Teaching pack · UAT 364
A 15-week teaching plan, 5 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.
Coverage of the course description
The lessons fully teach 10 of 10 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.
| Description topic | Modules | Where it is taught | Status |
|---|---|---|---|
| Surveillance operations | M1 | Module 1: Drone roles across the disaster timeline and Resources for continuous missions (Example 1 batteries for 4 hours of overwatch) | Covered |
| Search and rescue | M2 | Module 2: Search patterns, Coverage and probability of detection and POS and updating POC | Covered |
| Rapid mapping | M3 | Module 3: Rapid mapping versus full mapping and Coverage, age and completeness are different questions | Covered |
| Damage assessment | M3 | Module 3: Analysing flooded area (Example 1 affected houses from a grid), Training datasets and AI, and Building damage grades (FEMA four-level criteria by waterline, the xBD and RescueNet scales for top-view images, oblique images; Example 3 grading buildings from oblique drone images) | Covered |
| Emergency support | M4 | Module 4: Delivering emergency equipment (Example 2 drone versus ambulance arrival time) | Covered |
| Use of visual and thermal cameras | M2 | Module 2: Setting up visual and thermal cameras (GSD, Johnson criteria, timing and temperature difference, High/Low Gain, palette, FFC, shutter speed; Example 3 search altitude, blur and thermal contrast) and Reading images in search work | Covered |
| Search-area segmentation | M2 | Module 2: POS and updating POC (Example 2 area A searched without success) and splitting the training area into three in the lab | Covered |
| Real-time data transmission | M1M4M5 | Module 4: Live video and data links (the link chain, bit rate, latency, reliability, 3GPP TS 22.125 figures; Example 3 fitting live video into a field uplink) and confirmation of receipt · Module 1: offline file transfer drill in the lab · Module 5: Item status | Covered |
| Coordination with ground units | M1M4M5 | Module 1: The incident command system · Module 4: Mission requests and roles and Separating drones from other aircraft · Module 5: Three data versions | Covered |
| Risk management in emergency situations | M1M4M5 | Module 1: Law and data protection · Module 4: Site assessment and stop conditions · Module 5: Drills and indicators and Logs and after-action review | Covered |
Weekly teaching plan
| Week | Topic | Pre-class | Lecture | Lab | Evidence |
|---|---|---|---|---|---|
| 1 M1 | Drone roles across the disaster timeline and the incident command system | Read module 1 up to 'The incident command system' | Before, during and after a disaster; where the drone team sits in ICS | Worksheet 1 part A: draw the ICS chart for a mock incident with the drone team, tasking authority and data recipients | Lab notebook: ICS chart |
| 2 M1 | Resources for continuous missions | Read the resources section; run Example 1 | Battery count, charge cycles and backup power for 4 hours of overwatch | Worksheet 1 part B: plan 4 hours of continuous overwatch with the lab's drones and batteries; list equipment and owners | Lab notebook: battery rotation plan and equipment list |
| 3 M1 | Preparing data and the team; law and data protection | Read the last two sections; run Example 2; take the module 1 quiz | Age and coordinate system of baseline data; emergencies do not waive approvals automatically | Worksheet 1 part C: check baseline data near campus with the code; drill file transfer with the internet off | Lab notebook: baseline check and list of gaps; quiz result |
| 4 M2 | Search patterns | Read module 2 'Search patterns' | Parallel track, expanding square, sector and creeping line, chosen from what is known about the missing person | Worksheet 2 part A: split the training-area map into three areas and estimate POC from mock information with reasons | Lab notebook: segmented map and POC values |
