Module 11/20 · Weeks 8 · 7 h

The disaster management cycle and UAS roles before, during and after disasters

UAT 460 UAS for Public Safety, Search and Rescue, and Emergency Management

About 85 minDraft, awaiting reviewLast updated 24 October 2026

Lesson

By the end of this module you will be able to

  1. Explain the disaster risk management cycle in the national disaster prevention and mitigation plan, the Disaster Prevention and Mitigation Act B.E. 2550 and the Sendai Framework, including the levels of disaster management and who commands
  2. Separate hazard, exposure, vulnerability and risk, and rank the villages that should be baseline-mapped first when the number of sorties is limited
  3. Match UAS missions and data products to the phases before, during and after a disaster, and check the CAAT flight conditions that must be prepared in advance
  4. Compute the time from a request to data in the decision-maker's hands, and compare the area a UAS can cover per sortie with the size of the hazard

Prerequisites: UAT 304 UAS Mission Planning and Autonomous Flight · UAT 401 UAS Regulations, Safety and Risk Management (recommended)

Why this matters

A disaster does not end when the water goes down, and a drone is not there only to take pictures on the day of the event. The team that performs well on the day the governor must decide which village gets boats first is usually the team that mapped the baseline before the rainy season, secured flight permission in advance, and knew what the decision-maker needed within how many hours. A team that starts thinking after the phone call usually arrives when the important decision has already been made. This course therefore starts from the big picture: the whole cycle of disaster management, what UAS can help with in each phase, what they cannot do, and what must be prepared first.

Modules 11–15 of this course use one fictional case: a major flood in Phuwari Province (fictional name) along the Sai Kham River (fictional name), a tributary that flows into the Chao Phraya River, followed by a landslide on the Huai Phai hillside road. Rain falls for three days (280 mm cumulative, assumed), the water level at the Tha Sa-at gauge rises above the bank, and riverside villages flood. The governor, acting as provincial director, opens the provincial incident command centre and asks the drone team that the university and volunteers set up under a memorandum of understanding (assumed) to support. Four days later the continuing rain brings down the slope beside the Huai Phai road (km 8), closing the road and cutting off the hill village. The timeline used across modules 11–15 is as follows.

DayEvent (assumed)Module
45 days beforeBaseline maps of the riskiest villages; flight permission requested in advance11
Day 1, 07:30Command centre asks for maps of three cut-off villages by 14:0012
Day 1, eveningThe mobile-phone tower at Ban Khok Sa-at is flooded; no communication14
Day 2Delivery of medicine and essentials; assessment of flooded homes13, 14
Day 4Landslide on the Huai Phai road, km 8, cutting off Ban Huai Phai12, 13
Days 5 to 30Slope monitoring, damage survey, data handover13, 15

All place names, figures and events in this course are fictional. The Python code can be downloaded from /downloads/uat-460/. Search for missing persons, public-safety incident management, emergency mission planning and thermal imaging are each taught separately (modules 6–10, 1–5 and 16–20 of this course, and UAT 455), so modules 11–15 concentrate on the disaster cycle and on the information products that decision-makers use.

Disasters, risk and the management cycle

The Disaster Prevention and Mitigation Act B.E. 2550 (2007), section 4, defines public disaster as fire, windstorm, flood, drought, epidemics of humans, animals and aquatic animals, pest outbreaks and any other harm affecting the public, whether natural, man-made, accidental or otherwise, that endangers the life or body of people or damages the property of the people or the state. The Act does not name landslides, but provincial contingency plans in practice treat floods and landslides together in one plan (Chai Nat Provincial Disaster Prevention and Mitigation Directorate, 2567 [2024]).

The Sendai Framework of the United Nations, which Thailand’s national plan 2564 to 2570 (2021 to 2027) cites, sets four priorities: first understanding disaster risk, second strengthening risk governance, third investing in risk reduction for resilience, and fourth enhancing preparedness for effective response and to “Build Back Better” in recovery (UNDRR, 2015). Priority 1 says risk must be understood in all its dimensions: exposure, vulnerability and the characteristics of the hazard. This is why risk is not a single number. A village that floods often but where every house has two storeys and a boat may be at less risk than a village that floods rarely but has several bedridden elderly residents.

