UAT 460 UAS for Public Safety, Search and Rescue, and Emergency Management

Worksheet 11 A readiness plan for a provincial drone team

Lab 3 hAssesses CLO7

Objective

Rank the areas to baseline-map under a sortie budget, compute your own team's time from request to data, and prepare a mission request with advance flight permissions

Equipment and materials

  • Repeat-flood data or informants for five communities in the practice area
  • Computer with Python and the example code at /downloads/uat-460/
  • Drone with a camera and a complete take-off kit
  • Stopwatch

Safety

  • Fly in daylight within visual line of sight under the general CAAT conditions, no higher than 90 m, at the distance from uninvolved people that the notification requires, with a safety officer
  • Check batteries and propellers before every flight
  • Use real community data only as far as necessary and do not publish names of people

Steps

  1. Collect flood probability, households, vulnerability and area for five communities
  2. Compute the area per sortie and the sorties for each community with Example 1, then rank with the index R
  3. Change the budget to 4, 6 and 10 sorties; record the communities chosen in every case and those chosen only at high budgets
  4. Write a one-page mission request stating the decision-maker, question, deadline, area, product and the flight permissions needed in advance
  5. Time the real kit set-up, compute your own T, then fly one sortie of about 0.1 km² and compare the area per sortie with the formula

Record of results

Table 1 Risk index and communities selected under three budgets
Communityp, N, vR = pNvSortiesSelected at budget 4 / 6 / 10
One-page mission request (decision-maker, question, deadline, area, product and flight permissions needed in advance)
Table 2 Team timing and area per sortie
StepMeasured time (min)Example 2 value (min)Notes

Questions

  1. Which communities were chosen under every budget and which only at a high budget, and why? What happened to a community with a high R that needs many sorties?

  2. Why is the index R = pNv only a preparation priority, not a forecast? How should a low-scoring community exposed to another hazard be handled?

  3. What was your team's T, which part was longest, and which part can advance preparation (permits, packed kit, an on-call roster) shorten?

  4. How far did your measured area per sortie differ from A = s_line v t η, and why? If the whole province has 96 km² of flooding, which part should the team take on and which should be left to satellites?

Check before you hand in

What to hand in

  • Risk-index table and the communities selected under three budgets
  • One-page mission request
  • Team timing table and the value of T
  • Conclusion on the difference between measured and formula area per sortie

CLO7 Explain the disaster risk management cycle and the roles of unmanned aircraft systems before, during and after disasters, and choose the missions and data that match the decisions of each phase. (CLOs are a web-team draft; the course owner sets the final ones.)

Instructors: answers and teaching notes for this worksheet are in the teaching pack