Teaching pack · UAT 491

A 15-week teaching plan, 5 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.

Last updated: · 4(0-8-4) · Per week: lecture 0 h, lab 8 h, self-study 4 h; 120 contact hours per term

Coverage of the course description

The lessons fully teach 9 of 9 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.

Description topicModulesWhere it is taughtStatus
Problem and requirement definitionM1M2Module 1: Good problems come from real users (Example 1 the current cost of gutter inspection) · Module 2: Good requirements, the INCOSE wayCovered
Review of relevant information and prior workM1Module 1: Review related work systematicallyCovered
Project proposal preparationM1Module 1: A scope you can finish in 15 weeks (Example 2 full versus reduced scope) and Review gates through the semesterCovered
System or prototype design and developmentM2M3Module 2: Hardware and software architecture, Image budget (GSD) and Power and endurance budget · Module 3: Working in sprints and Controlling code, parameters and models with GitCovered
Hardware–software integrationM3Module 3: The integration ladder and Electrical budget of the integrationCovered
Testing and evaluationM4Module 4: Design experiments instead of changing one factor at a time and Logging tests so they can be tracedCovered
Analysis of resultsM4M5Module 4: Comparing two options with a t-test (Example 1 2 × 2 factorial, Example 2 propeller A versus B) · Module 5: A model card for the detectorCovered
Technical documentation and report writingM5Module 5: Structure of the project report and A reproducibility package following FAIRCovered
Demonstration and presentationM5Module 5: Demo day: go or no-go and The presentationCovered

Weekly teaching plan

WeekTopicPre-classLectureLabEvidence
1 M1Good problems come from real usersRead module 1 up to 'Good problems come from real users'; run Example 1Within the 8 supervised hours · Within the 8 supervised hours · First advisor meeting: form the team, choose a problem area and book real usersSupervised 8 h: advisor meeting and team formation 1 h · prepare the interview guide and book users 2 h · Worksheet 1 part A, interview at least two real users 4 h · review notes with the advisor 1 h · Self-study 3 h: compute the current numbers as in Example 1 and write up the interview notesInterview notes and current numbers
2 M1Review related work systematicallyRead the related-work sectionWithin the 8 supervised hours · Within the 8 supervised hours · Advisor meeting: review the problem statement and sources foundSupervised 8 h: advisor meeting to review the problem statement 1 h · search and select literature in databases 3 h · Worksheet 1 part B, write a problem statement of at most three sentences and revise it from comments 2 h · build the literature table of at least six real sources 2 h · Self-study 4 h: read the selected sources, take notes and check the DOI or link of every sourceProblem statement and literature table with DOIs or links
3 M1A 15-week scope; proposal dueRead the scope and review-gate sections; run Example 2 using the weekly hours of the 4(0-8-4) credit pattern, which is 12 h (8 supervised and 4 self-study); take the module 1 quizWithin the 8 supervised hours · Within the 8 supervised hours · Gate 1 project proposal: the team presents to the advisorSupervised 8 h: Gate 1 proposal presentation to the advisor 1 h · Worksheet 1 part C, build the WBS 3 h · estimate hours against team hours and trim scope 2 h · write the one-page proposal with a weekly plan 2 h · Self-study 3 h: revise the proposal from the advisor's comments before submittingOne-page project proposal (due week 3) and quiz result
4 M2Good requirements, the INCOSE wayRead module 2 on requirements; run Example 1Within the 8 supervised hours · Within the 8 supervised hours · Advisor meeting: check requirements against characteristics C1–C9Supervised 8 h: advisor meeting to check requirements against C1–C9 1 h · Worksheet 2 part A, write 8–12 requirements 3 h · check each against C1–C9 2 h · state the verification method of each 2 h · Self-study 3 h: revise requirements from comments and finish the requirements tableRequirements table with verification methods
5 M2Architecture and image budgetRead the architecture and image-budget sections; run Example 2Within the 8 supervised hours · Within the 8 supervised hours · Advisor meeting: review the architecture diagram and interface tableSupervised 8 h: advisor meeting to review the architecture diagram 1 h · Worksheet 2 part B, draw the architecture as in Figure 1 3 h · complete the interface table for every link 2 h · read a real camera specification and compute GSD and photo count as in Example 2 2 h · Self-study 3 h: check the interface table and finish the image budgetArchitecture diagram, interface table and image budget
6 M2Power budget and design reviewRead the power-budget section; run Example 3; take the module 2 quizWithin the 8 supervised hours · Within the 8 supervised hours · Gate 2 design review: presentation to the advisorSupervised 8 h: Worksheet 2 part C, build the power budget as in Example 3 from manufacturer data 3 h · state the margins 1 h · assemble the design review package 3 h · Gate 2 presentation to the advisor and recording feedback 1 h · Self-study 3 h: revise the package from the feedbackDesign review package and feedback record; quiz result
7 M3Working in sprints and control with GitRead the first two module 3 sectionsWithin the 8 supervised hours · Within the 8 supervised hours · Advisor meeting: set up the backlog and branch and pull-request rulesSupervised 8 h: advisor meeting to set branch and pull-request rules 1 h · Worksheet 3 part A, create the backlog with points 2 h · set up the team repo and rules 2 h · start the first sprint and open the first pull request 3 h · Self-study 3 h: work on the sprint items takenBacklog and repo with the first pull request
8 M3Forecasting progress; the integration ladderRead the integration-ladder section; run Example 1Within the 8 supervised hours · Within the 8 supervised hours · Progress review: forecast after the first two sprints and trim scope if neededSupervised 8 h: progress review, forecast after the first two sprints as in Example 1 and trim scope if needed 1 h · Worksheet 3 part B, test the gutter mission in SITL 4 h · record pass criteria for each ladder step 1 h · work on the third sprint 2 h · Self-study 3 h: make the sprint velocity chart and work on sprint itemsSprint velocity chart and SITL step results
9 M3Electrical budget of the integrationRead the electrical-budget section; run Example 2; take the module 3 quizWithin the 8 supervised hours · Within the 8 supervised hours · Advisor meeting: check the electrical budget, main leads and the 5 V converterSupervised 8 h: advisor meeting to check the electrical budget, main leads and the 5 V converter 1 h · Worksheet 3 part C, check the electrical budget as in Example 2 with real parts 2 h · measure current with a power module on the bench with propellers removed 3 h · climb the bench steps 2 h · Self-study 3 h: make the table of the electrical budget against measurementsElectrical budget versus measurements; quiz result
10 M4Designing experimentsRead module 4 on experiment design; run Example 1Within the 8 supervised hours · Within the 8 supervised hours · Advisor meeting: choose two factors and a randomised 2 × 2 factorial planSupervised 8 h: advisor meeting to choose two factors and the 2 × 2 factorial plan 1 h · Worksheet 4 part A, write the test plan and randomise the flight order 2 h · test-flight risk assessment 2 h · prepare simulated blockages at known positions and climb to the free-flight step in the test area 3 h · Self-study 3 h: finish writing the test plan and risk assessmentTest plan and risk assessment
11 M4Test readiness and the flight campaignRead the test-logging section; review the free-flight criteriaWithin the 8 supervised hours · Within the 8 supervised hours · Gate 3 test readiness: integrated system, test plan and risk assessmentSupervised 8 h: Gate 3 test readiness 1 h · Worksheet 4 part B, fly the factorial plan and fill in a test card for every run 6 h · review logs after flight 1 h · Self-study 3 h: check the log of every flight and complete the test cardsTest-readiness gate result and test cards
12 M4Comparing two options with a t-testRead the t-test section; run Example 2; take the module 4 quizWithin the 8 supervised hours · Within the 8 supervised hours · Progress review: number of flights needed and results against requirementsSupervised 8 h: progress review 1 h · Worksheet 4 part C, compute the flights needed 1 h · fly to collect more data 3 h · compare two options with the Example 2 test 1 h · classify every requirement as passed, failed or inconclusive 2 h · Self-study 3 h: finish the results-against-requirements tableResults against requirements; quiz result
13 M5Report structure and reproducibility packageRead the first two module 5 sections; run Example 1Within the 8 supervised hours · Within the 8 supervised hours · Advisor meeting: check that every conclusion in the draft cites a test cardSupervised 8 h: advisor meeting to check the draft report 1 h · Worksheet 5 part A, write the report to the Figure 1 structure and link every conclusion to a test card 4 h · package the repo with README, licence and hashes 2 h · verify the hashes with Example 1 1 h · Self-study 4 h: continue the draft and proofread the citationsDraft report and hash check result
14 M5Model card and go or no-go criteriaRead the model-card and demo-day sections; run Example 2; take the module 5 quizWithin the 8 supervised hours · Within the 8 supervised hours · Advisor meeting: agree go or no-go criteria and rehearse the timed presentationSupervised 8 h: advisor meeting to agree go or no-go criteria 1 h · Worksheet 5 part B, write the model card by tested condition 2 h · check the criteria with Example 2 and prepare the backup video 2 h · draft the user manual 2 h · timed presentation rehearsal 1 h · Self-study 3 h: revise the final reportModel card, go or no-go criteria and quiz result
15 M5Demonstration and presentationCheck the demo criteria at both times of day; submit the final report and reproducibility packageWithin the 8 supervised hours · Within the 8 supervised hours · Gate 4 demonstration and presentation to the committeeSupervised 8 h: check the demo criteria at both times of day 1 h · demonstrate the system (or the backup video if go criteria fail) 2 h · Gate 4 presentation to the committee 2 h · hand over the manual and train the real users 2 h · submit the final report and reproducibility package 1 h · Self-study 2 h: prepare answers to the committee's questionsDeliverable, report and presentation, scored with the rubric and the committee's evaluation