The national plan (Department of Disaster Prevention and Mitigation [DDPM], 2564 [2021]) describes the disaster risk management cycle as a continuous closed loop that need not follow a fixed before-and-after order (non-linear), because hazards occur in ways that are hard to predict and rarely repeat. It consists of prevention and mitigation, preparedness, response and relief, and recovery; the phases may overlap, and their duration depends on the severity of the hazard. Our case confirms this: flood recovery is not finished when the landslide response begins on top of it, and slope monitoring, which is a prevention task, starts in the middle of it.

Five columns from left to right joined by arrows with a dashed line returning from the far right to the far left. Column 1, blue, prevention and mitigation: UAS tasks are baseline maps and risk-area monitoring, modules 2 and 3. Column 2, green, preparedness: drills and advance permits, module 1. Column 3, pink, response: rapid maps, communication, situation survey, modules 2, 4 and 5. Column 4, yellow, relief: light relief supplies and data handover, modules 4 and 5. Column 5, purple, recovery: damage assessment and recovery watch, module 3. Bars above group columns 1 and 2 as before the disaster, columns 3 and 4 as during, and column 5 as after.
Figure 1 The disaster risk management cycle and the UAS task in each part

Keep these apart: hazard, exposure, vulnerability, risk

  • Hazard is the phenomenon that can cause harm, such as water deeper than 0.5 m or a saturated slope.
  • Exposure is what lies in the hazard area, such as households, roads and schools.
  • Vulnerability is how likely those things are to be damaged or how hard they find it to cope, such as elderly residents, single-storey homes, no boat.
  • Risk combines the three. In this module a simple index is used for ranking; it is not a damage value.

Who commands and who needs the data

Good data answers the question of someone who has to decide, so you must first know who decides. The national plan divides disaster management levels into four. Level 1, a small disaster: the district director or local director controls and commands. Level 2, a medium disaster: the provincial director controls, commands and directs through the Provincial Disaster Prevention and Mitigation Directorate, and when a disaster is expected a provincial incident command centre is set up. Level 3, a large disaster: the National Disaster Prevention and Mitigation Commander. Level 4, an extremely severe disaster: the Prime Minister or a Deputy Prime Minister designated by the Prime Minister. The level depends on area, population, complexity and the resources available to the legally empowered official. The governor or provincial director chairs the provincial directorate. In our case the Phuwari flood is level 2.

The Chai Nat provincial flood and landslide contingency plan for 2567 (2024) is an example of a provincial plan that uses numbers as escalation triggers. It sets watch areas by the discharge of the Chao Phraya Dam: below 700 m³/s is normal; 700 to 1,500 m³/s is watch and warning; 1,500 to 2,200 m³/s is a level 1 disaster handled with the district or local contingency plan; 2,200 to 2,500 m³/s is level 2 using the provincial contingency plan; and above 2,500 m³/s is level 3 to 4 with a provincial forward command centre (Chai Nat Provincial Disaster Prevention and Mitigation Directorate, 2567 [2024]). The plan also divides operations into before, during and after the hazard, with annexes for the radio network and the resource list. The lesson for a drone team is that escalation triggers are numbers known in advance, so the team can tie its own readiness triggers to the same numbers, for example starting to prepare the kit when discharge enters the watch band, without waiting for an order.

The Disaster Prevention and Mitigation Act gives directors several powers relevant to our work. A local director may use the communication equipment of government and private bodies in the area and may order people to enter or leave an area (section 21). The provincial director may order agencies or persons to act or refrain for up to 24 hours, and the commander may extend that for up to 7 days (section 22). Most important for later modules, section 30 requires the director to survey the damage from the disaster, keep a list of affected people and damaged property as evidence, and issue a certificate to affected people so they can receive relief and recovery assistance. The official damage survey is therefore the director’s duty. Drone images make the survey faster and reach places that are hard to access, but they are not the legal survey and they are not the certificate.

