UAT 203 Electrical and Electronic Systems for UAS
Worksheet 5 Wiring harness and distribution board
Objective
Check wire sizes and connector ratings, solder connectors properly, design a distribution board in KiCad and study compass interference reduction
Equipment and materials
- Training drone, tape measure and connector datasheets
- Soldering iron, solder, XT60 connectors, wire of the set gauge and heat-shrink
- Computer with KiCad and Python
- SITL or a real drone for CompassMot as the lecturer sets
- Safety glasses and a fume extractor
Safety
- The iron is several hundred degrees; always rest it in its stand, use fume extraction and glasses
- Disconnect the battery before soldering or rewiring
- If running CompassMot on a real drone, secure it or follow the lecturer's procedure; stay clear of propellers
Steps
- Measure battery and ESC lead lengths; check wire sizes with Example 1
- Compare every connector rating with the module 1 peak current
- Solder an XT60 to the set wire gauge; check strength and insulation
- Draw the distribution board schematic and layout in KiCad with calculated trace widths; pass ERC and DRC
- Mark the fuse, reverse-polarity protection and star ground on the schematic
- Study the CompassMot procedure in SITL or on a real drone and record the result
Record of results
| Lead or connector | Round-trip length (m) | Size or datasheet rating | Peak current (A) | Drop (V) and heat (W) | Verdict |
|---|---|---|---|---|---|
| Item | Input values | Result | Unit |
|---|---|---|---|
| Check | Result | Pass criterion | Pass or fail |
|---|---|---|---|
Questions
Does the training drone's battery lead meet the 1% drop limit, and how would counting only one wire's length mislead you? Show the numbers.
Do the training drone's connectors have a datasheet continuous rating sufficient for the roughly 101 A peak from module 1? If not, what should the team do?
Why is the 12 V branch fuse sized at the lowest battery voltage, and why does a 1 A fuse fail the check even though the running current is below 1 A?
Which band does your CompassMot result fall in, and if it were above 60%, how would you change the wiring or layout?
If the post-flight log shows path resistance rising from 21 mΩ to 30 mΩ, how would you locate the fault, and which point of today's harness is most at risk?
Check before you hand in
What to hand in
- Wire and connector check table
- Checked soldered connector
- KiCad files and ERC/DRC reports
- CompassMot record