UAT 491 Unmanned Aircraft Systems and Automation Technology Capstone Project
Worksheet 2 Design review package
Objective
Write verifiable requirements, design the architecture and build image and power budgets from real manufacturer data
Equipment and materials
- Manuals and specifications of the chosen camera, battery and motors
- Diagramming tool
- Python and the module 2 example code
Safety
- Desk work only; no flying
Steps
- Write 8–12 requirements, check each against C1–C9 and state its verification method
- Draw the architecture as in Figure 1 and complete the interface table for every link
- Read a real camera specification; compute GSD and photo count as in Example 2
- Build the power budget as in Example 3 from manufacturer data, with stated margins
- Present to the advisor in week 6 and record the changes requested
Record of results
| ID | Single requirement (with number and unit) | C1-C9 characteristic once violated and the fix | Verification method (for example test or analysis) |
|---|---|---|---|
| Interface (from to) | Physical connection | Data or power carried | Rate or frequency (with unit) |
|---|---|---|---|
| Quantity | Formula and inputs (cite the specification source) | Result | Unit |
|---|---|---|---|
Questions
Pick your group's weakest first-draft requirement. Which C1-C9 characteristic (give the code) did it violate, how did you rewrite it so it has a number and can be verified, and where did that number come from (user or calculation)?
In Table 2, which link is the riskiest at integration in module 3, and why? Which item of data on that link (for example where the photo position comes from) would cause a late surprise if left undefined now?
Compare the calculated maximum stand-off distance with the distance your group chose. How many metres of margin remain, and what changes if the smallest blockage shrinks to 4 cm? Why must the distance be camera to gutter and not height above the ground?
From your power budget, does a single flight pass the 70% planning limit? If the companion computer is swapped for a board drawing more power (for example 30 W instead of 15 W), what happens to endurance and to requirements R2 and R3?
Check before you hand in
What to hand in
- Requirements table with verification methods
- Architecture diagram and interface table
- Image and power budgets
- Design review feedback record