UAS in each phase

The table below matches each phase of the cycle with the tasks UAS can perform and the data products decision-makers use. The national plan names UAS directly in two places: in promoting staff learning of new information systems such as GIS, satellite maps, drone control and artificial intelligence, and in the flood contingency guideline that tells agencies to request resources such as water-pushing machines, unmanned aircraft and military equipment, with a clear list of contact persons for each agency. The rest of the table is application that this course teaches.

PhaseUAS taskProduct for the decision-makerModule
Prevention and mitigationBaseline maps of risk areas; monitoring of slopes and river banksBaseline orthomosaic and DSM; change report12, 13
PreparednessDrills, data-transfer tests, advance flight permission, a list of teams and equipmentContact list and ready flight permissions11
ResponseRapid maps, flood extent, communication relay, situation surveyEvent-extent map; points to check12, 14, 15
ReliefDelivery of light essentials; passing data to the coordination centreHandover record and proof of receipt14, 15
RecoveryDamage assessment; monitoring of recovery and slopesDamage grades, soil volume, monitoring report13, 15

The table does not say UAS do everything best. For many tasks another tool is better: satellites give province-wide pictures, boats and trucks carry heavy loads, and ground inspectors confirm the soundness of buildings. UAS earn their place when the question is local, needs fine detail and must be answered fast.

Setting priorities before the disaster: which villages to baseline-map first

A baseline map is the imagery and elevation model of an area on a normal day, used to compare with imagery after the hazard. The reference product of the Copernicus Emergency Management Service follows the same idea: it gives knowledge of the territory and assets before the event when that information does not otherwise exist (European Commission, n.d.). The real problem is that the team has a limited number of sorties and must choose where to start.

Start by finding out how much one sortie can map. Use a 1-inch sensor 13.2 mm wide, an 8.8 mm lens and a flying height of 90 m, the maximum under the general CAAT conditions. The image width on the ground is 135 m; with 65% side overlap the line spacing is 47.25 m; the speed is 10 m/s, the usable time 25 minutes, and efficiency 80% because of turns and transit. The area per sortie is (the design is detailed in module 12).

Example 1 Six villages and a budget of six sorties

The command centre coordinator gives data for six at-risk villages (codes A to F, assumed values): the annual probability of flooding deeper than 0.5 m, the number of households in the risk zone, a vulnerability index from 0 to 1, and the area to be mapped. The team has a budget of six sorties this month and must choose the villages that cover the most risk.

import math
from itertools import combinations

# Area one sortie can map at 90 m AGL: swath x speed x time x efficiency (detailed design is in module 12)
SWATH_ACROSS = 13.2 / 8.8 * 90                      # m, 1-inch sensor, f = 8.8 mm
LINE_SPACING = SWATH_ACROSS * (1 - 0.65)            # m, 65% side overlap
SORTIE_AREA = 25 * 60 * 10 * 0.8 * LINE_SPACING     # m2: 25 min at 10 m/s, 80% efficiency
print(f"line spacing {LINE_SPACING:.2f} m, one sortie maps {SORTIE_AREA / 1e6:.3f} km2")

# code: (annual probability of flooding >= 0.5 m, households in the flood-prone zone, vulnerability 0-1, area km2) assumed
villages = {"A": (0.60, 320, 0.55, 1.1), "B": (0.45, 410, 0.40, 1.8), "C": (0.30, 150, 0.70, 0.6),
            "D": (0.50, 260, 0.35, 0.9), "E": (0.10, 140, 0.80, 0.5), "F": (0.70, 95, 0.65, 0.4)}
risk, cost = {}, {}
for k, (p, hh, vul, area) in villages.items():
    risk[k] = p * hh * vul                           # a ranking index, not a probability
    cost[k] = math.ceil(area * 1e6 / SORTIE_AREA)    # whole sorties
    print(f"{k}: risk index {risk[k]:6.2f}  sorties {cost[k]}  risk per sortie {risk[k] / cost[k]:5.2f}")