| 5 M2 | Coverage and probability of detection | Read the coverage section; run Example 1 | Sweep width W, track spacing and POD | Worksheet 2 part B: measure W of the lab camera on mock targets, choose track spacing and plan tracks in QGroundControl | Lab notebook: W, track spacing and flight plan file |
| 6 M2 | POS, updating POC and reading images | Read the POS, 'Setting up visual and thermal cameras' and image-reading sections; run Examples 2 and 3; take the module 2 quiz | Updating POC after an unsuccessful search; thermal hot spots that are not people | Worksheet 2 part C: simulate a failed search, update POC, choose the next area; two students read the practice images independently | Lab notebook: updated POC, false alarms and misses; quiz result |
| 7 M3 | Rapid mapping versus full mapping | Read the first two module 3 sections | Decision-makers' questions, data cut-off time and the Copernicus EMS mechanism | Worksheet 3 part A: take a mock request, write the questions the map must answer, then fly a quick image capture of the training area | Lab notebook: request, questions and flight log |
| 8 M3 | Analysing flooded area | Read the flood-analysis section; run Example 1 | Flooded area and affected houses from a grid; labelling every item's status | Worksheet 3 part B: make a quick mosaic, classify it into a grid and compute affected area and buildings | Lab notebook: mosaic, grid and results |
| 9 M3 | Coverage, age and completeness; AI training datasets | Read the coverage, age and completeness section, 'Training datasets and AI' and 'Building damage grades'; run Examples 2 and 3; take the module 3 quiz | Three map indicators; cautions when using AI for flood and damage classification | Worksheet 3 part C: report the map indicators, deliver the map with limitations and have the recipient point out unconfirmed areas | Lab notebook: situation map with indicators; quiz result |
| 10 M4 | Mission requests and roles | Read module 4 'Mission requests and roles' | The five roles and closing a mission with confirmation of receipt | Worksheet 4 part A: assign the five roles; write a mock mission request stating question, area, urgency, recipient and deliverable | Lab notebook: mission request |
| 11 M4 | Separating drones from other aircraft | Read the separation section; run Example 1 | Altitude and time blocks; checking overlap | Worksheet 4 part B: the coordinator assigns blocks to two teams and a helicopter and checks overlap with the code | Lab notebook: block table and check result |
| 12 M4 | Site assessment, stop conditions and emergency delivery | Read the site assessment, emergency equipment and 'Live video and data links' sections; run Examples 2 and 3; take the module 4 quiz | Risk chains, go or HOLD decisions and AED drone arrival time versus an ambulance | Worksheet 4 part C: the pilot assesses the site; inject an early helicopter arrival; the team applies stop conditions and closes the mission | Lab notebook: decision record and list of areas without data; quiz result |
| 13 M5 | Item status and three data versions | Read the first two module 5 sections; run Example 1 | Checking the incident list before handover; original, operational and public versions | Worksheet 5 part A: check the synthetic dataset with planted errors by code and by eye; prepare the three versions | Lab notebook: errors found and what was removed from the public version |
| 14 M5 | Drills, indicators and after-action review | Read the last two sections; run Example 2; take the module 5 quiz | The plan, drill, evaluate and improve cycle; incident logs | Worksheet 5 part B: run the full flood drill at least twice, hand over to the command post and time until the recipient confirms | Lab notebook: incident log, after-action review and drill summary; quiz result |
| 15 M5 | Practical examination | Review the whole lab notebook | Exam scenario briefing and criteria | Practical exam: take a mock incident request, plan a search or rapid map, fly the plan, hand over data with status and run an after-action review | Practical exam result and completed lab notebook, scored with the rubric |
Worksheets and instructor guide
One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.