Worksheets and instructor guide

One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.

1Worksheet 1 A one-page project proposal
Analysis activity · About 24 h of class time · CLO1

Objective: Define a problem from real users with numbers, review literature systematically and scope the work to finish in one term

Equipment

  • User interview guide
  • Literature databases and a reference manager
  • Python and example code at /downloads/uat-491/
  • One-page proposal template

Safety

  • Desk work and interviews only; no flying
  • Obtain consent before interviews and do not publish interviewees' personal data

Steps

  1. Interview at least two real users, record measurable current numbers and compute as in Example 1
  2. Write a who, what and why problem statement in at most three sentences
  3. Build a literature table of at least six real sources with DOIs or links
  4. Break the work into a WBS, estimate hours, compare with team hours using Example 2 with 12 h per person per week (8 supervised and 4 self-study under the 4(0-8-4) credit pattern) and trim scope to fit
  5. Submit the one-page proposal with a weekly plan to the advisor by week 3

Deliverables

  • Interview notes and current numbers
  • Literature table
  • WBS and hour calculation
  • One-page proposal with weekly plan

Checklist

  • Table 1 has at least 2 interviewees, every value has a unit and a date, and the yearly results can be recomputed as people × days × hours × rounds (Problem, requirements and design)
  • The problem statement has at most 3 sentences and gives who, what (with a number) and why (Problem, requirements and design)
  • Table 2 has at least 6 sources you opened yourself, each row has a DOI or link, and the last column states what is reused or the gap (Documentation, demonstration and presentation)
  • Table 3 shows H_need (with 20% contingency) not above H_team computed with 12 hours per person per week, and the test hours were not cut (Development, integration and project management)

Instructor guide

Class timing 1440 min

  1. Advisor meeting, briefing on consent and not publishing personal data, preparing the interview guide and booking users180 min
  2. Interview at least two real users, review the notes with the advisor and compute the current numbers as in Example 1300 min
  3. Search and select literature from databases, and check the problem statement with the advisor240 min
  4. Write the revised problem statement and build the literature matrix with DOIs or links240 min
  5. Gate 1 presentation to the advisor, WBS, hour estimates, comparison with team hours and scope trimming360 min
  6. Write the one-page proposal with a weekly plan and submit it to the advisor120 min

