UAT 304 UAS Mission Planning and Autonomous Flight
Worksheet 4 From SITL to preparing the real flight
Objective
Check the mission and failsafes in SITL, prepare the stage 2 briefing and pre-flight checklist, rehearse stage 2 in SITL and review the log before the full mission
Equipment and materials
- ArduPilot SITL and QGroundControl
- Mission file from module 3
- Pre-flight checklist
Safety
- Simulation only; the course has no lab hours, so real flight is not included
- Test every failsafe in SITL only; never cut links on a real drone
- If the programme arranges a real stage 2 flight outside this course, fly within CAAT conditions in visual line of sight, in open ground with an observer and people kept clear, using this worksheet as the pre-flight plan
Steps
- In class: upload the module 3 mission in SITL, log it and compare times with Example 1
- Self-study: make the per-leg time table against the plan and find unusually long legs
- In class: in SITL cut the GCS link, turn off RC, lower simulated voltage and simulate GPS loss; record each result
- Self-study: compare with the Example 2 model; if different, trust SITL and fix the team's model
- In class: prepare the stage 2 briefing and pre-flight checklist with take-over conditions, then rehearse stage 2 in SITL
- Self-study: review the rehearsal log and write the criteria for whether to move to the full mission
Record of results
| Leg | Distance (m) | Planned time (s) | Log time (s) | Difference (%) | Investigate? |
|---|---|---|---|---|---|
| Case | Parameter and value set | Expected from the model | Actual in SITL | Time from event to response (s) | Match? |
|---|---|---|---|---|---|
Questions
Which leg took more than 20% longer than planned? What are the possible causes, and how would you check them in the log before concluding?
Did the SITL failsafe results match the Example 2 model in every case? If not, how did the group correct its model?
If the battery runs low while the aircraft is already in RTL, what does the battery failsafe do? How does that affect the energy reserve in the plan?
Why must stage 2 (limited height and range) come before the full mission, and which of the group's criteria matters most?
Check before you hand in
What to hand in
- Per-leg timing table
- Four-case failsafe table and corrected model
- Signed stage 2 pre-flight checklist
- Stage 2 SITL rehearsal log and review notes