1Worksheet 1 Preparing a disaster drone team
Analysis activity · About 12 h of class time · CLO1, CLO3
Objective: Place the drone team in ICS, plan resources for continuous overwatch and check the readiness of baseline data
Equipment
- Lab drones and batteries (for their specifications)
- Baseline data of an area near campus
- Python and example code at /downloads/uat-364/
- Two computers and removable storage
Safety
- Desk work only; no flying
- Inspect batteries visually only; never charge unattended
Steps
- Draw the ICS chart for a mock incident with drone team, tasking authority and data recipients
- Plan 4 hours of continuous overwatch with Example 1, including backup power
- Gather baseline data near campus and check it with Example 2
- List equipment and the owner of each item
- Drill file transfer to a peer with the internet off; record what is missing
Deliverables
- ICS chart
- Battery rotation and backup power plan
- Baseline data check
- Equipment list and gaps from the transfer drill
Checklist
- The ICS chart shows the Incident Commander and the four main sections, and marks the drone team, who tasks it and who receives its data
- Table 2 rounds up in the sortie and battery formulas, every value has a unit, and a backup power source for charging is named
- Every layer in Table 3 has a date, coordinate system and age in days, and each failing layer states the action needed
- Every item on the equipment list has an owner, and the gaps from the file transfer drill are written in the lab notebook
- The plan states that CAAT requirements must be checked and flights coordinated through the command post, even in an emergency
Instructor guide
Class timing
- Mock incident, objectives and desk-work safety briefing30 min
- Draw the ICS chart and fill in Table 1120 min
- Plan battery rotation and backup power with Example 1150 min
- Gather and check baseline data with Example 2180 min
- Equipment list and file transfer drill with the internet off200 min
- Wrap-up, questions and hand-in checklist40 min
Expected results
- Table 1: the Incident Commander and the Operations, Planning, Logistics and Finance/Administration sections. The lesson's example places the UAS unit under Operations (tasking) and sends data to the situation or GIS unit under Planning (recipient). Groups may arrange it differently if the tasking authority and the data recipient are clear and every row has a contact channel.
- Table 2 (if the lab uses the values of Example 1: 240 min mission, 25 min per battery, 5 min swap, 60 min charge): sorties ⌈240/25⌉ = 10, batteries per aircraft slot ⌈(25+5+60)/25⌉ = 4, plus 1 spare = 5, two aircraft alternating = 10 batteries with a charger that keeps up. If the lab drone's flight time differs, recompute with the real value. A backup power source, such as a generator or vehicle power, must be named.
- Table 3 (if the layers of Example 2 are used, with the event on 20 Sep 2026): village boundaries 322 days old, OK; buildings 1,225 days old, over a year, may miss new houses and need a field check; roads 82 days old, pass the age check but use EPSG:4326 unlike the others (EPSG:32647), so transform before overlaying; staging areas have no date or coordinate system and must not be used until checked. Real data near campus gives other numbers, but every row needs a date, coordinate system and age.
- With Example 1 values a single drone flies 25 min then stops 5 min each cycle, so in 240 min there are 8 battery swaps and 40 min with no drone in the air (about 83% of the time airborne). Two aircraft must alternate so one is up before the other lands. A strong answer notes that a gap may coincide with a rise in water level or someone needing help.
- 90 min charging: ⌈(25+5+90)/25⌉ = ⌈4.8⌉ = 5 batteries per slot, 6 with a spare, 12 for two aircraft. A strong answer checks that the backup power can charge several packs at once; if not, add batteries or chargers rather than shortening overwatch without telling the command post.
- Sample answer: village boundaries are usable at once; roads must be transformed from EPSG:4326 to EPSG:32647 before overlaying; the building layer, over three years old, needs a field check; staging areas need their date and coordinates checked first. A building layer missing new houses undercounts affected houses and may send too few boats or supplies.
- In most charts Operations tasks the team and the situation unit under Planning receives the data. Flying alone means images may never reach those who need them and the drone may block a rescue helicopter. An emergency does not automatically exempt the team from permission; CAAT requirements must be checked and the flight coordinated through the command post.
Discussion questions
- Why is training local people before a disaster, as in WFP's Mozambique example, as important as having drones?
- Where and in what form should baseline data be kept so that it still works when the internet and power are down?
- If several agencies send drone teams at once, which problems does the ICS chart help prevent?
Adapting to student background
- Upper secondary (M.6)
- Have them write the sortie and battery formulas by hand, predict the result before running the code and explain why we round up; pair them with a hands-on peer when reading real battery specifications.
- Vocational certificate
- Start by laying real batteries on the table in fly, swap and charge order and counting cycles on a paper timeline before filling in Table 2; check with a calculator alongside the code.
- Diploma
- Extension: build a minute-by-minute timeline for two aircraft and 10 batteries over 4 hours showing which pack is flying, charging or ready, and find how many charging bays are needed at once.