Expected results

  1. Record: Table 1 Current numbers from interviews with real usersTable 1: at least 2 interviewees in different roles, every value with unit and date, and yearly results that follow people × days × hours per day × rounds. With the lesson's values: the current method is 2 people × 3 days × 8 h × 4 rounds = 192 person-hours per year, all at height; lift hire is 2,500 × 3 × 4 = 30,000 baht per year. The drone estimate is 2 people × 4 h × 4 rounds = 32 person-hours per year and 1,000 × 4 = 4,000 baht per year, saving 160 hours and 26,000 baht. Groups' numbers will differ; they must be consistent and sourced.
  2. Record: Table 2 Literature matrix (at least 6 real sources)Table 2: at least 6 rows from several source groups (research papers, standards or regulator documents, product manuals, open-source projects, knowledge units in the drone knowledge base). Every row has a DOI or link the instructor can open. The last column must state what is reused, for example the same way of measuring, or the gap, for example no prior work on gutters, not just the word "good". Invented or unread sources fail the whole row.
  3. Record: Table 3 WBS hours compared with team hours (put H_need and H_team in the last rows)Table 3: with the lesson's WBS of 10 packages totalling 680 hours × 1.2 = 816 hours. Team hours are 3 × 15 × 12 × 0.85 = 459.0 hours, so the full scope is 357 hours over; the sum before contingency must be at most 459.0 / 1.2 = 382.5 hours, so at least 297.5 hours must go. After the lesson's cuts (ready-to-fly frame, existing survey mission, ready-made camera and driver, fine-tuned model, map and CSV export, document templates) 375 hours × 1.2 = 450 hours, 9 hours spare. The 90-hour test campaign must not be cut. Groups' tables will differ; require H_need not above H_team and a stated cut method in every row.
  4. Question 1: Using Table 1, compute the yearly person-hours and money spent by the current method, then pick one number as the success criterion for the demo day. Why must it be labelled an estimate from interviews?A strong answer uses a measurable current number that allows a before and after comparison, for example work at height 192 hours per year down to 0 and labour 192 down to 32 hours (the lesson's example numbers). It says the figure is an estimate from interviews, not a proven result, that module 4 must measure it, and who confirmed the current figure.
  5. Question 2: Compare your problem statement with a technology-first sentence such as "we want to build an AI drone to inspect roofs". Does yours state who, what and why, and what does it tell a reader that the technology sentence does not?A strong answer: the statement names who has the problem (building-services technicians), what can be measured (4 roof climbs a year, 192 hours) and why it matters (fall risk, lift hire). That lets the team set a success criterion and the user see the benefit. The technology sentence has no user, no number and no way to say when it has succeeded.
  6. Question 3: From Table 2, which source gave you a method to reuse and what gap will your project fill? What happens to the module 5 report if you cite a source you have not read yourself?A strong answer points to a real row of Table 2, for example reusing the way recall is measured in a roof-inspection paper, with the gap being no prior work on gutters. Citing a source you have not read can put a result in the report that does not exist or is out of context, cannot be checked, and damages trust in the whole report. The lesson says to keep the DOI or link from day one.
  7. Question 4: The team hours in this course use 12 hours per person per week from the 4(0-8-4) credit pattern. If the usable-time fraction u falls from 0.85 to 0.70 because waiting for parts and travel take more time than planned, how many team hours are left? Does your scope still fit, and if H_need exceeds H_team, which work did you cut and by which method?At u = 0.70 the team hours fall to 3 × 15 × 12 × 0.70 = 378.0 hours (459.0 at u = 0.85, a drop of 81.0 hours or 17.6%). The sum before contingency must be at most 378.0 / 1.2 = 315.0 hours, so the lesson's trimmed scope (375 hours, or 450 with contingency) is 72 hours over and at least 60 more hours must be cut before contingency, without cutting the 90-hour test campaign. At u = 0.85 the same scope still fits (9 hours spare). The team should therefore set u from its own real data and keep a contingency. A strong answer names the cut work and the method (buy not build, reuse, reduce output) with reasons.
  8. Question 5: Why did your group not cut the test campaign when time ran short? Answer by saying what the tests serve as evidence of in the proposal and in the final report.A strong answer: the tests are the evidence that the system meets the problem and the requirements; without them the committee cannot judge success, and every conclusion in the module 5 report must cite a test card. Cut other work first, for example buy a ready-to-fly frame instead of building one.

Discussion questions

  • If users have never recorded any numbers, how can the team find a baseline without inventing figures?
  • Does "buy not build" cheapen an undergraduate project? Which part is really the team's own contribution?
  • Is 20% time contingency too much or too little, and who should agree on it?

Adapting to student background

Upper secondary (M.6)
Have them write H_team and H_need symbolically before substituting, and predict how many hours the full scope exceeds. For the interviews, rehearse for 10 minutes with a classmate before meeting real users, and pair with a classmate who has worked in a technical or field job.
Vocational certificate
Give a spreadsheet template with H_team and H_need already built in. Start with a walk-through of the user's real work to collect numbers, and sort good and weak example problem statements before writing their own. Check arithmetic with a calculator alongside the spreadsheet.
Diploma
Extension: run a sensitivity analysis on the usable-time fraction u from 0.70 to 0.95 in Python. At 12 hours per week the team hours are 378.0, 432.0, 486.0 and 513.0 at u = 0.70, 0.80, 0.90 and 0.95, and the group states at which values of u its scope still fits.

