Teaching pack · UAT 362
A 15-week teaching plan, 5 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.
Coverage of the course description
The lessons fully teach 10 of 10 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.
| Description topic | Modules | Where it is taught | Status |
|---|---|---|---|
| Planning and execution of inspection missions | M1 | Module 1: asset management, motion blur and flight speed, patrolling linear assets, and hazardous areas and stand-off distances | Covered |
| Industrial facilities, buildings and bridges | M1 | Module 1: buildings, factories and bridges (facades under ASTM E2270, rust on steel roofs under ASTM D610, NBIS inspection intervals and hands-on inspection, Example 3 on images for a factory facade and a bridge soffit, and step 6 of the module lab) and Figure 1 in the asset management section | Covered |
| Electrical systems | M2M3 | Module 2: tree clearance from conductors and UV cameras for corona · Module 3: power lines, wind turbines and pipelines | Covered |
| Renewable energy assets | M3 | Module 3: solar farms, and wind turbines within the power lines, wind turbines and pipelines section | Covered |
| Utilities | M1M3 | Module 1: the industrial estate utilities case and pipeline patrols · Module 3: pipeline patrol frequency | Covered |
| Selection of visual and thermal sensors | M1M2 | Module 1: the defect-to-sensor table in Figure 1, Example 1 on choosing shutter and speed, and Example 3 on choosing a zoom or wide lens from the space available · Module 2: thermal cameras in energy work, LiDAR and UV cameras | Covered |
| Risk assessment | M1M5 | Module 1: hazardous areas and stand-off distances · Module 5: flight risk and asset risk | Covered |
| Data acquisition and analysis | M2M4 | Module 2: LiDAR travel time and pulse density · Module 4: from video to analysable images | Covered |
| Anomaly detection | M3M4 | Module 3: separating string-level from module-level anomalies · Module 4: the confusion matrix and image limits | Covered |
| Maintenance recommendations | M5 | Module 5: reports and work orders, and the example turning ranked defects into work orders | Covered |
Weekly teaching plan
| Week | Topic | Pre-class | Lecture | Lab | Evidence |
|---|---|---|---|---|---|
| 1 M1 | Asset management and the owner's decisions | Read module 1 up to 'Asset management' | Inspection for maintenance decisions and the industrial estate case | Worksheet 1 part A: choose three asset types on site, write the owner's decisions and build a defect-to-sensor table | Lab notebook: a Figure 1 style table with reasons |
| 2 M1 | Motion blur and flight speed | Read the motion blur section; run Example 1 | Maximum speed from GSD and shutter | Worksheet 1 part B: choose shutter and speed for the lab camera; obtain safe distances from the asset owner | Lab notebook: calculations and flight plan conditions |
| 3 M1 | Linear patrols, hazardous areas, and inspecting buildings, factories and bridges | Read the linear patrol, hazardous area, and buildings, factories and bridges sections; run Examples 2 and 3; take the module 1 quiz | Patrol time for a 3 km pipeline, stand-off from hazardous assets, and inspecting facades, factory roofs and bridges (intervals, hands-on inspection, flying under a deck) | Worksheet 1 part C: fly test images at three speeds, compare real blur with calculation, and plan a facade and bridge inspection with Example 3 | Lab notebook: blur table, facade and bridge inspection plan, and quiz result |
| 4 M2 | Thermal cameras in energy work | Read module 2 up to the thermal camera section | Pixel size on target and choosing thermal camera range | Worksheet 2 part A: open a sample point cloud in CloudCompare or QGIS and check real density in several areas | Lab notebook: density by area |
| 5 M2 | LiDAR | Read the LiDAR section; run Example 1 | Pulse travel time and density against height and speed | Worksheet 2 part B: compute density from an available LiDAR's specifications at several heights and speeds, compared with real data | Lab notebook: computed versus measured density |
| 6 M2 | Tree clearance and UV cameras | Read the tree clearance and UV sections; run Example 2; take the module 2 quiz | Distance from tree tops to a sagging conductor, and corona detection | Worksheet 2 part C: separate conductor and tree points, compute distances and list trees to trim | Lab notebook: trim list, and quiz result |
