UAT 463 Smart Robotics and Automation

Worksheet 5 Integrate, check and verify the MM-1 cell

Lab 12 hAssesses CLO3, CLO2

Objective

Make the interface table, check the handshake, set up OPC UA, calculate OEE and stopping distance, and plan the verification of the prototype's requirements

Equipment and materials

  • A PLC or PLC simulator and a test OPC UA server
  • The simulated cell or a test wheel base
  • Production data records of the simulated cell for one shift
  • Computer with Python and the example code at /downloads/uat-463/

Safety

  • Safety functions of the cell must be separately wired devices checked by a specialist; never use this exercise's handshake signals in their place
  • Measure the base's stopping distance in a guarded area, starting at low speed with nobody within stopping distance
  • The interface table, OEE and test plan are desk work

Steps

  1. Write the interface table for three seams and mark the signals that are safety functions needing a separate loop
  2. Adapt the handshake model to the cell, run the state exploration, and fix the logic until no violation is found
  3. Set up an OPC UA subscription, try at least three deadbands, measure notifications per minute and the largest error, and choose with a reason
  4. Calculate A, E, QR and OEE from one shift's records and propose one improvement with an estimate of its effect
  5. Measure real stopping time and distance at three speeds, compare with Example 4, and name the constants that must come from the real edition of a standard
  6. Write a table of at least 5 requirements, state how each is verified, plan the number of trials of the success-rate requirement with the code of Example 5, and report the first-round result with its lower bound

Record of results

Table 1 Interface table of the cell
SeamSignal or dataSender to receiverFormat and rateDecision ownerSafety function?
Table 2 Deadband, OEE and stopping measurements
QuantitySetting or inputMeasured or computed from group dataLesson example valueUnit
Table 3 Requirements, verification and first-round result
IDRequirementVerification methodPlanned trialsFirst-round resultLower bound or verdict

Questions

  1. In which handshake version did your state exploration find a violation? What story does the shortest counterexample tell, how did the group fix the logic, and why can a handshake that passes still not replace the light curtain?

  2. Which deadband did the group choose for belt speed? Explain from the accuracy the data consumer needs, and why must this OPC UA data never be used for picking?

  3. From your A, E and QR, which loss is largest? Propose one improvement and estimate its effect on OEE.

  4. How does your measured stopping distance differ from Example 4, is the proposed protective field enough, and which constants must come from the real edition of a standard before concluding?

  5. Is the success-rate requirement proved by the first round? Explain with the one-sided lower bound, and list the team's options.

Check before you hand in

What to hand in

  • Interface table with the safety signals marked
  • State-exploration result of the handshake
  • Deadband table and OEE result with the proposed improvement
  • Requirements table, test plan and first-round result with the lower bound

CLO3 Integrate a robot with factory automation (PLC, OPC UA, MES) safely, following a prototype development process and safety standards. CLO2 Develop and test a robot prototype that perceives, decides and controls its motion through ROS 2 and sensor and actuator interfaces. (CLOs are a web-team draft; the course owner sets the final ones.)

Instructors: answers and teaching notes for this worksheet are in the teaching pack