Common student mistakes: Common mistakes in the module 1 lesson

2Worksheet 2 Design review package
Analysis activity · About 24 h of class time · CLO1, CLO2

Objective: Write verifiable requirements, design the architecture and build image and power budgets from real manufacturer data

Equipment

  • Manuals and specifications of the chosen camera, battery and motors
  • Diagramming tool
  • Python and the module 2 example code

Safety

  • Desk work only; no flying

Steps

  1. Write 8–12 requirements, check each against C1–C9 and state its verification method
  2. Draw the architecture as in Figure 1 and complete the interface table for every link
  3. Read a real camera specification; compute GSD and photo count as in Example 2
  4. Build the power budget as in Example 3 from manufacturer data, with stated margins
  5. Present to the advisor in week 6 and record the changes requested

Deliverables

  • Requirements table with verification methods
  • Architecture diagram and interface table
  • Image and power budgets
  • Design review feedback record

Checklist

  • Table 1 has 8-12 requirements, each single, with a number and unit, no vague words such as fast, good or accurate, and a verification method for each (Problem, requirements and design)
  • Table 2 has a row for every link in the architecture diagram, and the camera to companion rate matches the photo interval in Table 3 (Problem, requirements and design)
  • The image budget uses the real camera specification from the manufacturer's manual, cites it, and is computed from the camera to gutter distance, with units on every value (Problem, requirements and design)
  • The power budget states the usable battery fraction, flight and payload power, the 70% margin, and the decision on splitting flights with reasons (Problem, requirements and design)
  • The design review feedback record lists every requested change with owner and due date, and the package is one document with numbered figures and tables and cited sources (Documentation, demonstration and presentation)

Instructor guide

Class timing 1440 min

  1. Advisor meeting and writing the 8-12 requirements240 min
  2. Check each requirement against C1-C9 and state its verification method240 min
  3. Review the diagram with the advisor and draw the architecture as in Figure 1240 min
  4. Complete the interface table for every link and read the real camera specification to compute GSD and photo count240 min
  5. Build the power budget as in Example 3 with manufacturer data and state the margins240 min
  6. Assemble the design review package, present at Gate 2 and record the feedback240 min

Expected results

  1. Record: Table 1 System requirements and verification methods (8 to 12)Table 1: 8-12 requirements, each single, with a number, a unit and a verification method, with no vague words. Examples from the lesson: R1 detect blockages of at least 5 cm, at least 85% of 40 placed (test); R2 capture the gutters of 2 buildings in one flight (test); R3 planned flight time at most 70% of calculated endurance (analysis); R4 blockage position error at most 2 m (test). The first draft "inspect gutters quickly and accurately" violates C3 (ambiguous), C5 (two things in one statement) and C7 (no number to test).
  2. Record: Table 2 Interface table (every link in the architecture diagram)Table 2: one row per link in the diagram. Lesson examples: camera to companion over USB, 4000 × 3000 JPEG, one photo every 4.8 s · companion to flight controller over UART, MAVLink, 921,600 bit/s · flight controller to GCS over telemetry radio, MAVLink, 57,600 bit/s · companion to report as a CSV file plus detected photos after landing, and the GNSS and IMU links to the flight controller. The 4.8 s must match Table 3 (9.6 m ÷ 2 m/s).
  3. Record: Table 3 Image budget (GSD) and power and endurance budgetTable 3 with the lesson's example camera (sensor width 6.17 mm, lens 4.5 mm, 4000 px): required GSD ≤ 0.50 cm/px (5 cm ÷ 10 px), maximum distance ≈ 14.6 m. At 10 m: GSD 0.34 cm/px, footprint 13.7 m, 30% overlap gives a photo every 9.6 m, so 127 photos for 1,200 m of gutter, one every 4.8 s at 2 m/s. Power: 4S 5,000 mAh = 74.0 Wh, 80% usable = 59.2 Wh, power 170 + 15 = 185 W gives 19.2 min, 70% planning limit = 13.4 min; one flight over 4 buildings 14.0 min (73%, over the limit), two flights 7.5 min (39%, passes). With real parts the numbers differ, but formulas, units and sources must be complete. Accept rounding differences of 0.1.
  4. Question 1: Pick your group's weakest first-draft requirement. Which C1-C9 characteristic (give the code) did it violate, how did you rewrite it so it has a number and can be verified, and where did that number come from (user or calculation)?A strong answer names the real characteristic code. For example "the system shall fly autonomously and stream images in real time" violates C5 (two capabilities) and C3 (real time is ambiguous without an allowed latency). It is split into single statements with numbers, and the number's source (user or calculation) is stated rather than a made-up figure.
  5. Question 2: In Table 2, which link is the riskiest at integration in module 3, and why? Which item of data on that link (for example where the photo position comes from) would cause a late surprise if left undefined now?A strong answer names a specific link, such as the companion to flight controller link that must carry position and the camera trigger over MAVLink, or the 5 V supply and common ground for UART, and names the data to settle now, such as whether the photo position comes from the flight controller and who triggers the camera. The lesson says most integration errors occur on these links.
  6. Question 3: Compare the calculated maximum stand-off distance with the distance your group chose. How many metres of margin remain, and what changes if the smallest blockage shrinks to 4 cm? Why must the distance be camera to gutter and not height above the ground?With the lesson camera: maximum distance 14.6 m versus 10 m chosen leaves 4.6 m margin (about 46%), which covers position error. With a 4 cm blockage needing 10 pixels, GSD must be ≤ 0.40 cm/px and the maximum distance falls to ≈ 11.7 m, still above 10 m but with only 1.7 m of margin. The distance must be camera to gutter because GSD is the real size one pixel covers on the gutter; using height above ground gives the wrong value. A group with a real camera will get different numbers.
  7. Question 4: From your power budget, does a single flight pass the 70% planning limit? If the companion computer is swapped for a board drawing more power (for example 30 W instead of 15 W), what happens to endurance and to requirements R2 and R3?Following the example: a single flight takes 14.0 min, over the 13.4 min limit, so it is split into two flights and R2 becomes 2 buildings per flight. With a 30 W payload the total is 200 W and endurance is 17.76 min (≈ 17.8), the 70% limit ≈ 12.4 min, and a single flight of 14.0 min is 79% of endurance, still too long; two flights at 7.5 min are 42%, which passes. The decision is unchanged but the margin shrinks. A strong answer says to update the budget before buying the board and not to use 100% of the battery (that would give 24.0 min, too optimistic).

Discussion questions

  • Why write the verification method together with the requirement instead of waiting until testing?
  • When a budget margin is thin, should the team change the flight plan, change the battery or change the requirement? Who should decide?
  • Why does an interface table reduce integration problems, and which links are most often forgotten?

