Teaching pack · UAT 460
A 15-week teaching plan, 20 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.
Coverage of the course description
The lessons fully teach 14 of 14 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.
| Description topic | Modules | Where it is taught | Status |
|---|---|---|---|
| Applications of UAS to public safety | M1M2M3 | Module 1: Public safety in Thailand and where drones help · Module 2: Monitoring a large public event · Crowd density from overhead imagery · Continuous overwatch by rotating drones · Other emergency support · Documenting a road-crash scene for the police · Module 3: Four real-time products | Covered |
| Search and rescue | M6M10 | Module 6: The SAR system and where drones fit · Search theory: sweep width and POD · Search patterns · Choosing a pattern for the mission · Module 10: Coordination in SAR missions | Covered |
| Disaster response and emergency management | M4M11M12M13M14M15 | Module 4: The incident command system · Module 11: Disasters, risk and the management cycle · UAS in each phase · Module 12: Products of rapid mapping · Module 13: Grading damage from images · Module 14: Communicating when the network fails · Delivering essentials: needs against capability · Module 15: Information requirements come before data | Covered |
| Situation analysis | M1M16 | Module 1: Three levels of situation awareness · A complete picture of the scene · How fresh is the information? · Essential information and the data collection plan · Module 16: Analysing the situation: known, assumed and unknown · Working back from the decision time · Essential information and the value of information | Covered |
| Mission planning | M16M17M18M19M20 | Module 16: The eight-step mission-planning process · Writing objectives that work · Choosing objectives within the aircraft-minute budget · Module 17: Gate G2: go, wait or no go · Module 18: From objectives to technical requirements · Weighted decision matrix with knock-out criteria · Module 19: Operating area by flight phase · Contingency plans: emergency procedures, the emergency response plan and the decision tree · Module 20: The mission file and gate G3 | Covered |
| Search-area allocation | M7 | Module 7: From the last known position to a search area · Dividing the area into segments · POA and the Mattson consensus · POS and allocating effort · Updating POA after an unsuccessful search | Covered |
| Visual (RGB) and thermal cameras | M8M18 | Module 8: The two cameras on a search drone · Ground sample distance and pixels on a person · Thermal cameras: timing, canopy and limits · RGB cameras: light and blur · Reading a thermal image: contrast, emissivity and reflections · Module 18: Thermal cameras, lenses and standoff from the wall | Covered |
| Locating persons or objects | M9 | Module 9: The detection chain · AI screening of imagery · Confirming a point of interest · Geolocation from a nadir image · Geolocation with a laser rangefinder · Searching for an object, not a person | Covered |
| Real-time transmission of imagery and data | M3M10M14 | Module 3: Live video to several units · Quick-look map of the scene · Data from a vapour sensor · Module 10: What to send to ground teams · Mountain links: line of sight and the Fresnel zone · Module 14: Link budget and Fresnel clearance · Keeping the relay on station | Covered |
| Damage assessment | M12M13 | Module 12: Water extent from images: index, threshold and error · Module 13: Grading damage from images · Flood depth at buildings from a height model · Landslides: height-model differences and the level of detection · Monitoring risk areas: how often is enough | Covered |
| Support for incident command centres | M3M4M15M16 | Module 3: Four real-time products · Module 4: The incident command system · Receiving and prioritising mission requests · Module 15: Ranking findings when people are limited · Formats for delivery · The handover package and protecting data · Module 16: Writing objectives that work | Covered |
| Coordination with ground agencies | M4M10M20 | Module 4: Airspace and communications · Data management · Sent, received, acknowledged: the receiver checks before accepting · Module 10: What to send to ground teams · Coordination in SAR missions · Module 20: Coordinating airspace with crewed aircraft · Communications plan and airspace notification | Covered |
| Risk management | M5M17 | Module 5: Legal conditions to check before flight · Risk to people on the ground · The risk register and controls · Ethics and privacy · Module 17: Rules that collide with emergency missions · Risk assessment with SORA, prepared in advance · Gate G2: go, wait or no go | Covered |
| Scenario-based exercises under safety requirements | M5M20 | Module 5: After-action review · Module 20: Computer-based drills · Keeping a live exercise safe · After-action review · Designing injects and evaluating an exercise fairly | Covered |
Weekly teaching plan
| Week | Topic | Pre-class | Lecture | Lab | Evidence |
|---|---|---|---|---|---|
| 1 M1M2 | The 360-degree picture, and supporting hazmat and other emergencies | Read Module 1 'Three levels of situation awareness' and 'A complete picture of the scene'; run Example 1. Read Module 2 'Emergency support: a dangerous-goods tanker' and 'Other emergency support'; run Example 3; take the Module 2 quiz | Perception, comprehension, projection and orbit time, then the ERG2024 sequence, Guide 130, isolation distances, pixels per character and drone safety near vapour | Worksheet 1 step 3: walk the upwind side only versus fly an orbit on a closed field under CAAT conditions; and Worksheet 2 step 5: photograph a sign at 60, 120 and 180 m with several zoom levels and compare with the pixel formula | Table of times and what each method saw (Worksheet 1), Worksheet 2 report and Module 2 quiz result |
| 2 M3 | Live video to several units, the quick-look map and sensor response time | Read 'Four real-time products', 'Live video to several units' and 'Quick-look map of the scene'; run Examples 1 and 2; take the Module 3 quiz | The four real-time products matched to questions, total bit rate and a media server fed by a single upload, the fallback when the network fails, GSD and track spacing for the quick-look map, and the first-order response time t90 of a sensor | Worksheet 3 steps 1 to 5: set up the server for three groups, measure bit rate and latency, test the still-every-minute fallback, fly a quick-look map of about 120 m × 80 m within visual line of sight and compare the distance with the tape, and find the sensor's t90 | Bit-rate and latency table, quick-look map with the distance check, sensor graph and t90 (Worksheet 3), and the Module 3 quiz result |
| 3 M4 | The incident command system | Read Module 4 'The incident command system'; run Example 1 | ICS principles in the national plan, the NIMS structure, unified command, span of control and the place of the UAS group | Worksheet 4 step 1: take roles from cards, draw the command chart and check span of control | Command chart with branches |
| 4 M5M6 | Risk register, ethics and privacy, and search theory: W, S, C and POD | Read Module 5 'The risk register and controls' and 'Ethics and privacy'; run Examples 2 and 3; take the Module 5 quiz. Read Module 6 'Search theory: sweep width and POD'; run Example 1 | ISO 31000, the risk matrix, PDPA bases, WP29 and NTIA principles and the DORI levels, then effective sweep width, coverage factor, random search versus the inverse cube model and cumulative POD | Worksheet 5 steps 3 and 4 (mini-project): write a six-hazard risk register and a one-page privacy impact assessment; and Worksheet 6 steps 1 and 2: generate the expanding-square waypoints, import them into QGroundControl or Mission Planner, fly SITL and compare real and computed time | Risk register and privacy impact assessment (Worksheet 5), SITL flight-time record and explanation of the difference (Worksheet 6) |
| 5 M7 | POS, allocation and POA updates | Read 'POS and allocating effort' and 'Updating POA after an unsuccessful search'; run Examples 3 and 4; take the Module 7 quiz | POS = POA × POD, block-by-block allocation, Bayesian updating, cumulative POS and revisiting after a clue | Worksheet 7 steps 4 and 5: Mattson scoring, compute POA, allocate flight hours, update POA after no find and justify the next round | Worksheet 7 report and Module 7 quiz result |
| 6 M8 | Camera set-up, blur and coverage routes for a segment | Read 'Ground sample distance and pixels on a person', 'RGB cameras: light and blur' and 'Planning a route to cover a segment'; run Examples 1 and 3; take the Module 8 quiz | GSD = pH/f and f from DFOV, Johnson's criteria at 2, 7 and 13 pixels, the limits of thermal and RGB cameras, blur b = vt_s/GSD, image width as an upper bound on W, choosing S = W/C and terrain following from a DEM | Worksheet 8 steps 2 to 5: photograph the dummy from 30, 45 and 60 m and compare pixel counts with the calculation, fly past at 6 m/s with three shutter speeds (dummy, not a volunteer), draw a segment polygon in QGroundControl and compare fixed altitude with terrain following in SITL | Table of counted against computed pixels, blur at three shutter speeds, the segment route split into sorties (Worksheet 8) and the Module 8 quiz result |
| 7 M9M10 | The detection chain, site assessment and coordination | Read Module 9 'Why this matters' and 'The detection chain'; run Example 1. Read Module 10 'Site assessment' and 'Coordination in SAR missions'; run Examples 3 and 4; take the Module 10 quiz | The four links, the payload operator's role, review workload and image tiling, then access routes, helicopter landing sites, ICS under the national plan, the communication plan, airspace separation and the search log | Worksheet 9 steps 1 and 2: sweep-width trial with eight dummies and two image readers, then estimate W from the lateral range curve; and Worksheet 10 steps 4 and 5: compare routes, screen landing sites and run the tabletop exercise as the helicopter arrives | Lateral range curve and estimated W (Worksheet 9), Worksheet 10 report and Module 10 quiz result |
| 8 M11 | UAS in each phase and ranking areas for baseline mapping | Read 'UAS in each phase' and 'Setting priorities before the disaster'; run Example 1 | The table of phase, task and product, the risk index R = pNv, area per sortie, and choosing villages under a sortie budget by trying every combination | Worksheet 11 steps 2 and 3: compute R, rank, then change the budget to 4, 6 and 10 sorties and see how the selected villages change | Table of indices and the villages selected under three budgets |
| 9 M12 | Water extent and map accuracy | Read 'Water extent from images' and 'What else a map must say'; run Example 3; take the module 12 quiz | Water index, Otsu threshold, commission and omission, the Wilson confidence interval, and the label of a map | Worksheet 12 steps 4 and 5: build the 3.2 km² timeline with measured values, compute the water index and Otsu threshold, draw 100 reference points and write the result as a full sentence | Worksheet 12 report and the module 12 quiz result |
| 10 M13M14 | Landslide volume, damage grading and slope monitoring, and communicating when the network fails with the link budget | Read Module 13 'Grading damage from images' and 'Landslides: height-model differences and the level of detection'; run Example 3. Read Module 14 'Communicating when the network fails' and 'Link budget and Fresnel clearance'; run Example 1 | The stratified estimator of building counts by damage grade, volume from a height-model difference cut at LoD95 and detection time t = LoD/v, then separating the control link from the data link, free-space loss, SNR, the Shannon limit, the radio horizon and the Fresnel zone | Worksheet 13 steps 1 to 3: fly the same plan before and after moving some soil, build two height models, set the LoD and compare the volume with the soil actually moved; and Worksheet 14 steps 1 and 2: predict the SNR of the department radio at 200, 400 and 800 m, then measure RSSI on the ground for comparison | Volume against the soil actually moved with its uncertainty range (Worksheet 13), and the table of predicted against measured RSSI (Worksheet 14) |
| 11 M15 | Screening tools, data formats and transfer | Read 'Screening images by machine to fit the reviewers' and 'Formats for delivery'; run Examples 2 and 3 | Precision, recall and the threshold set by reviewer capacity; GeoJSON, COG, CAP, OpenAerialMap; file sizes and transfer time over a link | Worksheet 15 steps 3 and 4: choose the screening threshold from reviewers and time, compute sizes and transfer times, and create GeoJSON and COG files | Precision and recall report and the table of sizes and transfer times |
| 12 M16 | Mission objectives and choosing them within the aircraft-minute budget | Read 'Writing objectives that work' and 'Choosing objectives within the aircraft-minute budget'; run Example 3; take the Module 16 quiz | The six-field objective (question, what to image, product, recipient, deadline, success criterion), the aircraft-minute budget, why ranking by value per minute can fail and the three questions of gate G1 | Worksheet 16 steps 5 to 7: write at least six objectives, choose the set with Example 3, check gate G1, time the real kit preparation and launch on the closed field, rerun Example 1 and submit mission file version 0 | One-page mission file version 0 (Worksheet 16) and the Module 16 quiz result |
| 13 M17M18 | Site and risk assessment of a facade scan, and thermal lens, standoff and the decision matrix | Read Module 17 'Rules that collide with emergency missions', 'Wind, height and tall buildings' and 'Can the aircraft be seen?'; run Examples 2 and 3. Read Module 18 'Thermal cameras, lenses and standoff from the wall' and 'Weighted decision matrix with knock-out criteria'; run Examples 2 and 3 | General conditions that collide with urban flights, wind by height with the power law and the pilot positions that see the aircraft, then pixel size on the wall g = pd/f, frames per wall, the SMART weighted matrix, knock-out criteria and the weight-sensitivity test | Worksheet 17 steps 3 and 4: climb vertically beside a teaching building to find the wind exponent, and find and check in practice the pilot positions that see the whole route; and Worksheet 18 steps 4 and 5: measure a 1.2 m sign at 45 m and count pixels against the formula, then score the department's aircraft and run Example 3 | Measured wind exponent against the expected range and the result of the pilot-position check (Worksheet 17), pixel table for the sign against the formula, and the weighted matrix with the share of runs ranking first (Worksheet 18) |
| 14 M19 | Risk footprint, facade scan route, return point and contingency plans | Read 'Scanning the facade in columns', 'Return point, rally point and return altitude' and 'Contingency plans'; run Examples 2 and 3; take the Module 19 quiz | The emergency volume by flight phase, splitting the wall into columns and the time of one aircraft against two, RTL, return altitude and RTL_ALT_M, the contingency table and the lost-link tree, and the single points of failure of the plan | Worksheet 19 steps 3 to 6: set the return altitude, RTL_ALT_M and the rally points and test commanding RTL from every station, write the contingency table, fly one scan column on the closed field while rehearsing lost-link and low-battery events, and find the single points of failure with Example 4 | RTL_ALT_M and rally points set with the RTL test results, the contingency table, the real column flight time against the computed time, and the proposed spare item (Worksheet 19), and the Module 19 quiz result |
| 15 M20 | Airspace coordination, communications plan and airspace notification | Read Module 20 'Why this matters', 'Coordinating airspace with crewed aircraft' and 'Communications plan and airspace notification'; run Examples 1 and 2 | Crewed aircraft have priority, separation by time, area or height and by communication, the number of sorties that fit a gap, the agreement with the pilot and ICS 220, the communications plan with primary and backup systems (ICS 205 and 213), and the NOTAM format | Worksheet 20 steps 1 to 3: choose a hypothetical emergency of the department, start the eight-item mission file, run Example 1 on the instructor's movement schedule, write a one-page airspace agreement and a communications table, draft a NOTAM as a format exercise and test one backup net | Draft mission file, one-page airspace agreement, communications table and a practice NOTAM draft (format exercise, not sent) |
Worksheets and instructor guide
One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.
1Worksheet 1 From the commander's questions to a complete picture
Lab · About 3 h of class time · CLO1
Objective: Define the essential information of an incident, compare walking and flying round the scene, measure the age of information from reporting channels, and sort information by situation-awareness level
Equipment
- Tanker-incident scenario cards and an EEI form
- A registered drone, batteries and ground station
- A parked car, a mock UN-number plate, cones and a measuring tape
- Stopwatches and a computer with Python and the example code
Safety
- Fly within visual line of sight in daylight under CAAT conditions, in an area closed to the public, never over people
- Check batteries before flight, charge them in a fire-resistant box and keep an extinguisher at the launch point
- Separate the pilot, observer and data manager roles and use a stop-flying call everyone knows
- The walking group stays at 60 m on the upwind side only, as in the scenario, and outside the flight path
Steps
- Read the scenario card, write at least six EEI with weights and list possible sources
- Set up the field with the car, the mock plate and cones for liquid, and set an assumed wind direction
- One group walks the upwind side at 60 m; another flies an orbit at 40 m; time both and note what each sees
- Role-play three reporting channels, log creation and receipt times, and compute mean and peak age
- Score the sources with the Example 3 code and write a report separating level-1, level-2 and level-3 information
Deliverables
- EEI list with weights and sources
- Times and observations from walking and flying
- Age-of-information table compared with the formula
- One-page report on the three levels and the EEI no source answered
Checklist
- Table 1 has at least six EEI, each with a weight and at least one source
- Table 2 gives measured and formula times for both methods, in minutes
- Table 3 logs creation and receipt times of every message and gives mean and peak age for all three channels
- The report separates level-1, level-2 and level-3 information and names the EEI no source answered
- The flight record names the pilot and observer and confirms visual line of sight and no flight over people
Instructor guide
Class timing
- Scenario briefing and writing the EEI at the desk30 min
- Scoring the sources with the Example 3 code25 min
- Field set-up, safety check and pre-flight briefing25 min
- Walking round and flying round, with timing35 min
- Role-playing three reporting channels and computing the age of information35 min
- Writing the three-level report, presenting and the hand-in checklist30 min
Expected results
- Good EEI are written as the commander's questions: what is the material (UN number), is it leaking or burning, where are the wind and vapour going, are there casualties or trapped people, what are the queue and access routes, and are there people downwind within 300 m. With the Example 3 scores the drone answers 84%, the shipping papers 38%, the first crew 41%, highway CCTV 22% and all sources together 94%. Group scores may differ; check that C = Σwᵢsᵢ / (2Σwᵢ) was computed correctly.
