Teaching pack · UAT 493
A 15-week teaching plan, 5 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.
Coverage of the course description
The lessons fully teach 9 of 9 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.
| Description topic | Modules | Where it is taught | Status |
|---|---|---|---|
| Definition of a capstone problem or need | M1 | Module 1: stakeholders · problem statement and ConOps | Covered |
| Review of relevant literature, research, standards and technologies | M1M2M5 | Module 1: reviewing literature, standards and existing technology (four source groups, search strings and snowballing, PRISMA-style screening, a review matrix with TRL, the gap statement, Example 2 and deliverable step 6) and step 5 checking CAAT conditions and PDRA · Module 2: ISO/IEC/IEEE 29148 and INCOSE for writing requirements · Module 5: IEC 60812 for FMEA | Covered |
| Feasibility analysis | M1M3 | Module 3: five feasibility gates (technical, legal, cost, time, safety) · Module 1: assumption register and mission sizing | Covered |
| System requirements | M2 | Module 2: from needs to requirements · prioritising with MoSCoW · verifying requirements | Covered |
| Concept and architecture development | M3M4 | Module 3: generating genuinely different alternatives · the Pugh matrix · Module 4: from functions to components · the N² chart · traceability | Covered |
| Methodology and development plans | M5 | Module 5: methodology and development plan (development approach, steps tied to requirements, data collection and analysis, product-based WBS, critical path and slack, schedule margin and a budget with contingency; Example 3 and deliverable step 4), taught within this course without relying on UAT 316 | Covered |
| Testing plans | M2M5 | Module 5: the V model · requirements verification matrix (RVM) · Module 2: verifying requirements | Covered |
| Risk-management plans | M5 | Module 5: risk and FMEA (Example 2) | Covered |
| Preparation and presentation of a project proposal before implementation | M5 | Module 5: the project proposal and the complete-proposal deliverable presented to a committee | Covered |
Weekly teaching plan
| Week | Topic | Pre-class | Lecture | Lab | Evidence |
|---|---|---|---|---|---|
| 1 M1 | Project start-up and stakeholders | Read module 1 'Why this matters' and 'Stakeholders' | Briefing on the capstone process, milestones, criteria and choosing a real problem | Form teams, choose a problem, identify stakeholders and schedule interviews; advisor meeting 1 | Project topic and advisor meeting record |
| 2 M1 | Problem statement and ConOps | Read 'Problem statement and ConOps' and 'Reviewing literature, standards and existing technology'; run Example 2 and start the search log | Solution-free problem statements; validation versus verification; reviewing literature, standards and technology in a checkable way | Worksheet 1 part A: interview at least two stakeholder groups, write the problem statement, have another team check for hidden solutions and draw the ConOps | Interview notes, problem statement and draft ConOps |
| 3 M1 | Assumption register; initial proposal due | Read 'Assumption register and mission sizing'; run Example 1; take the module 1 quiz | Which assumptions to test first and the initial legal check | Worksheet 1 part B: build an assumption register of at least 10 items, size the mission, check legal conditions, build a review matrix of at least 10 sources with a gap statement and submit the initial proposal | Initial proposal (problem, stakeholders, ConOps, assumptions, review), assessed under the project proposal component; quiz result |
| 4 M2 | From needs to requirements | Read module 2 'From needs to requirements'; run Example 1 | The shall form and the characteristics of good requirements C1–C9 | Worksheet 2 part A: write 15–25 requirements, run the Example 1 checker and fix flagged items | Draft requirements and checker output |
| 5 M2 | Prioritising with MoSCoW | Read 'Prioritising with MoSCoW'; run Example 2 | Must, Should, Could, Won't and the effort share of Musts | Worksheet 2 part B: peer review against C1–C9, MoSCoW prioritisation, effort estimates and a check that Musts stay under 60%; advisor meeting | Priority table and advisor meeting record |
| 6 M2 | Verifying requirements; progress review 1 | Read 'Verifying requirements'; take the module 2 quiz | Inspection, analysis, demonstration and test | Worksheet 2 part C: assign a verification method to every item, have stakeholders confirm the Musts and present progress to the advisor | Requirements document, progress review 1 result and quiz result |
| 7 M3 | Generating genuinely different alternatives | Read module 3 'Generating genuinely different alternatives' | Brainstorming techniques and non-drone alternatives | Worksheet 3 part A: generate at least four genuinely different concepts, including at least one that is not a drone | Sketches of all concepts |
| 8 M3 | The Pugh matrix | Read 'The Pugh matrix'; run Example 1 | Datum concept, criteria from requirements and a second Pugh round | Worksheet 3 part B: choose 6–10 criteria, run the Pugh matrix, improve the best concept and run a second round; advisor meeting | Two Pugh rounds and meeting record |
| 9 M3 | Feasibility gates; progress review 2 | Read 'Feasibility gates'; take the module 3 quiz | Technical, legal, cost, time and safety gates | Worksheet 3 part C: pass the final concept through all five gates, write a one-page rationale and give the mid-term progress presentation | Trade study, progress review 2 result and quiz result |
