people clear
  • Check batteries and propellers before every flight; store lithium batteries in fire-resistant bags or boxes
  • Test stopping at low speed first and increase step by step; use soft obstacles only

Steps

  1. Log GNSS from a stationary drone for 10 minutes in the open and near a tall building; compute the 95% spread by fix type
  2. Measure FTE from logs of autonomous straight-line flight
  3. Compute TSE for the group's corridors with Example 1 and set the positioning level for each segment
  4. Adapt Example 2 to the real log and report how often the system would slow down and divert
  5. Test stopping before a soft obstacle in SITL or the field; compare measured stopping distance with Example 3

Deliverables

  • 95% position spread and FTE table
  • TSE and positioning level per corridor
  • Navigation-monitor log analysis
  • Measured versus computed stopping distances

Checklist

  • Table 1 separates results by fix type and location (open ground and near a tall building), 10 minutes logged at each (Accuracy of weight, energy and route calculations)
  • Every segment in Table 2 has a required positioning level, and the TSE formula used is shown (Design of the mission, pickup and delivery points and hand-off)
  • The log analysis states how many slow-downs and diversions occurred, with log times (Accuracy of weight, energy and route calculations)
  • Table 3 starts at low speed and increases step by step, using soft obstacles only (Safe practice, records and presentation)
  • Battery, propeller and area-clearing checks are recorded before every flight (Safe practice, records and presentation)

Instructor guide

Class timing 360 min

  1. Briefing on TSE, the navigation monitor, the stopping formula and flight safety30 min
  2. Log stationary GNSS in the open and near a building, and fly autonomous straight lines90 min
  3. Compute 95% spread, FTE and TSE for the group's corridors60 min
  4. Adapt the navigation monitor to the real log60 min
  5. Stopping tests before a soft obstacle, speed step by step90 min
  6. Wrap-up, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 95% position spread and FTETable 1: real values depend on the receiver and site. The expected pattern is RTK fixed at centimetres, float at decimetres to half a metre, standard GNSS at several metres, and a clearly wider spread near tall buildings or metal tanks than in the open. Without RTK, use the Example 1 values (NSE 0.05, 0.5, 3.0, 6.0 m) and FTE 1.0 m as the reference.
  2. Record: Table 2 TSE and positioning level per corridorTable 2 (with the Example 1 values: FTE 1.0 m, PDE 0.2 m, half aircraft width 0.6 m): TSE RTK fixed 1.02 m, float 1.14 m, GNSS 3.17 m, degraded GNSS 6.09 m. A narrow corridor with 3 m half-width allows 2.4 m, so it needs RTK; a wide one with 8 m allows 7.4 m, so standard GNSS is fine.
  3. Record: Table 3 Measured versus computed stopping distanceTable 3 (with the Example 3 values: 0.4 s delay, 3 m/s² braking, 2 m to remain): computed stopping distance 3.47 m at 2 m/s, 4.70 m at 3, 6.27 m at 4, 8.17 m at 5, 10.4 m at 6, 14.4 m at 7.5 m/s. If the sensor really sees at 15 m the highest speed is 7.71 m/s. Measured distances should be close to or shorter than computed; longer means the real delay or braking is worse than assumed.
  4. Question 1: From Table 2, which part of TSE is largest with RTK, and does investing in more position accuracy still help?With RTK the 1.02 m TSE is almost all the 1.0 m FTE, so buying better positioning no longer helps; tune the position controller to hold the line better instead. With standard GNSS, NSE dominates.
  5. Question 2: Running the navigation monitor on the group's real log, how many times did the system slow down and divert to a dock? What would happen without a grace period?With the Example 2 log: slow-downs at seconds 2, 3, 7 and 8 (four times), and a diversion to a dock from second 9 once poor quality has lasted the full 3 s in a narrow corridor. Without a grace period, a one-second dip that recovers by itself would send drones back far too often. The group's real log gives other counts, but each must be explained.
  6. Question 3: Why does the measured stopping distance differ from the computed one, and which value should the group use to set the speed limit on a segment with obstacles?Causes include real sensing and processing delay differing from 0.4 s, real braking below 3 m/s², wind and the way distance was measured. Use the worse of the measured and computed values and stay a little below the limit, as the lesson sets 7.5 m/s under 7.71 m/s, and add the time lost (30 s per 600 m) to the ETA.
  7. Question 4: Why must you use the range at which the sensor really sees objects on site instead of the maximum range on the datasheet?Datasheet range is measured on easy targets. Real objects such as crane steelwork, thin cables or glass may be seen much closer or not at all. Using the datasheet range sets the speed too high and the drone cannot stop in time; avoidance sees only what the sensor sees.