- If the field uses the Example 1 values (60 m radius, walking 1.0 m/s, 90 s drone set-up, climb to 40 m at 4 m/s, orbit at 5 m/s), walking the upwind half takes 3.1 min (188 s) and sees only 50% of the circle, while flying takes 2.9 min (175 s) and sees 100%. Accept measured times of roughly 2.5 to 5 min for walking and 2.5 to 4 min for flying, depending on real speeds and set-up. The key point is that the drone sees the downwind side and the cones representing liquid that the walkers cannot see.
- Formula values from Example 2: radio every 600 s with 120 s latency gives a mean age of 420 s and a peak of 720 s; a still every 60 s with 20 s latency gives 50 s and 80 s; live video with 1.5 s delay gives about 1.5 s for both. The role-play may use shorter intervals than the lesson; check that the group substituted its own T and L correctly and that measured values are close to the formula (within about 20% when updates are regular).
- The times are very close; in Example 1 the drone is only 0.2 min faster. A strong answer says the value lies in what is seen, the downwind side where someone may be trapped or liquid may be running into a drain, without anyone approaching the tank. Judging by time alone wrongly concludes that the drone is not worth it.
- They may differ because reports are irregular, the reporter is busy or device clocks are not synchronised. A still every 30 s with 20 s latency gives a mean age of 20 + 30/2 = 35 s and a peak of 20 + 30 = 50 s.
- With the Example 3 scores, 'people downwind within 300 m' is answered by no source without the drone, and the share falls from 94% to 56%. A strong answer proposes a real extra source, such as community leaders or a register of buildings downwind, and says that a placard read from the drone must be confirmed against the shipping papers.
- Level 1 (perception), for example cones representing liquid running south; level 2 (comprehension), for example the liquid is flowing towards a drain; level 3 (projection), for example if the wind holds the vapour will soon reach the school downwind. The drone delivers level 1 well; levels 2 and 3 need hazmat expertise and more data.
Discussion questions
- If the drone gives live video at once, why does the commander still want stills stamped with their capture time?
- Which EEI must never rest on the drone alone, and which source would confirm it?
- How can staring at live video cost the team the big picture, and how should roles be split to prevent it?
Adapting to student background
- Upper secondary (M.6)
- Have them substitute into t = t_setup + h/v_z + 2πR/v and L + T/2 by hand before running the code and explain how the EEI weights change the result; pair them with an experienced partner for the field work.
- Vocational certificate
- Let them run the timing and field set-up first, then use a fill-in EEI table that multiplies weight by score row by row, with a calculator.
- Diploma
- Extension: try a radius of 80 m and a height of 60 m in the Example 1 code, find the radius at which walking is more than 1 min slower than flying, and propose an orbit plan that stays outside the 50 m isolation distance.
2Worksheet 2 Watching a simulated crowd and reading a placard from afar
Lab · About 3 h of class time · CLO1
Objective: Estimate crowd density from overhead images, plan a drone rotation from measured endurance, and test the zoom needed to read a UN number from afar
Equipment
- At least 300 cones or markers for people, and paint or pegs to mark 10 m × 10 m cells
- A drone with a zoom camera, at least three batteries and a ground station
- A mock UN plate with 100 mm digits fixed to a parked car
- A laser rangefinder or tape and a computer with the example code
Safety
- Fly within visual line of sight in daylight under CAAT conditions, in an area closed to the public, never over people
- Check batteries before flight, charge them in a fire-resistant box and keep an extinguisher at the launch point
- Separate the pilot, observer and data manager roles and use a stop-flying call everyone knows
- Do not use real people as the simulated crowd, and do not hover low over the car or cones while reading the plate
- Land when the battery reaches the reserve level you set (20% in Example 2), never fly down to the aircraft's low-battery failsafe, and keep the aircraft in sight throughout the hover
Steps
- Lay out five zones of different density, record the true count per cell and mark the cell corners
- Take overhead stills, count cones in the sample cells and compute densities with the Example 1 code
- Compare the mean and maximum with the true numbers and explain the errors
- Hover three batteries down to reserve, log the times and compute aircraft and batteries for four hours
- Hover at 60, 120 and 180 m, photograph the plate at several zoom levels, record readability and compare with the pixel formula
Deliverables
- Density per zone against the true numbers
- Rotation plan from measured endurance
- Plate-reading table by distance and zoom
- One-page recommendation on monitoring pattern and zoom
Checklist
- Table 1 gives mean and maximum density for all five zones, with units per m² and percentage error
- Table 2 uses the measured endurance of three batteries, and the plan counts transit, handover and charging
- Table 3 covers all three distances, at least three zoom levels each, with the formula value alongside
- The recommendation names a monitoring pattern that never overflies the crowd and the zoom for a hazmat incident
- The record confirms no real people were used as the crowd and no low hover over the car or cones
Instructor guide
Class timing
- Briefing and laying out five cone zones with marked cells30 min
- Overhead stills, counting cones and computing with the Example 1 code40 min
- Hovering three batteries to reserve and building the rotation plan45 min
- Reading the mock plate at 60, 120 and 180 m with several zoom levels35 min
- Writing the recommendation, presenting and the hand-in checklist30 min
Expected results
- Density ρ = N/100 per 10 m × 10 m cell; for example 45 cones gives 0.45 per m². Counting from sharp stills should be within about 10% per cell. Use Example 1 to check the code: zone B mean 5.70 and maximum 6.10 people per m², about 30,065 people in the five zones.
- With the Example 2 values (38 min flight, 20% reserve, 2 min transit each way, 1 min handover overlap, 10 min swap, 15 min cooling, 70 min charging) the time on station is 25.4 min, and four hours needs 10 sorties, 2 aircraft and 5 batteries plus 1 spare. If only 25 min is measured, time on station falls to 15.0 min, needing 16 sorties, 2 aircraft and 7 batteries.
- With 2.0 µm pixels, 100 mm digits and 12 pixels required, the minimum focal length is 14.4 mm at 60 m, 28.8 mm at 120 m and 43.2 mm at 180 m. A 24 mm lens gives 20.0, 10.0 and 6.7 pixels; a 48 mm lens gives 40.0, 20.0 and 13.3 pixels. If the lab camera has another pixel pitch, substitute it. Real readability may be worse than the formula with shake or backlight. If the drone is 40 m high and 120 m away horizontally, use the slant distance of 125.9 m as in Example 3, which needs at least 30.2 mm.
- In Example 1 zone B has a mean of 5.70 but a densest cell of 6.10, above the critical level of 6 people per m², and the lesson notes that the densest spot is often about twice the mean. A strong answer says the mean hides the spot where flow drops sharply and pressure builds, so both mean and maximum must be reported.
- Common causes: cones straddling cell edges, oblique images that make cells non-square, cones hiding each other and double counting. To reduce them: shoot straight down over the closed, empty area, set a rule for edge cones, and have two people count separately and compare.
- The answer substitutes measured values into n = ⌈(t_use + t_turn) / t_station⌉ and explains that shorter endurance cuts time on station faster, because transit and handover stay fixed: from 38 to 25 min, time on station falls from 25.4 to 15.0 min and batteries rise from 5 to 7. The real limits are often electricity and people.
- By the formula at 120 m at least 28.8 mm is needed (2.0 µm pixels), so use 48 mm, which gives 20 pixels with margin for shake. If the plate became unreadable sooner than the formula predicts, the causes are wind shake, focus, light or compression. Take several stills rather than reading from video, and always confirm against the shipping papers.
Discussion questions
- Why does event monitoring focus on entrances, exits and bottlenecks rather than flying over the whole event?
- In a six-hour rotation, which runs out first: aircraft, batteries, electricity or pilots?
- If wind makes the 48 mm image shake, what should the team do instead of flying closer to the plate?
Adapting to student background
- Upper secondary (M.6)
- Have them show that p = f h_c / (s D) comes from similar triangles and compute the minimum focal length by hand before testing the zoom; pair them with a confident flyer for the hover runs.
- Vocational certificate
- Give them cone laying and cell counting, then a step-by-step rotation sheet (usable time, time on station, sorties) with a calculator.
- Diploma
- Extension: plan six hours over two zones at once and find how many chargers must run at the same time with a 70 min charge.
3Worksheet 3 Live video to several units, a quick-look map and sensor response time
Lab · About 3 h of class time · CLO2
Objective: Design and measure live video through a media server, make a quick-look map with a distance check, and find a sensor's response time against the first-order model
Equipment
- A laptop with open-source streaming software, a router that can throttle bandwidth and a millisecond clock display
- A mapping drone, batteries and stitching software
- A safe humidity or carbon-dioxide sensor with a board logging every second
- A 50 m tape and a computer with the example code
Safety
- Fly within visual line of sight in daylight under CAAT conditions, in an area closed to the public, never over people
- Check batteries before flight, charge them in a fire-resistant box and keep an extinguisher at the launch point
- Separate the pilot, observer and data manager roles and use a stop-flying call everyone knows
- Streaming and sensor tests are desk work with no chemicals or hazardous gases, and no footage of outsiders is published
Steps
- Set up the server, upload once, let three groups watch, and measure the real bit rate and latency by filming the clock
- Throttle the router, test the still-every-minute fallback and record what each group sees
- Plan the lines with the Example 2 code and fly a quick-look map of about 120 m × 80 m within visual line of sight
- Stitch the images, measure the distance between two points on the map and compare with the tape
- Make a step change in the sensor's surroundings, log every second, find t90 and compare with the first-order model
Deliverables
- Bit rate and latency in normal and fallback modes
- Quick-look map with the distance check
- Sensor reading against time and the t90 value
- Recommendation on which real-time product answers which question
Checklist
- Table 1 gives bit rate and latency for all three groups in normal and fallback modes, with units
- Table 2 gives the GSD, number of lines, number of photos and the two-point distance against the tape
- Table 3 logs every second past t90 and states t90 and τ
- The recommendation matches real-time products to the commander's questions with their limits
- No outsiders appear in the exported video or map, and the flight stayed within visual line of sight below 90 m
Instructor guide
Class timing
- Briefing and media-server set-up25 min
- Measuring bit rate and latency with the clock, then testing the fallback mode35 min
- Planning and flying the quick-look map45 min
- Stitching and checking distance against the tape30 min
- Bench test of sensor response time30 min
- Writing the recommendation and the hand-in checklist15 min
Expected results
- Check the code with Example 1: a 10 Mb/s uplink with 30% kept free leaves 7.0 Mb/s; direct streams to four units need 12.0 Mb/s and do not fit; through a server 5.4 Mb/s and 2.4 Mb/s fit. In the lab the measured bit rate should be close to the encoder setting (within about 20%) and should not grow with the number of viewers through the server. Latency depends on the software. A still every minute with 20 s latency gives a mean age of 50 s and a peak of 80 s.
- With the Example 2 camera (5472 × 3648 pixels, 2.41 µm pixels, 8.8 mm lens, 75% forward and 65% side overlap), 120 × 80 m at 60 m gives a 1.64 cm GSD, a photo every 15.0 m, lines 31.5 m apart, 4 lines × 10 photos = 40 photos and about 1.8 min on the lines; at 80 m the GSD is 2.19 cm and 3 lines × 8 photos = 24 photos. For a two-point distance of about 50 m on a map stitched without ground control, a difference within about 1% (about 0.5 m) is a good result. If the lab drone has a different camera, substitute its pixel pitch, focal length and image size.
- τ = t90 / ln 10; for example t90 = 30 s gives τ = 13.0 s. The reading reaches 63% of the step at t = τ, 90% at t90 and about 95% at 3τ = 39.1 s. Low-cost humidity or carbon-dioxide sensors often have a t90 of several tens of seconds. Check that the measured curve lies close to the model and that the 90% point was found from the data, not guessed.
- Through a server k = 1: one upload, so the uplink load stays the same however many units watch. An 8 Mb/s uplink with 25% free leaves 6 Mb/s; three separate streams need 9 Mb/s and do not fit; through a server it uses only 3 Mb/s.
- Differences come from too little overlap, blurred images, distortion at the map edges or scale from the drone's GNSS. For a finer GSD without exceeding 90 m, fly lower, use a longer lens or a camera with smaller pixels, since GSD = h s / f, at the cost of more photos and more time.
- Use the measured t90; for example t90 = 20 s gives τ = 8.69 s, 30/3 = 10 s in the plume and a reading of 1 − e^(−10/8.69) = 68% of the true value, understating the hazard. Hovering at least t90 gives at least 90% of the true value.
- A strong answer follows the lesson: live video for what moves, such as spreading fire or crowd flow; geotagged stills for detail, such as a placard; quick-look maps for distances and extent; sensors for what cannot be seen. It also states limits: live video needs bandwidth and a constant watcher, and a sensor reading at drone height is not the value at nose height.
Discussion questions
- If the cellular network fails mid-event, what does the commander still get from the drone, and how?
- Why record full-quality originals on the drone's card when live video is already being sent?
- How can unsynchronised device clocks lead to a wrong reading of data from several sources?
Adapting to student background
- Upper secondary (M.6)
- Have them derive GSD = h s / f from similar triangles and show that τ = t90 / ln 10 follows from 1 − e^(−t/τ) = 0.9 before running the code.
- Vocational certificate
- Give them the router set-up, filming the clock and taping, then a sensor sheet with the percentage column pre-built, reading t90 from a printed graph.
- Diploma
- Extension: map the same area with 65% and 80% overlap, compare stitching time and distance accuracy, and recommend a setting for quick-look maps.
4Worksheet 4 Tabletop incident command and data handover
Lab · About 3 h of class time · CLO2, CLO3
Objective: Organise a command structure with a suitable span of control, receive and prioritise mission requests, fly them with airspace coordination, and hand over data with a SHA-256 manifest and custody record
Equipment
- Role cards, the mission request form and an ICS 214-style activity log
- Radios or channels assigned by the communications plan
- A drone, batteries and ground station
- A computer with Python and hashlib, and a memory-card reader
Safety
- Fly within visual line of sight in daylight under CAAT conditions, in an area closed to the public, never over people
- Check batteries before flight, charge them in a fire-resistant box and keep an extinguisher at the launch point
- Separate the pilot, observer and data manager roles and use a stop-flying call everyone knows
- Data in the exercise are images of the field and assumed data and are not shared outside the class
Steps
- Take roles from the cards, draw the command chart and check span of control with the Example 1 code
- Receive the instructor's requests, read them back, prioritise with the Example 2 code and report expected delivery times
- Fly two requests on the closed field and stop at once when the instructor announces a simulated helicopter
- Copy files from the card and build a SHA-256 manifest and custody record
- Pass them to another team to check without explaining, find the file the instructor altered, and summarise requests that skipped the chain
Deliverables
- Command chart with branches
- Task schedule and ICS 214-style activity log
- SHA-256 manifest and custody record
- The receiving team's check result
Checklist
- The command chart shows every branch and no supervisor exceeds the unit's span limit
- Table 2 gives P, team, start and finish for every request and flags any late start
- The ICS 214-style log has the read-back times, the stop-flying time and who logged them
- The manifest was made right after copying, is stored apart from the files, and the custody record is signed by sender and receiver
- Flying stopped at once at the simulated helicopter call, and exercise data stayed within the class
Instructor guide
Class timing
- Briefing, role cards and drawing the command chart30 min
- Receiving requests, reading back and prioritising with the Example 2 code40 min
- Flying two requests on the closed field and practising the stop-flying call45 min
- Copying files, building the hash manifest and custody record30 min
- Another team checks, activity-log summary and hand-in checklist35 min
Expected results
- Check with Example 1: unified command at 1:6 is fine; the Operations Section at 1:8 exceeds the unit's 1:7 limit and is split into a fire and hazmat branch, a traffic and evacuation branch, an EMS group and the UAS group, leaving 4 direct reports. Planning at 1:2 is not a problem, because 1:5 is an optimum, not a minimum. Group charts may differ, but the UAS group must sit under Operations and deliver products to the Planning situation unit.