BUDGET = 6                                           # sorties available for baseline mapping this month (assumed)
best = max((c for r in range(len(villages) + 1) for c in combinations(villages, r)
            if sum(cost[k] for k in c) <= BUDGET), key=lambda c: sum(risk[k] for k in c))
print(f"budget {BUDGET} sorties -> map {', '.join(best)}: sorties {sum(cost[k] for k in best)}, "
      f"risk covered {sum(risk[k] for k in best):.1f} of {sum(risk.values()):.1f}")
line spacing 47.25 m, one sortie maps 0.567 km2
A: risk index 105.60  sorties 2  risk per sortie 52.80
B: risk index  73.80  sorties 4  risk per sortie 18.45
C: risk index  31.50  sorties 2  risk per sortie 15.75
D: risk index  45.50  sorties 2  risk per sortie 22.75
E: risk index  11.20  sorties 1  risk per sortie 11.20
F: risk index  43.23  sorties 1  risk per sortie 43.23
budget 6 sorties -> map A, D, E, F: sorties 6, risk covered 205.5 of 310.8

One sortie maps 0.567 km². Village B has the second-highest index (73.8), but its 1.8 km² needs four of the six sorties, which gives only 18.45 risk per sortie. Village F is small and vulnerable: one sortie buys 43.2. Trying every combination of villages whose sorties fit the budget (only combinations) gives A, D, E and F, using all six sorties and covering a risk index of 205.5 out of 310.8, or 66%. Village E is included because it needs one sortie and the remaining sorties cannot cover any other village. Remember also that Ban Huai Phai in the case, the hill village, ranks low, yet on day 4 its road really did fail. The index is only a priority for preparation, not a forecast, and it gives no reason to abandon low-scoring areas.

Horizontal bar chart of the risk index of six villages sorted from highest to lowest. A 105.6 with 2 sorties, green. B 73.8 with 4 sorties, grey. D 45.5 with 2 sorties, green. F 43.2 with 1 sortie, green. C 31.5 with 2 sorties, grey. E 11.2 with 1 sortie, green. Green marks the villages selected for baseline mapping within the six-sortie budget.
Figure 2 Risk index and sorties for the six villages

Flight rules and permissions to prepare in advance

A disaster does not automatically suspend the flight rules

The Ministry of Transport notification B.E. 2558 (2015) (MOT 2558) sets the general conditions for remotely controlled aircraft up to 25 kg: the operator must see the aircraft at all times, fly between sunrise and sunset, not exceed 90 m above ground, not fly over towns, villages, communities or gatherings of people, not fly within 9 km of an airport without permission, and keep a horizontal distance from uninvolved people, vehicles and structures (30 m under item 5 and 50 m under item 9 for the registrants that item covers). Therefore a mapping mission over a flooded village, or a flight at night, needs permission to operate differently from the conditions under the CAAT notification B.E. 2569 (2026) (in force from 17 May 2569 [2026]), which treats such operation as medium-risk (Specific Category). The applicant needs an operating privilege (valid four years, requiring completed training), a registered aircraft, and an application stating the purpose, dates, times, area, procedures, list of pilots and third-party liability insurance of at least 1 million baht per event. The CAAT Director General may grant permission per operation or for a period.

The last sentence of the box is the lesson of the preparedness phase. A team that obtains permission for a period, for defined areas, before the rainy season does not have to start from scratch on the day water reaches people’s homes. The Disaster Prevention and Mitigation Act gives directors power to command but does not replace the flight conditions set by CAAT. This course therefore adopts the safe working rule: comply with both until the competent authority confirms otherwise in writing, and have the team carry the permit during operations.

Data must arrive in time for the decision

Decision-makers always have a deadline. The command centre must decide which village gets boats first before the first boats leave in six hours. Correct data that arrives after the deadline does not help that decision, although it may still help the next one. The time from request to data in the decision-maker’s hands is the sum of four parts, : waiting for the aircraft or satellite, acquiring, processing and checking, and delivering.

