UAT 471 UAS Operations for Aerial Photography and Creative Media
Worksheet 5 Open day rehearsal and practical exam
Objective
Build an operations folder with law, privacy and documents checked, run a full rehearsal, and demonstrate safe flying skills in the practical exam
Equipment and materials
- Camera drone and batteries per plan
- Barrier tape, signs and cones
- Operations folder
- Fire extinguisher
Safety
- Fly only in the university practice area under the instructor, in daylight and within sight
- Never fly over people; stop at once if someone enters the area or a stop is called
- Check the registrations of people and aircraft before every flight
- Have a fire extinguisher and a bag or box for abnormal batteries
- Classmates playing the audience stay behind tape beyond 50 m and never under the flight path
- Use footage in class only; do not publish classmates who have not agreed
Steps
- Build the operations folder: legal check table with sources and dates, registration and insurance status, draft filming notice and countdown schedule
- Run the full rehearsal in the event-day order, from briefing to last landing, with tabletop events injected
- Individual practical exam: checklist, take-off, stage shot from stand-off, orbit, event response and landing
- Present the group debrief
Record of results
| Law or condition | Requirement (own words) | Source | Date checked | Status (met / gap) |
|---|---|---|---|---|
| Person, aircraft or document | Expiry date | Days after event (+ / −) | Valid on the event day? | Action needed |
|---|---|---|---|---|
| Task | Start (D-) | Finish (D-) | Actual date | Owner |
|---|---|---|---|---|
Questions
From Table 2, which document expires before the event? What must the team do, and why check at D-21 rather than on the morning of the event?
Why does the club use 50 m rather than 30 m? Where must the pretend audience be in the rehearsal to meet the conditions?
What does your draft filming notice contain? Why can the exemption for personal or family benefit not be used for this job? How do the face sizes at 60 m and 15 m help you design the shots?
Answer your group's debrief questions: what went to plan, what did not, and what will you change next time, citing at least one piece of evidence from the rehearsal.
Check before you hand in
What to hand in
- Final operations folder
- Rehearsal record and flight logs
- Practical exam result
- Debrief summary