UAT 453 UAS for Infrastructure, Energy and Utility Inspection
Worksheet 11 Drafting a shutdown inspection plan
Objective
Rank assets by risk, choose methods that fit the shutdown, and list permits, hazards and controls
Equipment and materials
- 6–8 assets with repair history from the lecturer
- Computer with Python and example code at /downloads/uat-453/
- Layout of the fictional or partner plant
Safety
- Desk work only; no flying
- On a partner-plant visit, follow the plant's safety rules and wear the required PPE
- Never enter confined spaces
Steps
- Receive the asset list and repair history
- Score P and C with reasons
- Rank with the code in Example 1
- Choose a method per asset (drone, person, contact tool or mix)
- Compare time with the shutdown using Example 2
- List permits, area-specific hazards and controls
Record of results
| Asset | P (1-5) and reason | C (1-5) and reason | R = P × C | Band (high, medium, low) |
|---|---|---|---|---|
| Asset | Method (drone, person, contact tool, mix) | Days | Share of shutdown (%) | Person-days at height |
|---|---|---|---|---|
| Area or asset | Permit needed | Specific hazard | Control |
|---|---|---|---|
Questions
Which asset is likely to deteriorate yet sits in a medium or low band, why, and how should it be inspected?
Which number in Table 2 matters most in choosing a method: cost, time or person-days at height? Explain.
Which asset can a drone not fully inspect, and where did you plan people or contact tools?
When a drone goes into a confined space, which requirements of the B.E. 2562 confined-space regulation still apply?
Check before you hand in
What to hand in
- Asset score and ranking table
- Method and time table
- Permits, hazards and controls list
- Shutdown inspection plan