Adapting to student background

Upper secondary (M.6)
Have them derive the maximum distance from the GSD equation algebraically before substituting, and write units on every line. Pair with a hardware-confident classmate to read the real camera manual, and have them read requirements aloud one by one to spot ambiguous words.
Vocational certificate
Give a C1-C9 check card and a requirements table template with a notes column. Start by pointing to the camera specification fields needed (sensor width, focal length, pixel count), then fill the GSD formula into a prepared spreadsheet and check it with a calculator.
Diploma
Extension: compare three battery options from manufacturer data in the power budget (endurance, 70% limit and flights needed) and recommend one with its effect on R2 and R3, or update the interface table with the real ports and wiring of the group's hardware.

Common student mistakes: Common mistakes in the module 2 lesson

3Worksheet 3 Integrate step by step
Lab · About 24 h of class time · CLO2

Objective: Develop in sprints, version with Git and integrate hardware and software up the ladder to free flight

Equipment

  • Team repo on a Git service
  • ArduPilot SITL and a ground station
  • Real system parts and a power module
  • Multimeter
  • Approved test area

Safety

  • Remove propellers for every bench test
  • Check polarity and current before connecting a battery; charge LiPo in a fire-safe bag or box under supervision
  • Fly free-flight steps within CAAT conditions in visual line of sight in the test area; keep people clear

Steps

  1. Create a pointed backlog, record velocity every sprint, forecast as in Example 1 and trim scope when needed
  2. Set up the repo; use branches and pull requests every time; tag before each test flight
  3. Test the gutter mission in SITL and record pass criteria for each ladder step
  4. Check the electrical budget as in Example 2 with real parts and measure current with a power module
  5. Reach the free-flight step in the test area before week 11

Deliverables

  • Backlog and sprint velocity chart
  • Repo with pull-request history and tags
  • Integration ladder pass-criteria table
  • Electrical budget versus measurements

Checklist

  • Table 1 has the velocity of every finished sprint (points done, not planned), the forecast uses the slowest velocity, and the cut work is listed (Development, integration and project management)
  • The team repo shows branches and pull requests reviewed by a teammate before every merge, a tag for every version flown, and no passwords or keys in the repo (Development, integration and project management)
  • Every step in Table 2 has a measurable pass criterion, the previous step passed before the next, and evidence (tag, log file or photo) exists for each step (Testing and analysis)
  • Every value in Table 3 has a unit, shows the formula and inputs, states the measuring conditions (propellers removed or in flight) and explains the difference (Problem, requirements and design)
  • The bench-test record shows propellers removed every time, polarity checked before connecting the battery, and LiPo charging supervised, and permission to use the test area is on file before free flight (Development, integration and project management)

Instructor guide

Class timing 1440 min

  1. Advisor meeting, branch and pull-request rules, and setting up the backlog with point estimates180 min
  2. Create the team repo, start the first sprint and open the first pull request300 min
  3. Progress review, forecast as in Example 1 and trim scope, test the gutter mission in SITL and record pass criteria360 min
  4. Work the third sprint and draw the velocity chart120 min
  5. Meeting on the electrical budget, compute as in Example 2 with real parts, and measure current with a power module on the bench with propellers removed360 min
  6. Climb the bench step and plan the tethered and free-flight steps before week 11120 min

Expected results

  1. Record: Table 1 Sprint velocity and forecastTable 1: velocity is the points actually completed per sprint, and points left = previous value − points done. Lesson example: backlog 150, done 22 and 26, leaving 102; velocity 22-26 (average 24); 3 sprints left finish 66-78 points; at the average velocity 5 sprints are needed, so at least 36 points must be cut. Groups' numbers differ; require consistent arithmetic and the cut computed from the slowest velocity.
  2. Record: Table 2 Integration ladder and pass criteriaTable 2: the 5 steps are SITL, HITL, bench with propellers removed, tethered flight and free flight in the test area. Each has a measurable pass criterion, for example the gutter mission finishes all waypoints and the photo trigger is logged every 4.8 s (groups' values may differ). The previous step passes before the next. The tethered and free-flight steps may be completed in week 10 under the module 4 plan, but free flight must be reached before week 11. Evidence must be real (tag, log, photo).
  3. Record: Table 3 Electrical budget, calculated versus measuredTable 3 following the lesson example (12 AWG leads 15 cm each, 0.30 m total, 14.8 V): resistance 1.56 mΩ · hover 185 W ÷ 14.8 V = 12.5 A, drop 0.019 V, heat 0.24 W · full throttle 4 × 20 + 1.5 = 81.5 A, drop 0.127 V (0.86% of 14.8 V), heat 10.35 W · companion 5 V 3 A = 15 W through a 90% converter draws 16.7 W from the battery = 1.13 A. A bench measurement with propellers removed reads only the electronics, so it should not exceed about 1.13 A, because the calculation assumes a full 3 A load. Hover current must be read from the power-module log during real flight; if the group's parts are close to the example, expect about 10-15 A (±20% is this guide's screening band, not a standard). If parts differ, recompute with the group's own P ÷ V.
  4. Question 1: Use your group's sprint velocities to forecast the remaining sprints at the slowest and fastest velocity. How many points must be cut, which work was cut and why, and why use the slowest velocity as the basis?A strong answer: at the slowest velocity 22 × 3 = 66 points, at the fastest 26 × 3 = 78 points, with 102 left, so at least 102 − 66 = 36 points must be cut. Cut work from the end of the backlog (for example the interactive map display) and tell the advisor. The slowest velocity guards against optimism, which the lesson lists as a common mistake.
  5. Question 2: Pick one ladder step your group passed that still hides a problem the next step will find. Cite evidence from your logs, and explain why you do not jump straight to flying near real buildings.A strong answer uses the group's evidence. For example SITL passes the mission and photo trigger but does not use the real firmware and board configuration, so problems can still appear in HITL. The bench step finds motor direction, failsafe or UART communication problems, and the tethered step finds vibration and stability problems. Jumping to real buildings raises risk and makes causes impossible to find because everything is combined at once.
  6. Question 3: Compare calculated and measured current. Where does the difference come from (check whether you measured on the bench with propellers removed or in real flight), and how does it affect the endurance in the module 2 budget?A strong answer: on the bench with propellers removed the motors carry no load, so the measured current is far below the calculated hover value (12.5 A). Compare only the electronics with 1.13 A and compare hover current with the flight log. If real hover current is higher than calculated, endurance falls below the 19.2 min in the budget (module 2 example), so the budget and the 70% limit must be redone. Voltage drop in the leads is tiny (0.019-0.127 V) and not the main cause.
  7. Question 4: If someone asks which code and parameter versions flew in the first test flight, how does your group answer from the repo? Show the evidence, and say what is lost if you cannot answer.A strong answer: use the tag created before flight (for example flight-test-2026-10-14) recorded in the test log, then open that commit to see the code and parameter file. Without it, test results cannot be compared because nobody knows whether a difference came from code, parameters or the model.