The Sentinel-1 radar satellites image day and night and through cloud, and are used to monitor floods around the world. The ESA source states that one satellite has a 12-day repeat cycle, the pair has a 6-day exact repeat cycle, and the IW mode images a 250 km swath at 5 m × 20 m, and that the revisit rate at low latitudes such as the equator is significantly lower than at high latitudes (European Space Agency, n.d.). So a satellite offers very wide coverage but you must wait for the orbit, and you must check the actual acquisition schedule for the area rather than use 6 days as one value for everywhere. The Copernicus rapid mapping service describes itself as providing geospatial information “within hours or days” after an event (European Commission, n.d.), and its online situational report starts within 4 hours of the start of an activation. That is hours to days, not minutes.

Example 2 Who reaches the command centre within 6 hours

The command centre wants to know which village has the deepest water before the first boats leave in 6 hours. The flood across the province is about 96 km² (assumed). The time of each source is in minutes from the request and is entirely assumed, except the Sentinel-1 cycle, which comes from the source. The example also computes the effect of advance preparation, which shortens only the waiting part.

# minutes from the request (t = 0): wait for aircraft or satellite, acquire, process and check, deliver (all assumed)
FLOOD_KM2 = 96.0                                     # flood extent the command wants to know about (assumed)
sources = {
    "local UAS team":      dict(wait=90,   acquire=60, process=40,  deliver=20,  km2=2 * SORTIE_AREA / 1e6, gsd="2.5 cm"),
    "Sentinel-1 new pass": dict(wait=1800, acquire=1,  process=120, deliver=60,  km2=1e9,                   gsd="5 x 20 m"),
    "rapid-mapping service": dict(wait=240, acquire=30, process=480, deliver=120, km2=1e9,                   gsd="few m"),
}
DEADLINE = 6 * 60                                    # boats must be sent by t = 6 h
for name, s in sources.items():
    total = s["wait"] + s["acquire"] + s["process"] + s["deliver"]
    verdict = "in time" if total <= DEADLINE else f"late by {(total - DEADLINE) / 60:.1f} h"
    cover = min(1.0, s["km2"] / FLOOD_KM2)
    print(f"{name:<22} {total / 60:5.1f} h  {verdict:<13} covers {cover:6.1%} of the flood, detail {s['gsd']}")

# preparedness shortens only the waiting part: pre-approved permit, kit already packed, team on call
ready = dict(sources["local UAS team"], wait=30)
total_ready = ready["wait"] + ready["acquire"] + ready["process"] + ready["deliver"]
print(f"pre-positioned UAS team: {total_ready / 60:.1f} h, saves {90 - 30} min = {60 / DEADLINE:.0%} of the {DEADLINE // 60} h window")
local UAS team           3.5 h  in time       covers   1.2% of the flood, detail 2.5 cm
Sentinel-1 new pass     33.0 h  late by 27.0 h covers 100.0% of the flood, detail 5 x 20 m
rapid-mapping service   14.5 h  late by 8.5 h covers 100.0% of the flood, detail few m
pre-positioned UAS team: 2.5 h, saves 60 min = 17% of the 6 h window

No source is both fast and wide. The local drone team delivers in 3.5 hours, in time, but covers only 1.2% of the flood (two sorties give 1.13 km²) at 2.5 cm detail. Sentinel-1 covers the whole flood but waits 30 hours for the orbit as assumed, 33 hours in total, 27 hours late; and the rapid-mapping service, with 14.5 hours assumed, also misses the first decision. A good decision process therefore uses both, with different jobs: drones answer “which village goes first” within 6 hours, satellites answer “how wide is the flood and is it falling” the next day. And a team that prepared in advance and cut its waiting time from 90 to 30 minutes saves 60 minutes, or 17% of the 6-hour window, without buying any equipment.

Four horizontal bars each divided by colour into wait, acquire, process and check, and deliver. The pre-positioned UAS team totals 2.5 hours, the local UAS team 3.5 hours, the rapid-mapping service 14.5 hours and Sentinel-1 new pass 33.0 hours. A dashed pink line at 6 hours marks the decision deadline; only the first two bars end before it.
Figure 3 Time from request to delivery for three data sources

How much can a UAS cover

Example 2 shows that drones cover little. The next example turns that into numbers you can plan with. The team has three aircraft, each flying three sorties in daylight, nine sorties a day (assumed).