| 10 M4 | From functions to components | Read module 4 'From functions to components'; run Example 1 | Functions before hardware and checking allocation | Worksheet 4 part A: list functions from the requirements, allocate them to components and check none is missing | Function allocation table |
| 11 M4 | The N² chart and interface list | Read 'The N² chart' | The most connected component and testing that interface first | Worksheet 4 part B: build the N² chart and interface list (signal, protocol, data rate, voltage, connector, owner); advisor meeting | N² chart, interface list and meeting record |
| 12 M4 | Traceability; progress review 3 | Read 'Traceability'; take the module 4 quiz | The traceability matrix and finding gaps | Worksheet 4 part C: build the requirements-to-components traceability matrix, close gaps and present the architecture document to the advisor | Architecture document, progress review 3 result and quiz result |
| 13 M5 | The V model and the RVM | Read module 5 'The V model' and the RVM section; run Example 1 | The test ladder from SITL to field and pass criteria set before testing | Worksheet 5 part A: build an RVM with 100% coverage and a test plan following the V model | RVM and test plan |
| 14 M5 | Risk, FMEA and assembling the proposal | Read the risk/FMEA, methodology and development plan, and proposal sections; run Examples 2 and 3; take the module 5 quiz | Failure modes and severity, writing the methodology, WBS, critical path, contingency and the six-part proposal outline | Worksheet 5 part B: FMEA of at least 10 modes, write the methodology, build the WBS, schedule with critical path and budget with Example 3, assemble the proposal and rehearse with the advisor | FMEA, draft proposal and quiz result |
| 15 M5 | Proposal defence before the committee | Submit the complete proposal to the committee in advance | Committee assessment against the criteria | Present for 15 minutes, answer the committee's questions, then revise the proposal as advised | Complete proposal, presentation and revised version, scored with the rubric |
Worksheets and instructor guide
One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.
1Worksheet 1 Mission concept and assumption register
Analysis activity · About 18 h of class time · CLO1
Objective: Define a real problem from stakeholders' voices without implying a solution, write a ConOps, identify the assumptions to test first, and review literature, standards and technology to find the gap
Equipment
- Interview and consent forms
- Python and the example code at /downloads/uat-493/
- Latest CAAT conditions and PDRA guidance
- University access to article databases, and ThaiJO
Safety
- Desk work and interviews; no flying
- Get consent before interviewing or recording and keep informants' personal data confidential
- For site visits, go as a team and inform the advisor in advance
Steps
- Choose a real UAS or automation problem (or use the irrigation-canal case) and interview at least two stakeholder groups
- Write a solution-free problem statement and have another team check it for hidden solutions
- Draw the stakeholder map and ConOps as in Figures 1 and 2
- Build an assumption register of at least 10 items, size the mission with Example 1 and mark which assumptions to test first
- Do an initial legal check: general conditions or a Specific authorisation, and whether a PDRA applies
- Keep a search log for at least three databases, build a review matrix of at least 10 sources (research, standards and products), summarise with Example 2 and write the gap statement
Deliverables
- Interview notes
- Problem statement with peer check
- Stakeholder map and ConOps
- Assumption register and mission sizing
- Search log, review matrix and gap statement
- Initial proposal (due week 3)
Checklist
- The problem statement gives who, what, impact and measure, names no technology or solution, and the other team's check is recorded
- Interview notes cover at least two stakeholder groups and show that consent was obtained
- Table 1 has at least 10 items, each with owner, check method and status, and every value in Table 2 has a unit and code that reruns
- Table 3 has at least 10 sources covering research, standards and products, every row has a TRL, and the gap statement follows from the table
- The initial legal check (general conditions or Specific, and PDRA) is recorded with the document name and the date checked
Instructor guide
Class timing
- Briefing on the process, milestones and criteria; form teams and choose a real problem90 min
- Interview at least two stakeholder groups, write the problem statement and have another team check it240 min
- Draw the stakeholder map and ConOps150 min
- Build the assumption register, size the mission with Example 1 and do the initial legal check240 min
- Search at least three databases, screen, build the review matrix with Example 2 and write the gap statement270 min
- Answer the questions, run the hand-in checklist and hold the advisor meeting90 min
Expected results
- Table 1: at least 10 rows, each with a data owner, check method and status. With the lesson's irrigation-canal case in Example 1 there are 6 items: canal length 2000 m, corridor width 60 m, footprint across track 90 m, footprint along track 60 m, forward overlap 0.75 and ground speed 5.0 m/s. Only 1 is checked (length, from the map) and 5 are not. A good register adds at least 4 more (for example 25 MB per photo, rounds per week) and puts the items to check first (corridor width, footprint) at the top.
