Energy and utility assets and risk ranking
UAT 453 UAS for Infrastructure, Energy and Utility Inspection
Lesson
By the end of this module you will be able to
- Describe the main assets of energy and utility systems and where drones help
- Rank assets by risk to set inspection intervals
- Compute conductor sag and explain its effect on vegetation clearance and flight planning
- Identify hazards specific to flying near high-voltage systems and pipelines
Why this matters
Energy and utility systems have assets spread over long distances and wide areas: tens of kilometres of transmission line, tens of thousands of solar panels, pipelines crossing farmland. Inspecting on foot or by helicopter is slow and costly, and some tasks require switching off power before climbing. Drones inspect faster and more often without stopping the system, but resources are limited, so you must know what to inspect first and how often.
Modules 6 to 10 of the course follow one fictional case through all of them: an energy company owns a 12 km 115 kV transmission line crossing farmland and a river, a 5 MWp solar farm, one wind turbine at a test site, and a raw-water pipeline, and wants a cost-effective, safe drone inspection plan. All figures are fictional. The Python code can be downloaded from /downloads/uat-453/.
Assets and what drones can inspect
| Asset | What to inspect | Main sensors |
|---|---|---|
| Lines and towers | Cracked insulators, missing pins, hot connectors, trees near conductors | Zoom camera, thermal camera, lidar |
| Substations | Unusually hot connections and equipment | Thermal camera |
| Solar farms | Hot modules, failed bypass diodes, cracked panels, soiling | Thermal camera, RGB camera |
| Wind turbines | Leading-edge erosion, cracks, lightning damage | High-resolution camera |
| Pipelines | Encroachment, subsidence, leaks | RGB camera, thermal camera, gas sensors |
Ranking by risk
Inspecting everything at the same interval is wasteful. Risk-based maintenance scores each asset by the likelihood of a problem and its consequence , then inspects high-risk assets more often.
Example 1 Inspection intervals for five assets
The scores and interval rules are the company’s assumptions (risk 12 or more every 6 months, 6–11 every 12 months, lower every 24 months).
assets = { # name: (likelihood 1-5, consequence 1-5, current interval in months)
"115 kV line, river crossing": (2, 5, 12),
"115 kV line, farmland": (3, 4, 12),
"solar farm inverter blocks": (3, 3, 6),
"wind turbine blades": (2, 4, 12),
"raw-water pipeline": (2, 3, 24),
}
for name, (p, c, months) in sorted(assets.items(), key=lambda kv: -kv[1][0] * kv[1][1]):
risk = p * c
plan = 6 if risk >= 12 else 12 if risk >= 6 else 24
print(f"{name:<28} risk {risk:>2} current {months:>2} mo -> suggested {plan:>2} mo")
115 kV line, farmland risk 12 current 12 mo -> suggested 6 mo
115 kV line, river crossing risk 10 current 12 mo -> suggested 12 mo
solar farm inverter blocks risk 9 current 6 mo -> suggested 12 mo
wind turbine blades risk 8 current 12 mo -> suggested 12 mo
raw-water pipeline risk 6 current 24 mo -> suggested 12 mo
The line section over farmland is riskiest, because of fast-growing trees and stubble burning near the conductors, so it should be inspected every 6 months. The solar inverters can move to 12 months, and the raw-water pipeline should tighten from 24 to 12 months. The table must be reviewed every year against actual defects found.
Conductor sag
A conductor between towers is not a straight line but hangs in a curve. The approximate mid-span sag (as a parabola, valid when sag is small compared with the span) is
where is conductor weight per length, the span and the horizontal tension. Sag grows when the conductor is hot, because it expands and tension falls, so hot days with high load are when conductors come closest to trees.
Example 2 Sag for three spans
The conductor weight and tension are assumed values.