| 7 M3 | Solar farms | Read module 3 up to 'Solar farms' | Thermal patterns of modules and imaging conditions | Worksheet 3 part A: take thermal images of the campus solar array on a sunny day, recording irradiance, air temperature and wind | Lab notebook: images and conditions at capture |
| 8 M3 | String-level versus module-level anomalies | Run Example 1 | Setting criteria before viewing results, and confirming with inverter data | Worksheet 3 part B: tabulate module temperatures by the real string layout and classify anomalies with Example 1 | Lab notebook: temperature table and classification |
| 9 M3 | Power lines, wind turbines, pipelines and patrol frequency | Read the power line, turbine, pipeline and patrol sections; run Example 2; take the module 3 quiz | Pipeline class locations and minimum patrols (US rule as an example) | Worksheet 3 part C: confirm findings with colour images and current data, then write the findings list | Lab notebook: findings list, and quiz result |
| 10 M4 | The confusion matrix | Read module 4 up to the confusion matrix; run Example 1 | TP, FP, FN, precision, recall and F1 | Worksheet 4 part A: prepare a specialist-labelled test set separate from training data and run the detector | Lab notebook: TP, FP and FN at three thresholds |
| 11 M4 | Choosing a threshold and from video to images | Read the video-to-images section; run Example 2 | Cost of misses against false alarms, and frame sampling | Worksheet 4 part B: compute precision, recall and F1, choose a threshold with reasons, and sample frames from real video | Lab notebook: metrics table and chosen threshold |
| 12 M4 | Image limits | Read the image limits section; take the module 4 quiz | What is seen, what is hidden and what is still unknown | Worksheet 4 part C: check for gaps in video coverage and write a report separating these three | Lab notebook: model evaluation report, and quiz result |
| 13 M5 | Flight risk | Read module 5 up to 'Flight risk'; run Example 1 | Ranking risks of a power line inspection flight before and after mitigation | Worksheet 5 part A: identify at least six hazards of an inspection flight and assess them with Example 1 | Lab notebook: flight risk register |
| 14 M5 | Asset risk, reports and work orders | Read the asset risk and reporting sections; run Example 2; take the module 5 quiz | PoF, CoF, ranking defects and the information a report must contain | Worksheet 5 part B: score defects from modules 2–4, rank them, write report entries and build a CMMS import table with a manifest | Lab notebook: inspection report and work order table, and quiz result |
| 15 M5 | Practical examination and presentation to the asset manager | Review all five worksheets and complete the lab notebook | Present to the asset manager (the instructor) and adjust the ranking with added consequence information | Practical exam: plan and fly an asset data collection on site within CAAT conditions, analyse the images and submit ranked findings | Practical exam score using the rubric, and the completed lab notebook |
Worksheets and instructor guide
One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.
1Worksheet 1 An asset inspection plan
Lab · About 12 h of class time · CLO1, CLO2
Objective: Tie inspection to the asset owner's decisions, choose sensor, shutter and speed, and check the blur calculation against real images, and plan the inspection of a building facade and a bridge
Equipment
- Drone with the lab RGB camera
- Python and the module 1 example code
- Site plan and safe distances from the asset owner
- Lab notebook
Safety
- Fly within CAAT conditions in visual line of sight; keep people clear
- Keep the stand-off and respect restricted areas set by the asset owner
- Check batteries before flight and store them in fire-safe containers
Steps
- Choose three asset types and write the owner's decision for each
- Build a Figure 1 style table: defects, smallest size, chosen sensor and reasons
- Use Example 1 to choose shutter and speed for the required GSD
- Obtain safe distances and restricted areas from the asset owner and record them as flight plan conditions
- Take test images at three speeds, compare real blur with the calculation and record it in the lab notebook
- Apply Example 3 to one building facade and one bridge, footbridge or culvert nearby (measured from the ground, no flight under traffic): choose lens and stand-off, count the images and list the parts that still need a hands-on inspection
Deliverables
- Asset, defect and sensor table
- Shutter and speed calculation
- Flight plan conditions