- If the instructor uses the Example 2 requests, the order is R4 (P 9) Team 1 minutes 0 to 5, R1 (P 9) Team 2 minutes 0 to 8, R2 (P 6) Team 1 minutes 5 to 11, R6 (P 6) Team 2 minutes 8 to 23, R3 (P 4) Team 1 minutes 11 to 21 and R5 (P 2) Team 1 minutes 21 to 33, with no late start. With other requests, check that they are sorted by P from high to low, shorter tasks first on ties, and that every requester was told when to expect the product.
- The receiving team must find the one file the instructor altered as a MISMATCH and all others matching (in Example 4 one changed character changes the whole hash). A good team refuses that file as evidence, records the event in the custody record and requests a fresh copy from the original.
- At least ⌈9/5⌉ = 2 branches. A strong answer shows a chart in which no supervisor exceeds the limit and similar units share a branch.
- With equal P the shorter task goes first: A (3 × 2 = 6, 10 min) and B (2 × 3 = 6, 4 min) gives B first. A request that skips the chain goes back to the group supervisor, is read back and is prioritised with the others; the pilot takes no direct orders even from a senior officer, for unity of command.
- A matching hash shows the file has not changed by a single bit since the manifest was made, but not where, when or by whom it was taken, whether it reflects reality or whether it was lawfully obtained; and if someone altered both the file and the manifest they could still match, so the manifest must be stored apart and backed by a custody record.
- S = 30 × 10⁶ × 4 × 3,600 / 8 = 54 × 10⁹ bytes, or 54 GB. In Example 3 one night gives about 118.8 GB, nearly all of ordinary people unrelated to any incident, so scheduled deletion reduces the risk of a large personal-data leak; evidence clips (about 4.8 GB) are kept separately with hashes and a custody record.
Discussion questions
- If a senior officer gives the drone pilot an order directly at the screen, how should the team respond politely while keeping unity of command?
- Why does sending clips to private chat groups damage both privacy and the weight of the evidence?
- How do sent, received and acknowledged differ, and why must a request that is still silent never be closed?
Adapting to student background
- Upper secondary (M.6)
- Have them write their own ordering function before looking at the Example 2 code and explain why one changed character changes the whole hash; let them observe before flying.
- Vocational certificate
- Give them the data manager role, copying the card and filling in the real custody record, with a ready-to-run hash script and a fill-in P = u × i table.
- Diploma
- Extension: add a message receiver like Example 5 that rejects expired or old-plan requests, and test it on the requests the instructor sends in the exercise.
5Worksheet 5 Readiness file for a public-safety mission (mini-project)
Lab · About 3 h of class time · CLO3, CLO1
Objective: Prepare a readiness file for one real or hypothetical mission covering legal conditions, ground risk, a risk register, a privacy impact assessment, a demonstration flight and an after-action review
Equipment
- The 2015 MOT notification, the latest CAAT notifications and SORA 2.5
- A map of the event area and attendance figures
- A drone, batteries and a ground station that can set a geofence
- A computer with the Module 5 example code
Safety
- Fly within visual line of sight in daylight under CAAT conditions, in an area closed to the public, never over people
- Check batteries before flight, charge them in a fire-resistant box and keep an extinguisher at the launch point
- Separate the pilot, observer and data manager roles and use a stop-flying call everyone knows
- The demonstration uses a closed area without outsiders, even if the chosen event has large crowds
Steps
- Choose the event, check every legal condition, identify what needs permission and list the documents under the latest notifications
- Estimate population density, compute the iGRC, fall distance and buffer, and draw a route that avoids people
- Write a risk register of at least six hazards with verifiable controls and name who accepts the residual risk
- Write a one-page privacy impact assessment with the default zoom, public notice and retention period
- Fly the demonstration on the designed route and buffer, hold the four-question review and present to the class
Deliverables
- Legal condition checklist and document list
- iGRC and buffer calculations and the route plan
- Risk register and privacy impact assessment
- Demonstration flight log, review findings and presentation slides
Checklist
- Table 1 checks every general condition, marks what needs permission and cites the latest notification checked on the day
- Table 2 shows population density, iGRC, fall distance and buffer with units and working
- The risk register has at least six hazards, scores before and after controls and the name of who accepts the residual risk
- The one-page privacy impact assessment states the default zoom, the public notice and the retention period
- The demonstration route never passes over people and the flight log matches the designed route and buffer
Instructor guide
Class timing
- Briefing and choosing the event15 min
- Checking legal conditions and listing documents40 min
- Computing iGRC, fall distance and buffer, and drawing the route30 min
- Writing the risk register and privacy impact assessment35 min
- Demonstration flight in the closed area on the designed route30 min
- Four-question review and presentation30 min
Expected results
- From the lesson, the general conditions of the 2015 Ministry of Transport notification are: keep the drone in sight without relying on its camera, fly between sunrise and sunset, no higher than 90 m, no flights over cities, villages, communities or gatherings, do not approach crewed aircraft, do not infringe privacy, and registered operators stay at least 50 m from uninvolved people, vehicles and buildings. A graduation ceremony or charity run usually breaks the gathering and 50 m conditions, so permission to operate differently under clause 17 and the CAAT Specific notification is needed in advance. Check that the group really checked the latest notifications.
- Example 1: 60,000 people in 0.15 km² gives 400,000 people/km² and iGRC 7; the closed, controlled river gives iGRC 1. At 60 m and 10 m/s the fall takes 3.50 s, the horizontal travel is 35.0 m, the impact energy about 894 J and the buffer 60 m. For a run with 25,000 people in 0.2 km², density is 125,000 people/km² and iGRC 7; at 50 m and 12 m/s the fall distance is 38.3 m and the buffer 50 m. The group's own values must come from its chosen event.
- Example 2 scores before and after controls: fly-away over the crowd 15 high to 5 low; sky lantern strike 16 high to 8 medium; C2 link loss 9 to 6; battery fire 8 to 4; face footage leak 12 to 4; police helicopter entry 10 to 5 (high ≥ 15, medium ≥ 8). The group's register must have verifiable controls, such as a geofence with return to launch, not 'be more careful'.
- A strong answer names the conditions the chosen event really breaks (such as near a gathering, under 50 m from people, or at night) and explains that the notifications require permission and pre-flight notification: an emergency is a reason to be granted permission, not an exemption in itself, and a date known in advance means applying weeks ahead.
- Using the group's height and speed, for example 50 m and 12 m/s gives d = 38.3 m, less than 50 m, so 50 m is used. A strong answer says that moving the route over a controlled area with no people drops the iGRC from 7 to 1 at once, while small controls reduce it far less.
- In Example 2 the sky lantern risk is still medium (8) after controls, so the commander must accept it in writing or order no flights while many lanterns are released. Controls checkable on the day include testing the geofence, an interference check before flight, an extinguisher at the charging point and a list of who may watch the live picture.
- q = 0.024 / (2.0 × 10⁻⁶ × 120) = 100 pixels per metre, between observe (62.5) and recognise (125), so the observe level. With 24 mm the slant distance must be at least 96 m to stay below recognise; with 48 mm, 192 m. A good assessment makes the widest setting the default and requires a logged reason to zoom in.
- A good review answers all four questions (what was planned, what actually happened, why it differed, what will be done differently) and turns them into a change to the standard operating procedure with an owner and a date, such as adding a geofence check before flight, not a conclusion that 'everyone must be more careful'.
Discussion questions
- If an agency falls under the exemption in section 4(2) of the PDPA, what duty does it still have towards personal data in its imagery?
- Which of the five ethical principles does reusing event imagery to track individuals later (function creep) break?
- If far more people turn up than estimated, what should the team decide about the permitted plan?
Adapting to student background
- Upper secondary (M.6)
- Have them derive d = v√(2h/g) from projectile motion and compare it with the 1-to-1 buffer; let them read the notifications in pairs and summarise them as a condition table.
- Vocational certificate
- Give them the geofence set-up and the pre-flight checklist for the demonstration, a risk-register form with L, S and product columns, and an iGRC table with the density bands marked.
- Diploma
- Extension: plan two routes for the same event, compute the iGRC, buffer and DORI level of each, and propose the route to submit for permission with reasons.
6Worksheet 6 Generate and fly search patterns
Lab · About 3 h of class time · CLO4
Objective: Generate search-pattern waypoints in code, check length and time, and find a dummy with an expanding square on the field
Equipment
- Computer with Python and the example code at /downloads/uat-460/
- QGroundControl or Mission Planner and ArduPilot SITL
- Registered training drone, spare batteries and radios
- Dummy missing person in dark clothing
Safety
- Fly in daytime, within visual line of sight, no higher than 90 m under the general CAAT conditions, with a safety officer and an observer
- Check batteries before flight, store and charge them in fire-resistant bags or boxes, and never use swollen or very cold packs
- Cordon off the take-off area and flight line and never fly over uninvolved people
- The person placing the dummy leaves the field before take-off
Steps
- Write a function that builds expanding-square waypoints from the start point, S, number of legs and first-leg direction, and check the total against 4m(m+1)S
- Import the waypoints into the mission planner, fly SITL and record real against computed time
- Build parallel-track, creeping-line and track-line plans for a 200 × 120 m area and compare length and number of turns
- An assistant hides the dummy; the team flies a 9-leg expanding square and records whether, on which leg and when it is found
Deliverables
- Waypoint code with length check
- SITL flight time against computed time
- Comparison table of three patterns
- Dummy search flight record
Checklist
- Table 1 lists every leg and the total equals 4m(m+1)S
- Table 2 gives length, turns and time for all three patterns, plus the SITL time of the expanding square
- The pattern choice is justified by how well the position is known, the shape of the area and the number of turns
- Table 3 records the leg and time of the find, height and speed, or a no-find with the expected POD
- The flight was in daytime, within visual line of sight, below 90 m, with a safety officer, and the dummy placer left before take-off
Instructor guide
Class timing
- Briefing and writing the waypoint function40 min
- Importing into the mission planner and flying SITL30 min
- Building and comparing the three pattern plans30 min
- Safety check and the dummy search flight on the field50 min
- Results, questions and the hand-in checklist30 min
Expected results
- A 9-leg expanding square (m = 2) at S = 30 m has legs of 30, 30, 60, 60, 90, 90, 120, 120 and 120 m, a total of 720 m, equal to 4 × 2 × 3 × 30; at S = 25 m the total is 600 m. Leg directions rotate one way, for example north, east, south, west, and the final leg closes the square.
- At 6 m/s the computed time for 720 m is 120 s (2.0 min) with 8 turns; with the 10 s per turn assumed in Module 8, about 200 s (3.3 min). In SITL the real time should always exceed the computed time. For 200 × 120 m at S = 30 m: parallel track with legs along the 200 m side gives 4 legs, 890 m, 3 turns, about 2.5 min; creeping line with legs along the 120 m side gives 7 legs, 1,020 m, 6 turns, about 2.8 min; a single track line of 200 m takes about 0.6 min, or three tracks 660 m about 1.8 min, but covers only a 90 m band.
- The team should find the dummy on the leg that passes closest to it; placed within about 60 m of the start, it lies inside the 150 m square of the 9-leg pattern (at S = 30 m). If it is not found, record the expected POD, for example, if the lab uses W = 30 m and S = 30 m as in Example 2, C ≈ 0.96 gives about 77% under the inverse cube model, so there was still about a 23% chance of a miss, and note conditions that made the true W smaller than assumed, such as shade or dark clothing that blends with the ground.
- The difference comes from slowing and accelerating at every corner and from flying from launch to the start point. If SITL took 200 s against 120 s computed, the 80 s difference over 8 turns is 10 s per turn. A strong answer says to use the measured seconds per turn plus transit to the start when budgeting batteries.
- Among the plans that cover the whole 200 × 120 m area, parallel track has the fewest turns (3) and the shortest track (890 m), because legs along the long side mean fewer legs and less time lost turning. A track line of three tracks is shorter (660 m, 2 turns) but covers only a 90 m band, and it suits a known intended route and the fast search on the first night; an expanding square suits a fairly well-known position, such as around a clue.
- A strong answer compares the leg of the find with where the assistant placed the dummy and explains that POD is always below 100% and the reported POD holds only when the W used matches reality, so a no-find lowers the probability that the person is in the area but never makes it zero.
- C = 24/40 = 0.6. Random search POD = 1 − e^(−0.6) = 45.1%; inverse cube erf(√π × 0.6 / 2) = 54.8%. The models differ by about 10 points (at C = 1, 63.2% against 79.0%), so the model must be named, or the commander may think the area was searched more thoroughly than it was.
Discussion questions
- Two searches at C = 0.5 or one at C = 1 use the same effort; which is better, and when is a sparse but wider search worth more?
- Why does using the image width as W inflate POD?
- Before choosing a pattern in a valley, what must you check about the control link?
Adapting to student background
- Upper secondary (M.6)
- Have them prove 4m(m+1)S from the sum of the legs and graph 1 − e^(−C) against the erf curve before flying.
- Vocational certificate
- Have them draw the pattern on graph paper before coding and give them a function skeleton where they fill in only the leg-length loop; on the field they act as observer and timekeeper.
- Diploma
- Extension: add first-leg rotation and conversion to latitude and longitude, then build a sector-search mission file and compare it with the expanding square.
7Worksheet 7 Plan a search area on a real map
Analysis activity · About 3 h of class time · CLO4
Objective: Define a search area with four methods, draw segments, estimate POA, allocate flight hours and update POA after no find
Equipment
- Computer with QGIS and Python
- Topographic map or DEM and satellite imagery of one hiking trail
- Mattson scoring form
Safety
- Desk work, no flying
- Use a fictional incident and no personal data of real missing people
- If walking a real trail, go as a group, inform the rangers and return before dark
Steps
- Choose a real trail, set a last known position and time missing, and compute the theoretical radius with Example 1
- Draw the statistical ring and mark decision points, funnelling gullies and animal tracks
- Divide the probable area into six to ten segments by the AMSA rules and compute areas in QGIS
- Have four classmates score independently, compute POA and Pden, and allocate flight hours with Example 3
- Assume no find, update POA with Example 4 and justify the next round
Deliverables
- Map of radii, decision points and segments
- POA and Pden table
- Flight-hour allocation with POS
- Updated POA table and one-paragraph justification
Checklist
- Table 1 counts time missing from the time last seen and deducts fatigue, ascent and descent correctly
- Six to ten segments with boundaries visible in the field, such as streams or ridges, with areas computed in QGIS
- Table 2 has four separate sets of scores, ROW, and POA summing to 1
- Table 3 gives the plan's total POS and new POA summing to 1, with a paragraph justifying the next round
- A fictional incident was used, with no personal data of real missing people
Instructor guide
Class timing
- Briefing and choosing the trail25 min
- Computing radii and drawing the rings on the map30 min
- Marking decision points and dividing segments in QGIS45 min
- Mattson scoring and computing POA and Pden30 min
- Allocating flight hours and updating POA after no find30 min
- Writing the next-round justification and the hand-in checklist20 min
Expected results
- With the Example 1 values (missing 6.5 h, 500 m up, 600 m down), walking time left is 6.5 − 1 − 1 − 0.6 = 3.9 h, giving a radius of 5.85 km (107.5 km²) at 1.5 km/h and 11.70 km (430.1 km²) at 3.0 km/h; the 80% statistical ring is 5.76 km (104.2 km²). Group values depend on the assumed trail and times; check the deductions follow the formula.
- Check the code with Example 2: grand total 157, POA of D = 34/157 = 0.217, the highest, but the highest Pden is F at 0.364 and A at 0.340 per km² because they are small; ROW 0.038. For the group, check that POA plus ROW sums to 1 and that Pden = POA/A.
- Examples 3 and 4: four hours go to A 1.0 h, C 1.0 h, D 1.5 h and F 0.5 h for a POS of 0.552 (spreading evenly gives 0.420). After no find, A falls from 0.153 to 0.024, B rises from 0.076 to 0.171 and ROW to 0.085; the dawn ranking by Pden is F, C, H, B.
- The theoretical ring at the higher speed is often several times the statistical one (430 km² against 104 km² in the example), and both are still too large to search. A strong answer says decision points, funnelling gullies and clues remove unlikely ground, and that time missing is counted from the time last seen, not the report time.
