UAT 457 UAS for Transportation and Autonomous Delivery

Worksheet 4 Hand-off testing and mission tracking

Lab 6 hAssesses CLO2, CLO3

Objective

Test lowering or releasing goods in SITL and in the field, measure swing, tune touchdown confirmation and track a mission from logs

Equipment and materials

  • Computer with ArduPilot SITL
  • Training drone with a gripper or small winch
  • Dummy box and lines of two lengths
  • Tension sensor (if available) and a stopwatch

Safety

  • Fly within CAAT conditions in visual line of sight in a closed area; keep people clear
  • Lower from low height only; nobody under the box
  • Approach the box or drone only after it has disarmed

Steps

  1. Configure a winch or gripper in SITL, write a mission with DO_WINCH or DO_GRIPPER and record each step's time
  2. Lower the dummy box on two line lengths and time the swing against Example 2
  3. Log tension while lowering onto grass and concrete, then tune the threshold in Example 3
  4. Take positions from the log and compute cross-track error and arrival time with Example 4
  5. Write a chain-of-custody record for one box from packing to the recipient's confirmation

Record of results

Table 1 Measured versus calculated swing period
Line length (m)Time for 10 swings (s)Measured period (s)Calculated period 2π√(l/g) (s)Difference (%)
Table 2 Line tension and touchdown threshold
SurfaceBox weight (N)Threshold used (N and consecutive samples)Touchdown confirmed at (s)False release?
Table 3 Cross-track error from the log
Time (s)x (km)y (km)Along-track (km)Cross-track (m)Alert?

Questions

  1. How far did the measured period differ from the formula, what is the likely cause, and on a 40 m line how long must the box be left to settle?

  2. Why wait for several consecutive tension values below the threshold before releasing the hook, and how did grass and concrete differ?

  3. If the log shows a point outside the corridor that came back by itself, what must the operator do, and why must it still be logged and reported?

  4. In the chain-of-custody record, which event can close the delivery, and why can neither an acknowledgement nor adding every count report close it?

  5. Compare landing, winch lowering and parachute drop for the group's delivery point. Which suits it, and why?

Check before you hand in

What to hand in

  • SITL mission file and time table
  • Measured versus calculated swing periods
  • Tested tension threshold
  • Cross-track results, arrival time and chain-of-custody record

CLO2 Plan routes, pickup and delivery points and landing or hand-off methods, and track delivery missions safely. CLO3 Manage the fleet and assess the safety of the delivery system against the law and risk-assessment methods. (CLOs are a web-team draft; the course owner sets the final ones.)