- Table 2 (values of the lesson's irrigation-canal case): photo spacing 60 × (1 − 0.75) = 15 m, passes ⌈60 / 90⌉ = 1, photos 1 × (⌊2000 / 15⌋ + 1) = 134, flight time 2000 / 5 / 60 + 3 = 9.7 min per round (9.67), weekly for 52 rounds a year 6,968 photos, about 174 GB at 25 MB each. Source counts from Example 2: found 64 + 38 + 9 + 7 = 118, after 21 duplicates 97, after 58 removed on title and abstract 39, after 22 removed on full text 17 sources. A team using its own problem must show the formula and unit in every row. Accept rounding differences of 0.1 min.
- Table 3: at least 10 sources covering research, standards and products (laws or regulator notices are a good addition). Every row has an integer TRL from 1 to 9 and the last column explains with numbers against the need. Assumed values from the lesson: Study A smallest crack 10 cm, recall 0.82, has coordinates, TRL 6; Study B 2 cm, 0.91, no coordinates, TRL 5; Study C 5 cm, 0.75, coordinates, TRL 7; Product D 8 cm, recall not given, coordinates, TRL 9. Against a need of 5 cm, recall 0.90 and coordinates, no source passes all. A real team may or may not find one; if it does, it must explain why the project is still needed.
- A strong answer isolates the words that carry a solution, such as "drone", "AI" or "thermal camera", and rewrites the statement with who, problem, impact and measure. In the lesson, "We need a drone with AI to inspect the canal" is poor because it names the solution, while the better statement says the irrigation office finds defects only after a leak because staff walk the 2 km once a month. Writing it this way lets module 3 compare non-drone concepts.
- The lesson's irrigation-canal case: corridor width changes from 60 m to 100 m, which exceeds the 90 m footprint across the track. Passes become ⌈100 / 90⌉ = 2, photos 2 × 134 = 268 (double), flight time 2 × 2000 / 5 / 60 + 3 = 16.3 min against 9.7 min (up 6.7 min), and data per year 13,936 photos, about 348 GB. The 16.3 min is above the 15 min used in module 2's example requirement R4 (the estimate includes 3 min for takeoff and travel). A strong answer concludes that corridor width and footprint must be measured on site first. Teams may choose another assumption if they show the change with code.
- Lesson example: 17 / 118 = 14.4% (17 left of 118). The numbers at each stage are 118, 97, 39 and 17, with reasons for removing 21, 58 and 22 items. A strong answer says the record lets the committee and other teams repeat the search and check which criteria removed each source, in line with the PRISMA-style flow the lesson uses. Teams must calculate from their own numbers.
- The gap statement must come from the table, not from what the team wants to build. Lesson example: "No system yet finds cracks 5 cm wide with recall 0.90 and gives coordinates." A strong answer names the three conditions that must hold together and the evidence that would disprove it, for example a source with recall 0.90 at 5 cm and coordinates, or a product that does it. It also mentions TRL as a technical risk.
Discussion questions
- Why is interviewing only one stakeholder group risky, and in the irrigation-canal case whose needs conflict? How would the team design for that?
- How does an assumption register change the team's decisions compared with keeping assumptions in people's heads? If there is time to check only two, which would you pick and why?
- If the review matrix shows that a product already meets every need, what should the project do next?
Adapting to student background
- Upper secondary (M.6)
- Have them practise writing the problem statement on the lesson's case before going out, and pair them with a peer who has interviewed on site to practise open questions. Give extra time to the interview step, since this group is strong on theory but has little field experience.
- Vocational certificate
- Start with a site visit and photos, then have them fill in an assumption register template with the column headings ready. Run the code of Example 1 changing one value at a time instead of writing formulas, and check the results with a calculator.
- Diploma
- Extension: a sensitivity analysis changing 3 assumptions one at a time with the code of Example 1 and ranking which affects flight time and data volume most, or coaching teammates on database searching and recording search strings.