Discussion questions

  • Who should own the decision to slow down or divert: the flight controller, the companion computer or the server?
  • If stops before obstacles happen often on one corridor segment, what should be done with that segment?
  • Should directions without sensor coverage be forbidden or allowed at low speed? Why?

Adapting to student background

Upper secondary (M.6)
Have them solve the quadratic for the highest speed by hand and explain the root-sum-square TSE, then measure stopping distances in the field.
Vocational certificate
Give them the drone, soft screen and tape measurements, and use a fill-in table for the stopping distance term by term (v t_d, v²/2a, m).
Diploma
Extension: test two obstacle types (fabric screen and a thin pole) and find the real detection range of each.

Common student mistakes: Common mistakes in the module 8 lesson

9Worksheet 9 Precision landing, dock sizing and a mock locker
Lab · About 6 h of class time · CLO5, CLO4

Objective: Design a landing marker, prove landing accuracy and lost-target behaviour, size the dock bank, and build a locker that verifies recipients with TOTP

Equipment

  • Drone supporting precision landing with a downward camera or IR-LOCK
  • ArUco marker printed at the computed size with a nested marker
  • Microcontroller board, keypad and a mock solenoid lock
  • Computer with SITL and Python

Safety

  • Fly within CAAT conditions in visual line of sight; keep people clear
  • Check batteries and propellers before every flight; store lithium batteries in fire-resistant bags or boxes
  • Test landings in open ground with nobody near the marker during descent
  • Power the mock locker from low voltage; do not connect 230 V mains directly to the test circuit

Steps

  1. Compute the marker size with Example 1 for the department's camera and print an ArUco marker with a nested marker
  2. Set up precision landing in SITL, then land on the marker at least 20 times in the field; measure offsets and analyse with Example 2
  3. Test with the marker half covered and missing; record whether the drone follows PLND_STRICT or required mode
  4. Size the dock bank for the site with Example 3 for both charge-in-dock and battery swap
  5. Build a mock locker that checks TOTP codes as in Example 4 and test valid, expired and wrong codes

Deliverables

  • Marker-size calculation and the marker used
  • Offset table and landing-accuracy summary
  • Dock-count calculation for both options
  • Working mock locker and code test results

Checklist

  • The marker-size calculation uses the real camera, and the printed marker has a nested marker in the centre (Accuracy of weight, energy and route calculations)
  • Table 1 has all 20 landings, summarised as mean, maximum, 95th percentile and the number within the capture radius (Accuracy of weight, energy and route calculations)
  • Table 2 covers half-covered and missing marker, and valid, expired and wrong codes (Design of the mission, pickup and delivery points and hand-off)
  • The mock locker runs on low voltage, with no 230 V mains connected directly to the test circuit (Safe practice, records and presentation)
  • The record shows nobody was near the marker during every descent (Safe practice, records and presentation)

Instructor guide

Class timing 360 min

  1. Briefing on precision landing, docks, TOTP and safety30 min
  2. Compute and print the marker; set up precision landing in SITL60 min
  3. Land on the marker 20 times in the field and analyse offsets105 min
  4. Test with the marker half covered and missing45 min
  5. Size the docks and build the mock locker with code tests90 min
  6. Wrap-up, questions and hand-in checklist30 min

