UAT 493 Unmanned Aircraft Systems and Automation Technology Capstone Project I

Worksheet 2 Requirements document

Analysis activity 18 hAssesses CLO2

Objective

Turn needs into measurable system requirements, prioritise them, assign verification methods and obtain stakeholder confirmation

Equipment and materials

  • Worksheet 1 outputs
  • Python and the module 2 example code
  • Spreadsheet

Safety

  • Desk work only; no flying

Steps

  1. Turn module 1 needs into 15–25 shall-form requirements, each with a measurable criterion
  2. Run Example 1 on the team's requirements, fix flagged items, then have another team review against C1–C9
  3. Prioritise with MoSCoW, estimate effort and check with Example 2 that Musts stay under 60%
  4. Assign a verification method to every item (inspection, analysis, demonstration, test)
  5. Have stakeholders confirm the Musts and log any changes

Record of results

Table 1 Automated and peer review of requirements, with the corrected text
IDOriginal textFlaw found (from the code or characteristic C1-C9)Corrected text (shall form with a measurable value)
Table 2 MoSCoW priority, effort and verification method (the last row sums total effort and the Must share)
IDMoSCoW priorityEffort (person-weeks)Verification methodMeasurable pass criterion
Table 3 Log of stakeholder confirmation of the Must requirements
Must requirement IDConfirmed by (group)ResultWhat changedReason and date

Questions

  1. What must a person still check in a requirement that passed the automated check (such as R1, R4 and R6 in the example)? Give one requirement of your team that passed the code but another team still challenged, and say which of C1-C9 it breaks.

  2. Calculate the Must share of effort in Table 2. Does it meet the 60% guidance? If not, which items would you move or cut? If it does, how does the remainder help?

  3. Pick one requirement for which your team chose Test as the verification method. If it were changed to Demonstration, what evidence would be lost?

  4. Which Must requirements did stakeholders change or reject? How did each change affect other requirements, priorities or verification methods?

Check before you hand in

What to hand in

  • Requirements document with priorities and verification methods
  • Automated and peer review results
  • Confirmation and change log

CLO2 Define requirements and system architecture. (CLOs are a web-team draft; the course owner sets the final ones.)

Instructors: answers and teaching notes for this worksheet are in the teaching pack