2Worksheet 2 Requirements document
Analysis activity · About 18 h of class time · CLO2
Objective: Turn needs into measurable system requirements, prioritise them, assign verification methods and obtain stakeholder confirmation
Equipment
- Worksheet 1 outputs
- Python and the module 2 example code
- Spreadsheet
Safety
- Desk work only; no flying
Steps
- Turn module 1 needs into 15–25 shall-form requirements, each with a measurable criterion
- Run Example 1 on the team's requirements, fix flagged items, then have another team review against C1–C9
- Prioritise with MoSCoW, estimate effort and check with Example 2 that Musts stay under 60%
- Assign a verification method to every item (inspection, analysis, demonstration, test)
- Have stakeholders confirm the Musts and log any changes
Deliverables
- Requirements document with priorities and verification methods
- Automated and peer review results
- Confirmation and change log
Checklist
- Every requirement is in shall form with a measurable value and unit, and no item is flagged when Example 1 is run
- The other team's review against C1-C9 is recorded, with what was changed
- Every requirement traces back to a stakeholder need from Worksheet 1
- Every row of Table 2 has a MoSCoW priority, effort, verification method and pass criterion, and the calculation shows Must is within 60%
- Table 3 shows stakeholders confirmed the Must requirements, with changes and dates logged
Instructor guide
Class timing
- Review Worksheet 1 outputs and turn needs into shall-form requirements330 min
- Run Example 1, have another team review against C1-C9 and fix flagged items240 min
- Prioritise with MoSCoW, estimate effort, check with Example 2 and assign verification methods300 min
- Have stakeholders confirm the Musts and log changes150 min
- Answer the questions and run the hand-in checklist60 min
Expected results
- Table 1: at least 8 rows that were flagged or edited. Output of the lesson's Example 1 code: R1 ok; R2 vague 'user-friendly' and no measurable value; R3 vague 'fast' and 'good' and no measurable value; R4 ok; R5 no measurable value and several requirements in one; R6 ok. Good fixes: split R5 into three requirements (store images, send report, alert the office) as the lesson does, and rewrite R2 with a measurable time or number of steps, as the lesson rewrites "send the report quickly" to "within 2 hours after landing". The third column must cite the C1-C9 characteristic that is broken (for example unambiguous, singular, verifiable), not just say "bad".
- Table 2: The full document has 15-25 requirements. This table holds up to 11 (list the Musts first), but its last row must hold the totals for the whole document. Lesson example: Must = R1 6 + R4 3 + R6 2 = 11; Should = R5a 2 + R5b 3 = 5; Could = R5c 2 + R8 2 = 4; Won't = R7 0; total 20 person-weeks, giving Must 55%, Should 25%, Could 20%, within the 60% guidance. Every item has one of the four methods (inspection, analysis, demonstration, test) and a measurable pass criterion, such as R1 test recall of at least 0.90 on the user-certified image set, R4 test round of at most 15 min, R6 test coordinates within 3 m of reference points, R5a analysis, R5b demonstration.
- Table 3: every Must requirement is confirmed by at least one stakeholder group (for example the irrigation office as the user in the lesson case). The result is confirmed, changed or rejected, with a date. If nothing changed, it must say so rather than stay blank. A strong answer records what was changed from what to what, and the stakeholder's reason.
- The program only catches the listed vague words, missing numbers, and repeated "and" or "shall". It cannot tell whether a requirement is necessary, appropriate, feasible or correct. The lesson says R1, R4 and R6 pass but still need the questions "is it really needed" and "is it feasible". Example: R6, coordinates within 3 m, passes the code, but a person must ask whether users really need 3 m (necessary) and whether the chosen equipment can do it (feasible). A strong answer names the exact C1-C9 characteristic broken.
- Lesson case: Must = 11 of 20 = 55%, within 60%. Moving R8 (2) from Could to Must gives 13/20 = 65%, which fails; moving R5b (3) to Must gives 14/20 = 70%, which fails. A strong answer cuts or demotes items the system can live without (to Should, Could or Won't) and records the decision, rather than lowering effort numbers to pass. What remains beyond Must is the margin for when problems occur. Teams use their own numbers.
- Test measures a value under controlled conditions, so it yields a number to compare with the criterion, such as recall 0.90 on a labelled image set. Demonstration shows the function without detailed measurement, so there is no numerical evidence that the criterion is met: showing the system finds a crack does not show recall reached 0.90. A strong answer links the method to the requirement's pass criterion.
- Answers depend on the team. A strong answer names the stakeholder group, quotes the old and new text and follows the change through everything it touches: related requirements, MoSCoW priority, effort and verification method, then reruns Example 1 and the Must share check. If a stakeholder rejects a Must, the team goes back to check whether the need in Worksheet 1 is still met.
Discussion questions
- How would you rewrite an unmeasurable requirement such as "easy to use" so that it is measurable and still matches what users really want?
- If every item is a Must because users say everything is important, how should the team negotiate or decide?
- How does choosing a verification method while writing a requirement make the requirement better?