Expected results

  1. Record: Table 1 Offsets of 20 landingsTable 1 (with the Example 2 data, 12 cm capture radius): mean 8.0 cm, maximum 13.2 cm, 95th percentile 12.7 cm, 18 of 20 within the radius, misses at (-12, 4) and (2, 13). Marker size (Example 1: 1,280 px image, 80° field of view, 30 px needed at 12 m): focal length 762.7 px, so the marker must be at least 0.47 m wide. The department's camera gives a different value.
  2. Record: Table 2 Lost-target and locker-code testsTable 2: with the marker half covered, ArUco may still be detected because it is designed to tolerate partial occlusion. With no marker, PX4 required mode searches for the target, and ArduPilot must follow the PLND_STRICT setting chosen (normal landing, retry then land, or retry then hover). For delivery the right choice is retry the allowed number of times, then return to a dock. TOTP: the RFC test vector at t = 59 gives 94287082; code 287082 entered at 70 s and 89 s opens, at 95 s is refused; a wrong code is always refused.
  3. Record: Table 3 Dock count for both optionsTable 3 (with the Example 3 values: 18 sorties per hour, 0.8 ceiling): charge in dock 14.8 min per sortie, 4.44 slots busy on average, 6 slots needed; battery swap 5.5 min, 1.65 busy, 3 slots needed, but 13.5 batteries on bench chargers on average.
  4. Question 1: From Table 1, what are the mean, maximum and 95th percentile offsets? Does a good-looking mean tell the whole story?A mean of 8.0 cm looks good, but 2 of 20 landings (10%) fell outside the capture radius; on a day of 150 flights about 15 landings would not seat. Look at the maximum and 95th percentile and reduce the offset, for example by slowing the final descent or hovering to correct position first, then test again, rather than widening the criterion until it passes.
  5. Question 2: With the marker half covered or missing, did the drone follow its setting? Why should a delivery system not fall back to a normal landing?Falling back to a normal landing when the target is not found may put the drone down in the wrong place on a factory roof, which is more dangerous than flying back. After the allowed retries it must return to a dock and the job moves to RETURNING. A strong answer reports whether the group's drone followed its setting and says it must be fixed before use if not.
  6. Question 3: From Table 3, what is traded between charging in the dock and swapping batteries? Which would you choose for the group's site?Charging in the dock is simple but needs more slots (6); swapping needs fewer slots (3) but many spare batteries and chargers (13.5 on average). The trade is dock cost against battery cost and charging space. The manufacturer's charge time is measured at 25 °C and the end of a charge is slower, so on a hot roof real times must be measured.
  7. Question 4: A code generated at second 100 is entered at second 155. Does the locker open? Explain with the 30 s step and the accepted window.No. The code belongs to step ⌊100/30⌋ = 3, while second 155 is in step 5, and the locker accepts only steps 4 to 6 (current step and one either side), as RFC 6238 recommends. Such a short life suits an app that generates the code while the recipient stands at the locker.
  8. Question 5: Why should the system not mark a job DELIVERED as soon as the drone reports it has released the box?The drone's message only shows the mechanism operated; it does not prove the box is in the locker and reached the recipient. Proof of delivery is a sequence of events: locker sensors confirm a box of the right weight, the locker locks, the recipient is notified and authenticated, the door opens and sensors confirm the box was removed; only then does the job become DELIVERED.

Discussion questions

  • If the recipient does not collect the box within the agreed time, what should the system do and who decides?
  • The locker can check codes even when the network is down; what risks come with that?
  • Why must the drone climb vertically to a safe height before entering the corridor?

Adapting to student background

Upper secondary (M.6)
Have them derive the marker formula S = n h / f and explain the HMAC step in TOTP before coding, and make them responsible for measuring every landing offset.
Vocational certificate
Give them the mock-locker wiring, keypad and low-voltage solenoid, and use a fill-in table for the dock count step by step.
Diploma
Extension: add a load sensor to the mock locker to confirm the box arriving and leaving, and send the events to a log in proof-of-delivery order.