- Blur comparison in the lab notebook
- Facade and bridge inspection plan: lens, stand-off, image count and parts needing hands-on inspection
Checklist
- Table 1 has all 3 assets, every row starts from the owner's decision, and defect sizes have units
- Flight plan conditions (safe distances, restricted areas, permitted times) are recorded with the name of who gave them in the lab notebook
- Table 2 has at least 3 speeds with units in every cell, and the test images used to measure blur are attached
- Table 3 checks the stand-off against the real space available and names at least one part needing hands-on inspection
- The lab notebook separates measured values from assumed ones (for example the required GSD and time per image)
Instructor guide
Class timing
- Case briefing, owner decisions and flight safety60 min
- Build the asset, defect and sensor table and obtain conditions from the asset owner120 min
- Compute shutter and speed with Example 190 min
- Fly the three-speed test and measure blur210 min
- Plan the facade and bridge inspection with Example 3 (measured from the ground)180 min
- Wrap-up, questions and hand-in checklist60 min
Expected results
- Table 1: 3 rows, for example solar panels (which modules to replace before the hot season; hot spots and cracks; thermal and RGB), the 22 kV line (which spans need trimming or joint repair; hot joints, corona and nearby trees; thermal, UV and LiDAR), and a building or tank (when to repair the facade or repaint; rust and cracks; zoom RGB). The smallest size has a unit and can set a GSD. Sensors are chosen from the defects, not from the equipment at hand.
- Table 2 (if the lab uses 1 cm GSD and a 1/500 s shutter as in Example 1): blur b = v t / GSD at 3, 6 and 9 m/s is 0.60, 1.20 and 1.80 px, and the maximum speed for 1.5 px is 7.5 m/s, so the 9 m/s run should exceed the limit. Accept measured blur within about ±0.5 px of the calculation; it is usually larger in wind or when the camera picks a slower shutter by itself.
- Table 3 (with the Example 3 assumptions: 1 mm GSD, 70% overlap, 13.2 x 8.8 mm 5472 px sensor, 3 s per image, 20 usable minutes per battery): the 50 mm lens needs 20.7 m stand-off with 5.47 x 3.65 m per image, so the 60 x 18 m factory facade takes 38 x 18 = 684 images, 34 min, 2 batteries. Under a 90 x 10 m bridge with 5 m clearance only the 8.8 mm lens fits, at 3.6 m: 56 x 11 = 616 images, 31 min, 2 batteries. For an assumed 30 x 12 m campus facade the 50 mm lens gives 20 x 12 = 240 images, 12 min, 1 battery; under an assumed 20 x 3 m footbridge with 4 m clearance the 8.8 mm lens gives 14 x 4 = 56 images. Hands-on parts include, for example, non-redundant steel tension members or areas that must be sounded.
- Measured blur is usually larger than calculated in the fast or windy runs. A strong answer checks whether the real GSD matched the plan (a wrong stand-off changes the GSD), whether the shutter stored in the image file is the one that was set, and separates motion blur from poor focus.
- At 1 cm GSD and 1/500 s the maximum speed is 7.5 m/s. Halving the GSD to 0.5 cm drops it to 3.75 m/s at the same shutter and 1.88 m/s at 1/250 s. A strong answer gives the lesson's options: a faster shutter (needs enough light; 1/1000 s gives 7.5 m/s) or stopping to hover for each image.
- Stand-off depends on GSD and focal length: the 50 mm lens needs about 20.7 m, but there are only a few metres under a bridge, so a wide lens must be flown close. The added risks are that the deck blocks GNSS so the drone drifts, steel girders disturb the compass, wind funnels through the span, and there is traffic or boats below.
- Conditions must come from the asset owner, the risk assessment (module 5) and the CAAT announcements in force. EGAT's 4 m is a warning for the general public, not a distance set for drones, and drones have their own problems such as magnetic fields near transformers disturbing the compass.
- A strong answer names concrete parts, for example under the NBIS example, non-redundant steel tension members need inspection within arm's length, and facade areas under ASTM E2270 where the inspector must sound or open up. Drone images give close views of high places and a complete record that locates each defect, which helps the inspector choose where to get hands-on, but they do not replace touching or sounding.
Discussion questions
- If the asset owner says "just fly and capture everything, we will look later", how should the team respond, and what is lost by doing so?