2Worksheet 2 Tabletop search planning
Lab · About 12 h of class time · CLO1, CLO2
Objective: Segment the search area, measure sweep width, choose spacing and patterns, update POC after a failed search and measure image-reading accuracy
Equipment
- Training-area map
- Lab camera and mock targets
- QGroundControl
- Practice image set for reading
- Python and the module 2 example code
Safety
- Measure W on the ground or fly within CAAT conditions in visual line of sight; keep people clear
- Use dummies or objects as targets, not outsiders
Steps
- Split the training map into three areas and estimate POC from the mock profile with reasons
- Measure the camera's W on mock targets in one condition and choose track spacing with Example 1
- Choose a search pattern for each area and plan tracks in QGroundControl
- Simulate an unsuccessful search, update POC with Example 2 and choose the next area
- Have two students read the practice images independently and count false alarms and misses
Deliverables
- Segmented map with POC
- W and track spacing
- Flight plan files for each area
- Updated POC and image-reading results
Checklist
- Every area in Table 1 has a POC with a reason, and POC adds up to 1.00 before and after the update
- Table 2 uses the W measured in the trial, not the image width, and every row has C, POD (%), track length (km) and time (min)
- There is a QGroundControl flight plan file for every area, stating the search pattern and track spacing
- Table 3 counts each reader's false alarms and misses separately against the lecturer's key
- The lab notebook records that W was measured on the ground or flown within CAAT conditions in visual line of sight, dummies were used as targets, and no coordinates or images of people were shared
Instructor guide
Class timing
- Mock missing-person brief, safety and flight conditions30 min
- Segment the area and estimate POC with reasons120 min
- Measure the camera's W on mock targets180 min
- Choose track spacing and plan tracks in QGroundControl150 min
- Simulate an unsuccessful search, update POC and read the practice images200 min
- Wrap-up, questions and hand-in checklist40 min
Expected results
- Table 1 (if the values of Example 2 are used: initial POC A 0.5, B 0.3, C 0.2, and A searched with C = 1 giving POD = 1 − e^(−1) = 0.632): POS of searching A = 0.316; updated POC A 0.269, B 0.439, C 0.292, summing to 1.00. Groups' POC values differ with the missing-person profile, but each needs a reason such as last known position, behaviour and terrain. Accept ±0.001 from rounding.
- Table 2 (if the values of Example 1 are used: 1,000 × 600 m area, W = 20 m, 5 m/s): S = 40 m gives C 0.5, POD 39%, 15 km, 50 min; S = 20 m gives C 1.0, POD 63%, 30 km, 100 min; S = 10 m gives C 2.0, POD 86%, 60 km, 200 min. The W measured in the lab depends on camera, target and conditions, so recompute with the measured value. Using the image width as W is wrong.
- Table 3: numbers depend on the image set the lecturer prepared; correct detections plus misses must equal the number of targets in the key. Typically the two readers disagree on some images, false alarms are often sun-warmed rocks or roofs, and misses are often under trees. A good record lists the image ID of every image where the readers disagree.
- With Example 1 values, going from 40 to 20 m adds 24 points of POD (39% to 63%) while time rises from 50 to 100 min, and from 20 to 10 m adds only 23 points (63% to 86%) while time rises to 200 min. Each halving gains less. A strong answer links this to POS = POC × POD: the same time may yield more total POS by searching another area with high POC.
- A's POC is multiplied by (1 − POD) and the other areas rise after normalising so the total is 1 again. In Example 2 B is highest (0.439), so B is searched next: searching B with C = 1 gives POS 0.277, more than 0.170 for searching A again. A strong answer uses the group's own numbers and explains why not to search the same place again.
- GSD = pH/f. Recognising a person needs about 7 pixels across 0.5 m, so the highest altitude is 0.5 × 0.0135 / (7 × 12×10⁻⁶) ≈ 80 m, with GSD 7.1 cm and swath 640 × 0.071 ≈ 46 m. At 60 m there are 9.4 pixels and a 34 m swath. The altitude must also stay within the permitted ceiling, and any detection must be confirmed with the zoom camera or a ground team. If the lab camera is another model, use its pixel pitch and focal length.