Example 3 How many sorties and how many days

Compare three scopes: the province-wide flood of 96 km², the three cut-off villages of 3.2 km², and the road-and-bridge corridor of 0.9 km², and see whether a permit to fly at 120 m would help.

SORTIES_PER_DAY = 9                                  # 3 aircraft x 3 sorties in daylight (assumed)
zones = {"whole flood": 96.0, "three isolated villages": 3.2, "road and bridge corridor": 0.9}
for name, km2 in zones.items():
    n = math.ceil(km2 * 1e6 / SORTIE_AREA)
    print(f"{name:<26} {km2:5.1f} km2 -> {n:3d} sorties, {n / SORTIES_PER_DAY:5.1f} days")
area_120 = SORTIE_AREA * 120 / 90                    # swath grows with height, so area per sortie grows in proportion
print(f"with a permit for 120 m: {area_120 / 1e6:.3f} km2 per sortie, whole flood {math.ceil(96e6 / area_120)} sorties")
whole flood                 96.0 km2 -> 170 sorties,  18.9 days
three isolated villages      3.2 km2 ->   6 sorties,   0.7 days
road and bridge corridor     0.9 km2 ->   2 sorties,   0.2 days
with a permit for 120 m: 0.756 km2 per sortie, whole flood 127 sorties

Mapping the whole provincial flood by drone would take 170 sorties, nearly 19 days, and by then the water would long since have fallen. Even with permission to fly at 120 m it would still take 127 sorties, because the area per sortie grows with height by only 33%. By contrast the three cut-off villages need only 6 sorties (0.7 days) and the road-and-bridge corridor only 2. The conclusion: use UAS only where the question is local and needs detail, and leave the overall picture of the flood to satellites and models. A real Thai example is GISTDA, which used the Sentinel-1A image of 24 November 2568 (2025) with a HAND model to estimate flood depth across Hat Yai District and passed the dataset to the principal disaster-management agencies (Geo-Informatics and Space Technology Development Agency, 2568 [2025]). A good drone team prepares to work alongside such products, not in competition with them.

Module lab

Lab: a readiness plan for a provincial drone team

  1. Choose a practice area with at least five villages or communities. Each group collects flood probability, number of households and vulnerability from open data (for example a repeat-flood map) or from local informants, then computes the index and ranks the villages with the code in Example 1.
  2. Change the budget to three values (for example 4, 6 and 10 sorties) and see how the selected set changes. Record which villages are chosen in every case and which only when the budget is high.
  3. Write a one-page mission request stating the decision-maker, the question to answer, the deadline, the area, the product to deliver and the list of flight permissions needed in advance (review the flight-rules box), then compute your own team’s with Example 2, timing the real kit set-up.
  4. Field (daytime, within visual line of sight, no higher than 90 m under the general CAAT conditions, at the distance from uninvolved people that the notification requires, with a safety officer): fly one mapping sortie of about 0.1 km² over the practice area, time it, and compare the real area per sortie with the formula. Explain the difference.

Common mistakes

Watch out

  • Starting from the drone instead of the decision-maker’s question, producing images nobody wants and that arrive too late.
  • Assuming a disaster waives the flight rules, then flying over villages without permission or asking for it only after the event.
  • Using the risk index as a forecast when it is only a priority, or using assumed numbers without checking the data.
  • Forgetting how little a UAS covers, then promising a province-wide map that needs hundreds of sorties.
  • Treating drone images as the section 30 damage survey when they are only supporting data for the director.

Summary

  • The disaster risk management cycle is an overlapping closed loop of prevention and mitigation, preparedness, response and relief, and recovery. There are four levels of disaster management, and at level 2 the decision-maker is the provincial director.
  • Risk comprises hazard, exposure and vulnerability. The simple index ranks the areas to baseline-map under a limited sortie budget, but it is not a forecast.
  • The general CAAT conditions do not exempt disaster missions. Flights over villages or at night need permission under the 2569 (2026) notification, which can be requested for a period in advance.
  • Data must reach the decision-maker before the deadline, . Preparedness cuts the waiting time; drones suit local questions, satellites suit the overview, and one UAS sortie maps only 0.567 km² at 90 m.