- Usually not. In the example D has the highest POA but F the highest Pden. Rank by Pden, because an hour in a small, dense segment buys more POS: P (0.30, 1.5 km²) has Pden 0.20 while Q (0.20, 0.5 km²) has 0.40, so Q goes first.
- Thoroughly searched segments fall sharply while unsearched ones and ROW rise, by new POA = POA(1 − POD)/(1 − ΣPOS): a segment with POA 0.40 searched at POD 0.70 has POS 0.28 and new POA 0.12/0.72 = 0.167. A good paragraph cites the new Pden ranking and says a new clue triggers a fresh POA estimate at once.
- The answer should name the segment with the widest spread and each person's reasoning. Discussing before scoring makes the scores follow the most senior person instead of a real consensus. ROW must always be included, or the segments add up to 1 and everyone believes the person must be inside the drawn area.
Discussion questions
- If a ground team finds a shoe in segment H mid-morning, what must happen to the POA table you just updated?
- When can block-by-block allocation produce a plan that cannot actually be flown?
- Why should segment boundaries follow streams or ridges rather than straight coordinate lines?
Adapting to student background
- Upper secondary (M.6)
- Have them derive the POA update from Bayes' theorem and check by hand that the new POA sums to 1 before running the code; pair them with a confident QGIS user.
- Vocational certificate
- Give them the topographic reading for decision points and gullies, then a POA spreadsheet with the division built in and a calculator for Naismith's rule.
- Diploma
- Extension: run a second round from the updated values with a three-hour budget, find the cumulative POS after two rounds, and propose when to enlarge the area or change strategy.
8Worksheet 8 Set up the cameras and plan a segment route
Lab · About 3 h of class time · CLO4, CLO5
Objective: Choose height from pixels on a person, control blur, plan coverage routes and check height above ground with a DEM
Equipment
- Drone with an RGB camera, and a thermal camera if available, with camera specifications
- Dummy or consenting volunteer
- QGroundControl, ArduPilot SITL, QGIS and a DEM of the practice area
Safety
- Fly in daytime, within visual line of sight, no higher than 90 m under the general CAAT conditions, with a safety officer and an observer
- Check batteries before flight, store and charge them in fire-resistant bags or boxes, and never use swollen or very cold packs
- Cordon off the take-off area and flight line and never fly over uninvolved people
- Volunteers lying on the field give written consent, and the drone never flies low directly over them
Steps
- Compute f from the DFOV of the available camera and build a height table like Example 1
- Photograph the dummy from 30, 45 and 60 m and compare real pixel counts with the calculation
- Fly past the dummy (not a volunteer) at 6 m/s at a height used in step 2 with three shutter speeds and compare blur with Example 2
- Draw a segment polygon in QGroundControl, try two track angles and split into sorties
- Extract DEM heights along the longest leg and compare fixed altitude with terrain following in SITL
Deliverables
- Height table with day and night height choices
- Pixel counts and blur comparison images
- Two-angle route plans with legs, time and batteries
- Height-above-ground profile along the leg
Checklist
- Table 1 shows f derived from the DFOV and the GSD at every height, with units
- Real images at 30, 45 and 60 m with counted pixels against the formula
- Table 3 covers both leg angles with battery counts and the reason for the chosen angle
- A height-above-ground profile from the DEM, comparing fixed altitude with terrain following in SITL
- Volunteers gave written consent and the drone never flew low directly over them
Instructor guide
Class timing
- Briefing, focal length and the height table30 min
- Photographing the dummy at 30, 45 and 60 m and counting pixels40 min
- Fly-pasts at three shutter speeds30 min
- Planning two-angle routes in QGroundControl35 min
- DEM profile and terrain-following test in SITL30 min
- Wrap-up and hand-in checklist15 min
Expected results
- With the Example 1 cameras (thermal 640 × 512, 12 µm, DFOV 45°, f ≈ 11.9 mm; wide 8064 × 6048, DFOV 82°) and a 0.5 m wide person: at 30 m the thermal GSD is 3.0 cm, 16.5 pixels, and the wide camera 0.52 cm, 97 pixels; at 45 m 4.5 cm, 11.0 pixels and 0.78 cm, 64 pixels; at 60 m 6.1 cm, 8.2 pixels and 1.03 cm, 48 pixels; at 80 m 8.1 cm, 6.2 pixels. The thermal camera recognises up to about 71 m and detects to 247 m (above the 90 m ceiling). Accept counted pixels within about ±20%. If the department camera differs, compute from its real specifications.
- Example 1 wide camera at 60 m and 6 m/s (if the lab camera differs, use its own GSD): 1/1000 s gives 0.6 pixels of blur, 1/250 s 2.3 pixels and 1/60 s 9.7 pixels (double at 30 m: 1.2, 4.6 and 19.3 pixels). Real images should blur close to the formula; more blur suggests gimbal shake or wind as well.
- Example 3 (segment 1.9 × 0.5 km, S = 30 m, 6 m/s, 10 s per turn, 25 min per battery): legs along the valley give 17 legs, 16 turns, 32.78 km, 93.7 min and 4 batteries; legs across give 64 legs, 63 turns, 33.89 km, 104.6 min and 5 batteries. Example 4, set 80 m above a 1,300 m take-off on a leg whose ground rises from 1,180 to 1,545 m, gives AGL from 200 m down to −165 m, a collision with the slope. For the group's segment, check the chosen angle has fewer turns and that no point has AGL below a safe level or above 90 m.
- Using the Johnson criteria of 2, 7 and 13 pixels, the example camera recognises up to about 71 m. A strong answer chooses the thermal camera at night at no more than about 70 m to recognise, or higher to detect and then descend to confirm, and the RGB camera by day, which gives several times more pixels, with every height below the 90 m ceiling.
- Typical causes are the dummy's pose (arms out or curled up), true height above ground differing from the set height, a camera not pointing straight down and edges blending with the ground. A strong answer says which of these increase and which decrease the count.
- b = v t_s / GSD at 6 m/s, 1/60 s and 60 m gives 9.7 pixels, about a fifth of the 48 pixels on the person. Fix it by locking a fast enough shutter and letting ISO rise, or by flying slower in poor light, not by flying lower than planned or closer to people.
- Height relative to take-off is fixed above sea level, so as the ground rises AGL shrinks until the drone hits the slope, and as it falls AGL exceeds the ceiling and the GSD coarsens. A strong answer reads the minimum and maximum AGL from the group's profile and concludes that terrain following from a DEM is needed, knowing whether the DEM is a DSM or a DTM to allow for canopy height.
Discussion questions
- Why might a thermal camera miss a person in the middle of the frame on a sunny afternoon?
- How is the swath an upper bound on W, and where does the real W come from?
- If the route crosses a ridge, where should the launch point go to improve both transit time and the link?
Adapting to student background
- Upper secondary (M.6)
- Have them derive f = (d/2)/tan(DFOV/2) from the sensor geometry and compute the highest height for each criterion by hand before running the code.
- Vocational certificate
- Give them the dummy set-up, distance measuring and on-screen pixel counting with the viewer's measuring tool, using a sheet with the GSD formula already in place.
- Diploma
- Extension: write code that samples the DEM every 50 m along a leg, computes target altitudes for a constant AGL and imports them as waypoints with altitude into SITL.
9Worksheet 9 Measure detection and position accuracy
Lab · About 3 h of class time · CLO5
Objective: Estimate sweep width by trial, evaluate AI screening and measure position error against RTK
Equipment
- Drone with a camera and a laser rangefinder if available
- Eight dummies and an RTK GNSS receiver
- Computer with the department's person-detection model
Safety
- Fly in daytime, within visual line of sight, no higher than 90 m under the general CAAT conditions, with a safety officer and an observer
- Check batteries before flight, store and charge them in fire-resistant bags or boxes, and never use swollen or very cold packs
- Cordon off the take-off area and flight line and never fly over uninvolved people
- Images showing people are kept in restricted storage and deleted at the end of the course
Steps
- Place eight dummies 0 to 40 m from the flight line, fly past at 6 m/s and have two readers search independently
- Plot the lateral range curve and estimate W from the area under it
- Run the model on 640-pixel tiles and compute precision, recall and F2 at three or more thresholds
- Survey the dummies with RTK and compute positions from nadir images and oblique aiming
- Fill in one point-of-interest report with uncertainty radius and status
Deliverables
- Lateral range curve and W
- AI evaluation table and chosen threshold with reasons
- Position error table against the budget
- Point-of-interest report
Checklist
- Table 1 has all eight dummies, measured lateral ranges and two independent readers' results
- A lateral range curve and W computed from the area under it, with units
- Table 2 has at least three thresholds and the choice is justified by misses and reader time
- Table 3 compares every position with RTK, and the POI report has image ID, time, coordinates, uncertainty radius, method and status
- Images showing people are in restricted storage with deletion set for the end of the course
Instructor guide
Class timing
- Briefing, placing eight dummies and measuring lateral ranges30 min
- Fly-past and independent image search by two readers40 min
- Plotting the curve and estimating W25 min
- Running the AI on 640-pixel tiles and computing metrics35 min
- RTK survey and positions by two methods35 min
- Writing the POI report and the hand-in checklist15 min
Expected results
- W is the area under the curve of detection probability against lateral range, on both sides of the track. Worked method: if every dummy is found from 0 to 15 m, half are found at 20 and 25 m and none at 30 and 40 m, the trapezoid area on one side is 22.5 m, so W ≈ 45 m. W must not exceed the swath (about 83.5 m for the Module 8 wide camera at 60 m) and is usually smaller among trees than in the open.
- Check the code with Example 2 (120 people, 300 images): threshold 0.25 gives P 0.22, R 0.95, F2 0.57, 6 missed and 20.5 min of false-alarm checking per sortie; 0.40 gives 0.42, 0.90, 0.73, 12 missed, 7.5 min; 0.55 gives 0.65, 0.81, 0.77, 23 missed, 2.6 min; 0.70 gives 0.82, 0.67, 0.69, 40 missed, 0.9 min. With eight dummies, for example TP 7 and FP 3 at one threshold gives P 0.70, R 0.875, F2 0.83; such small counts must be reported with the limit of a small sample.
- Example 3: GSD 8.09 cm, the spot is 7.4 m right and 5.5 m ahead, rotated by the 30° heading to 9.2 m east and 1.0 m north; if the ground under it is 15 m lower the true offset is 11.0 m, not 9.3 m. Example 4: laser 212 m at 35° down gives 173.7 m horizontal, with a budget of GNSS 1.5 m, yaw 2° 6.06 m, pitch 1° 2.12 m and laser 0.52 m, about 6.6 m RSS. Errors against RTK are acceptable when within the budget computed for the group's own geometry.
- The real W is usually smaller than the swath, because dummies at the image edge or under leaves are in the image but not noticed. If the two readers differ, link 3 of the chain (a person notices it) is uncertain; real POD is the product of all links, so W must come from real readers in real conditions, allowing for fatigue.
- In search a miss costs more than a false alarm. F2 weights recall more than precision, so it suits search better than F1, but judgement is still needed. In Example 2 F2 peaks at 0.55 but misses 23 people; the team chose 0.40, which misses 12 and needs 7.5 min of checking per sortie that one reader can handle. At 0.25 false alarms wear readers out until they dismiss everything.
- Nadir images are accurate near the image centre on level ground but worse on slopes and at the edges. Laser aiming uses d = R cos θ and Δh = R sin θ, and yaw error usually dominates (6.06 m in Example 4). A strong answer compares the real errors with the group's RSS budget.
- A good report gives the RSS uncertainty radius rounded up, for example 'about 7 m', the method (nadir or laser), the capture time and a status showing it is still a point of interest awaiting confirmation. Six decimal places imply about 0.1 m resolution, far more precise than the real position.
Discussion questions
- How should a model trained on foreign scrub imagery be tested before use in Thai forest?
- How should points checked and found not to be people be closed, and why must they not be deleted?
- If you search for an object, such as a car or debris, instead of a person, how do camera and height choices change?
Adapting to student background
- Upper secondary (M.6)
- Have them derive F2 from the general Fβ formula and compute the area under the curve by the trapezoid rule by hand before using the code.
- Vocational certificate
- Give them dummy placement, taping or laser ranging and holding the RTK receiver, with a tally sheet for TP, FP and FN and a spreadsheet that computes the metrics.
- Diploma
- Extension: repeat the sweep-width trial in the open and under trees, then recompute the POD of the Module 7 plan with the measured W values.
10Worksheet 10 Tabletop exercise from find to handover
Analysis activity · About 3 h of class time · CLO6
Objective: Send a casualty report over a slow channel, choose the ground station position, assess routes and landing sites, and coordinate airspace separation with a helicopter
Equipment
- Computer with Python, QGIS and the practice-area DEM
- Radios or a messaging app with simulated delay
- Role cards and a stopwatch
Safety
- Tabletop work, no flying
- Use fictional data and images, no real personal data
- Do not send exercise traffic on radio channels or groups used by real agencies
Steps
- Assign incident commander, aviation coordinator, drone pilot, payload operator, image analyst, ground team leader and helicopter pilot
- Write a casualty report of no more than 300 bytes, send it over the slow channel and have it acknowledged with the same code
- Check line of sight and Fresnel clearance from two ground station positions with Example 2 and choose one
- Compare two access routes and screen three landing sites with Examples 3 and 4
- The instructor injects a helicopter arriving in 10 minutes; the group applies airspace separation and logs every step
- Close out with a search log and a one-page after-action review
Deliverables
- Casualty report and acknowledgement log
- Line-of-sight results and chosen station
- Route and landing-site table with recommendation
- Airspace separation timeline, search log and review
Checklist
- The casualty report is at most 300 bytes with status, capture time, WGS 84 coordinates with uncertainty and method, what is seen and hazards
- The acknowledgement log separates event time from receipt time and the receiver replies with the same code
- Table 2 gives results for both positions and the reason for the chosen station
- Table 3 compares at least two routes and three landing sites, recommending a primary and an alternate
- Fictional data only, and no exercise traffic on channels or groups used by real agencies
Instructor guide
Class timing
- Briefing and assigning roles15 min
- Writing and sending the casualty report over the slow channel30 min
- Checking line of sight and Fresnel clearance for two positions30 min
- Comparing routes and screening landing sites40 min
- Helicopter inject and timed log30 min
- Search log, after-action review and hand-in checklist35 min
Expected results
- t = 8B/r: a 300-byte text takes 8.0 s over a 0.3 kbit/s satellite messenger and 0.25 s over a 9.6 kbit/s link; a 25 kB chip takes about 11 min by satellite and 0.2 s over 1 Mbit/s mesh radio; an 18 MB full image about 133 h by satellite. The simulated slow channel will be slower than the formula because of connection set-up and retransmission; check that the group logged both send and acknowledgement times.
- With the Example 2 DEM (2.4 GHz, 2 m mast, drone at 60 m), the ridge station 1.8 km away has a worst clearance of −9.32 F1 at 0.8 km, fully blocked; the cliff-edge station 0.8 km away has 1.50 F1 at 1.2 km, meeting the 1.0 F1 criterion. For the practice-area DEM, check the group included earth bulge (k = 4/3) and chose a position that meets the criterion.
- Examples 3 and 4: route 1 (trail and stream, 3.0 km) takes 1.49 h with a carry-out of about 3.0 h; route 2 (forest road and spur, 3.8 km) 1.21 h and about 2.4 h, about 17 min faster. A 17 m helicopter needs at least 25.5 m clear: L1 32 m and 4.6° passes, L2 60 m and 1.7° passes, L3 22 m fails. Recommend L1 as primary and L2 as alternate.
- On a slow link the vital message waits behind images, so the short text goes first and is designed for the slowest link: 8 × 40,000 / 9,600 = 33.3 s. A good report has status, capture time, WGS 84 coordinates with uncertainty radius and method, what is seen, hazards, and a stated coordinate format so latitude and longitude are not swapped.
- The convex shoulder of a slope is the usual obstruction; in Example 2 the ridge path is blocked at 0.8 km. If the station cannot move, use a second drone hovering high as a relay or a repeater on the ridge. For reference, F1 at mid-path of a 2 km, 5.8 GHz link is 17.3√(1 × 1 / (5.8 × 2)) = 5.1 m.
- Not always: in the example route 2 is 0.8 km longer but faster because most of it is road. Landing sites need at least 1.5D (a 13 m helicopter needs 19.5 m) and a slope within the helicopter unit's limit. A strong answer says oblique images from four directions go to the pilot to decide, and the first ground team must check and clear the site in person because a coarse DEM can miss rocks and stumps.