Discussion questions

  • If the forecast says the work cannot be finished, whom should the team tell and when? Which work is cut first, and why?
  • Why is the rule that main must always run especially important in a project whose code actually flies?
  • If one ladder step fails in week 10, should the team skip it or fix it first, and what is at stake?

Adapting to student background

Upper secondary (M.6)
Have them explain with physics before measuring by predicting the voltage drop from R = ρL/A and ΔV = IR and comparing it with the measurement. Pair with a classmate who has trade experience for wiring and current measurement, while the M.6 student takes the roles of backlog writer and pull-request reviewer, under supervision.
Vocational certificate
Provide a bench-test check card (propellers removed, battery polarity, multimeter range) and a one-page summary of the five Git commands from the lesson (switch -c, add, commit, push, tag) to practise before the real work. For calculations, use a prepared spreadsheet and check with a calculator.
Diploma
Extension: write a script that reads current from the flight log after a real flight and compares it with the calculated 12.5 A, or add a HITL step with evidence to the pass-criteria table, and propose how to reduce the companion computer's draw if the endurance budget is tight.

Common student mistakes: Common mistakes in the module 3 lesson

4Worksheet 4 A test campaign
Lab · About 24 h of class time · CLO3

Objective: Design and fly a factorial test, compare options statistically and conclude against every requirement traceably

Equipment

  • Integrated system and spare batteries
  • Simulated blockages at known positions
  • Test cards
  • Python and the module 4 example code

Safety

  • Fly within CAAT conditions in visual line of sight, following the risk assessment approved at the test-readiness gate
  • Get the building owner's permission before flying near gutters; do not climb onto roofs
  • Do not capture people or neighbouring homes at identifiable detail

Steps

  1. Pick two factors expected to affect a key requirement; design a 2 × 2 factorial and randomise the flight order
  2. Place simulated blockages in the gutter, fly the plan and analyse as in Example 1
  3. Compute the flights needed before comparing two options, then test as in Example 2
  4. Fill in a test card for every run, keep the log files and review them after each flight
  5. Classify every requirement as passed, failed or inconclusive

Deliverables

  • Test plan with randomised order
  • Test cards and logs for every run
  • Factorial and t-test analysis
  • Results against requirements table

Checklist

  • Table 1 states how the order was randomised (for example drawing lots), every run has a test card number and log file name, and recall = found ÷ placed × 100 (Testing and analysis)
  • Every test card has the requirement verified, factor settings, software tag, parameter and model files with hashes, environment and recorder (Testing and analysis)
  • Main effects and interaction are in percentage points, and Table 2 gives the p value, Cohen d and the number of flights computed before flying (Testing and analysis)
  • The risk assessment passed at the test-readiness gate and the building owner's permission are on file before flying near gutters, and the images kept do not identify people or neighbouring homes (Development, integration and project management)
  • Table 3 covers every requirement from Worksheet 2, with evidence and a passed, failed or inconclusive verdict in each row and no blanks (Testing and analysis)

Instructor guide

Class timing 1440 min

  1. Advisor meeting, choosing two factors, and writing the test plan with a randomised flight order180 min
  2. Risk assessment of the test flights, preparing simulated blockages at known positions, and climbing to free flight in the test area300 min
  3. Gate 3 test readiness, then flying the factorial plan and filling in a test card for every run420 min
  4. Review the logs after flying and check the test cards60 min
  5. Progress review, computing the flights needed, flying more and running the Welch t-test as in Example 2360 min
  6. Conclude every requirement as passed, failed or inconclusive120 min