- Hovering for each image or a faster shutter: which suits a sunny factory facade and which suits a dark bridge soffit?
- Inside a factory with cranes and forklifts, what must the team agree with the plant before flying?
Adapting to student background
- Upper secondary (M.6)
- Have them predict blur with b = v t / GSD before every run and explain the difference after measuring; pair them with a confident pilot for the test flights.
- Vocational certificate
- Provide a calculation sheet where they only enter speed, shutter and GSD, and let them measure blur by counting pixels at a target edge, focusing on the relationship rather than rearranging the formula.
- Diploma
- Extension: plan the footbridge soffit at two real clearance values, find the longest lens that still fits, and show how the image count changes.
2Worksheet 2 Point clouds and conductor clearance
Analysis activity · About 12 h of class time · CLO2
Objective: Check point cloud quality against specifications and measure tree-to-conductor clearance in 3D
Equipment
- Sample point cloud (or the one from UAT 361 module 3)
- CloudCompare or QGIS
- Python and the module 2 example code
- Specifications of an available LiDAR
- Lab notebook
Safety
- Computer lab work only; no flying
Steps
- Open the point cloud and check real density in several areas
- Use Example 1 to compute density at different heights and speeds
- Separate conductor and tree points and compute distances with Example 2
- Explain why a side view alone misjudges distances
- List trees to trim by the line owner's criterion (or the instructor's assumed one)
Deliverables
- Computed versus measured density
- Tree-to-conductor distance table
- Explanation of side-view error
- Trim list
Checklist
- Table 1 has at least 3 height and speed pairs, and real density measured in at least 3 named areas
- Every tree in Table 2 has both the side-view vertical gap and the 3D distance, in metres to 2 decimals
- The clearance criterion and its source (the line owner's or the instructor's assumed one) are stated; no foreign criterion is substituted
- The trim list cites tree IDs and 3D distances so the line crew can use it
- Runnable code is attached and the point cloud file name is recorded in the lab notebook
Instructor guide
Class timing
- Review LiDAR ranging, USGS quality levels and clearance criteria60 min
- Open the point cloud and measure real density in several areas150 min
- Compute density with Example 1 and compare with measurements120 min
- Separate conductor and tree points and compute distances with Example 2240 min
- Write the side-view explanation, the trim list and answer questions150 min
Expected results
- Table 1 (with the Example 1 assumed LiDAR: PRF 240,000 pulses/s, 70° field of view): H 60 m, v 6 m/s, swath 84.0 m, 476 pulses/m²; H 80 m, v 10 m/s, swath 112.0 m, 214 pulses/m²; H 100 m, v 12 m/s, swath 140.0 m, 143 pulses/m². All meet QL1 (at least 8). Measured values should be of the same order and vary by area.
- Table 2 (Example 2 data: 200 m span, 4 m sag, assumed 3 m criterion): 3D distances T1 4.20 m, T2 2.24 m (trim), T3 6.40 m, T4 6.02 m. Side-view vertical gaps T1 2.94 m, T2 1.01 m, T3 5.00 m, T4 0.46 m. With a real point cloud, the tree top coordinates and the instructor's criterion must be stated.
- A good explanation: a side view shows only the vertical gap and hides the lateral offset (y). T4 is tallest and looks closest in side view (0.46 m), but it stands 6 m to the side, so its true distance is 6.02 m. T2 sits under mid-span where the conductor hangs lowest, so it is truly the closest. Distance must be computed in 3D against every point on the conductor.
- Measured density rarely equals the calculation because the formula is an average over the whole swath. A strong answer explains the differences in the group's own data, for example more points where flight lines overlap, and notes that a real speed or height different from the plan changes the value.
- No. Density is not position accuracy. Positions still depend on GNSS/INS and calibration, and a thin conductor may return only a few points. A strong answer proposes checking the number of conductor points in each span before trusting the distances.
- With the Example 2 data a side view would put T1 (2.94 m) and T4 (0.46 m) under the 3 m criterion although their true distances are 4.20 m and 6.02 m, so they would be trimmed unnecessarily. T2 is correctly flagged, but the side view ranks closeness wrongly (it shows T4 as closest). A strong answer uses the group's own Table 2.