- A strong answer: false alarms show that a hot spot is not always a person, and misses show that not seen does not mean not there, especially under trees or roofs, so an area is never declared empty; suspected sightings go to a reviewer with image ID, time and location. In Example 3, at 09:00 a person is only 1 °C warmer than the ground and only 2 °C under 60% canopy, so they are easy to miss; fly at night or before sunrise (7 °C difference at 05:30).
Discussion questions
- How will the W measured in the lab with dummies differ from a real night search in riverside forest, and how should the plan be adjusted?
- If the missing person's relatives insist they are in an area already searched, how should the team use this to adjust POC without abandoning the calculation?
- Why must a suspected sighting go to a reviewer before a ground team is sent, and why must victims' coordinates never be published?
Adapting to student background
- Upper secondary (M.6)
- Have them prove that the updated POC still sums to 1 and sketch POD = 1 − e^(−C) before running the code, then take the field W measurement with a hands-on peer for practice.
- Vocational certificate
- Start with the hands-on W measurement, approaching the mock target and recording the distance at which it is seen, then fill in Table 2 row by row from a template with the formulas given; use a calculator for e^(−C) alongside the code.
- Diploma
- Extension: plan two patterns for the same area in QGroundControl (parallel track and expanding square), compare length, time and batteries, and set a shutter speed that keeps blur under one pixel.
3Worksheet 3 A situation map within one hour
Lab · About 12 h of class time · CLO2, CLO1
Objective: Produce a rapid map that answers the command post's questions within a time limit, with indicators and limitations
Equipment
- Lab mapping drone and batteries
- Mosaicking and GIS software
- Python and the module 3 example code
- Timer
Safety
- Fly within CAAT conditions in visual line of sight; keep people clear
- Time pressure is no reason to skip the pre-flight checklist
- Do not share images of homes or people in the area
Steps
- Take a mock request from the command post; write the map's questions and the data cut-off time
- Fly a quick capture of the training area, make a rough mosaic and classify it into a grid
- Compute affected area and buildings with Example 1 and label every item's status
- Report coverage, age and completeness with Example 2
- Deliver the map with limitations and have the recipient point out unconfirmed areas
Deliverables
- Request and map questions
- Situation map with item status
- Map indicator table
- Actual time against the one-hour target
Checklist
- Record 1 has the map's questions and the data cut-off time, and the map states the capture time
- Every item in Table 2 has a status, and no item from image classification is marked confirmed without a reviewer
- Table 3 reports coverage, data age and completeness separately with the missing items, and no-data areas are marked as no data, not left blank
- The pre-flight checklist is signed, and the actual time is recorded against the one-hour target
- No images of homes or people in the area have been shared outside the class
Instructor guide
Class timing
- Safety briefing and mock request from the command post60 min
- Pre-flight check and rapid capture (one-hour timer starts)180 min
- Rough mosaic and grid classification210 min
- Compute area, buildings and indicators with Examples 1 and 2120 min
- Deliver the map and have the recipient point out unconfirmed items100 min
- Wrap-up, questions and hand-in checklist50 min
Expected results
- Record 1: the questions must support decisions, such as which villages are surrounded by water, which roads are usable and where to send boats, with a clear cut-off time (for example 11:00) and the map's recipient. Writing only 'make a flood map' is incomplete.
- Table 2 (if the grid of Example 1 is used: 8 × 12 cells of 25 × 25 m): 35 of 96 cells flooded = 35 × 625 / 10,000 = 2.19 ha; 4 of 10 houses in flooded cells. Every item is pending until a ground team or more detailed images confirm it. A grid from the real training area gives other values, but every row needs a status and capture time.
- Table 3 (if the values of Example 2 are used): coverage (96 − 6)/96 = 93.8%, data age 07:40 to 11:10 = 3.5 h, completeness 3/5 = 60%, still missing road R12 and the pump station. Time row: 60 minutes or less meets the target; groups over the target must say why.
- A strong answer: 93.8% coverage sounds almost complete, but the data is 3.5 h old in a fast-rising flood and completeness is only 60%, so the status of road R12 and the pump station is unknown. Combining them into one number hides the missing items, so all three are reported separately with the missing list.