Adapting to student background
- Upper secondary (M.6)
- Start with the lesson's R1-R6 and practise naming the broken C1-C9 characteristic item by item before writing the team's own. Use their numeracy to write criteria that can be calculated, and pair them with a hands-on peer to check that they are achievable.
- Vocational certificate
- Give a sentence template "The system shall ... at least ... under conditions ..." and fix items one by one from the output of Example 1. Choose verification methods by asking how they would actually check it by hand rather than by definition.
- Diploma
- Extension: extend the code of Example 1 to detect one more flaw (for example a number without a unit) and test it on the team's requirements, or serve as peer reviewer for another team against C1-C9.
3Worksheet 3 Trade study
Analysis activity · About 18 h of class time · CLO1, CLO2
Objective: Generate genuinely different concepts, compare them with a Pugh matrix, improve the best and pass it through feasibility gates with evidence
Equipment
- Requirements document from worksheet 2
- Python and the module 3 example code
- Paper or whiteboard for brainstorming
Safety
- Desk work only; no flying
Steps
- Brainstorm at least four genuinely different concepts, including at least one that is not a drone
- Pick 6–10 criteria from the requirements and run the Pugh matrix with Example 1
- Improve the best concept's weaknesses and run a second Pugh round with it as the datum
- Pass the final concept through all five feasibility gates, recording evidence for each
- Write a one-page rationale citing every relevant requirement
Deliverables
- Sketches of all concepts
- Two Pugh rounds
- Feasibility gate table with evidence
- One-page rationale
Checklist
- Sketches of at least four genuinely different concepts, at least one that is not a drone
- Every criterion in the Pugh matrix points to a requirement ID from Worksheet 2, and the summary row matches a hand count
- Round 2 uses the improved concept as the datum and states which weakness was improved
- Table 3 covers all five gates with evidence and source for each, and the legal gate states general conditions or Specific with the date the CAAT document was checked
- The one-page rationale cites every relevant requirement ID and explains why the other concepts were dropped
Instructor guide
Class timing
- Review the Worksheet 2 requirements and brainstorm at least four genuinely different concepts180 min
- Choose criteria from the requirements and run Pugh round 1 with Example 1240 min
- Improve the best concept and run Pugh round 2 with it as the datum210 min
- Pass the final concept through the five feasibility gates and collect evidence210 min
- Write the one-page rationale and have another team review it150 min
- Answer the questions and run the hand-in checklist90 min
Expected results
- Table 1: 6-10 criteria, each pointing to a requirement from module 2, scored +, − or S. Lesson example (criteria: survey time, detection quality, covers all 2 km, cost, ease of permission, weather tolerance, skill needed, safety): B = +4 −1 net +3, weakness cost; C = +2 −2 net 0, weaknesses cost and ease of permission; D = +5 −3 net +2, weaknesses detection quality, covers all 2 km and cost. The team's summary row must match its own count in every column. A team on a different problem will have different numbers but must justify each criterion.
- Table 2: the new datum has no column because it scores S everywhere. A strong answer has at least one criterion that differs from round 1 because the concept was improved (lesson example: reduce B's cost by running the AI model on the ground station after flight), and recalculates the summary with net = number of + minus number of −. The lesson gives no round 2 numbers, so check the reasoning and the counting, not fixed values, and a concept that conflicts with a Must requirement must not survive without explanation.
- Table 3: all five gates from the lesson. Technical (TRL, and can the team do it within one academic year); legal (general conditions or a Specific authorisation, see UAT 313 and the CAAT PDRA, check the latest version and record the date); cost (within the budget, using the method of UAT 316); time (delivered by the next semester); safety (risk to people and property can be managed). The result must be pass, adjust or drop. A "pass" without evidence and source is not accepted.
- Lesson example: B has the highest net score (+3) but is weak on cost, while D has net +2 but cannot cover the whole 2 km, a Must requirement, so it drops out. A strong answer says the Pugh matrix is not for picking a winner from the total; look at each weakness, especially those that conflict with Must requirements.
- Net = number of + minus number of −, so five + and two − gives 5 − 2 = +3. Lesson example: B 4 − 1 = +3, C 2 − 2 = 0, D 5 − 3 = +2. S is not counted. A strong answer reports what the hand count shows and corrects the summary row if it does not match.
- The answer depends on the team. Lesson example: concept D (fixed cameras along the canal) scored + on five criteria (survey time, ease of permission, weather tolerance, skill needed, safety) and − on three (detection quality, covers all 2 km, cost). A strong answer says a non-drone concept tests whether a drone is really the right answer, for example showing the drone is needed to cover the whole line, and perhaps borrows an idea from it.