- A good sequence: the aviation coordinator receives the call and directs through one channel, drones leave the helicopter's route or area, descend or land as agreed, the helicopter pilot is told, and every step is timed in the log. Drones resume only with the aviation coordinator's permission, and all steps should finish well before the helicopter arrives.
Discussion questions
- Why should image analysts not direct ground teams themselves?
- How do sent, received, acknowledged and ground verified differ, and who fills in the last step?
- What happens if casualty images or positions leak to a public group before passing through the person assigned?
Adapting to student background
- Upper secondary (M.6)
- Have them derive the F1 formula from the geometry of the Fresnel ellipsoid and compute the clearance at mid-path by hand before running the code.
- Vocational certificate
- Give them the ground team leader or drone pilot role, a fill-in report form and a character counter for the byte limit.
- Diploma
- Extension: build the sector and candidate registries of Example 5 for the group's exercise and show how the recall denominator changes when a reference answer is missing.
11Worksheet 11 A readiness plan for a provincial drone team
Lab · About 3 h of class time · CLO7
Objective: Rank the areas to baseline-map under a sortie budget, compute your own team's time from request to data, and prepare a mission request with advance flight permissions
Equipment
- Repeat-flood data or informants for five communities in the practice area
- Computer with Python and the example code at /downloads/uat-460/
- Drone with a camera and a complete take-off kit
- Stopwatch
Safety
- Fly in daylight within visual line of sight under the general CAAT conditions, no higher than 90 m, at the distance from uninvolved people that the notification requires, with a safety officer
- Check batteries and propellers before every flight
- Use real community data only as far as necessary and do not publish names of people
Steps
- Collect flood probability, households, vulnerability and area for five communities
- Compute the area per sortie and the sorties for each community with Example 1, then rank with the index R
- Change the budget to 4, 6 and 10 sorties; record the communities chosen in every case and those chosen only at high budgets
- Write a one-page mission request stating the decision-maker, question, deadline, area, product and the flight permissions needed in advance
- Time the real kit set-up, compute your own T, then fly one sortie of about 0.1 km² and compare the area per sortie with the formula
Deliverables
- Risk-index table and the communities selected under three budgets
- One-page mission request
- Team timing table and the value of T
- Conclusion on the difference between measured and formula area per sortie
Checklist
- Table 1 has five communities with data sources, R, sorties and the sets chosen under all three budgets
- The mission request names the decision-maker, question, deadline, area and product
- The request lists the permissions needed in advance, such as flying over villages or at night under the 2026 CAAT notification
- Table 2 times every step and gives T and area per sortie against the formula
- No names of people from community data are published, and the flight stayed within the general CAAT conditions
Instructor guide
Class timing
- Briefing and collecting data on five communities40 min
- Computing R and sorties and choosing sets under three budgets30 min
- Writing the one-page mission request and permission list35 min
- Timing the kit set-up and flying one sortie45 min
- Comparing area per sortie, wrap-up and hand-in checklist30 min
Expected results
- Check the code with Example 1 (one sortie maps 0.567 km² at 90 m with 47.25 m line spacing): R for A to F is 105.60, 73.80, 31.50, 45.50, 11.20 and 43.23, needing 2, 4, 2, 2, 1 and 1 sorties. Budget 4 selects A, E, F (160.0 of 310.8, 51%); budget 6 A, D, E, F (205.5, 66%); budget 10 A, B, D, E, F (279.3, 90%). The group's values must come from real community data or informants.
- A good request starts from the decision-maker's question, for example the provincial director must know within 6 h which village has the deepest water to send boats, states the area in km², the product (orthomosaic or water extent) and the permissions: flying over villages or communities, at night, or closer to people than the notification allows needs permission to operate differently under the 2026 CAAT notification, which can be requested in advance for a period.
- Example 2: the local drone team waits 90 min, acquires 60 min, processes 40 min and delivers 20 min, T = 3.5 h; cutting the wait to 30 min through preparation gives 2.5 h, saving 60 min or 17% of the 6 h window. By A = s_line v t η at 90 m, 10 m/s and η = 0.8, 0.1 km² needs about 4.4 min of line time (about 6.6 min at 60 m). If 6.0 min was measured at 90 m, the real η is about 0.59. Accept answers that explain turns, wind and transit to the start.
- In Example 1, A, E and F are chosen under every budget because their risk per sortie is high (A 52.80, F 43.23) or they need only one sortie (E). B has the second-highest R (73.8) but needs 4 sorties, only 18.45 per sortie, so it is chosen only at budget 10. A strong answer says trying every combination beats ranking by R alone.
- R ranks by flood probability, households and vulnerability; it is not a damage value or a probability of occurrence. In the case study Ban Huai Phai scored low, yet its road failed in a landslide on day 4. A strong answer proposes adding other hazards to the index or always keeping a small, cheap baseline for such areas.
- The longest part is usually waiting (permission, assembling the team, travel) or processing. A strong answer separates that preparation cuts only the waiting time, through pre-approved permits, packed kit and an on-call roster, while processing time needs a different method or more machines (Module 12).
- Differences come from turns, wind, transit to the start and the assumed η. By Example 3, the whole 96 km² needs 170 sorties, about 18.9 days, and even with a 120 m permission still 127 sorties. The team should take only local questions that need detail, such as the three cut-off villages of 3.2 km² (6 sorties) and the road and bridge corridor of 0.9 km² (2 sorties), and use satellite imagery for the overall flood picture.
Discussion questions
- Can drone images showing three hundred damaged homes replace the section 30 damage survey? Why or why not?
- In each phase of the disaster management cycle, which drone mission answers which decision?
- In a level-2 disaster, who decides, and to whom should the drone team send its data?
Adapting to student background
- Upper secondary (M.6)
- Have them count the 2⁶ = 64 combinations and explain why ranking by risk per sortie can still miss the best set, before running the code.
- Vocational certificate
- Give them kit packing and timing each step, a spreadsheet that multiplies R row by row, and a mission request form with headings to fill in.
- Diploma
- Extension: add landslide hazard as a second factor in the index, recompute the selected sets and compare with the original, arguing which suits their province.
12Worksheet 12 A rapid map of the practice area
Lab · About 3 h of class time · CLO8
Objective: Design a rapid-map flight plan, measure real flight and processing times, and report the accuracy of a water extent with a confidence interval
Equipment
- Drone with an RGB camera and the camera specifications
- Computer with OpenDroneMap or equivalent photogrammetry software
- Two images of a pond or pool, or the set the instructor provides
- Computer with Python and the example code at /downloads/uat-460/
Safety
- Fly in daylight within visual line of sight under the general CAAT conditions, no higher than 90 m, at the distance from uninvolved people that the notification requires, with a safety officer
- Check batteries and propellers before every flight
- Do not fly over villages or gatherings and do not capture outsiders at identification level
Steps
- Enter the camera and aircraft values in the design function, compute three overlap plans for a 0.5 km² practice area and choose one
- Fly the chosen plan over about 0.1 km² and time take-off, landing and copying
- Process the same image set with default settings and with fast-orthophoto, then find the images per minute of the machine
- Put the measured values into Example 2 and build the timeline for 3.2 km²
- Compute the water index and Otsu threshold for the pond images, draw 100 reference points, and write the result as a full sentence with confidence interval and limits
Deliverables
- Table of three overlap plans and the reason for the choice
- Table of flight times and measured processing speeds
- Timeline for 3.2 km² with measured values
- Sentence stating the accuracy of the water extent with its confidence interval
Checklist
- Table 1 uses the department camera's real specifications and the real height, no more than 90 m, with the reason for the choice
- Table 2 has take-off, landing, copying and both processing runs, with images per minute
- The 3.2 km² timeline uses measured values in place of the assumed ones and states when version 1 and the full version can be delivered
- The accuracy sentence has image time, percentage, confidence interval and limits, such as over-estimating water in wet fields or shadow
- No flight over villages or gatherings, and no outsiders captured at identification level
Instructor guide
Class timing
- Briefing and designing three overlap plans30 min
- Flying the chosen plan and timing take-off, landing and copying40 min
- Processing twice and finding images per minute45 min
- Building the 3.2 km² timeline with measured values20 min
- Water index, Otsu threshold and 100 reference points30 min
- Writing the result sentence, wrap-up and hand-in checklist15 min
Expected results
- With the Example 1 camera (13.2 × 8.8 mm sensor, 5,472 pixels, 8.8 mm lens, 25 min per sortie, η = 0.8), every plan at 90 m has a 2.47 cm GSD: standard 80/70 with 40.50 m spacing at 9.0 m/s maps 0.437 km² per sortie; balanced 75/65 with 47.25 m at 10 m/s maps 0.567 km²; rapid 70/55 with 60.75 m maps 0.729 km². The 0.5 km² practice area needs 2, 1 and 1 sorties respectively; at 60 m the GSD is 1.64 cm and the balanced plan needs 2 sorties. If the department camera differs, substitute its real values.
- Measured values depend on the machine and software. Example 2 assumes 20 images per minute for the fast orthophoto, 6 per minute at full quality and 5 min of copying per sortie; the fast option should be several times faster than the default. Check that the group computed images per minute as images divided by actual processing time, excluding copying.
- Example 2 (6 sorties of 533 images, 2 aircraft, take-off 08:30): the last landing is 10:05; full quality on one machine publishes at 18:13 and misses, fast on one machine at 12:00, fast on two at 10:57. If the group's machine manages only 10 images per minute, fast on one machine publishes at about 14:40 and misses. Example 3: 183 of 200 points agree, accuracy 91.5%, interval 86.8% to 94.6%. A good sentence gives the image time, percentage, interval and where the map over-estimates water.
- GSD = p h / f depends only on height, so the plans differ in sorties (8, 6 and 5 for 3.2 km²). The standard plan must slow to 9.0 m/s because an 18 m shot spacing is shorter than the camera can keep up with at 10 m/s. Smooth water has almost no texture, so low overlap stops the software matching points; test the rapid plan on a similar area first.
- The answer must use the measured images per minute in the Example 2 code. Usually the bottleneck is processing, since flying ends at 10:05 in every case. The fix is to send the fast mosaic on time as version 1, labelled as not fully checked, then the full version, or to add processing machines.
- 91/100 = 91%, with a 95% Wilson interval of about 83.8% to 95.2%, wider than with 200 points (86.8% to 94.6%) because the sample is smaller; the width shrinks roughly with the square root of the number of points.
- Choosing the threshold against the same answer lets the two kinds of error cancel by chance and makes accuracy look better than it is; in Example 3, shifting the threshold up by 0.10 gives 18.2 ha, equal to the truth, although the boundary is still wrong. Checkpoints must be independent of the choice. A rapid map must be labelled with time, source, GSD, coordinate system, method, accuracy, limits and version.
Discussion questions
- If the recipient has already acted on version 1 and version 2 differs, how should the team tell them?
- Cloud processing saves time, but what data questions does it raise?
- Why can one threshold not be used for every image set, even of the same area?
Adapting to student background
- Upper secondary (M.6)
- Have them compute one Wilson interval by hand and explain how the Otsu threshold maximises between-class variance before using the code.
- Vocational certificate
- Give them flight timing, card copying and watching the processing runs, a timeline form with a slot per step, and the visual check of reference points on the image.
- Diploma
- Extension: fly the rapid and balanced plans over real water, compare the share of images the software stitches, and conclude the lowest workable overlap.
13Worksheet 13 From a soil pile to a change report
Lab · About 3 h of class time · CLO8
Objective: Estimate volume from a height-model difference using a detection limit, check damage grades with an error matrix, and plan slope monitoring
Equipment
- A pile of soil or sand of roughly known volume and at least 6 fixed marks
- Drone with an RGB camera and software that builds height models
- Simulated orthomosaic of a village prepared by the instructor
- Computer with Python and the example code at /downloads/uat-460/
Safety
- Fly in daylight within visual line of sight under the general CAAT conditions, no higher than 90 m, at the distance from uninvolved people that the notification requires, with a safety officer
- Check batteries and propellers before every flight
- Nobody goes onto an unstable slope; use the drone instead
- Do not stand below a pile that may collapse and wear protective equipment when moving soil
Steps
- Place the fixed marks outside the pile and fly the same plan before and after moving some soil
- Build two height models, compute the difference, find the height offset from the fixed marks, and set the LoD from the check-mark errors
- Compare the volume with the volume actually moved and report the uncertainty both for independent cells and for fully correlated cells
- Two students grade buildings from the simulated orthomosaic separately, build the error matrix and compute user's and producer's accuracy
- Choose one risk slope and write a one-page monitoring plan with Example 4 stating the trigger, frequency, control points and the limit on detecting creep
Deliverables
- Two height models and the height offset
- Table of computed volume against the volume moved
- Error matrix and accuracy
- One-page slope monitoring plan
Checklist
- Table 1 has at least six fixed marks outside the pile, separates offset marks from check marks and computes LoD = 1.96√(σ₁² + σ₂²)
- Table 2 gives raw, offset-removed and offset-removed-with-LoD volumes with both uncertainty bounds
- Table 3 comes from two interpreters working separately and gives user's and producer's accuracy for every grade
- The one-page monitoring plan states the trigger, frequency, control points, report recipients and the limit that a drone cannot detect creep
- Nobody went onto unstable slopes or stood below the pile, and protective equipment was worn when moving soil
Instructor guide
Class timing
- Briefing, placing marks and the first flight40 min
- Moving some soil and the second flight30 min
- Building height models, finding offset and LoD and computing volume45 min
- Separate damage grading and building the error matrix30 min
- Writing the monitoring plan and the hand-in checklist35 min
Expected results
- The offset is the mean height difference at the fixed marks; Example 3 found 0.031 m. The LoD uses the check-mark errors: with σ of 0.03 and 0.04 m for the two models, LoD = 1.96 × 0.05 = 0.098 m (0.05 and 0.07 m as in the example give 0.169 m). Group values depend on GSD and control.
- Example 3 (true erosion 676.7, deposit 855.8 m³): raw 822.4 and 1,293.5 m³; offset removed 945.6 and 1,123.5 m³; offset removed with LoD 710.8 and 887.7 m³, about 4 to 5% high. Independent-cell uncertainty is 1.2 and 1.5 m³; fully correlated 70.0 and 103.9 m³. For the lab pile, a good volume lies within the correlated bound of the volume moved: for example 40 m² of change with σΔ = 0.05 m gives a correlated bound of about 2.0 m³, while the independent value (0.1 m cells) is only about 0.03 m³.
- Check the code with Example 1 (1,200 buildings): overall accuracy 86.8%; destroyed user's 87.5%, producer's 66.4%; estimated true number 92.2 ± 24.8 against 70 mapped. For the two students, worked method: a 30-building matrix of [[18,2,0],[1,6,1],[0,1,1]] gives 83% overall agreement and 50% user's and 50% producer's accuracy for destroyed; the hard grades are usually 'damaged' against 'destroyed'.
- In Example 3 an offset of only 0.031 m over 9,600 m² put the net volume out by about 290 m³ (raw +471 m³ against a true +179 m³). The offset can only come from ground that did not change; marks on the pile would mix real change into it.
- Errors in photo-based models are correlated in space, so they do not cancel like independent cells: in the example the independent value of 1 to 2 m³ is far below the real difference of about 34 m³. Report a range using the correlated bound, for example erosion about 710 ± 70 m³, counting only differences beyond the LoD.
- In Example 1 destroyed has the lowest producer's accuracy, 66.4%: about a third of truly destroyed buildings were labelled merely damaged, so the true number is about 92, not 70, and damaged plus destroyed about 426 against 380. Relief planned from raw map counts would fall short. A truly random reference sample and the stratified estimator are needed, and it is still not the section 30 survey.
- t = LoD / v: with LoD 0.169 m at 5 mm per day, about 33.8 days (with LoD 0.098 m about 19.6 days). Consecutive rounds 7 days apart will not show it; compare with the baseline round. In Example 4 the rain-triggered plan uses 4 flights (8 sorties) and flies the day after both heavy-rain days, while weekly flights use 5 flights (10 sorties) and are 3 to 4 days late. Creep under 1 m per decade needs over 600 days, so it needs ground instruments.
Discussion questions
- Why is declaring a building safe or collapsed from overhead images alone dangerous?
- If the water depth at a house has an interval straddling 0.5 m, how should the team report it?
- Who should set the rainfall threshold that triggers a slope flight?
Adapting to student background
- Upper secondary (M.6)
- Have them derive LoD₉₅ from combining two variances and compute the stratified estimate for one grade by hand before running the code.