- Because the numbers come from image classification, not confirmation that a house is actually flooded; a ground team or more detailed images must confirm them, naming the reviewer and time. No-data areas must be clearly shown as 'no data', because a gap may be read as a safe area.
- A waterline of 0.5 m is above the 0.3 m outlets, so the grade is major. A raised house with water only under the floor is affected, because the waterline is measured from the living-space floor, not the ground. If the waterline cannot be seen the building stays pending for a field check and is never graded 'no damage'; only a collapse clearly visible from the air can be graded destroyed at once.
- Answers depend on the drill; mosaicking and classification usually take longest. A strong answer saves time in processing, for example by narrowing the area to the question, using a rough mosaic instead of a full one, or sending partial results with status first, never by skipping the pre-flight checklist.
Discussion questions
- When should the team request satellite images from Copernicus EMS or the International Charter instead of, or together with, drone images?
- If AI counts damaged houses much faster than people, how should the team use the result before specialists review it?
- Is a map 3.5 hours old still useful to the command post, and what must be added for it to be used safely?
Adapting to student background
- Upper secondary (M.6)
- Have them compute area and indicators by hand before running the code and write the damage criteria as a decision flowchart, then act as assistant pilot or observer for field practice.
- Vocational certificate
- Give them the pre-flight check and capture flight, then classify the grid on squared paper before using software; use a Table 3 template with the formulas filled in.
- Diploma
- Extension: capture oblique images of two or three buildings in the training area, read the mock waterlines the lecturer has marked, and grade them with the rules of Example 3.
4Worksheet 4 Tabletop mission coordination
Analysis activity · About 12 h of class time · CLO3, CLO1
Objective: Practise the five coordination roles, separate aircraft with altitude and time blocks, decide by stop conditions and close the mission properly
Equipment
- Mock incident map and five role cards
- Handheld radios or a class chat channel
- Python and the module 4 example code
Safety
- Tabletop exercise only; no flying
Steps
- Assign the five roles and write one mock mission request
- The coordinator assigns altitude and time blocks to two teams and a helicopter and checks them with Example 1
- The pilot assesses the site, writes the risk chain and decides go or HOLD with reasons
- Inject an early helicopter arrival; the team applies stop conditions and reports status
- Close with confirmation of receipt and a list of areas without data
Deliverables
- Mission request
- Block table and overlap check
- Go or HOLD decision record
- Mission close-out record
Checklist
- The mission request has the question, area, urgency, data recipient, deliverable format and stop conditions
- Table 2 checks every pair of aircraft, stating time overlap and vertical gap in ft against the 100 ft buffer, with the output of Example 1 attached
- The go or HOLD decision has a full risk chain: hazard, who is exposed, possible harm, control, owner and evidence of checking
- Table 3 logs the helicopter inject with its time, the decision and the status reported
- The close-out record has the time the recipient confirmed receipt and the list of areas still without data
Instructor guide
Class timing
- Mock incident briefing, assign five roles and write the mission request140 min
- Allocate altitude and time blocks and check them with Example 1150 min
- Site assessment, risk chains and the go or HOLD decision150 min
- Inject: early helicopter arrival and applying stop conditions120 min
- Mission close-out, confirmation of receipt, wrap-up and hand-in checklist160 min
Expected results
- Record 1: a good request states the question to be answered (for example which villages still have people on roofs), a clear area, the urgency, the data recipient by unit or name, the deliverable format (geotagged and timestamped images, a map or live video) and stop conditions agreed in advance, such as another aircraft entering the area, abnormal communications or weather departing from the plan.
- Table 2 (if the blocks of Example 1 are used: UAS-1 0-60 min at 0-300 ft, UAS-2 30-90 min at 200-400 ft, HELI 45-75 min at 500-1,000 ft, 100 ft buffer): UAS-1 and UAS-2 overlap in time and altitude, gap −100 ft, conflict; UAS-1 and HELI are 200 ft apart, ok; UAS-2 and HELI are exactly 100 ft apart, meeting the buffer. Two fixes checked with the code: start UAS-2 at minute 60 (no time overlap), or lower UAS-1's ceiling to 100 ft (100 ft below UAS-2). The real buffer must come from the coordinator and agency requirements.