W, T = 15.0, 25_000.0 # conductor weight per length (N/m) and horizontal tension (N), assumed
for span in (250, 300, 350): # span length (m)
sag = W * span ** 2 / (8 * T) # approximate parabolic sag
print(f"span {span} m: sag {sag:.2f} m")
span 250 m: sag 4.69 m
span 300 m: sag 6.75 m
span 350 m: sag 9.19 m
Sag grows with the square of the span: a 350 m span sags about 9.2 m, almost twice a 250 m span. For flight planning, remember the conductor is lowest at mid-span, not at the tower tops, and trees at mid-span are where clearance must be measured first.
Hazards specific to energy work
- Electric and magnetic fields near high-voltage lines may disturb the drone’s compass and communications; test safe distances first and keep the clearances set by the system owner
- Wire strikes: thin conductors, earth wires and guy wires are hard to see for both pilots and obstacle sensors
- A drone falling onto electrical equipment could cause a wide outage, so the consequence is far greater than in ordinary work
- Hazardous areas in gas or fuel systems may require equipment designed for flammable atmospheres and the site owner’s permission
- Coordination: work on electrical systems must be coordinated with the owner’s control centre and comply with the current CAAT notification
Module lab
Lab: a risk-based inspection plan
- Survey energy assets on campus, such as rooftop solar panels, transformers and distribution lines, listing at least five
- Score likelihood and consequence with facilities staff, and rank them and set intervals with the code in Example 1
- Measure or estimate one distribution span and compute its sag with the code in Example 2 using values your lecturer provides
- List the specific hazards of each asset and their controls
Common mistakes
Watch out
- Inspecting every asset at the same interval when risks differ greatly
- Keeping the same risk table forever, never updating it from defects actually found
- Assuming the conductor is at tower-top height, when it sags several metres at mid-span
- Approaching high-voltage lines without testing the effect on compass and communications
- Not coordinating with the owner’s control centre
Summary
- Drones inspect lines, substations, solar farms, wind turbines and pipelines without stopping the system
- Rank inspection by risk and review it every year
- Sag grows with the square of the span and when conductors are hot
- Energy work has specific hazards: electric fields, thin wires, system impact of a crash, and hazardous areas
Check your understanding
- An asset with likelihood 4 and consequence 3 has what risk score?
- With N/m, m and N, what is the sag?
- If the span doubles, how does sag change?
- Why is sag greater on hot days with high electrical load?
- Why is a drone falling onto electrical equipment a high risk?
Answers
- m
- It becomes four times larger
- The hot conductor expands and its tension falls, so it sags more
- It could cause a wide outage, harming the system and its users far more than in ordinary work
Key formulas
| Risk score | |
| Conductor sag (parabola) |
Key references
- Barnhart, R. K., Marshall, D. M., & Shappee, E. (Eds.). (2021). Introduction to unmanned aircraft systems (3rd ed.). CRC Press. link
- Vollmer, M., & Möllmann, K.-P. (2017). Infrared thermal imaging: Fundamentals, research and applications (2nd ed.). Wiley-VCH. link
- International Organization for Standardization. (2018). Occupational health and safety management systems — Requirements with guidance for use (ISO 45001:2018, with Amendment 1:2024, Climate action changes). link
- สำนักงานการบินพลเรือนแห่งประเทศไทย. (2569). ประกาศ กพท. เรื่อง หลักเกณฑ์และวิธีการในการอนุญาตให้ผู้บังคับหรือปล่อยอากาศยานซึ่งไม่มีนักบิน ประเภทอากาศยานที่ควบคุมการบินจากภายนอก ที่มีน้ำหนักไม่เกิน 25 กิโลกรัม ปฏิบัติแตกต่างไปจากเงื่อนไขที่กำหนด พ.ศ. 2569 (มีผล 17 พฤษภาคม 2569). link
Further reading
Study the assigned knowledge units in advance, review media and take the module quiz
In class / field
Lab or field practice from worksheets with a safety checklist
Learning evidence: Checked worksheets and quiz results