- Vocational certificate
- Give them mark placement, taping the pile and counting truckloads moved, with a matrix spreadsheet that computes user's and producer's accuracy.
- Diploma
- Extension: fly a third round at a different height, compare LoD and volume, and propose the most cost-effective height for provincial slope monitoring.
14Worksheet 14 Link budget, relay and logistics plan
Lab · About 3 h of class time · CLO9
Objective: Predict and measure radio signal, choose a relay site, plan a continuous relay, and measure the effect of payload on flight time
Equipment
- A radio pair or Wi-Fi access point with an antenna mast of at least 3 m, usable under the NBTC notifications
- Baseline map or height model of the practice area
- Drone within its rated payload and a firmly fixed dummy mass
- Computer with Python and the example code at /downloads/uat-460/
Safety
- Fly in daylight within visual line of sight under the general CAAT conditions, no higher than 90 m, at the distance from uninvolved people that the notification requires, with a safety officer
- Check batteries and propellers before every flight
- Nothing may be released from the aircraft in this lab; any dummy mass must be fixed firmly per the manufacturer's manual and within the rated payload
- Use only registered radios and permitted bands, and never use the flight-control channel as a test data channel
Steps
- Put the radio data into Example 1 and predict SNR at 200, 400 and 800 m
- Measure RSSI on the ground at the same distances, compare with the prediction and find the extra loss that makes them agree
- Read a terrain profile between two points, compute the 0.6 Fresnel clearance and choose a hypothetical relay site
- Measure flight, swap and charge times, then compute the aircraft and batteries for a 4-hour relay
- Hover at 10 m for three minutes without and with the dummy mass, record the battery drop against the prediction, then write a one-page delivery request
Deliverables
- Table of predicted against measured RSSI and the extra loss
- Relay-site table
- Aircraft and battery plan for a 4-hour relay
- Table of battery drop against prediction and the delivery request
Checklist
- Table 1 has predictions from the department radio's real data and measurements at 200, 400 and 800 m, in dB and dBm
- A terrain profile and the 0.6 F1 clearance result for the chosen relay site
- The four-hour relay plan uses the measured flight, swap and charge times
- The one-page delivery request lists items, indivisible masses, packing, sorties, cycle time, receiver and backup plan
- Nothing was released, the dummy mass was fixed per the manufacturer's manual, and only registered radios in permitted bands were used
Instructor guide
Class timing
- Briefing and predicting SNR from the radio data25 min
- Measuring RSSI on the ground at three distances40 min
- Reading the terrain profile and choosing a relay site30 min
- Timing flight, swap and charge and computing the relay plan30 min
- Hovering empty and with the dummy mass35 min
- Writing the delivery request and the hand-in checklist20 min
Expected results
- If the radio uses 2.4 GHz, 20 dBm and 3 dBi antennas at both ends, before other losses, free-space loss is 86.1, 92.1 and 98.1 dB at 200, 400 and 800 m, giving predicted RSSI of −60.1, −66.1 and −72.1 dBm and SNR of 37.9, 31.9 and 25.9 dB against a −98 dBm noise floor in 10 MHz. Ground measurements are usually several dB lower because of the ground and obstacles; extra loss is prediction minus measurement. Use the department radio's real data in place of these assumed values.
- Example 1: site A is blocked by a 78 m hill at 2.6 km, 20.1 m below the 0.6 F1 criterion; site B is clear by 12.3 m. A relay with the Example 2 values (25 min flight, 2 min climb and descent, 2 min handover overlap, 10 min swap, 45 min charge) gives 21 min on station per sortie, so four hours needs 12 sorties, 2 aircraft and 4 battery sets (eight hours 23 sorties). If only 18 min is measured, time on station is 14 min, needing 18 sorties, 2 aircraft and 6 sets.
- By the model, flight time scales with (m₀/(m₀ + Δm))^(3/2), so the battery drains faster by the inverse: a 5 kg aircraft with a 1.0 kg mass drains 1.315 times faster. If 3 min empty uses 12% of the battery (25 min endurance), with the mass it uses about 15.8%. Accept measurements within about ±2 percentage points, since battery percentage readings are coarse and depend on temperature. Use the department aircraft's real mass.
- Differences come from ground reflection, antenna pointing, cables, people's bodies and trees. Free-space loss is 20 log₁₀(4πd/λ), so doubling the distance adds 20 log₁₀ 2 = 6.0 dB. A strong answer uses the measured extra loss to correct the planning value for the real link.
- Height is capped at 90 m by the general conditions. The radio horizon is no problem (46.2 km in total in the example), but terrain can block, so the position must be chosen rather than the height raised. The control link must stay separate from the data link with a lost-link plan; pushing test data over the control channel risks losing control.
- The answer must put the measured values into the Example 2 code. The bottleneck of a long relay is batteries, chargers that run on backup power and pilots who can hand over shifts, not the number of aircraft: in the example two aircraft are enough but 4 battery sets are needed, because each set takes 80 min to come round.
- A strong answer compares measurement with prediction and explains the gap, such as wind, battery temperature or coarse readings. Example 3: 220 people need 15 L per person per day, 3,300 kg, or 1,320 sorties at 2.5 kg each, so water must go another way; drones suit light, urgent supplies in kilograms, such as medicines and batteries.
Discussion questions
- How does a parachute reduce impact energy yet enlarge the area that must be cleared?
- Why is arrival at the destination not yet a successful delivery?
- When should the team propose the existing network or another unit instead of a drone relay?
Adapting to student background
- Upper secondary (M.6)
- Have them derive free-space loss in the form 32.44 + 20 log f + 20 log d and the 3/2 exponent from hover power in momentum theory.
- Vocational certificate
- Give them mast set-up, RSSI readings and fixing the dummy mass per the manual under supervision, with a table that subtracts prediction from measurement.
- Diploma
- Extension: pack the group's real boxes by first-fit decreasing, find how far the sorties exceed the mass lower bound, and add it to the delivery request.
15Worksheet 15 The handover package for the Phuwari case
Analysis activity · About 3 h of class time · CLO9
Objective: Write an information-requirements table, rank findings, set a screening threshold, and prepare and present a two-copy handover package
Equipment
- The instructor's list of twelve findings and a set of labelled image tiles
- Computer with Python, GIS software and GDAL
- Products of Worksheets 12 and 13 (polygon, orthomosaic, damage-grade table)
- Computer with Python and the example code at /downloads/uat-460/
Safety
- This is desk work; use assumed data only and never enter real personal data
- Do not upload group data to a public service, and remove location information from the public copy
- Any CAP message created must have the status Exercise and must not be sent as a real warning
Steps
- Write a five-row information-requirements table for the provincial director stating decision, essential information, product, source and deadline
- Compute S for the twelve findings, change two confidences, then write the list of findings to confirm by flying
- Run the detector on the labelled tiles, choose a threshold from reviewers and time, then report precision, recall and the number missed
- Compute the sizes and transfer times of the products, create GeoJSON and COG files, and check they open in GIS software
- Make two packages with a manifest, complete metadata and checksums, then give a three-minute briefing to the "director"
Deliverables
- Five-row information-requirements table
- Table of index S and the list of findings to confirm by flying
- Report of precision, recall and the chosen threshold
- Operational and public handover packages with manifest, and the three-minute briefing slides
Checklist
- Table 1 has at least five rows, each starting from a decision and with a deadline
- Table 2 computes S for all twelve findings, shows the effect of changing two confidences and names the findings to confirm by flying
- The screening report gives precision, recall, the number missed and the reasoning from reviewers and time
- Both packages have a manifest, complete metadata and checksums, and the public copy has identifying location data removed
- Any CAP message has status Exercise and is not sent as a real warning, and the three-minute briefing covers all five points
Instructor guide
Class timing
- Briefing and the information-requirements table30 min
- Computing S and testing sensitivity to confidence30 min
- Running the screening tool and choosing a threshold40 min
- Sizes and transfer times, creating GeoJSON and COG30 min
- Building the two packages and peer check30 min
- Three-minute briefing to the director and hand-in checklist20 min
Expected results
- A good table starts from decisions, for example which village gets boats first: essential information is water depth and people trapped, the product is a water extent with accuracy, sources are the drone and ground reports, and the deadline is before the boats leave. Five rows should cover life safety, routes, relief supplies, risk areas and recovery, not a list of data the team happens to have.
- Example 1: the order is F12 (1.60), F04 (1.50), F09 (1.33), F06 (1.12), F03 (0.90), F08 (0.62) ... F05 (0.03); the top five are F03, F04, F06, F09 and F12 with 1.4 expected false alarms (1.7 ignoring confidence); confirm F06 and F08 by flying. If the group changes F08 to 0.8 and F04 to 0.4, the top five become F08 (1.67), F12, F09, F06 and F03, and F04 drops out. Group results depend on the changes; check that S = cn/h was computed correctly.
- Example 2 (1,500 tiles, 90 targets, one reviewer at 60 tiles per hour for 2 h, so 120 tiles): threshold 0.6 flags 85 tiles in 1.4 h, precision 89%, recall 84%, 14 of 90 missed (about 16%). Example 3: the 3.2 km² orthomosaic at 2.47 cm GSD has 5.25 billion pixels, 1.31 GB compressed, about 62 min over a 2.8 Mbit/s link; an overview 8 times coarser is 20.5 MB, about 59 s; the GeoJSON polygon 0.04 s. Six decimal places give about 0.11 m. If the lab tile set or number of reviewers differs from the example, the numbers will differ; check that the threshold gives the highest recall within the review-time budget.
- F08 (25 people, confidence 0.3) falls from rank 2 to 6 and F06 from 1 to 4. A strong answer explains that low confidence risks sending boats where nobody is, so such findings are confirmed by flying first, since a confirmation sortie costs less than a boat mission to the wrong place, and the assumptions are recorded for review; the commander still decides.
- By Example 2 the message is 'about 16% of blocked roads are missed (14 of 90 tiles)', not just that checking is done; with more reviewers or time, lower the threshold, for example 0.5 needs 123 tiles and gives 93% recall. For the group, check that the threshold gives the highest recall within the review budget and was not tuned on the test set.
- Send the small thing that answers the decision first: the 20.5 MB overview takes about 59 s against about 62 min for the full file. A 500 MB file over 2.8 Mbit/s takes 500 × 8 / 2.8 = 1,428.6 s, about 23.8 min. If the link is not enough, send the full file on a storage medium, and use COG so the recipient fetches only the part being viewed.
- The operational copy is complete for the units with a duty to act; the public copy removes locations and identifying data. A version number tells the recipient a new file replaces the old; a checksum lets them verify the file is not damaged or altered. Warnings are the power of officials charged by law; the drone team sends checked information with its confidence for the director to decide.
Discussion questions
- If a sector has no current observation, why must the briefing say 'unknown' rather than 'no problem found'?
- What is the risk of hiding names but leaving images and metadata that show locations?
- When should the CAP certainty Observed be used, and when Likely or Possible?
Adapting to student background
- Upper secondary (M.6)
- Have them test the sensitivity of S to confidence by hand for one finding and sum 1 + 1/4 + 1/16 + ... = 4/3 for the overview levels.
- Vocational certificate
- Give them file creation with prepared GDAL commands, opening the files in GIS and building the manifest, with an information-requirements template that has one worked row.
- Diploma
- Extension: write a time-cutoff filter like Example 5 for the group's data and list the sectors the briefing must report as 'unknown'.
16Worksheet 16 Planning a mission to beat the commander's decision time
Lab · About 3 h of class time · CLO10
Objective: Analyse the situation as known, assumed and unknown information with constraint clocks, build a backward schedule from the decision time and find the critical path, rank information sources by their value, write six-field objectives and choose a set of objectives within the aircraft-minute budget
Equipment
- High-rise fire scenario cards (handed out by the instructor, or a new incident card in the same format) and a form for the known, assumed and unknown table
- A computer with Python and the code of Examples 1 to 3 of Module 16
- Stopwatches for timing the planning and the field tasks
- A registered aircraft, charged batteries and a ground station for timing kit preparation and launch on the closed field
Safety
- Fly within visual line of sight in daylight under CAAT conditions, in an area closed to the public, never over people; the instructor checks the distance from uninvolved people, vehicles and buildings (50 m under the general conditions) before the flight points are set
- Check batteries before flight, charge them in a fire-resistant box away from people and keep an extinguisher at the launch point
- Everyone stays clear of the propellers and outside the flight path; fit propellers only when ready to fly and remove them for bench work on the aircraft
- The situation analysis, schedule and value-of-information work is desk work with assumed numbers, using no real incident or personal data
- Rest and drink water in the field, anyone tired or overheated does not take a duty, and hot batteries and airframes cool down before they are handled or charged
Steps
- Receive the scenario card at time T0 and start timing the planning at once, in teams of 4 to 5
- Write the known, assumed and unknown table with the source and age of every line, and at least five constraint clocks
- Split the work from receiving the request to reporting the result, add estimated durations, run the code of Example 1 to find the critical path, the float and the time left, then propose two options that add time
- Set the loss table of the decision, estimate the sensitivity and specificity of three sources, run the code of Example 2 to get the ranking and the decision threshold, then change the assumed values to see whether the ranking changes
- Write at least six objectives with all six fields, set the aircraft-minute costs, choose the best set for the budget the instructor sets with the code of Example 3 and check gate G1
- On the university's closed field, time the real kit-preparation and launch tasks, substitute the real times in Example 1, rerun it and report whether the critical path changed
- Submit mission file version 0, one page
Deliverables
- Known, assumed and unknown table with the constraint clocks
- Backward schedule, critical path, float and two options that add time, with the rerun using real times
- Value-of-information table (EVSI per minute) and decision threshold with the assumptions
- The chosen six-field objectives, the G1 result and the reasons for dropping the rest (mission file version 0)
Checklist
- Every line of Table 1 has a source and age, with at least five constraint clocks
- Table 2 shows the critical path, float and the rerun with measured times
- Table 3 has the loss table, recorded assumptions and the decision threshold P*
- At least six objectives with all six fields (question, what to image, product, recipient, deadline, success criterion)
- Field timing was flown within visual line of sight on a closed field, with propellers fitted only when ready to fly
Instructor guide
Class timing
- Receiving the card at T0 and writing the known, assumed and unknown table30 min
- Splitting the work and finding the critical path with Example 130 min
- Loss table and EVSI with Example 230 min
- Writing six-field objectives and choosing the set with Example 330 min
- Timing kit preparation and launch on the closed field and rerunning40 min
- Mission file version 0 and the hand-in checklist20 min
Expected results
- A good table separates the known (for example the fire floor and the 16:05 request time), the assumed (such as wind direction) and the unknown (whether fire has spread to floors 17 to 19), with source and age on every line, and at least five constraint clocks such as the 16:35 decision time, sunset, battery, wind and helicopter arrival.
- Example 1 (request 16:05, decision 16:35): one aircraft finishes at 16:39, 4.0 min late, with every task except preparation on the critical path and preparation carrying 4.0 min of float; two aircraft finish at 16:34:30 with 0.5 min left; two aircraft with an advance airspace plan finish at 16:31:30 with 3.5 min left and preparation float falls to 1.0 min. If preparation is measured at 9 min and launch at 3 min in the last case, the finish is 16:34:30 with 0.5 min left and the critical path moves to preparation.
- Example 2 (P(spread) = 0.40): with no information, commit 12.0 and hold 7.6, EVPI 6.0; thermal scan EVSI 4.06 (0.580 per minute), zoom camera 2.28 (0.285), stairwell crew 5.18 (0.432), building manager 0.00; threshold P* = 0.278. Example 3: budget 25 min picks O1+O3+O4 (10.46); 30 min O1+O3+O4+O5 (13.86); 35 min O1+O2+O3 (15.76) while value per minute gives 14.46; 40 min O1+O2+O3+O5 (19.16) against 17.96.
- A strong answer substitutes the real times and says whether the critical path moved: when preparation takes 9 min instead of 6 in the pre-agreed airspace plan, it becomes critical, and staged kit then becomes a useful option. An option only adds time if it shortens a critical task, such as agreeing the airspace plan in advance or using two aircraft.
- A task with float can slip without moving the finish, so speeding it up does not finish sooner. In Example 1 preparation has 4 min of float; buying more batteries does not help because the task causing the delay is airspace coordination. After each fix, check where the critical path has moved.
- In Example 2 the thermal scan has the highest EVSI per minute, 0.580; the stairwell crew has the highest EVSI but takes 12 min and sends people into a burning building. The manager's report is worth 0 because even a 'not spread' report leaves the probability at 0.30, above the 0.278 threshold, so the commander should still wait. A strong answer shows whether the ranking changed with the assumed values and notes that EVSI peaks when the probability is near the threshold.
