UAT 460 UAS for Public Safety, Search and Rescue, and Emergency Management
Worksheet 13 From a soil pile to a change report
Objective
Estimate volume from a height-model difference using a detection limit, check damage grades with an error matrix, and plan slope monitoring
Equipment and materials
- A pile of soil or sand of roughly known volume and at least 6 fixed marks
- Drone with an RGB camera and software that builds height models
- Simulated orthomosaic of a village prepared by the instructor
- Computer with Python and the example code at /downloads/uat-460/
Safety
- Fly in daylight within visual line of sight under the general CAAT conditions, no higher than 90 m, at the distance from uninvolved people that the notification requires, with a safety officer
- Check batteries and propellers before every flight
- Nobody goes onto an unstable slope; use the drone instead
- Do not stand below a pile that may collapse and wear protective equipment when moving soil
Steps
- Place the fixed marks outside the pile and fly the same plan before and after moving some soil
- Build two height models, compute the difference, find the height offset from the fixed marks, and set the LoD from the check-mark errors
- Compare the volume with the volume actually moved and report the uncertainty both for independent cells and for fully correlated cells
- Two students grade buildings from the simulated orthomosaic separately, build the error matrix and compute user's and producer's accuracy
- Choose one risk slope and write a one-page monitoring plan with Example 4 stating the trigger, frequency, control points and the limit on detecting creep
Record of results
| Fixed mark | Height before (m) | Height after (m) | Difference (m) | Used for offset or LoD check |
|---|---|---|---|---|
| Method | Erosion volume (m³) | Deposit volume (m³) | Uncertainty independent / correlated (m³) | Volume actually moved (m³) |
|---|---|---|---|---|
| Grade by interpreter 1 | Reference: no visible damage | Reference: damaged | Reference: destroyed | User's accuracy |
|---|---|---|---|---|
Questions
What height offset did the fixed marks show, how far would the net volume be off without removing it, and why must the marks be outside the pile?
How far was the computed volume from the volume moved, why is the independent-cell uncertainty unrealistically small, and which should be reported?
Which grade had the lowest producer's accuracy, what does that mean for the true number of destroyed buildings, and why can you not just count map labels?
With your LoD, how many days until a slope moving 5 mm per day is detectable? How is a rain-triggered plan better than weekly flights, and can a drone detect creep?
Check before you hand in
What to hand in
- Two height models and the height offset
- Table of computed volume against the volume moved
- Error matrix and accuracy
- One-page slope monitoring plan