- Table 3: at least the pre-flight decision (HOLD if the block has not yet been received from the coordinator), the inject (early helicopter: stop or descend and inform the coordinator) and the close-out, each row with time, reason and who was told. Example: if the helicopter enters from minute 20 and descends to 400 ft, Example 1 finds UAS-2 in conflict with a 0 ft gap and UAS-1 exactly 100 ft below.
- A strong answer says UAS-1 and UAS-2 conflict because they overlap in both dimensions at once (minutes 30-60 and 200-300 ft); overlap in only one dimension is not a conflict. Moving time delays the mission; moving altitude must watch the other pairs, for example raising UAS-2 brings it closer to the helicopter, so every pair is rechecked with the code after the fix.
- The stop condition is another aircraft entering the area: the team stops or lands, reports its status with the time to the coordinator and waits for a new block. Turning HOLD into go without confirmed information may cause a collision or block the helicopter route and halt life-saving work, a mistake the lesson warns about.
- Usable budget 10 × (1 − 0.3) = 7 Mbps, so one 720p stream (two would need 8 Mbps). A strong answer tells the command post honestly, offers the most important camera first, periodic stills from the second camera and full-quality recording on board for later handover, and warns that live video shows the past (a 2 s delay means a boat at 4 m/s has moved 8 m).
- A successful transfer does not mean the recipient opened or can use the data; receipt must be confirmed by the recipient. The list of areas without data tells the coordinator which parts were surveyed and which were not, so gaps are not read as safe areas and the next sortie can be planned.
Discussion questions
- How can a two-person team combine the five roles without losing the checking function?
- Drone AED delivery beats ambulances in many cases, but which conditions must hold for it to actually save a life?
- Why must live video of victims never be streamed on a public platform, even if it is convenient and free?
Adapting to student background
- Upper secondary (M.6)
- Have them write the overlap condition for two blocks as inequalities and check every pair by hand before running the code, then play the pilot role to practise deciding and radio communication.
- Vocational certificate
- Have them draw the blocks on time-altitude graph paper and see which boxes overlap before using the code, and give them the pilot or coordinator role with radio calls from the role card.
- Diploma
- Extension: use Example 3 to allocate three live cameras when the measured uplink drops from 12 to 8 Mbps, and propose a new priority order with reasons to the coordinator.
5Worksheet 5 A full flood incident drill
Analysis activity · About 12 h of class time · CLO3, CLO2
Objective: Check and hand over incident data with status, prepare three data versions, repeat the drill and review it with indicators
Equipment
- Synthetic dataset with errors planted by the lecturer
- Computer with a SHA-256 tool
- Python and the module 5 example code
- Timer and incident log form
Safety
- Mainly tabletop; any supporting flight must follow CAAT conditions in visual line of sight
- The public version must remove personal data and sensitive locations
Steps
- Check the synthetic dataset with Example 1 and by eye
- Prepare the three versions and record what was removed from the public one and why
- Hand over to the command post and time until the recipient confirms understanding
- Keep an incident log of faults and improvements, then run an after-action review
- Repeat at least twice and summarise the rounds with Example 2
Deliverables
- List of errors found
- Three data versions with a SHA-256 manifest
- Incident log and after-action review
- Drill indicator table for every round
Checklist
- Every error in Table 1 has an action of hold, downgrade or ask the source, and no item has been filled in or corrected by the team
- The public version has no faces, names, victims' locations or location metadata, and the reason for each removal is stated
- The original has a SHA-256 manifest, and the hashes were rechecked after copying and match
- Table 3 has at least two rounds, each with detection rate in percent, number missed and minutes until the recipient confirmed understanding
- Every improvement in the after-action review has an owner, review date and closing evidence, and none is written to find someone to blame
Instructor guide
Class timing
- Mock incident, data protection and drill rules briefing30 min
- Check the synthetic dataset with Example 1 and by eye150 min
- Prepare the three versions and the SHA-256 manifest150 min
- Hand over to the command post and time until the recipient confirms understanding90 min
- Event, defect and improvement logs and after-action review120 min
- Repeat rounds, summarise with Example 2, questions and hand-in checklist180 min
Expected results
- Table 1 (if the data of Example 1 is used): 4 problems in 5 IDs: EV02 duplicate ID, EV03 missing time, EV04 outside the incident area (latitude 41.055 outside 14.0-14.1), EV05 confirmed without reviewer. Actions: hold and ask the source; EV05 is downgraded to pending. The lecturer's dataset will have different errors, and some can only be found by eye, such as an image showing a face.
