UAT 460 UAS for Public Safety, Search and Rescue, and Emergency Management
Worksheet 4 Tabletop incident command and data handover
Objective
Organise a command structure with a suitable span of control, receive and prioritise mission requests, fly them with airspace coordination, and hand over data with a SHA-256 manifest and custody record
Equipment and materials
- Role cards, the mission request form and an ICS 214-style activity log
- Radios or channels assigned by the communications plan
- A drone, batteries and ground station
- A computer with Python and hashlib, and a memory-card reader
Safety
- Fly within visual line of sight in daylight under CAAT conditions, in an area closed to the public, never over people
- Check batteries before flight, charge them in a fire-resistant box and keep an extinguisher at the launch point
- Separate the pilot, observer and data manager roles and use a stop-flying call everyone knows
- Data in the exercise are images of the field and assumed data and are not shared outside the class
Steps
- Take roles from the cards, draw the command chart and check span of control with the Example 1 code
- Receive the instructor's requests, read them back, prioritise with the Example 2 code and report expected delivery times
- Fly two requests on the closed field and stop at once when the instructor announces a simulated helicopter
- Copy files from the card and build a SHA-256 manifest and custody record
- Pass them to another team to check without explaining, find the file the instructor altered, and summarise requests that skipped the chain
Record of results
| Supervisor | Direct reports | Span of control | Branches needed? | After restructuring |
|---|---|---|---|---|
| Request | P = u × i | Team | Start to finish (min) | Latest start (min) | Through the chain? |
|---|---|---|---|---|---|
| File name | First 16 hash characters at collection | Hash at receipt | Match? | Action taken |
|---|---|---|---|---|
Questions
If the Operations Section Chief has nine direct reports and each branch should have no more than five units, how many branches are needed at least? How did your chart solve this?
In Table 2, how did the group order two requests with equal P, and how were requests that skipped the chain handled?
Did the receiving team find the altered file? What does a matching hash confirm, and what does it not confirm?
Recording a combined 30 Mb/s for 4 h produces how many GB, and why is scheduled deletion a personal-data safety measure rather than just saving space?
Check before you hand in
What to hand in
- Command chart with branches
- Task schedule and ICS 214-style activity log
- SHA-256 manifest and custody record
- The receiving team's check result