Expected results

  1. Record: Table 1 Randomised factorial plan and the result of each runTable 1: the order must be truly random and the method stated; every run has a card and a log; recall = found ÷ placed × 100. With the lesson's factors (6 m and 10 m, 1 m/s and 2 m/s, 40 blockages placed): found 37, 34, 33 and 24 give recall 92.5%, 85.0%, 82.5% and 60.0% (one item is 2.5 percentage points). The group's results will differ.
  2. Record: Table 2 Comparing two options with a Welch t-testTable 2 with the lesson's propeller data, 6 flights each: means 18.95 and 19.98 min (SD 0.29 and 0.32), difference 1.03 min, Welch t = 5.89, p = 0.00016, Cohen d = 3.4. The number of flights per group computed before flying (σ = 0.3 min, δ = 0.5 min, two-sided α = 0.05, power 80%) is 5.65, rounded up to 6. The group's data will differ; require the flights to be computed before flying, a Welch test, d, and the test conditions. If the lab has no second propeller, use any two options the advisor approves.
  3. Record: Table 3 Test results against every requirementTable 3: every requirement from Worksheet 2 must have a verdict with no blanks; an untested requirement is recorded as inconclusive. Example R1 (recall at least 85%) from the lesson: 6 m at 1 m/s gives 92.5% and clearly passes; 10 m at 1 m/s gives 85.0% (34 of 40), exactly on the threshold and inconclusive from one run because one more miss falls below it; 10 m at 2 m/s gives 60.0% and fails. The final verdict depends on which setting the group fixes as the system standard.
  4. Question 1: Compute the main effects and the interaction from Table 1 in percentage points and state their meaning in sentences. What does a negative interaction mean for your system, and which factor setting should the group choose?From the lesson's example: main effect of distance 6 → 10 m = −15.0 points, of speed 1 → 2 m/s = −17.5 points, interaction = −7.5 points. Meaning: both factors reduce recall, and the harm of moving away is larger when flying faster (motion blur and smaller targets at once, hence 60.0%). 6 m at 1 m/s clearly passes, but the module 2 budget must be revisited because flying slower doubles capture time and each photo covers less gutter, so more flights may be needed.
  5. Question 2: Which requirement is so close to its threshold that one run cannot decide it? How many more flights are needed, using the σ and δ your group chose, and why not conclude from a single flight?From the example: 10 m at 1 m/s gives 85.0% (34 of 40), exactly on the threshold, so it must be replicated. The number of flights comes from n = 2(z₁₋α/₂ + z₁₋β)²σ²/δ² with summed z = 2.80: σ = 0.3 and δ = 0.5 give 5.65, so 6 flights per group; σ = 0.4 gives 10.05, so 11 per group. Accept the group's σ and δ if justified. Do not conclude from one flight because results vary and this one sits at the threshold.
  6. Question 3: How did your group randomise the flight order, and what in the test cards or logs changed over time (wind, light, temperature, battery)? What would have happened if you had flown in the convenient order?A strong answer states a real randomisation method, such as drawing lots or a random number list, and cites what changed over time in the group's own cards: wind rising in the afternoon, light changes, a warmer battery. If all 6 m runs were flown in the morning and all 10 m runs in the afternoon, the effect of time would be mixed with the effect of distance and could not be separated.
  7. Question 4: What do the p value and Cohen d in Table 2 each tell you? If p is tiny but the difference is very small, how should it be reported, and which test conditions must be stated?The p value says the difference is unlikely to be chance; d says how big it is (Cohen: 0.2 small, 0.5 medium, 0.8 large; here d = 3.4, very large). If p is tiny (for example 0.001) but the difference is only 0.1 min, report that it is statistically significant but too small to matter in practice, and state the conditions such as temperature, wind and mission, because the result holds only in the range tested.

Discussion questions

  • Why does changing one factor at a time hide interactions? Which pair of factors in your system is likely to interact?
  • If a key requirement fails in week 12, how should the team report it honestly and still be useful to the user?
  • What conditions should stop a test flight even at the cost of losing a test slot, and who has the authority to decide?

Adapting to student background

Upper secondary (M.6)
Before flying, compute main effects and the interaction by hand from the end-of-lesson exercise (90, 80, 70, 60 gives A = −10, B = −20, AB = 0) and predict the real system. For placing blockages, cordoning the area and preparing batteries, pair with a classmate with field experience, with the M.6 student as data analyst.
Vocational certificate
Use pre-printed test cards and randomise by drawing numbered cards. Provide a spreadsheet with main-effect formulas built in. For the Welch t-test, run the example script with the group's data and read the output line by line with the teacher.
Diploma
Extension: replicate the factorial twice (8 runs in all), compare two settings with a Welch t-test and report Cohen d, and compute the flight count with σ estimated from the group's own data, or test the centre point at 8 m and 1.5 m/s.

Common student mistakes: Common mistakes in the module 4 lesson

5Worksheet 5 Hand over the project
Field/workplace · About 24 h of class time · CLO3

Objective: Write a report where every conclusion has evidence, package it reproducibly following FAIR, demonstrate safely, present and hand over to real users

Equipment

  • Team repo and all test results
  • Python and the module 5 example code
  • Demo-ready system and backup video
  • Report and slide templates

Safety

  • Fly the demo only if the agreed go criteria are met, within CAAT conditions in visual line of sight
  • Keep the audience outside the flight area; use the backup video if the criteria fail

Steps

  1. Write the report to the Figure 1 structure, with every conclusion citing a test card or table
  2. Package the repo with README, licence and hashes of key files; verify with Example 1
  3. Write the detector's model card, reporting results by tested condition
  4. Agree go or no-go criteria with the advisor, check them with Example 2, prepare a backup video and rehearse the timed talk
  5. Hand over the user manual and train the real users

Deliverables

  • Final project report
  • Reproducibility package with hashes
  • Model card
  • Slides, backup video and user manual

Checklist

  • Every conclusion in the report links to a test card or table (Table 1), failed or inconclusive requirements are reported and not hidden, and references follow APA 7 (Documentation, demonstration and presentation)
  • The repo has a README (install steps, software versions, how to run each analysis, and which script produced each figure or table), a licence, and Table 2 re-checked on hand-over day (Documentation, demonstration and presentation)
  • The model card reports recall by tested condition and states the intended use, training data and untested limits (Testing and analysis)
  • Go and no-go criteria were agreed in writing with the advisor before demo day, Table 3 was filled in with real readings and times, a backup video exists, and the audience stayed outside the flight area (Documentation, demonstration and presentation)
  • The report compares the final result with the current numbers from Worksheet 1, and there is evidence of the manual hand-over and training of real users (for example an attendance list or a note from the user) (Problem, requirements and design)

Instructor guide

Class timing 1440 min

  1. Advisor review of the draft and writing the report to the Figure 1 structure, linking every conclusion to evidence300 min
  2. Package the repo with README, licence and hashes, and verify hashes with Example 1180 min
  3. Agree the go and no-go criteria with the advisor and write the model card by condition180 min
  4. Check criteria with Example 2, prepare the backup video, draft the user manual and rehearse the timed talk300 min
  5. Check the criteria in two time slots and demonstrate the system, or use the backup video if criteria fail180 min
  6. Gate 4 presentation to the committee, manual hand-over and training of real users, and submitting the report and package300 min

