Condition inspection and maintenance records
A good condition inspection record lets others know what was inspected, when, by what method and what was found. The absence of visible damage does not mean the aircraft is ready to fly; the manufacturer's checklist and criteria for that model must be used.
M01 · Exercise and case study
A good condition inspection record lets others know what was inspected, when, by what method and what was found. The absence of visible damage does not mean the aircraft is ready to fly; the manufacturer's checklist and criteria for that model must be used.
The PC worksheet is ready to use; the physical inspection checklist is awaiting the drone model, the OEM manual and a responsible instructor
Read the formulas, worked examples and additional exercises ↓
Before you start
Use a Windows or Linux computer, read CSV files with a spreadsheet program or text editor, and save your own work files separately from the originals. The basic Python set uses the standard library; the actual AI programs and simulators have separate installation steps.
By the end of this lesson
- Record condition, part numbers and history from evidence
- Separate defects that require withdrawal from use and refer them to the responsible person
Task and hands-on steps
The training equipment register for D-TRAIN-01 has an entry “inspected, normal” but no date, inspector or manual version. Another sheet notes an abnormality at a mounting point without a photo or part number.
Unzip the file and open M01-guide.md and M01-worksheet.csv . Keep assumptions and verified results separate. A blank in the worksheet means data must be collected, not that it has passed.
- Separate the aircraft serial number, equipment model and manual version from the symptom description
- Create a defect ID for each finding, marking it observed/unknown instead of guessing the cause
- Link findings to sections of the manual; if there is no manual, keep the status as awaiting inspection
- Refer items beyond your scope and name the responsible person; do not change the status to serviceable yourself
Deliverables and assessment criteria
Submit: inspection and defect log
Key criteria: model/part/time/inspector fully recorded; hold points from the task sheet and OEM must not be missed
Attach files that can be opened for review, the date, the data version and the reasons when no conclusion can yet be drawn. Completing the worksheet does not replace actual tests with models or equipment, or real skill assessment.
Open the model answer after completing the worksheet
Neither sheet is yet sufficient evidence to release the equipment back into service. Information must be added from real sources; do not retroactively create inspector names or inspection results that were not performed.
Instructor activity plan
The basic level practises recording from document cases; the advanced level checks consistency across several rounds and looks for recurring error patterns. Real stations use only manuals for models confirmed by the organiser.
Review question: Is this image sufficient to conclude that the condition is serviceable?
| Learning set | Explain | Practise | Assess | Including equipment stations |
|---|---|---|---|---|
| Maintenance technician, basic level | 180 min | 405 min | 135 min | 240 min |
| Maintenance technician, advanced level | 45 min | 105 min | 30 min | 60 min |
Equipment station time is part of the total time in the plan and is not added twice. Instructors keep PC results separate from observed tasks and have each learner explain their work individually before revealing the model answer.
See the full-track activity arrangement and basic extensions →Bibliography and scope of citations
Additional sources checked 9 September B.E. 2569 (2026). Fictitious cases, figures, worksheets and activity criteria newly compiled by PK-Research
- ArduPilot, Downloading and Analyzing Data Logs
Guidance on viewing logs; the CSV in the practice pack is fictitious data, not a DataFlash log
- NASA, Requirements Verification Matrix
Used to link requirements with inspection methods; the worksheets and figures in this lesson are our own design
Formulas and additional exercises · updated 2026-09-26
F38: count events and hours together before interpreting readiness
| Variable | Meaning and units, input → output | Range/source of values |
|---|---|---|
| N_events | Number of distinct events per the definition (input) | Integer ≥ 0; event log with the window closed |
| H_exposure | Observed system operating hours (input) | > 0; same fleet/asset definition and period as the events |
| H_up,H_down | Available/unavailable hours in the service window (input) | ≥ 0; non-overlapping, covering the whole window, and the sum > 0 |
| rate,A_obs | Observed rate 1/h and dimensionless availability (output) | rate ≥ 0; A_obs 0–1, multiply by 100 for % |
Basic level · Question: during the data collection period, how many events per hour occurred and what fraction of the time was the system available for service?
event_rate = N_events/H_exposure
A_observed = H_up/(H_up + H_down)
Before counting, define what an event is, e.g. one fault requiring a mission to be stopped. Multiple alarms from the same event do not automatically increase the count. State the asset, start and end times, how duplicate events are removed, and periods with missing logs. Separate operating exposure from the service window; uptime may include waiting time while available, so it need not equal system operating hours.
The availability example counts planned maintenance as downtime and assumes the status is known for every hour. If there are unknowns, the gap must be reported first rather than silently counted as up. NIST separates the event rate of repairable systems from the hazard of service life. This lesson reports observed proportions only; it does not fit a hazard and does not automatically call the reciprocal of the rate the MTBF.
Worked substitution example
One exposure account found 2 events in 100 operating h, giving rate = 2/100 = 0.02/h, or 2 events/100 h. A separate service window example of 100 h with 90 h up/10 h down gives A_obs = 90/(90+10) = 0.9 = 90%. The figures in the two accounts are for practising definitions and are not claimed to be the same real flight history.
Exercise: change the values
Change the number of events to 0 while keeping exposure at 100 h and the same availability account. How do you interpret the result?
Open the F38 answer
Observed rate = 0/100 = 0/h and A_obs = 90% unchanged; accept ±0.000001 per value. Observing no events in 100 h does not prove that the population risk is zero, and the MTBF should not be reported as infinite.
Reference: NIST/SEMATECH Engineering Statistics Handbook §8.1.2.1 (P3E10); checked 26 September B.E. 2569 (2026)
Download the engineering and sensor formula practice pack (CSV/JSON with answers) · Synthetic data for comparing answers and units