Common student mistakes: Common mistakes in the module 9 lesson

10Worksheet 10 End-to-end mock delivery system and dashboard
Analysis activity · About 6 h of class time · CLO6

Objective: Connect the mock delivery system to external systems with REST, webhooks and MQTT, and measure performance with SLIs, SLOs and a p chart

Equipment

  • Computer with Python, a Mosquitto broker and an OpenAPI editor
  • SITL drone or device simulator
  • Code from Worksheets 6 to 9

Safety

  • Desk work, no flying
  • Set passwords and per-device permissions on the broker; do not expose it to the public internet

Steps

  1. Write an OpenAPI document for POST /api/v1/jobs and GET /api/v1/jobs/{id} with units, status codes and examples
  2. Build a mock server that uses the intake gate from Worksheet 6
  3. Set up Mosquitto, design topics, set per-device permissions, use retained and will messages, and test with SITL
  4. Write a webhook consumer following Example 1 and test it with repeated and reordered messages
  5. Run the mock system for at least an hour, compute SLIs with Example 3 and a p chart with Example 4, and write a one-page report

Deliverables

  • OpenAPI document and mock server
  • Broker configuration and topic list
  • Webhook consumer test results
  • One-page KPI report

Checklist

  • The OpenAPI document gives units for every value, status codes and example requests, with v1 in the path (Design of the mission, pickup and delivery points and hand-off)
  • Table 1 includes repeated and reordered messages, and the final state is correct (Design of the mission, pickup and delivery points and hand-off)
  • In Table 2 every command topic has an expiry and QoS 1, and each device can write only its own topics (Safety assessment and legal compliance)
  • Table 3 reports percentiles (p50 and p95) and the on-time rate, not only the mean, with a p chart (Accuracy of weight, energy and route calculations)
  • The broker has passwords set and is not exposed to the public internet (Safe practice, records and presentation)

Instructor guide

Class timing 360 min

  1. Briefing on the integration map, REST, webhooks, MQTT, SLI and SLO30 min
  2. Write the OpenAPI document and the mock server with the intake gate90 min
  3. Set up the Mosquitto broker, topics and permissions, and test with SITL75 min
  4. Write and test the webhook consumer45 min
  5. Run the mock system for at least an hour; compute SLIs and the p chart90 min
  6. Write the one-page report, answer questions and run the hand-in checklist30 min

Expected results

  1. Record: Table 1 Webhook consumer testsTable 1 (with the Example 1 messages): the repeated e3 is ignored, e4 (seq 4) arriving after e5 (seq 5) is logged only, and the final state is J201 DELIVERED and J202 QUEUED. The group's tests must reach the same final state whether messages are repeated or reordered.
  2. Record: Table 2 Broker topics and permissionsTable 2: topics in the pattern estate/v1/drone/D3/telemetry, .../status, .../cmd and estate/v1/dock/H2/state, with the server subscribing to estate/v1/drone/+/telemetry. Telemetry uses QoS 0, commands and important events QoS 1, status is retained, a will message announces offline, commands have an expiry, and drone D3 may write only its own topics and read only its own commands. Data load (Example 2: 6 drones at 2 per second, 260 B, 7 h, and 8 docks every 10 s, 400 B): 12.8 messages per second, 106 MB per day, 38.8 GB per year.
  3. Record: Table 3 Indicators of the mock systemTable 3 (with the Example 3 simulated data: 600 jobs, seed 472, 30 min promise): 581 delivered (96.8%), mean 18.4 min, p50 17.4, p90 26.7, p95 30.6, p99 36.7 min, on time 94.3%, so the 95% SLO is missed. p chart (Example 4: 80 jobs a day over 14 days): p̄ 0.0563, UCL 0.1335, LCL 0; day 11 (13 jobs = 0.163) is outside. The group's mock system gives other values.
  4. Question 1: From Table 1, if the consumer did not check event_id and seq, what would a late message do to the factory's ERP?The late e4 (AT_DEST) would overwrite DELIVERED and purchasing would think the item had not arrived, and repeats could be counted twice. The consumer must be idempotent: remember received event_ids and use seq to decide whether a message is newer, while still logging old messages because their timestamps feed the indicators.
  5. Question 2: Why must a take-off command over MQTT carry a message expiry, and what harm do the per-device permissions in Table 2 prevent?A command stuck in the broker that reaches the drone two minutes late may be executed after the situation has changed, which is more dangerous than never receiving it, so it must expire and the server decide again. Per-device permissions stop a compromised device from commanding other aircraft.
  6. Question 3: From Table 3, how do the mean and the 95th percentile of order-to-delivery time tell different stories, and does the group's system meet its SLO?The 18.4 min mean looks far from 30 min, but p95 is 30.6 min and only 94.3% are on time, so the SLO is missed. The mean hides customers who wait long; p99 shows 1% wait over 36.7 min. The team must find which drop points and times the slow jobs belong to, such as the high-utilisation peak hour of Module 7.
  7. Question 4: On the group's p chart, is any day outside the control limits? What should be done on a day that is slightly worse but still inside them?In Example 4, day 6 with 6 late jobs (0.075) looks worse but is inside the limits, so no cause hunt is needed. Day 11 (0.163) is above the 0.1335 UCL, so the logs are checked; in the fictional case the W3-W5 corridor was closed all day and the extra flight time was not added to the ETA. That finding feeds back into the Module 6 intake gate and Module 7 scheduling.