- At 5 m sag (recomputed with the same equation): T1 3.78 m, T2 2.00 m, T3 5.83 m, T4 6.00 m. The trim list is still T2 only, but T2 moves 0.24 m closer and T1 is now only 0.78 m above the criterion. A strong answer concludes that clearance must be checked for the largest sag, not only for the day of the flight.
Discussion questions
- Why does each power utility set its own vegetation clearance, and what should the team ask the line owner for before starting?
- If a thin conductor returns very few points in some spans, how should the team report clearance for those spans?
- A UV camera can see corona in daylight, so why can severity still not be judged from the UV image alone?
Adapting to student background
- Upper secondary (M.6)
- Have them derive R = c t / 2 and w = 2H tan(θ/2) with a sketch before coding, and relate the 3D distance to the Euclidean distance from school maths.
- Vocational certificate
- Start with measuring distances by hand with the CloudCompare or QGIS measuring tool, then compare with the code; provide a sheet with formulas ready for height and speed.
- Diploma
- Extension: add a lateral wind swing of the conductor (assumed offset), recompute every tree's distance and propose a trimming cycle.
3Worksheet 3 Reading thermal patterns on a solar array
Lab · About 12 h of class time · CLO2, CLO3
Objective: Capture thermal images of a solar array under correct conditions, classify module- and string-level anomalies and confirm with other data
Equipment
- Drone or thermal camera kit with a colour camera
- Irradiance meter, thermometer and anemometer
- String layout and inverter current data from the system operator
- Python and the module 3 example code
- Lab notebook
Safety
- Fly within CAAT conditions in visual line of sight and coordinate with the operator before entering
- Do not touch modules, cables or DC equipment; work under the operator's supervision
- Beware of sun heat; drink water and rest in shade
Steps
- Take thermal images on a sunny day, recording irradiance, air temperature and wind
- Tabulate module temperatures by the real string layout
- Use Example 1 to classify module- and string-level anomalies with criteria set before viewing results
- Confirm findings with colour images and inverter current data
- Write a findings list with module positions, possible causes and follow-up checks
Deliverables
- Thermal images with conditions
- Module temperature table
- Anomaly classification
- Findings list
Checklist
- Table 1 records irradiance, air temperature and wind for every capture period, with image numbers
- String- and module-level criteria are written in the lab notebook with a time, before running Example 1
- Every finding in Table 3 has a position from the real string layout and is confirmed by a colour image or inverter current
- The flight met CAAT conditions and coordination with the system operator before entry is recorded
- The report separates what the images show from the assumed causes
Instructor guide
Class timing
- DC area safety briefing and coordination with the operator60 min
- Set criteria in advance and obtain the string layout from the operator60 min
- Fly thermal and colour capture and record conditions240 min
- Tabulate module temperatures and run Example 1180 min
- Confirm with colour images and inverter current, write the findings list120 min
- Wrap-up, questions and hand-in checklist60 min
Expected results
- Table 1: every capture period has the time, irradiance in W/m², air temperature in °C, wind in m/s and image numbers, all measured on the day. The lesson gives no minimum irradiance or wind values; those criteria are in IEC TS 62446-3, which must be obtained, so grade the completeness and consistency of the record.
- Table 2 (with the Example 1 data and the 2 K and 5 K criteria): array median 45.30 °C; S1 45.20 °C (-0.10 K); S2 45.25 °C (-0.05 K) with module 7 +11.8 K above the string median; S3 45.20 °C (-0.10 K); S4 49.20 °C (+3.90 K), warm as a whole, with no module in S4 more than 5 K above its own median. Inverter currents must be real values from the operator.
- Table 3: at least two entries following the patterns found, for example S2-7 hot on its own, cause likely in that module, check the colour image for shading or damage and then the module; and S4 warm as a whole, cause at string level, check connections and the inverter first rather than replacing all ten modules.
- S4 warm as a whole points to a string-level problem such as a string not delivering current, so check the connections and inverter first; S2-7 hot alone means checking that module. A strong answer quotes the group's own numbers and notes that replacing a whole string is the mistake the lesson warns about.
