Three end-to-end survey training missions

Practise on an open area, a material stockpile and a road corridor, with tasks, evidence, assessment criteria and suggested answers.

Last updated:

The practice survey area consists of an open field, a material stockpile and a long road corridor
Concept illustration generated with AI

Choose a mission and prepare evidence

Complete brief and lab before starting. The following missions are computer-based exercises and a field framework, not completed survey results. Download the mission sheet and rubric

For kit-selection planning, reference systems and the KSEC evidence in three separate roles, read M01 Survey and mapping , which uses its own synthetic data and keeps gaps as open items before delivery

Three missions and the deliverables that must be checked differently

Mission 1: Map of an open area

Task: prepare a map of a hypothetical 120 × 80 m yard for space-use planning, delivering a GeoTIFF, a QGIS project and a CP report. On a computer, use the hypothetical sketch plan and the practice CSV first. If a real map is required, choose imagery with rights-checked control data.

  1. Define the extent and the criteria awaiting confirmation, calculate GSD/footprint and then plan the points.
  2. Prepare an image inventory and check for missing areas. Process a real image set following the lab when ready.
  3. Check CPs separately from GCPs, then state the verdict: pass/fail/insufficient evidence.

Event: 10% of the area's edge is missing and no CPs have been measured. The answer is that the data is incomplete and the accuracy evidence is insufficient, even though the imagery in the centre of the area is sharp. The area to re-collect and the method for obtaining check points must be specified; do not submit it as 'pass'.

Criteria: the brief is complete, the work extent is evidenced, the reference system is clear and the verdict matches the evidence. The hypothetical CP numbers are only for testing result interpretation.

Mission 2: Stockpile volume

Task: a hypothetical area divided into 4 cells, each 2 × 2 m, with heights above the base = 1, 2, 3, 4 m. Calculate the volume, experiment with changing the base, and draw the stockpile boundary.

V = Σ A_i × (z_surface,i − z_base,i)

A_i is the cell area in m² and height is in m, so volume is in m³. Example: V = 4 × (1 + 2 + 3 + 4) = 40 m³ . When the base is raised by 0.5 m in every cell, what remains is 32 m³ , a difference of 8 m³. If the real ground slopes, a per-cell z_base must be used; do not substitute a constant level without justification.

Event: part of the stockpile is not visible to the camera. Learners must record NoData and propose additional collection, not treat it as zero height. QGIS Raster surface volume uses a constant base level; work with a variable base must first build a compatible difference surface. See the QGIS manual

Criteria: the formula, units, extent and base are clear; the result of 40/32 m³ is correct for the hypothetical data; and missing portions are disclosed. Use terrain grid further in the volume chapter

Mission 3: Road or canal corridor

Task: design a survey plan on a computer for a hypothetical corridor 600 m long and 40 m wide, specifying start/end points, bends, control points, check points and flight segmentation.

  1. Create a centreline and buffer to communicate the work extent, and choose a camera specification that is actually known.
  2. Compare a plan that assumes flat ground with a plan over terrain of varying elevation, and check GSD and overlap in high areas.
  3. Specify the overlap between flights and check the seams, while recording energy conditions that are still unknown.

Event: the end of the corridor is 20 m higher than the start. When flying at a constant altitude above the start point, the height above ground decreases, making the footprint smaller and changing the overlap, so the plan and obstacles must be reviewed. Using terrain following does not guarantee avoidance of trees or power lines. See QGroundControl Corridor Scan

Criteria: the plan is reasoned, the survey extent is separated from the flight extent, and seams and areas still without data are checked. A real flight is not necessary to pass the planning part.

How to use it with DroneSim

Use the mission evidence exchange form to record assumptions, plans and events from the simulator yourself. This form is not yet an API or an automatic integration with DroneSim. Simulation results are for practising decision-making; map accuracy must be checked from real imagery and CPs.

Self-check before submitting

Submit the brief, plan, test log, QA report and limitations. The instructor assesses 4 aspects, each scored 0–3: task requirements, evidence, procedure and reasoning. A score of 0 means no evidence, 1 means present but not reproducible, 2 means checkable but incomplete, and 3 means complete with limitations explained. Key conditions on CRS, CP independence and completeness must also be met; the total score does not compensate for failed conditions.

Bibliography and scope

Documents checked 25 September 2026 (B.E. 2569). The practice numbers are hypothetical data, not flight test results or survey certification.

Used in courses

How to cite this page

Drone Institute, Rangsit University. (2026). Three end-to-end survey training missions. In UAS Technology Knowledge Hub (B.Tech.). https://rsu-uat.pk-research.work/en/kb/knowledge/drone-mapping/missions/

Original from Drone-Hub: https://drone.pk-research.work/knowledge/drone-mapping/missions/ · © PK-Research