- Lesson example: B's cost weakness is addressed by running the AI model on the ground station after the flight, and the next round uses B as the datum. Changing the datum means the + and − of every concept are recalculated and can differ from before. A strong answer says which weakness disappeared, whether a new one appeared, and whether the ranking changed, with reasons.
- The answer depends on the team. A strong answer picks a gate and states the evidence it has and lacks, for example a legal gate where the latest document has not yet been checked, then proposes a concrete adjustment: narrowing the flight scope to fit general conditions, planning time for a Specific authorisation or PDRA, or going back to another round 2 concept. The lesson says a concept that fails any gate must be adjusted or dropped.
Discussion questions
- Why do most teams pick a concept on day one, and how does requiring a non-drone concept help?
- If the concept with the highest net score conflicts with a Must requirement, should the team change the concept or the requirement, and who should decide?
- How does a criterion that is not linked to a requirement damage a Pugh matrix?
Adapting to student background
- Upper secondary (M.6)
- Have them first do the lesson's canal Pugh matrix by hand and explain the reason for each +, − and S. Use their logic to write the rationale, and ask a hands-on peer to help check the technical and safety gates.
- Vocational certificate
- Use real objects to help generate concepts, such as site photos or actual parts, and judge each criterion with something visible. Give a blank table with headings ready, and let them explain each +, − and S aloud before writing.
- Diploma
- Extension: add real component costs from quotations for the improved concept and do the cost gate in detail, or review another team's Pugh matrix.
4Worksheet 4 Architecture document
Analysis activity · About 18 h of class time · CLO2
Objective: Allocate functions to components, analyse interfaces with an N² chart and trace every requirement to components
Equipment
- Requirements document and trade study
- Python and the module 4 example code
- Diagramming software
Safety
- Desk work only; no flying
Steps
- List system functions from the requirements without naming hardware
- Allocate functions to the chosen concept's components and check with Example 1 that none is missing
- Build the N² chart, find the most connected component and plan to test that interface first
- List interfaces: signal type, protocol, data rate, voltage, connector and owner
- Build the requirements-to-components traceability matrix and close any gaps
Deliverables
- Function and allocation table
- N² chart and interface list
- Traceability matrix
- Architecture document
Checklist
- The function list names no hardware, every function points to a requirement and has a responsible component, and the Example 1 code leaves no function missing
- The N² chart has every component on the diagonal, names the most connected component and plans to test that seam first
- Every interface has signal type, protocol, data rate, voltage, connector and an owner on both sides
- The traceability matrix works both ways: no requirement without a component and no component without a requirement, or a stated reason
- The interface list includes power and timing, and the test plan for the most connected seam is recorded for the Worksheet 5 proposal
Instructor guide
Class timing
- Review the requirements and chosen concept, then write the function list without naming hardware150 min
- Allocate functions to components and check with Example 1180 min
- Build the N² chart, find the most connected component and plan to test that seam first210 min
- Write the interface list with the owner on both sides240 min
- Build the two-way traceability matrix and close the gaps210 min
- Answer the questions and run the hand-in checklist90 min
Expected results
- Table 1: every function has at least one component, and functions use verbs rather than equipment names. Lesson example: plan route → GCS; fly route → FC; capture images → Camera; detect defects → Companion; transmit data → GCS and Companion; produce report → Cloud. log flight data has no component yet, and the Example 1 code reports functions with no component: ['log flight data']. The lesson suggests letting the FC log it. Other teams' functions will differ; the result must show the check was done and any missing function fixed.
- Table 2: every row has all six fields and every interface has an owner on both sides (UAT 321). The lesson gives no protocol or connector for the example system, so there is no fixed answer; check that values match the data sheets of the equipment the team chose and agree on both sides. The lesson's example system has 10 directed interfaces among 7 components: GCS-FC both ways, FC-Companion both ways, Companion-Camera both ways, FC to Gimbal, GNSS to FC, Companion to GCS, GCS to Cloud.
- Table 3: every requirement has at least one component and every component points to at least one requirement. The gap column must record a real fix (add a component, remove one, or add a requirement) or say none found. As the lesson says, a component with no requirement may be excess, while a requirement with no component is a gap to close.
- Lesson example system: 7 components give at most 7 × 6 = 42 directed interfaces and 10 exist (about 23.8%). Interfaces per component: FC 6, Companion 5, GCS 4, Camera 2, Gimbal 1, GNSS 1, Cloud 1 (the total is 20 = 2 × 10 because each link has two ends). FC and Companion are the most connected, so their seams are tested first because a failure there affects many parts. Teams use their own numbers.