Expected results

  1. Record: Table 1 Report conclusions traced to evidenceTable 1: at least one row per requirement, including failed or inconclusive ones, each with evidence that points to a real test card or table. A correct form: "the system meets requirement R1 (see test cards 1-4 and Table 5)". A conclusion without a number and conditions, such as "the system is highly accurate", fails.
  2. Record: Table 2 Reproducibility package files and hashesTable 2: lesson example data/test_runs.csv starts 2274ba858be1 and config/params.txt (content WP_SPD 2.0) starts 794daa5e3729. A SHA-256 is 64 hexadecimal characters (256 bits). After editing to WP_SPD 1.5 the checker must report that file as CHANGED. The group's hashes depend on its real files; the list should include raw data, parameter file, model file (name and hash), analysis scripts, README and the repo tag, recomputed on hand-over day, with any mismatch explained.
  3. Record: Table 3 Go or no-go check on demonstration dayTable 3: the criteria are the group's own, agreed in advance from the risk assessment. With the lesson's example criteria (wind at most 8 m/s, gust at most 10 m/s, no rain, every battery at least 95%, audience at least 30 m away, written site permission): 09:00 wind 4.2, gust 6.5, batteries 100% and 98%, audience 35 m = GO · 13:30 wind 7.1, gust 11.8, batteries 97% and 93%, audience 35 m = NO-GO (gust above 10 and one battery below 95%). Real readings and clock times must be entered, not filled in beforehand.
  4. Question 1: Pick one conclusion in the report. In how many steps can an outside reader find its evidence, where are failed or inconclusive requirements reported, and how does the report compare the final result with the current numbers from Worksheet 1?A strong answer picks one conclusion and reaches its test card within 1-2 steps through Table 1. Failed or inconclusive requirements appear in the results and their causes in the discussion (not hidden), and the final result is compared with the current numbers from Worksheet 1, such as hours of work at height per year, separating estimates from measured values.
  5. Question 2: If the hash of the parameter file no longer matches after the report, what does that mean, which test results can still be trusted, and how does the group find out what changed?A strong answer: the file was changed after the report (lesson example: WP_SPD 2.0 changed to 1.5), so the report's results cannot be reproduced until it is known what changed. Tests flown with the tagged version remain trustworthy if opening that tag's commit gives a file matching the old hash. The group finds what changed by comparing the current commit with the tag (for example git diff) and recording the reason.
  6. Question 3: Why must the model card report results by tested condition instead of one overall average, and which untested limits does your group's model card state?A strong answer: an overall average hides bad conditions. In the lesson, recall is 92.5% at 6 m and 1 m/s but 60.0% at 10 m and 2 m/s; the mean of the four settings is 80.0%, below the 85% criterion although some conditions pass clearly. Users need to know under which conditions it works. Untested limits in the example: wet gutters, strong shadows and different roof types; the intended use is to point to likely blockages for a technician to recheck, not to decide for the technician.
  7. Question 4: Apply your group's criteria to two time slots. Is each GO or NO-GO, and why? When the answer is NO-GO, why should the team not negotiate with the audience?With the example criteria: 09:00 = GO and 13:30 = NO-GO because gust 11.8 m/s exceeds 10 and one battery at 93% is below 95%. (End-of-lesson exercise: wind 6, gust 9.5, battery 96%, permission held, but audience at 25 m is closer than 30 m = NO-GO; move the audience and recheck, or use the video.) Do not negotiate: criteria are fixed in advance so decisions are not made under pressure or out of politeness to the audience. A demo is riskier than a test flight because people are nearby.
  8. Question 5: How did the timed rehearsal go? Does every number on the slides match the report? What could the real users not do during training, and how was the manual changed?A strong answer: rehearsed at least twice with a real timer. An example 15-minute split is 2, 3, 4, 4 and 2 minutes (problem and users, solution, demo or video, results against requirements, limits and next steps). In 12 minutes the same proportions give 1.6, 2.4, 3.2, 3.2 and 1.6 minutes. Every number on the slides matches the report, and the answer cites something real users could not do, with the resulting manual fix.

Discussion questions

  • When the audience wants to see a real flight but the criteria fail, what should the team do, and who has the authority to decide?
  • If the report shows a key requirement failed, how should the conclusion be written to be honest and still useful to the user?
  • After the team graduates, who maintains the system, and what must the reproducibility package and manual contain for the user to carry on?

Adapting to student background

Upper secondary (M.6)
Assign the role of report reviewer, checking that every conclusion points to real evidence, using the Figure 1 section template. For demo preparation and user training, pair with a classmate comfortable with fieldwork, and rehearse the timed talk before the real day.
Vocational certificate
Hold the go and no-go card and the pre-flight checklist during the demo, and lead the real-user training, which suits hands-on strengths. For the report, use sentence templates with blanks for numbers and test card references, and check hashes with a prepared example script.
Diploma
Extension: write a script that checks a manifest of hashes for the whole repo and write the go and no-go criteria as code like Example 2, then run it with real readings for both time slots, or act as reviewer of another group's model card.

Common student mistakes: Common mistakes in the module 5 lesson

Scoring rubric

For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.

CriterionWeightExcellent (4)Good (3)Fair (2)Needs work (1)
Problem, requirements and design25%Problem from real users with numbers, every requirement verifiable, design budgets with margins from manufacturer dataNearly complete, some requirements need minor reworkVague problem or requirements, incomplete budgetsNo measurable requirements
Development, integration and project management25%Climbs the integration ladder on plan, uses Git and sprints consistently, passes every gate on timePasses gates with minor delaysMajor delays or skipped integration stepsSystem not integrated or gates failed
Testing and analysis25%Sound randomised experiments, appropriate statistics and every requirement concluded with evidenceComplete tests, mostly analysedOne-factor-at-a-time or missing test cardsNo test evidence
Documentation, demonstration and presentation25%Every conclusion evidenced, package reproduces, demo safe and within criteria, clear talk on timeComplete with minor flawsKey parts missing or not reproducibleNot delivered or unsafe demo

Assessment map: CLOs and how they are assessed Draft

The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.

CLOWorksheetsModule quizzes
CLO1 Identify real problems and define system requirementsW 1W 2M1M2
CLO2 Design, develop and integrate a prototype systemW 2W 3M2M3
CLO3 Test, evaluate and present work ethicallyW 4W 5M4M5