Discussion questions

  • Why should the ERP not poll status every few seconds, and how do webhooks solve that?
  • How long should detailed telemetry be kept, and when should it be reduced to per-flight summaries?
  • Which indicators should an SLA with customers be tied to, and which should it not?

Adapting to student background

Upper secondary (M.6)
Have them explain the control limits p̄ ± 3√(p̄(1-p̄)/n) and the difference between mean and percentile, then own the OpenAPI document.
Vocational certificate
Start with setting up the broker and sending real messages between two computers to see retained and will messages work, then run the prepared indicator code changing only the data file.
Diploma
Extension: use a shared subscription to spread telemetry across two workers and show no messages are lost when one is stopped.

Common student mistakes: Common mistakes in the module 10 lesson

Scoring rubric

For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.

CriterionWeightExcellent (4)Good (3)Fair (2)Needs work (1)
Accuracy of weight, energy and route calculations30%Mass budget, power, energy budget, wind effects and fleet size all correct, with reproducible codeNearly all correct, method shownSome errors or missing stepsMany errors or no method
Design of the mission, pickup and delivery points and hand-off25%All eight requirement aspects, reasoned aircraft and payload choice, delivery points that pass the criteria, hand-off suited to the goodsNearly complete, mostly reasonedSome aspects missing or reasoning unclearIncomplete or unreasoned
Safety assessment and legal compliance25%Correct permissions identified, correct SAIL and FMEA, measures with evidence, assumptions clearly statedMostly correct, some measures lack evidenceSome assessment steps or legal points missingNo assessment or law ignored
Safe practice, records and presentation20%Checklists followed every time, complete records and chain of custody, clear presentation and answersNearly always followed, nearly complete recordsSome records missing or unclear presentationSafety ignored or no records

Assessment map: CLOs and how they are assessed Draft

The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.

CLOWorksheetsModule quizzes
CLO1 Analyse delivery mission requirements, select the aircraft and payload equipment, and compute weight and energyW 1W 2M1M2
CLO2 Plan routes, pickup and delivery points and landing or hand-off methods, and track delivery missions safelyW 3W 4M3M4
CLO3 Manage the fleet and assess the safety of the delivery system against the law and risk-assessment methodsW 4W 5M4M5
CLO4 Explain the architecture, job life cycle and job intake of autonomous delivery systemsW 6W 9M6M9
CLO5 Develop algorithms for job scheduling, routing, navigation-health checks and dock sizing in delivery systemsW 7W 8W 9M7M8M9
CLO6 Integrate delivery systems with information systems and monitor system performance with indicatorsW 10M10