- Lesson example: log flight data had no owner and the decision was to let the FC log it. A strong answer checks that the receiving component has both the data and enough storage, then updates the N² chart and the requirement to match. The lesson lists functions without an owner as a common mistake, for example logging and handling abnormal events.
- A strong answer lists voltage, required current and time synchronisation. Problems the lesson points to: parts that connect but have too little power, or timing that does not match (for example the time of an image against the position), which would make a defect's coordinates wrong and would not show up if only data cables were counted. A team without them should add power and timing rows.
- The answer depends on the team. A strong answer says a component with no requirement may be excess or a requirement may be missing, and must be checked, while a requirement with no component is a gap to close, and says what was cut or added. The lesson's common case is adding a component because the team wants to try something new.
Discussion questions
- Why write functions before choosing hardware, and if the camera is later changed to another model, how does the functional architecture help?
- If the most connected component is in the hands of a single team member, how should the team manage that risk?
- How does having the owner of each side of an interface sign it reduce problems when the system is put together?
Adapting to student background
- Upper secondary (M.6)
- Start with the lesson's example N² chart, calculating n(n−1) and counting interfaces by hand before doing the team's own. Use their conceptual strength for the functional architecture and ask a hands-on peer to check connector and voltage data against equipment data sheets.
- Vocational certificate
- Put component name cards on a table and draw connecting lines in pencil before building the N² chart. Read the real equipment data sheets to fill in connectors and voltages, using a table template with the headings ready.
- Diploma
- Extension: write a small program from Example 1 that checks the team's traceability matrix and reports requirements without components and components without requirements, or help another team review its interface list.
5Worksheet 5 Complete project proposal
Analysis activity · About 18 h of class time · CLO3
Objective: Plan tests that verify every requirement, analyse risk with FMEA, write the methodology and development plan, and combine all deliverables into a proposal defended before a committee
Equipment
- Worksheets 1–4
- Python and the module 5 example code
- Example 3 code for the schedule, critical path and budget
- Slide software
Safety
- Desk work and presentation; no flying
- Field tests in the proposal must state CAAT conditions and controls for high-severity failure modes
Steps
- Build an RVM for every requirement and check with Example 1 for 100% coverage and no activity without a requirement
- Plan tests following the V model and test ladder, stating each step's pass criteria before testing
- Do an FMEA of at least 10 failure modes following Example 2, rank them and state controls for every high-severity mode
- Write the methodology, build the WBS, a schedule with its critical path and a budget with contingency using Example 3, then assemble the proposal following Figure 2
- Present to the committee for 15 minutes, answer questions and revise as advised
Deliverables
- RVM and test plan
- FMEA table
- Methodology, WBS, schedule with critical path and budget
- Complete proposal and slides
- Revised version following committee advice
Checklist
- The RVM covers 100% of requirements, has no activity without a requirement, and every pass criterion was set before testing
- The FMEA has at least 10 modes, RPN calculated correctly, ranked, with a control for every high-severity mode
- The schedule shows the critical path, slack and margin before the deadline, and the budget has a contingency tied to FMEA risks
- The proposal follows the six sections of Figure 2, every section traces to requirement IDs, and stop-or-review conditions are stated
- Field tests state the CAAT conditions, and the committee's questions are logged with what was changed in the revised version
Instructor guide
Class timing
- Build the RVM for all requirements and check coverage with Example 1150 min
- Plan tests following the V model and test ladder, setting pass criteria before testing150 min
- Do an FMEA of at least 10 modes following Example 2 and define controls180 min
- Write the methodology, WBS, schedule, critical path and budget with contingency using Example 3270 min
- Assemble the proposal following Figure 2 and make the slides150 min
- Present to the committee for 15 minutes, answer questions, revise the proposal and run the hand-in checklist180 min
Expected results
- Table 1: every requirement has at least one activity and a measurable pass criterion set before testing. Lesson example: R1 test on the labelled image set (T1), R4 test on a timed SITL round (T2), R6 test by surveying reference points (T3), R5a analysis of storage (A1), R5b and R8 demonstration by opening the report (D1). The last column refers to the SITL, HITL and field test ladder (UAT 322) that the lesson mentions. A criterion written after seeing test results is not accepted. The lesson example criteria come from the requirements, for example recall of at least 0.90, a round of at most 15 minutes and coordinates within 3 m.
- Table 2: at least 10 rows, and RPN = S × O × D must be correct on every row. Lesson example ranked by RPN: AI misses a crack S5 O5 D6 = 150; camera trigger drift S4 O5 D5 = 100; GNSS loss near tall trees S8 O4 D3 = 96; companion computer hangs S6 O3 D4 = 72; battery sag in wind S9 O2 D2 = 36. Every high-severity mode (the lesson flags S of 9 and above) needs a control even when the RPN is low. The team's S, O and D values are its own judgement; check the reasoning and the multiplication.