- With the Example 1 data, S4 modules are only +3.7 to +4.1 K above the array median, so none passes 5 K and the string-level problem disappears from the report, while S2-7 still shows (+11.7 K). A strong answer concludes both levels are needed; if the group's data has no warm string, explain with these example numbers.
- Criteria set after viewing tend to be adjusted toward the expected answer, so anomalies are found or missed according to the analyst's belief and the report cannot be checked. A strong answer says that recording the criteria with a time before viewing lets others repeat the analysis.
- If the warm string's current is clearly lower than the others, the data confirms a string-level problem. If the current is normal, treat it as unconfirmed, check the colour images and conditions, and propose a re-inspection. A strong answer does not conclude from the thermal image alone.
- Uneven sunlight, passing clouds or strong wind change module temperatures between images so they cannot be compared, and reflections from smooth surfaces can mislead (module 2). The abnormality classes and required conditions are in the actual standard; the lesson only practises comparing within the same group, so IEC criteria must not be quoted without the standard.
Discussion questions
- Why does sending a team to replace a whole string waste money and time, even though the thermal image shows the whole string really is warm?
- Which data from the system operator makes thermal inspection far more valuable, and should be requested at the planning stage?
- What happens if power line joints are inspected on a low-load day, and how does that relate to choosing a day for solar thermography?
Adapting to student background
- Upper secondary (M.6)
- Have them find one string's median by hand before running the code and explain why the median is used instead of the mean when one module is hot; in the field let them log conditions alongside the pilot.
- Vocational certificate
- Have them colour the module temperature table on a paper string layout first to see the warm-string and hot-module patterns by eye, then confirm with the code.
- Diploma
- Extension: draft a ground confirmation procedure for the warm string, stating that all electrical steps are done by the authorised system operator.
4Worksheet 4 Evaluating an anomaly detection model
Analysis activity · About 12 h of class time · CLO2, CLO3
Objective: Evaluate a detector on a held-out test set, choose a threshold with reasons and report image limits
Equipment
- Specialist-labelled test images
- A detector (for example from UAT 322)
- Real inspection video
- Python and the module 4 example code
- Lab notebook
Safety
- Computer lab work only; no flying
- Do not share images of others' assets outside class
Steps
- Prepare a labelled test set separate from the training set
- Run the detector and record TP, FP and FN at no fewer than three thresholds
- Use Example 1 to compute precision, recall and F1 and choose a threshold with cost and safety reasons
- Sample frames from real video with Example 2 and check for gaps
- Write a report separating what is seen, what is hidden and what is still unknown
Deliverables
- TP, FP, FN and metrics table
- Chosen threshold with reasons
- Frame sampling result
- Model evaluation report
Checklist
- Table 1 has at least 3 thresholds, each row with TP, FP, FN, precision, recall and F1 to 3 decimals
- States how the test set is separated from the training set and who labelled it
- The threshold reason covers the cost of misses and the workload of false alarms, not F1 alone
- The report has three separate parts (seen, hidden, still unknown) and reads no temperature from colours of non-radiometric images
- No images of others' assets are in any file shared outside class
Instructor guide
Class timing
- Review the confusion matrix and agree the cost of misses and false alarms for the case60 min
- Prepare a separate test set and run the detector180 min
- Count TP, FP and FN at several thresholds and compute metrics with Example 1150 min
- Sample video frames with Example 2 and check for gaps150 min
- Write the evaluation report, answer questions and run the hand-in checklist180 min
Expected results
- Table 1 (with the Example 1 results, 50 real defects): threshold 0.3: TP 46, FP 30, FN 4, precision 0.605, recall 0.920, F1 0.730; 0.5: TP 42, FP 12, FN 8, precision 0.778, recall 0.840, F1 0.808; 0.7: TP 33, FP 4, FN 17, precision 0.892, recall 0.660, F1 0.759. With a real detector, compute from the group's results; TP + FN must equal the number of real defects in every row.
- Table 2 (Example 2: 20 m footprint, 80% overlap, 5 m/s, 30 fps): 0.80 s between frames, one in every 24 frames, a 10-minute video of 18,000 frames becomes 750. For the practice case, a 15 m footprint with 75% overlap gives 0.75 s, about one in every 22 frames. The gaps column gives video times or states that none were found.