- At a 35 min budget the value-per-minute method takes several small items and leaves too little budget for O2, which has the highest value, giving 14.46 instead of 15.76, so trying every subset is better. A dropped objective, such as O6, which is in no best set at any of the four budgets, must be reported to the requester with the time it is expected to be flown. G1 passes when every chosen objective has all six fields and fits the budget; 'do not fly' with reasons can also be a correct result.
Discussion questions
- Why is 'photograph the whole building' a poor objective while 'send thermal images of all four faces before 16:35 with every window at least 10 pixels' is a good one?
- How do the airspace-coordination minutes in the plan differ from the time to obtain permission from CAAT?
- When is 'do not fly' a correct result of planning, and how must it be reported to the commander?
Adapting to student background
- Upper secondary (M.6)
- Have them do the CPM forward and backward passes by hand before running the code and compute P* = a/(a + b) from the loss table.
- Vocational certificate
- Give them timing of kit preparation and launch on the field, with a six-field objective form to fill in.
- Diploma
- Extension: find the range of prior probability over which the thermal scan has EVSI above zero and propose when the team should not fly for more information.
17Worksheet 17 Assessing the site and risk of a teaching-building facade scan
Lab · About 3 h of class time · CLO11
Objective: Check the general flight conditions against the plan, find a height ceiling from wind with an uncertainty range and refit it from on-board measurement, find pilot positions that see the aircraft along the whole route, compute iGRC to SAIL and decide at gate G2
Equipment
- The team's flight set from the Module 16 plan, and a computer with Python and the code of Examples 1 to 5 of Module 17
- The laboratory anemometer
- An aircraft, batteries and a ground station from which wind can be read in the flight log
- A plan or aerial photo of the chosen teaching building with approximate heights, and Table 3 of SORA 2.5
Safety
- Fly within visual line of sight in daylight under CAAT conditions, in an area closed to the public, never over people; the instructor checks the distance from uninvolved people, vehicles and buildings (50 m under the general conditions) before the flight points are set
- Do not fly when the measured wind exceeds the aircraft's planning limit (the manufacturer's limit with a 20% margin) and abort the vertical climb at once if the wind rises
- Check batteries before flight, charge them in a fire-resistant box away from people and keep an extinguisher at the launch point
- Pilots stand outside the area where objects can fall, as the instructor sets, and do not walk into the flight path while checking line of sight
- The legal check and the document list are desk work; no real permit application is filed in the name of the team or the university
Steps
- Desk work: run the code of Example 1 on the team's flight set, write the list of conditions that need permission and the list of documents under Article 21 of the 2026 CAAT notification
- Measure the wind at 10 m with the laboratory anemometer, then use Example 2 to find the height ceiling of the department aircraft, setting the exponent as a range and considering the corner factor
- Field: climb vertically at least 20 m beside a tall teaching building, read the wind from the flight log at 10 m and 30 m (or two other safe heights), calculate the exponent and compare it with the expected range
- Build boxes for the buildings around the teaching building, run Example 3 to find positions that see each aircraft's whole route, then check in practice with a pilot standing there calling out the places that cannot be seen
- Estimate the density around the building from SORA Table 3, run Examples 4 and 5 to get the iGRC, GRC, SAIL and the number of objectives at high robustness
- Write the gate G2 result, go, wait or go with limits, with reasons from the five knock-out criteria
Deliverables
- List of conditions broken and the documents to prepare before an incident
- Table of wind by height, the height ceiling, and the measured exponent against the expected range
- Pilot-position plan with the field check against the code result
- The iGRC to SAIL chain with its evidence burden, and the gate G2 record with reasons
Checklist
- Table 1 checks every flight against all five conditions and lists the documents to prepare before an incident
- Table 2 has wind measured at two or more heights, the computed α, the expected range and the corner ceiling
- A pilot-position plan with the field check against the code result
- The iGRC to SAIL chain shows density, reductions and the number of objectives needing high robustness
- The G2 record uses the five knock-out criteria, and no flight took place with wind above the planning limit
Instructor guide
Class timing
- Briefing and checking legal conditions with Example 130 min
- Measuring wind at 10 m and finding the ceiling with Example 225 min
- Vertical climb beside the building and reading wind from the log40 min
- Finding pilot positions with Example 3 and the field check35 min
- Computing iGRC, GRC and SAIL with Examples 4 and 530 min
- Writing the G2 result and the hand-in checklist20 min
Expected results
- Example 1: the daytime facade scan breaks two conditions (over a community, and within 50 m of other people's buildings), the night rubble search three (adding flight outside sunrise to sunset), and losing sight of the aircraft adds one more; 80 m is still within 90 m. For a teaching building on a closed field the result depends on the instructor confirming that the target building counts as related to the flight. Every condition broken needs a Specific-category permit prepared before an incident.
- Example 2 (5 m/s at 10 m, 9.6 m/s allowed, corner factor 1.4): open-terrain α 0.228 gives a corner ceiling of 39.9 m, α 0.30 gives 28.7 m and α 0.40 gives 22.0 m; refitting from 6.6 m/s at 30 m and 8.0 m/s at 60 m gives α 0.278 and a corner ceiling of 34.4 m. If the lab measures 4.0 m/s at 10 m, open-terrain α is 0.248; 5.2 m/s at 30 m gives α 0.239 (5.6 m/s gives 0.306). With a 12 m/s aircraft limit (9.6 m/s allowed) the corner ceiling is about 88 m; with an 8 m/s limit (6.4 m/s allowed) about 66.6 m mid-face and only about 17.1 m at the corner.
- Example 3: no single position sees both routes (N1 sees 51 of 90 points), so two pilots stand at S2 (119 m) and N3 (115 m). Examples 4 and 5: the daytime facade scan is iGRC 6, reduced by M1(C) to GRC 5, ARC c to b, giving SAIL IV with 4 objectives at high robustness. If the peak density around the teaching building is below 5,000 people/km² (for example 4,000), iGRC is 5, GRC 4 and SAIL III, with 1 objective at high robustness (operational procedures). The group's density must be estimated from SORA Table 3.
- The 2026 CAAT notification has no exemption channel for emergency missions; an emergency is a reason to apply. Counting 14 working days from Wednesday 7 October 2026 gives Tuesday 27 October 2026 (ignoring public holidays), so permission is measured in weeks and the team needs a period permit and evidence file before an incident.
- α from two heights is ln(V₂/V₁)/ln(z₂/z₁); the lesson uses a range of about 0.23 to 0.40, and beside tall buildings it may be higher than in the open. The ceiling z_max = 10(V_allow/(kV₁₀))^(1/α) is very sensitive to α (almost a factor of two in the example) and to k: at α 0.30, lowering k from 1.4 to 1.2 raises the corner ceiling from 28.7 to 47.9 m. The windward corner is always the tightest limit.
- A strong answer compares the places the pilot called out as unseen with the code result; differences usually come from trees, lamp posts or estimated building heights. If no position sees everything, cut the unseen part from the plan, fly it from another direction, or request EVLOS with an observer in the permit in advance, never fly on hoping to see the aircraft.
- SAIL is an evidence burden: SAIL III needs 1 objective at high and 9 at medium robustness, SAIL IV 4 at high and 12 at medium, and high robustness needs third-party validation that cannot be done on the day. A good G2 result cites the five knock-out criteria (authority, wind, sight, SAIL evidence, people); the lesson's case is 'Go with limits' because the south-west corner is limited to 34 m, recording the cut part as a gap in O1.
Discussion questions
- Why can an observer not replace the pilot's own sight under the general conditions?
- Is moving people out to lower the density a realistic shortcut within a few minutes?
- Which flights does PDRA101 apply to, and how can it still help the team build a playbook?
Adapting to student background
- Upper secondary (M.6)
- Have them derive z_max from the power law by hand and compute α from two heights before using the code.
- Vocational certificate
- Give them the anemometer, reading wind from the flight log and the field sight check, with a tick-box table of the five conditions.
- Diploma
- Extension: compute how many people must move to drop one density band around their teaching building and compare with preparing an M2 mitigation in advance.
18Worksheet 18 Testing the department's aircraft and choosing one for the facade scan
Lab · About 3 h of class time · CLO10
Objective: Turn the objectives into a numeric requirements table, fit the flight-time model from hover tests, check the pixel formula against a real sign, choose an aircraft with a weighted matrix that has knock-out criteria and a sensitivity test, and calculate batteries for a long mission
Equipment
- The department's aircraft, charged batteries and a ground station from which power and time can be read in the flight log, with a scale for the aircraft and payload
- The department's thermal or RGB camera, a sign 1.2 m wide and a tape or laser rangefinder to measure 45 m
- Stopwatches and a charger whose real charging time can be timed
- A computer with Python and the code of Examples 1 to 4 of Module 18
Safety
- Hover tests at 2 m in an area closed to the public, within visual line of sight, in daylight under CAAT conditions and never over people; if a camera is mounted on the aircraft the same rules apply
- Hover to the low-battery warning level and land at once, never fly on until the battery is empty, charge in a fire-resistant box away from people and keep an extinguisher at the launch point
- Everyone stays clear of the propellers and outside the flight path; fit propellers only when ready to fly and remove them for bench work on the aircraft
- Separate the pilot, observer and safety officer roles, keep to the radio channels in the plan and a stop-flying call everyone knows, and the instructor may order a stop at any time
- Rest and drink water in the field, anyone tired or overheated does not take a duty, and hot batteries and airframes cool down before they are handled or charged
- The lens calculations, decision matrix and logistics are desk work; images are taken of the sign and training field only, never of outsiders
Steps
- From the objectives and assessment results of Modules 16 and 17, write a seven-row technical requirements table with numbers
- Hover each aircraft at 2 m until the low-battery warning level and record the time and power from the flight log, twice: with no payload and with the full payload
- Use the code of Example 1 to adjust FM and η to the measured times, then predict the flight time at 35 °C and compare it with the manufacturer's figure
- Measure a 1.2 m sign at 45 m with the thermal or RGB camera, count the pixels across the sign against g = pd/f and run Example 2 with the cameras and lenses available
- Score the department's aircraft from these results, set the weights for two tasks, run Example 3 with the knock-out included and report the share of runs ranking first
- Calculate battery sets and chargers for a four-hour overwatch with the code of Example 4, using the charging time you actually measured
Deliverables
- The seven-row technical requirements table
- Measured hover times, the fitted FM and η, and the flight time predicted at 35 °C against the manufacturer's figure
- Table of pixels measured on the sign against g = pd/f, and the Example 2 result for the cameras available
- Weighted score table for two tasks with the knock-out and the share ranking first, and the battery plan for the four-hour overwatch
Checklist
- Table 1 has seven rows, each with a number and a check method
- Table 2 has two hovers per aircraft (without and with payload) with time and power from the flight log
- Images of the 1.2 m sign at 45 m, the counted pixels and the g = pd/f value
- The two-task matrix has the knock-out and share ranking first, and the battery plan uses the measured charge time
- Hovers ended at the low-battery warning with an immediate landing, and charging was in a fire-resistant box away from people
Instructor guide
Class timing
- Briefing and the seven-row requirements table25 min
- Hovering at 2 m without and with payload55 min
- Fitting the model and predicting flight time at 35 °C20 min
- Measuring the 1.2 m sign at 45 m and running Example 230 min
- Scoring the aircraft and running Example 330 min
- Battery calculation and the hand-in checklist20 min
Expected results
- Good requirements are checkable numbers: a 1.2 m window at least 10 pixels (O1), a person at least 7 pixels (O2), expected wind within 80% of the manufacturer's limit (Module 17), endurance for one scan plus a 20% reserve, standoff set by the safety officer, operation under the 90 m ceiling and a configurable return to launch.
- Example 1 (FM 0.65, η 0.80, 80% of the battery used): A at 25 °C hovers at 1,097 W for 28.5 min, at 35 °C 1,115 W for 28.0 min; B 38.9 and 38.3 min; without its 1.3 kg payload A gets 35.4 min, about 5.7 min per kilogram. If A is measured at 26 min at 25 °C, FM × η must fall from 0.52 to about 0.475, predicting about 25.6 min at 35 °C. Time to the low-battery warning depends on the level set, so record that level too.
- The 1.2 m sign at 45 m: a 12 µm thermal camera with a 9 mm lens gives g = 6.00 cm, 20.0 pixels; with 13 mm, 4.15 cm and 28.9 pixels; an RGB camera with 2.41 µm pixels and an 8.8 mm lens gives 1.23 cm and 97.4 pixels. Accept counts within about ±10%. Example 3: for the facade scan A ranks first in 100% of runs and B and C are knocked out; for six-hour overwatch C wins 88%. Example 4 for four hours: 24 min on station per sortie, 10 sorties, 5 battery sets (plus 1 spare) and 3 chargers running at once, about 1.9 kW; with a measured 90 min charge, 6 sets and 4 chargers.
- From objectives: 10 pixels per window from O1 and 7 pixels per person from O2, which fix lens and standoff. From the assessment: corner wind from Module 17 and SAIL, which sets the evidence needed. A strong answer traces every row back to its source.
- The answer must put the measured times into the Example 1 code to find the FM × η that fits. In the example the 1.3 kg payload cuts A from 35.4 to 28.0 min (about 5.7 min per kilogram); mass matters far more than temperature (25 to 35 °C costs under 1 min), so remove equipment the task does not need.
- g = pd/f depends only on d/f: a 13.5 mm lens at 67.5 m has d/f = 5.0, the same as 9 mm at 45 m, so pixels per window and frame count stay the same, but the ground risk footprint grows by 22.5 m for nothing. Use the shortest lens that meets the criteria and back off only as far as the safety officer requires.
- In Example 3 the expected 8.7 m/s exceeds the planning limits of C (8.0) and B (6.4), so both are knocked out of the facade scan; other scores cannot offset a knock-out. A share below 100%, such as B's 77% for the first look, shows the result is sensitive to the weights, so prepare a backup. The bottleneck of a long task is batteries, chargers and power, not the drone itself.
Discussion questions
- Why is choosing an aircraft from the manufacturer's brochure risky?
- What does a tethered aircraft gain and lose compared with a battery aircraft?
- If the commander weights sensors more heavily, how does the first-look choice change, and how should the commander be told?
Adapting to student background
- Upper secondary (M.6)
- Have them derive hover power from momentum theory and compute one endurance by hand before fitting FM and η in the code.
- Vocational certificate
- Give them weighing the aircraft, reading time and power from the flight log and counting pixels on the sign, with a requirements table that has one worked row.
- Diploma
- Extension: test the matrix with 1,000 random weight sets and propose what share ranking first counts as a firm choice.