- Table 3 (numbers from the lesson's Example 3): WP1 3 weeks, finish week 3, slack 1; WP2 4 weeks, finish 4, slack 0; WP3 5 weeks, finish 5, slack 1; WP4 2 weeks (after WP1, WP2), finish 6, slack 0; WP5 2 weeks (after WP3, WP4), finish 8, slack 0; WP6 3 weeks, finish 11, slack 0; WP7 2 weeks, finish 13, slack 0. The critical path is WP2 → WP4 → WP5 → WP6 → WP7. The project finishes in week 13 of 15, leaving a 2-week margin. Teams use their own work packages: at least one chain must have 0 slack and the margin must be positive. Slack = latest finish − earliest finish.
- Lesson example: 8 requirements with 6 covered = 75%. R2 and R3 have no verification activity (they are the unmeasurable ones from module 2 and must be rewritten first). T4, the motor noise log, verifies no requirement, so it may be extra work or a noise requirement may be missing. The goal is 100% and no floating activity (the lesson's practice question: 17/20 = 85%).
- Lesson example: battery sag in wind has severity 9 (the drone could crash) but an RPN of only 36, so it ranks last when ranked by the product of three values although it is the most severe. That is dangerous because equal RPNs can come from very different severities. The AIAG-VDA handbook (2019) therefore uses Action Priority, which puts severity first. A strong answer shows the mode's control as an activity in the test plan or a work package.
- Lesson example: the critical path is WP2 → WP4 → WP5 → WP6 → WP7, finishing in week 13 with a 2-week margin. If WP3 (slack 1) runs 2 weeks late, it finishes in week 7, WP5 starts in week 7 instead of 6, and the project finishes in week 14 with a 1-week margin (WP1 running 2 weeks late gives the same result). The slack absorbs 1 week and the rest passes through to the end. If WP2, on the critical path, is 1 week late the finish is also week 14.
- Lesson example: camera and mount 18,000 + companion computer 9,000 + spare batteries 12,000 + RTK checkpoint survey 6,000 = 45,000 baht; 15% contingency (an assumed value) = 6,750 baht; total 51,750 baht. A strong answer ties the contingency to a high-severity FMEA mode, such as GNSS loss near tall trees possibly forcing a repeat field test. Teams use their own figures and percentage.
- The answer depends on the team. A strong answer logs the committee's question, decides whether to accept it and why, edits the affected part of Figure 2, then rechecks the RVM and traceability so every part still matches the requirements, and states the conditions for stopping or reviewing the project where relevant.
Discussion questions
- Why does setting a pass criterion after seeing test results ruin the evidence, and how can a team protect itself from moving the goalposts?
- If the critical path goes through work the team has no experience in, how should people and time be allocated?
- How should stop-or-review conditions be written so the committee sees the team is honest about risk?
Adapting to student background
- Upper secondary (M.6)
- Do Example 3 by hand on a board, going forward and backward to find slack before running the code. Use their calculation strength for the data collection and analysis method, and pair them with a hands-on peer to estimate field test durations realistically.
- Vocational certificate
- Start from a list of real jobs they have done and arrange which waits for which as an arrow diagram on paper before using code. Build the FMEA by asking from experience which parts failed and with what result, and rehearse the short presentation before the day.
- Diploma
- Extension: build a checker for the RVM and critical path for the team from the code of Examples 1 and 3, or act as a mock committee asking another team questions before the real presentation.
Scoring rubric
For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.
| Criterion | Weight | Excellent (4) | Good (3) | Fair (2) | Needs work (1) |
|---|---|---|---|---|---|
| Problem definition and stakeholder evidence | 20% | Real, solution-free problem with evidence from several stakeholder groups; key assumptions tested | Clear problem with adequate evidence | Hidden solution or thin evidence | No real problem defined |
| Quality of requirements and verification | 25% | Every requirement measurable, meets C1–C9, has a verification method; RVM 100% covered | Most requirements good; RVM nearly complete | Many requirements unmeasurable or unverified | No usable requirements |
| Design reasoning and architecture | 25% | Genuinely different alternatives; choice cites requirements and gates; fully traceable architecture | Sound reasoning with small gaps | Similar alternatives or incomplete traceability | Choice without reasons |
| Planning, risk and presentation | 30% | Realistic test and work plans, thorough FMEA with controls, concise pitch and direct answers to the committee | Good plans and presentation with minor weaknesses | Unrealistic plans or many questions unanswered | No plan or no presentation |
Assessment map: CLOs and how they are assessed Draft
The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.