Self-check questions

  1. A village has an annual flood probability of 0.4, 200 households in the risk zone and a vulnerability index of 0.5. What is the risk index ?
  2. An area of 2.3 km² must be mapped with a drone that maps 0.567 km² per sortie. What is the minimum number of sorties?
  3. A drone team has a waiting time of 45 minutes, acquisition 60 minutes, processing 40 minutes and delivery 20 minutes. What is the total in hours, and how much time is left before a 6-hour deadline?
  4. Why might choosing villages only by risk index miss Ban Huai Phai in the case?
  5. Can drone images showing three hundred damaged homes replace the damage survey and the certificate for affected people under section 30? Why or why not?
Answers
  1. , rounded up to 5 sorties
  2. minutes, or 2.75 hours; minutes, or 3.25 hours, remain
  3. The index ranks by flood probability, households and vulnerability. Ban Huai Phai has low flood risk and so sits at the bottom, but it is exposed to landslides on its road, which this index does not consider. Either add other hazard types to the index or always keep a small, cheap baseline for such areas.
  4. No. Section 30 makes the director responsible for the survey, the list of affected people and property, and the certificate. Drone images show only what is visible from above, cannot identify owners and cannot judge internal soundness, so they are supporting data that lets officers inspect quickly and reach places that are hard to access.

Key formulas

Village risk index
Area mapped per sortie
Time from request to delivered data

Key references

  1. United Nations Office for Disaster Risk Reduction. (2015). Sendai framework for disaster risk reduction 2015–2030. link
  2. กรมป้องกันและบรรเทาสาธารณภัย. (2564). แผนการป้องกันและบรรเทาสาธารณภัยแห่งชาติ พ.ศ. 2564–2570. กระทรวงมหาดไทย. link
  3. พระราชบัญญัติป้องกันและบรรเทาสาธารณภัย พ.ศ. 2550. ราชกิจจานุเบกษา, 124(52 ก), 1–23. link
  4. กองอำนวยการป้องกันและบรรเทาสาธารณภัยจังหวัดชัยนาท. (2567). แผนเผชิญเหตุอุทกภัยและดินถล่ม จังหวัดชัยนาท ปี 2567. จังหวัดชัยนาท. link
  5. กระทรวงคมนาคม. (2558). ประกาศกระทรวงคมนาคม เรื่อง หลักเกณฑ์การขออนุญาตและเงื่อนไขในการบังคับหรือปล่อยอากาศยานซึ่งไม่มีนักบิน ประเภทอากาศยานที่ควบคุมการบินจากภายนอก พ.ศ. 2558. ราชกิจจานุเบกษา, 132(86 ง), 6–12. link
  6. สำนักงานการบินพลเรือนแห่งประเทศไทย. (2569). ประกาศ กพท. เรื่อง หลักเกณฑ์และวิธีการในการอนุญาตให้ผู้บังคับหรือปล่อยอากาศยานซึ่งไม่มีนักบิน ประเภทอากาศยานที่ควบคุมการบินจากภายนอก ที่มีน้ำหนักไม่เกิน 25 กิโลกรัม ปฏิบัติแตกต่างไปจากเงื่อนไขที่กำหนด พ.ศ. 2569 (มีผล 17 พฤษภาคม 2569). link
  7. European Space Agency. S1 mission. SentiWiki (Copernicus). link
  8. European Commission. Copernicus Emergency Management Service: Rapid mapping portfolio (first estimate, delineation and grading products). link

Further reading

Study the assigned knowledge units in advance, review media and take the module quiz

In class / field

Lab or field practice from worksheets with a safety checklist

Learning evidence: Checked worksheets and quiz results

Module quiz

This is a formative self-check, not a graded exam

Knowledge domain: Public safety and disasters