19Worksheet 19 Map, route and contingency plan for a teaching-building scan
Lab · About 3 h of class time · CLO11
Objective: Set the risk footprint of each flight phase, lay out the scan route in columns and compute the times, set the return point, rally points and return altitude, write the contingency table and tree, and find the single points of failure of the plan
Equipment
- A map or plan of the chosen teaching building, and a computer with Python and the code of Examples 1 to 4 of Module 19
- An aircraft, batteries and a ground station that can set RTL_ALT_M, rally points and a geofence, or the ArduPilot SITL simulator if available
- Radios or channels for the pilot, observer and safety officer
- Stopwatches, an extinguisher and a first-aid kit at the launch point
Safety
- Fly within visual line of sight in daylight under CAAT conditions, in an area closed to the public, never over people; the instructor checks the distance from uninvolved people, vehicles and buildings (50 m under the general conditions) before the flight points are set
- The instructor creates the lost-link and low-battery events with everyone outside the flight path and clear of the propellers; crash and battery-fire events are rehearsed on paper only, with no real damage to batteries and no real fire
- Set up and test RTL in the simulator first, and remove the propellers when configuring the real aircraft on the bench
- Check batteries before flight, charge them in a fire-resistant box away from people and keep an extinguisher at the launch point
- Separate the pilot, observer and safety officer roles, keep to the radio channels in the plan and a stop-flying call everyone knows, and the instructor may order a stop at any time
- Rest and drink water in the field, anyone tired or overheated does not take a duty, and hot batteries and airframes cool down before they are handled or charged
Steps
- Run the code of Example 1 with the department aircraft's speeds and errors, draw each phase's footprint on the map of the chosen building and check which density cells it touches
- Lay out the scan columns for the widest wall of the building, run the code of Example 2 to compute the time for one aircraft against two, then check it against the real flight time in step 5
- Set the home and rally points, run Example 3 and set the return altitude, set RTL_ALT_M and the rally points in the aircraft or simulator, then test commanding RTL from every station
- Write a contingency table of at least eight rows and a tree for the lost-link event, state the values set in the aircraft and the time limits, then write an ERP checklist following the relevant PDRA101 items
- Field: fly one scan column of the building at the planned speed and time it, then rehearse the lost-link and low-battery events from the table with the instructor creating the events
- Run the code of Example 4 with the team's list of resources, then propose the one spare item that reduces the single points of failure the most
Deliverables
- Footprint map of each phase with the map-layer checklist
- The column scan plan, the time table for one aircraft against two, and the real flight time against plan
- Return-altitude table, the RTL_ALT_M value and the RTL test result from every station
- Contingency table of at least eight rows, the lost-link tree, the ERP checklist and the single-point-of-failure result with the proposed spare
Checklist
- Table 1 covers all three phases with the department aircraft's speeds and errors, drawn on the map of the chosen building
- Table 2 gives columns, one against two aircraft, the real column time, the RTL_ALT_M value and the RTL test from every station
- The contingency table has at least eight rows, with the lost-link tree and an ERP checklist
- Single points of failure from Example 4 are listed and one spare is proposed with a reason
- Lost-link and low-battery events were rehearsed with everyone outside the flight path, while crash and fire were rehearsed on paper only
Instructor guide
Class timing
- Briefing and the risk footprint with Example 130 min
- Laying out columns and computing time with Example 225 min
- Setting home and rally points and testing RTL in the simulator30 min
- Writing the contingency table, decision tree and ERP checklist30 min
- Flying one column and rehearsing lost-link and low-battery events45 min
- Single points of failure and the hand-in checklist20 min
Expected results
- Example 1 (45 m standoff, 6.5 m of combined error plus 0.5 s latency, 5 s failsafe, 2 s reaction, 2.5 m/s² braking): the 1 m/s sweep has an outer edge of 59.2 m, the 4 m/s ring 84.7 m and the 6 m/s transit 103.7 m; at 3 m/s it is 75.8 m. With the 90 m buffer every phase touches all 9 cells. Group values must use the department aircraft's data.
- Example 2: one aircraft for four faces 10.9 min, two aircraft 6.3 min, leaving A with 17.1 and 21.7 min of battery. Columns n = 1 + ⌈(W − w)/(w(1 − o))⌉: with the 9 mm thermal lens at 45 m the frame is 38.4 m wide, so with 20% overlap a 60 m wall needs 2 columns and an 80 m wall 3. A 20 m column at 1 m/s should take about 20 s plus the 15% allowance (about 23 s) plus the column shift. Return altitude is the tallest building under the path plus 15 m: Example 3 gives 47 m, so RTL_ALT_M is 50 m; with a 25 m tallest building, 40 m.
- A good table has at least eight events, such as control-link loss, low battery, GNSS loss, fly-away, a crewed aircraft entering, a person entering the operating area, battery fire and crash, each with detector, aircraft setting (such as a 5 s failsafe and RTL_ALT_M), crew action, responsible person and time limit, separating emergency procedures (recover the aircraft) from the emergency response plan (manage effects on people and notify agencies).
- s_cm = v(t_fs + t_r) + v²/2a depends on speed, so the slow sweep has the smallest outer edge, but with the 90 m buffer every phase still touches the same cells, and the iGRC from the densest cell does not change. A strong answer re-checks every time the volume is adjusted, because the result may or may not change.
- A strong answer compares the timed column with the plan and explains the gap, such as acceleration at column ends or wind, then puts the real value into Example 2. In the lesson the computed 10.9 and 6.3 min are close to the 11 and 6.5 min estimates of Module 16, so the original schedule holds; if real times are much longer, the one-aircraft plan may miss the decision time.
- RTL flies a straight line to home or the nearest rally point. In Example 3, station W returning to N3 needs 110.2 m, above the 90 m ceiling, because the line cuts through the 95.2 m tower; rally points near the stations never cross the tower, so a single value of at least 47 m works for all stations, set to 50 m, and RTL must be tested from every station in the simulator first.
- A good team follows the table within the time limits and logs the times. When the signal returns, the failsafe does not revert by itself; the pilot must change the mode. Example 4: the first plan has 4 points that stop everything (permit, radio, data manager, generator) and 60 of 136 failure pairs; after adding a backup link, a second data manager and a second generator only the permit remains, with 24 of 190 pairs. The permit cannot be duplicated, so someone must watch its expiry date.
Discussion questions
- Why is a plan that only says 'command RTL' not enough as an emergency response plan?
- How must an objective gap caused by wind or line of sight be reported to the commander?
- If one A aircraft is lost, how much slower is the plan, and when should the commander know?
Adapting to student background
- Upper secondary (M.6)
- Have them derive s_cm from motion during the delays plus braking distance and compute one phase's outer edge by hand before using the code.
- Vocational certificate
- Give them setting RTL_ALT_M and rally points in the simulator from a checklist and timing the column flight, with a contingency-table template that has the column headings.
- Diploma
- Extension: add a combined event, such as lost link with low battery, to the decision tree and test in SITL whether the aircraft behaves as configured.
20Worksheet 20 Mission file, drills and after-action review (mini-project)
Lab · About 3 h of class time · CLO12
Objective: Prepare a mission file for one hypothetical emergency covering the airspace agreement, communications plan and a NOTAM draft (format exercise), rehearse the plan on a computer with the team's real task times, fly a demonstration after passing gate G3 with an ICS 214 log, and write a SMART AAR/IP
Equipment
- The team's results from Modules 16 to 19, and a computer with Python and the code of Examples 1 to 5 of Module 20
- The instructor's schedule of hypothetical aircraft movements (the instructor plays the air branch coordinator) and ICS 205, 213 and 214 forms
- An aircraft, batteries and a ground station that can set rally points and a geofence, with radios for the drone-group and airspace nets
- Stopwatches, an extinguisher and mobile phones as the backup for the communications nets
Safety
- Fly the demonstration on a closed field with no outsiders, within visual line of sight, in daylight under CAAT conditions and never over people; pass all ten checks of gate G3 before launch, and the instructor checks the distance from uninvolved people, vehicles and buildings (50 m under the general conditions)
- Night search and airspace notification (NOTAM) are desk exercises only: no night flying and no real NOTAM or request is sent
- The instructor's ‘helicopter in’ call is a radio simulation; the team must stop flying at once each time and the safety officer logs the time in ICS 214
- Check batteries before flight, charge them in a fire-resistant box away from people and keep an extinguisher at the launch point
- Everyone stays clear of the propellers and outside the flight path; fit propellers only when ready to fly and remove them for bench work on the aircraft
- Separate the pilot, observer and safety officer roles, keep to the radio channels in the plan and a stop-flying call everyone knows, and the instructor may order a stop at any time
- Rest and drink water in the field, anyone tired or overheated does not take a duty, and hot batteries and airframes cool down before they are handled or charged
- Image only the training field, signs and exercise objects, never outsiders, and keep images and data within the class
- Name a safety controller and a stop word for a real emergency that anyone may call to end all play and land every aircraft, keep calls to the real ambulance service separate from the exercise, set wind and heat limits before starting, and fly no higher than 60 m so every aircraft is down within 45 s of the stop word
Steps
- Choose a hypothetical emergency of the department, such as a fire in a classroom building, and combine the results of Modules 16 to 19 into a mission file following the eight-item table
- Run the code of Example 1 on the instructor's movement schedule, compare the two options and write a one-page airspace agreement
- Write a table of communication nets with primary and backup systems for every net, draft a NOTAM following Example 2 (format exercise, not sent) and test the backup of one net
- Measure the team's real task times at least five times each, substitute them for the assumed values in the code of Example 3, run at least three plan versions and report the median, the 90th percentile and the share within target
- Field: pass gate G3, then fly the demonstration of the plan in the file on the closed field while the safety officer fills in ICS 214 and the instructor announces ‘helicopter in’ twice by radio, as scheduled, to test the stop-flying procedure
- Use the code of Example 4 to compare the plan with the log, write at least three SMART AAR/IP rows, rehearse again as appropriate, then use Example 5 to check whether the improvement is real, with an honest summary of the remaining uncertainty
Deliverables
- The eight-item mission file checked against gate G3
- One-page airspace agreement, communications table with backups and a NOTAM draft (format exercise, not sent)
- Computer-based drill report (at least three plan versions) and the ICS 214 log of the demonstration flight
- AAR/IP of at least three SMART rows with the check that the improvement is real and a summary of the remaining uncertainty
Checklist
- The mission file has all eight items and passed all ten G3 checks before launch
- A one-page airspace agreement, a communications table with a backup for every net, and a NOTAM draft in UTC marked as a format exercise, not sent
- The computer drill report uses at least five real times per task, at least three plan versions, with median, 90th percentile and share within target
- The ICS 214 log has both 'helicopter in' calls and the actual stop times
- The AAR/IP has at least three SMART rows and an honest summary of the remaining uncertainty
Instructor guide
Class timing
- Briefing and assembling the eight-item mission file30 min
- Flight windows with Example 1 and the airspace agreement25 min
- Communications table, NOTAM draft and backup test25 min
- Timing real tasks and the computer-based drill35 min
- Gate G3 and the demonstration flight with the ICS 214 log35 min
- After-action review, writing the AAR/IP and presenting30 min
Expected results
- Example 1 (5 min margin around each movement, 10.9 min scan, 6 min swap, flying 16:22 to 17:50): stopping every time gives stops of 16:47 to 17:07 and 17:15 to 17:53 and 1 sortie (10.9 min, 12%); with the police orbiting at 150 m by agreement, 3 sorties at 16:22, 17:07 and 17:23 (32.7 min, 37%), so the agreement is worth 2 sorties. Apply n = ⌊(w + t_swap)/(t_sortie + t_swap)⌋ to the instructor's schedule. Every net needs a primary and a backup system.
- Example 3 (15 min target, 2,000 runs): the baseline plan has a median of 21.1 min, P90 24.0 min and 0.1% within target; with the airspace plan agreed 18.3 / 21.2 / 3.4%; with staged kit 17.5 / 19.8 / 6.6%; with planning templates 11.3 / 13.8 / 95.0%. With the team's real times the numbers will change; check that at least five real times per task were used and all three values reported.
- Example 4: the plan totals 26.3 min, finishing at 16:31; the real run took 41.0 min, briefing the commander at 16:46, 11 min after the decision time. The largest overrun is airspace coordination, 9 min instead of 1 (8.0 min over); other steps overran by 0 to 2 min. A good SMART correction has an owner, an action, a measure and a due date, and fixes the critical step with the largest overrun first.
- By the lesson's formula, if the instructor uses the self-check schedule (8 min margin, police separated by height), the stops are 16:44 to 17:10 and 17:35 to 17:56, the gaps 22 and 25 min, one sortie each, so 2 sorties at 16:22 and 17:10. A strong answer compares both options and says the agreed height must be accepted by the pilot and recorded, and if the pilot changes their mind the team must return to stopping every time at once.
- UTC is 7 hours behind Thai time: B) 2610141300, C) 2610142230; radius 2,000/1,852 = 1.08 NM, rounded up to 002; upper limit (150 + 90)/0.3048 = 787.4 ft, rounded up to hundreds gives 008; G) 90/0.3048 = 295.3, so 295FT AGL. Common mistakes are using local time or forgetting the UTC date differs. This teaches the format only; the real process must be checked with CAAT.
- In Example 3 the planning templates lower the median most, by 6.2 min (17.5 to 11.3), more than the airspace agreement (2.8 min) and staged kit (0.8 min). Staged kit helps little because preparation runs in parallel with planning and airspace coordination and is off the critical path. Task times are assumed, so the result only ranks corrections; rehearse in the field and measure real times.
- Example 5: median 21.8 before and 14.2 min after, 7.6 min lower, with a 95% bootstrap interval of −9.9 to −4.5 min that does not straddle zero, so the improvement is credible; but 4 of 6 within target (67%) has a Wilson interval of 30% to 90%. Five of six (83%) gives a Wilson interval of 44% to 97%, while the normal approximation gives 0.535 to 1.132, an impossible upper bound above 100%. The honest conclusion is 'definitely better, not yet known whether the target is met consistently, rehearse more'.
- The answer cites the largest difference in Table 3. A SMART example: 'The data manager prepares an annotated thermal-map template in advance and rehearses it three times by 15 November 2026; target: the product-ready step takes no more than 4.5 min in three drills in a row.' 'Train the team to coordinate better' is not SMART: it is not specific, cannot be measured and has no owner or due date.
Discussion questions
- Why is deciding alone how many metres counts as 'close' dangerous, even when it looks safe?
- If an inject card arrives after the trainee's decision time, how should it be scored fairly?
- How does a 45 s stop-flying budget limit the drill height, and why is an exercise still a real operation that needs approval?
Adapting to student background
- Upper secondary (M.6)
- Have them compute one Wilson interval by hand, explain why the normal approximation exceeds 100% with small data, and convert Thai time to UTC across midnight by hand.
- Vocational certificate
- Give them the safety officer role filling in ICS 214 or testing the backup net, with a NOTAM form that has a box for each item.
- Diploma
- Extension: design three inject cards following Example 6 with all five fields and real recipients, and use them in the next drill with fair evaluation rules.
Scoring rubric
For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.
| Criterion | Weight | Excellent (4) | Good (3) | Fair (2) | Needs work (1) |
|---|---|---|---|---|---|
| Accuracy of calculations and analysis | 30% | Age of information, EEI coverage, density, rotation, focal length, bit rate, GSD, response time, span of control, storage, iGRC, buffer, risk scores and pixels per metre all correct, with reproducible code | Nearly all correct, method shown | Some errors or missing steps | Many errors or no method |
| Mission design that answers the commander's questions | 25% | Starts from the EEI, chooses real-time products that fit the questions, watches bottlenecks without overflying people, stays upwind at hazmat scenes and always confirms data with other sources | Good design, some details missing | Several parts missing or not linked to the users' questions | No usable design |
| Coordination and data management | 20% | Places the team correctly in ICS, takes requests through one channel with read-back, prioritises with reasons, uses the stop-flying call, and hands over data with a manifest, custody record and redaction | Nearly complete | Coordination or data handling only partly done | No structure, or data leaked |
| Safety, law, ethics and presentation | 25% | Fully follows CAAT conditions, identifies what needs permission, has verifiable controls, applies the five ethical rules in the design, turns the review into procedure changes and presents clearly | Nearly complete, presentation partly unclear | Some conditions or ethical principles neglected | Unsafe practice or privacy breached |
Assessment map: CLOs and how they are assessed Draft
The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.
| CLO | Worksheets | Module quizzes |
|---|---|---|
| CLO1 Explain the roles of unmanned aircraft systems in situational awareness, area monitoring and emergency support for public-safety agencies | W 1W 2W 5 | M1M2 |
| CLO2 Plan real-time image and data acquisition and operate with field units under the incident command system | W 3W 4 | M3M4 |
| CLO3 Manage data and assess the risk, safety and ethics of operations in line with the law | W 4W 5 | M4M5 |
| CLO4 Plan searches with suitable search patterns, search-area segmentation, probabilities and flight routes for the terrain and resources | W 6W 7W 8 | M6M7M8 |
| CLO5 Use RGB and thermal cameras to detect casualties and geolocate them with a stated position uncertainty | W 8W 9 | M8M9 |
| CLO6 Transmit data to ground teams, assess the site and coordinate within search-and-rescue missions | W 10 | M10 |
| CLO7 Explain the disaster risk management cycle and the roles of unmanned aircraft systems before, during and after disasters, and choose the missions and data that match the decisions of each phase | W 11 | M11 |
| CLO8 Produce rapid maps, assess damage and monitor risk areas from drone imagery, stating the uncertainty of the results | W 12W 13 | M12M13 |
| CLO9 Plan communication and logistics support, prioritise information, and disseminate data to support the decisions of the incident commander | W 14W 15 | M14M15 |
| CLO10 Plan UAS missions under the incident command system by analysing the situation, setting measurable objectives and selecting aircraft, sensors and payloads | W 16W 18 | M16M18 |
| CLO11 Assess the site, risk and flight rights under Thai law, define routes and operating areas and prepare contingency plans for emergency missions | W 17W 19 | M17M19 |
| CLO12 Coordinate airspace and communications, rehearse plans on a computer and review after the mission to improve plans with data | W 20 | M20 |