- A good report has three parts: seen (for example confirmed hot spots with locations), hidden (for example the back of equipment, areas in shadow or behind trees) and still unknown (for example the true temperature in images exported as colour without radiometric data), and merges repeated detections across frames into one location.
- A strong answer ties the choice to cost: if missing one hot joint could black out the estate, choose 0.3, which misses only 4, and let people screen out the 30 false alarms. Choosing 0.5 for the highest F1 (0.808) must explain why 8 misses are acceptable. Choosing a threshold is a business and safety decision.
- Assuming 2000 normal candidates: at 0.5, TN = 2000 - 12 = 1988 and accuracy = (42 + 1988)/2050 = 0.990, while a model that answers normal every time gets 2000/2050 = 0.976 and finds no defects at all. Accuracy always looks high because normal images dominate, so precision and recall must be reported.
- With one in every 24 frames at 6 m/s the image moves 4.8 m and overlap drops to 76%; at 8 m/s it moves 6.4 m and drops to 68%, below the required 80%. The analysis may have gaps or fail to merge images, so the frame step must be recomputed from the real speed in the log, and blur checked as well (module 1).
- If the training images are reused, the model has already seen the answers, so the numbers look better than reality and say nothing about how it performs on new images; Table 1 could not be trusted. A strong answer also mentions specialist labelling of the test set.
- A good example: a joint hidden by branches in every frame shows no heat, but that does not mean it is not hot; record it as hidden and propose another view. Or a thermal image exported as colour without measurement data means the temperature is still unknown.
Discussion questions
- Who should choose the threshold, the image analysis team or the asset owner, and what information must they share?
- If the model raises many false alarms, screeners tire and start passing images without looking. How should this risk enter the threshold choice?
- Can a model trained on one solar farm be used on another straight away? What must be tested first?
Adapting to student background
- Upper secondary (M.6)
- Have them write the precision, recall and F1 formulas by hand before the code and explain why F1 is a harmonic mean rather than a plain average.
- Vocational certificate
- Use printed image cards to sort into TP, FP, FN and TN on the desk first, then enter the counts in the code, stressing what a miss and a false alarm mean more than the formulas.
- Diploma
- Extension: add three more thresholds, plot the group's own precision-recall curve, and propose a threshold with the person-hours needed to screen false alarms (assumed time per image).
5Worksheet 5 Risk plan and inspection report
Analysis activity · About 12 h of class time · CLO3, CLO1
Objective: Assess flight and asset risk, and turn defects into recommendations and work orders the operator can use
Equipment
- Defects collected in worksheets 2–4
- Python and the module 5 example code
- Spreadsheet or CMMS import template
- Lab notebook
Safety
- Desk work and presentation only; no flying
Steps
- Identify at least six hazards for an inspection flight on site and assess them with Example 1 before and after mitigation
- Score PoF and CoF for each defect with reasons and rank them with Example 2
- Write one report entry per defect with all required information
- Build a table importable into a CMMS or the operator's spreadsheet, with an image manifest
- Present to the asset manager (the instructor) and adjust the ranking with added consequence information
Deliverables
- Flight risk register
- Ranked defect table
- Inspection report
- Work order table with manifest
Checklist
- Table 1 has at least 6 hazards, each scored before and after mitigation, with the team's band criteria stated
- Every defect in Table 2 has an asset ID, a location and reasons for PoF and CoF
- The work order table opens in a spreadsheet or the CMMS template without editing columns
- Every image cited in the report is in the manifest with its SHA-256, and originals are kept apart from working copies
- The ranking change after the presentation is recorded with the added information
Instructor guide
Class timing
- Review the two levels of risk, the ICAO example matrix and the team criteria60 min
- Identify hazards and assess before and after mitigation with Example 1150 min
- Score PoF and CoF and rank with Example 2150 min
- Write per-defect report entries, the work order table and the manifest210 min
- Present to the asset manager and adjust the ranking120 min
- Wrap-up, questions and hand-in checklist30 min
Expected results
- Table 1 (team criteria from the lesson: A to E become 5 to 1, multiplied by probability; 15 or more high, 6 to 14 medium): before mitigation H1 collision with the 22 kV conductor 3B = 12 medium, H2 compass error near the transformer 4C = 12 medium, H3 crash onto the road 2A = 10 medium, H4 bird strike 2D = 4 low. Example after mitigation (assumed): H1 keeping the utility's distance gives 1B = 4 low; H2 calibrating away from the transformer or a mode that does not rely on the compass gives 2C = 6, still medium; H3 avoiding the road line gives 1A = 5 low. Groups add at least two more hazards from the real training site.
