UAT 364 Unmanned Aircraft Systems Technology for Public Safety and Emergency Management
Worksheet 1 Preparing a disaster drone team
Objective
Place the drone team in ICS, plan resources for continuous overwatch and check the readiness of baseline data
Equipment and materials
- Lab drones and batteries (for their specifications)
- Baseline data of an area near campus
- Python and example code at /downloads/uat-364/
- Two computers and removable storage
Safety
- Desk work only; no flying
- Inspect batteries visually only; never charge unattended
Steps
- Draw the ICS chart for a mock incident with drone team, tasking authority and data recipients
- Plan 4 hours of continuous overwatch with Example 1, including backup power
- Gather baseline data near campus and check it with Example 2
- List equipment and the owner of each item
- Drill file transfer to a peer with the internet off; record what is missing
Record of results
| Position or section | Agency or person | Tasks the drone team or receives its data | Contact channel |
|---|---|---|---|
| Quantity | Formula used | Inputs (with units) | Result |
|---|---|---|---|
| Layer | Data date | Coordinate system (EPSG) | Age (days) | Result and action |
|---|---|---|---|---|
Questions
With only one drone, how many minutes in your 4-hour overwatch plan have no drone in the air? Use the flight and swap times in Table 2, then explain why two aircraft must alternate.
If the flooded area has no mains power and charging from a generator slows to 90 minutes, how many batteries per aircraft slot and in total for two aircraft do you need? Can your backup power plan cope?
From Table 3, which layers can be used at once, which need a coordinate transformation or a field check first, and how could a very old building layer lead the command post to a wrong decision?
In your ICS chart, who tasks the drone team and who receives its data? What can go wrong if the team flies on its own without the command post, and does an emergency remove the need for flight permission?
Check before you hand in
What to hand in
- ICS chart
- Battery rotation and backup power plan
- Baseline data check
- Equipment list and gaps from the transfer drill