UAT 362 Unmanned Aircraft Systems Technology for Industrial, Energy and Infrastructure Applications

Worksheet 5 Risk plan and inspection report

Analysis activity 12 hAssesses CLO3, CLO1

Objective

Assess flight and asset risk, and turn defects into recommendations and work orders the operator can use

Equipment and materials

  • Defects collected in worksheets 2–4
  • Python and the module 5 example code
  • Spreadsheet or CMMS import template
  • Lab notebook

Safety

  • Desk work and presentation only; no flying

Steps

  1. Identify at least six hazards for an inspection flight on site and assess them with Example 1 before and after mitigation
  2. Score PoF and CoF for each defect with reasons and rank them with Example 2
  3. Write one report entry per defect with all required information
  4. Build a table importable into a CMMS or the operator's spreadsheet, with an image manifest
  5. Present to the asset manager (the instructor) and adjust the ranking with added consequence information

Record of results

Table 1 Flight risk register
Code and hazardProbability-severity beforeScore and band beforeMitigationProbability-severity afterScore and band after
Table 2 Ranked defects as work orders
Defect and asset IDLocationPoF and reasonCoF and reasonRisk and levelDue (days)
Table 3 Image manifest
File nameDefect codeSHA-256Original or working copy

Questions

  1. After mitigation, which hazards in Table 1 are still medium or high? May your group fly, and what more is needed?

  2. In Table 2, does the defect that looks worst in the images rank first? Use PoF and CoF to explain why consequences matter as much as visible severity.

  3. After your presentation the asset manager gives extra consequence information that changes one defect's CoF. How do the ranking and due date change?

  4. What does the SHA-256 manifest in Table 3 prove, and what does it not prove?

  5. Why must the job be re-inspected after repair before the work order is closed, and which step of the asset management loop does that link back to?

Check before you hand in

What to hand in

  • Flight risk register
  • Ranked defect table
  • Inspection report
  • Work order table with manifest

CLO3 Assess risk and report inspections. CLO1 Plan industrial and energy inspection missions. (CLOs are a web-team draft; the course owner sets the final ones.)