- Table 2 (Example 2 defects with assumed due dates): D1 joint +18 K on the feeder to the water plant 4 x 5 = 20, P1, 7 days; D3 string S4 not producing 5 x 3 = 15, P1, 7 days; D4 tree 2.2 m from the 22 kV line 3 x 4 = 12, P2, 30 days; D2 single hot module S2-7 4 x 2 = 8, P2, 30 days; D5 surface rust on the tank ladder 2 x 2 = 4, P3, 90 days. With the group's own defects from worksheets 2 to 4 the numbers may differ, but every score needs a reason.
- Table 3: every image cited in the report has a file name, defect code, a 64-character hexadecimal SHA-256 and a note of original or working copy; originals are never overwritten.
- From the example, H2 after mitigation still scores 6, medium, so it needs clear mitigations and an owner, then reassessment; any hazard still high after mitigation means no flight. A strong answer stresses that these are the team's criteria, not ICAO values, and that the organisation must set its own acceptance criteria.
- Not necessarily. D2, a module +11.8 K hot, looks severe but scores 8, while D4, a tree near the 22 kV line, scores 12 and D1 scores 20 because the consequence for the water plant supply is far greater. A strong answer also covers equal scores: PoF 2, CoF 5 and PoF 5, CoF 2 both give 10, but CoF 5 may need handling first if that consequence is unacceptable.
- Example: if the manager says the 22 kV span of D4 feeds a hospital, CoF rises from 4 to 5, risk becomes 3 x 5 = 15, and D4 moves to P1 with the due date cut from 30 to 7 days. A strong answer records who gave the information and when.
- SHA-256 confirms the file has not changed since the manifest was made, so the images in the report can be traced to the ones captured, but it does not prove the conclusions drawn from them are right, nor that they were taken in suitable conditions.
- Re-inspection confirms the repair worked and closes the job with evidence; without it a closed job may still be faulty. It leads back to the inspect step of the loop (inspect, analyse and rank, report, work order, repair and re-inspect), the core of an asset management system under ISO 55001.
Discussion questions
- If the asset owner asks to use ICAO's example risk matrix exactly as printed, how should the team explain the issue?
- Which information in the report can the repair team not do without, and what happens on the repair day if it is missing?
- Who should score CoF, the drone inspection team or the owner's engineering team, and why?
Adapting to student background
- Upper secondary (M.6)
- Have them explain in their own words how flight risk differs from asset risk, and write a full-sentence reason for every score.
- Vocational certificate
- Start by walking the training site or viewing its photos and pointing out hazards before scoring, using a spreadsheet form with the multiplication and band colours built in.
- Diploma
- Extension: build a CMMS import file with every field the lesson lists, generate the manifest with a script, and re-verify that the SHA-256 values match.
Scoring rubric
For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.
| Criterion | Weight | Excellent (4) | Good (3) | Fair (2) | Needs work (1) |
|---|---|---|---|---|---|
| Safe inspection planning and execution | 30% | Plan tied to the owner's decisions; correct GSD, shutter and stand-off; all flight conditions met | Nearly all correct | Some conditions or values missing | No plan or unsafe flying |
| Data quality and anomaly analysis | 30% | Complete data with conditions, criteria set in advance, confirmed with other data, correct metrics | Nearly complete | Some confirmation or metrics missing | Conclusions from images without evidence |
| Maintenance recommendations | 20% | Ranked by PoF and CoF with reasons; report ready to raise work orders | Usable with minor edits | Missing information the operator needs | Not usable |
| Lab notebook and communication | 20% | Complete weekly entries, traceable, observations clearly separated from assumptions | Nearly complete | Several weeks missing or hard to read | No notebook |
Assessment map: CLOs and how they are assessed Draft
The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.