- Table 2: the original is complete, access-restricted and kept for later review with a SHA-256 manifest; the operational version holds only what the mission needs for responding units; the public version is an overview with personal data, faces, victims' locations, sensitive points and location metadata removed, with a reason for each removal.
- Table 3 (if results match Example 2, with 8 errors planted per round): D1 found 5 = 62.5%, missed 3, 52 min; D2 found 6 = 75%, missed 2, 41 min; D3 found 8 = 100%, missed 0, 33 min; time improved by 19 min (37%). Groups' results differ, but the rate must be found ÷ planted, and timing must run to confirmed understanding, not to pressing send.
- A strong answer uses the group's own numbers, for example detection rising from 62.5% to 100% and time falling from 52 to 33 min as in Example 2, names the error type most often missed (often something the code does not check, such as faces in images), links a checkable improvement such as adding a reviewer before sending to the better result, and separates behaviour that did not happen from a case with no chance to observe it.
- Hold the item and ask the source. Never correct a coordinate yourself even if digits look swapped: a wrong guess sends rescuers to the wrong place and makes the data look trustworthy without evidence. An item confirmed without a reviewer is downgraded to pending until a reviewer confirms it with a time.
- Images or metadata may still reveal location and identity, for example coordinates in image files, recognisable houses or faces, so removal or anonymisation must cover text, images and metadata. The SHA-256 manifest proves the original has not been changed since it was stored; recomputed hashes must match the manifest.
- As in Example 3, R2 was received but has been silent for 16 min and R3 was sent with no evidence of arrival for 20 min. Both stay 'awaiting acknowledgement' with an owner chasing them and cannot be closed. If a new revision is issued, earlier recipients are told and asked which version they opened. R1, acknowledged after 7 min, can be closed.
Discussion questions
- How does a blame-free after-action review make a team more willing to report its own mistakes?
- If a journalist asks for the team's drone images, which version should they get and what must be checked first?
- Why are the criteria in this drill exercises rather than a team certification standard?
Adapting to student background
- Upper secondary (M.6)
- Have them add one check rule to Example 1 (for example a time outside the incident window) and explain what SHA-256 proves and does not prove, then play the handover role that must explain the data to the recipient.
- Vocational certificate
- Have them check the data by eye with a printed checklist before running the code and compare what each method finds, and practise computing hashes of real files step by step with prepared commands.
- Diploma
- Extension: act as drill controller, prepare one inject with its delivery time, record whether it arrived before the decision time, and separate results the trainees had no chance to show from behaviour that did not happen.
Scoring rubric
For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.
| Criterion | Weight | Excellent (4) | Good (3) | Fair (2) | Needs work (1) |
|---|---|---|---|---|---|
| Quantitative emergency mission planning | 30% | POC, POD, track spacing, resources and map indicators computed correctly and used to decide | Nearly all correct | Some errors or results not used to decide | No calculation or badly wrong |
| Operational and flight performance | 25% | Executes to plan and time, flies safely within conditions, delivers before the cut-off | Good execution with minor delays or slips | Major delays or frequent help needed | Fails to execute or unsafe |
| Coordination and data handover | 25% | Request, roles, item status and three data versions complete; recipient confirms understanding | Nearly complete | Some status or confirmation missing | Data sent without status or confirmation |
| Safety, law and lab notebook | 20% | Applies stop conditions, protects personal data and keeps a complete weekly notebook with lessons learned | Nearly complete | Some points ignored or several weeks missing | Unsafe, privacy breached or no notebook |
Assessment map: CLOs and how they are assessed Draft
The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.