Instructor guide: surveying and mapping
Prepare datasets, survey stations, comparison activities and portfolio assessment, keeping PC evidence separate from field competence
Activity guide · not yet trialled with real learners
Prepare datasets, survey stations, comparison activities and portfolio assessment, keeping PC evidence separate from field competence
Preparation before the course opens
- Select an image set licensed for teaching, have GCP/CP and CRS/datum checked by someone with survey experience, and keep the original files and rights
- Install and test the same engine/version on the instructor's machine, prepare finished outputs and logs for learners whose processing does not finish in time, and record the specs and actually measured times
- Prepare GNSS, targets and equipment per the manuals, the site and any required permissions, and define team roles and stop conditions
- Announce the criteria before starting, set aside the CPs for final assessment, and manage the data learners use to tune their work separately
If the field is not ready, switch to a data-analysis activity and state that field skills have not yet been assessed; do not let images or videos substitute for evidence of actually setting up equipment
Assessment during the work
Have learners explain why one point is used as a GCP and another as a CP, and how they checked that height data was not corrected twice. Record what they could do, what needed help, and what still lacks evidence
Sample 120-minute activity for the quality-check session
| Time | Activity | What the instructor checks |
|---|---|---|
| 0–15 min | Read the brief and guess the causes of error | Separating resolution from accuracy |
| 15–45 min | Compute CP results from the CSV and compare with the script | Units of residual, bias and RMSE |
| 45–75 min | Read hypothetical results from three processing runs | Compare using a single CP set, without adjusting results so that one method wins |
| 75–105 min | Decide to deliver or request more evidence | The decision cites evidence item by item |
| 105–120 min | Peers review portfolios and revise reports | Can be reopened and acknowledges limitations |
This activity is part of the 8-hour acceptance-check session, not time added on top of the 40-hour frame. If sample processing results are used, the instructor must actually generate or prepare those results before teaching
Suggested answers and errors to catch
Why is the X/Y bias zero while there is still an RMSE?
Positive and negative values cancel in the mean, but squaring does not cancel them. The practice CSV gives RMSE_H 0.05 m and bias_Z 0.05 m. The Z value indicates a systematic error in the example, but the evidence must be checked before identifying the real cause
A stockpile of 40 versus 32 m³: which value is correct?
Both are correct under different base levels for the hypothetical grid. If the question is the actual volume, you need to know the base that represents the real ground and any missing parts; do not pick the number you want and then change the base
A CP has already been used to choose processing settings: what should be done?
Disclose the use of that point and prepare a final check set that is not used for tuning; do not call a test on the same point independent without qualification
Should a learner pass when the images look good but there are no CPs?
Pass only the product-generation skill for which there is evidence; for positional accuracy give “insufficient evidence” and request more data. Report assessment results skill by skill
Criteria and post-teaching records
Use the 4-aspect rubric with the QA report and give feedback that identifies missing evidence, points to fix and how to re-check. The target is at least 2/3 in every aspect plus meeting the key conditions; this is not a professional standards certificate
Use the pilot-teaching preparation kit to record actual time, machine problems, understanding of formulas, and revisions before/after feedback. There are currently no pilot results for this surveying course
Download exercises and formsReferences
- USGS: calibration, control and metadata
- WebODM: control points and checkpoints
- Formulas and references for the practice set
Documents checked 25 September B.E. 2569 (2026). The time plan and rubric were compiled for this project and are not yet learner assessment results