การตรวจสอบระบบพลังงานด้วยโดรน

Power lines, solar farms, wind turbines and pipelines

Last updated:

Why it matters

Energy assets stretch for kilometres or cover hundreds of rai, and many parts sit high up or close to high voltage. Traditional inspection means climbing towers, hiring helicopters or walking panel by panel, which is slow, costly and risky. Drones allow more frequent inspection without putting people near the hazard, and they record images that can be compared between inspection rounds. They do not replace every method, though. Some defects still need contact measurement or electrical testing.

Drone inspection of energy systems covers four main asset groups:

AssetWhat to look forMain sensors
Power lines and jointsHot joints, broken insulators, damaged conductors, vegetation near linesZoom camera, thermal camera, LiDAR
Solar farmsHot cells (hotspots), failed bypass diodes, dead strings, broken glassThermal camera, RGB camera
Wind turbinesLeading-edge erosion, lightning damage, surface cracksHigh-resolution camera
PipelinesGas leaks, ground subsidence, encroachment on the right of wayRGB camera, methane sensor, thermal camera

Thermal imaging on electrical equipment

Faulty electrical equipment usually heats up before it fails, because a loose or dirty joint has higher resistance and the heat produced is P = I2 R. A thermal camera measures infrared radiation from a surface, not temperature directly. The reading therefore depends on the surface emissivity. Shiny metal emits little and reflects a lot of heat from its surroundings, so it can look cool while hot, or hot because it reflects the sun.

A more reliable method than reading single temperatures is to compare similar components, for example the same joint on three phases carrying equal load, and look at the temperature difference (ΔT). ANSI/NETA gives guidance for ranking urgency by ΔT. Remember that ΔT depends on the current at the time of measurement. A faulty joint may look harmless at low load, so ask the operator for load data and plan flights for high-load periods.

Near high-voltage lines, the magnetic field from the current disturbs the drone's compass, and steel towers partly block GNSS. Keep to the distances set by the asset owner and be ready to fly manually if navigation misbehaves.

Solar farms

A defective PV module shows cells or areas warmer than the rest while the module is producing power. The technical specification IEC TS 62446-3 sets the conditions for outdoor thermographic inspection. The two that most affect flight planning are an in-plane irradiance of at least 600 W/m2 and a resolution of at least 5 × 5 pixels per cell. The latter sets the maximum flight height Hmax = GSDmax × f / p, where GSDmax is the cell width divided by 5, f the focal length and p the sensor pixel pitch. The camera should not look exactly perpendicular to the panels, to avoid seeing the reflection of the drone and the camera itself. RGB images help separate heat caused by dirt, bird droppings or shading from real cell damage.

Wind turbines and pipelines

Wind turbines are inspected with the rotor stopped and locked. The drone follows each blade on both sides looking for leading-edge erosion, lightning damage around the receptors, and cracks or delamination of the surface. Every image needs a position on the blade, such as distance from the root, so the repair team can find the defect and compare it year to year.

Pipelines run for tens or hundreds of kilometres. The main task is right-of-way patrol: excavation, encroaching structures, subsidence and signs of leaks. Gas leak detection needs dedicated sensors, such as laser sensors that measure methane absorption (TDLAS) or optical gas imaging cameras. The long distances favour fixed-wing or VTOL aircraft over multirotors and often require beyond-visual-line-of-sight flight, which needs case-by-case approval.

Example: planning a thermal survey of a 10-hectare solar block

Assume a 640 × 512 thermal camera with 12 µm pixels, a 9.1 mm lens and 182 mm wide cells.

  • GSDmax = 182 / 5 = 36.4 mm.
  • Hmax = 0.0364 × 0.0091 / 12 × 10-6 ≈ 27.6 m.
  • One image covers 640 × 0.0364 ≈ 23.3 m across track and 512 × 0.0364 ≈ 18.6 m along track.
  • For a 400 × 250 m block with 20% side overlap, line spacing = 23.3 × 0.8 ≈ 18.6 m. That needs 14 lines (250 / 18.6 rounded up) of 400 m each, 5.6 km in total.
  • At 5 m/s the imaging takes about 18.7 minutes, before turns, take-off and landing.

If irradiance measured during the flight drops below 600 W/m2 because of cloud, pause and re-fly that line. For comparison, patrolling a 60 km pipeline with a VTOL drone at 15 m/s takes about 67 minutes along the line per trip. All values are assumed.

Common pitfalls

  • Reporting absolute temperatures without setting emissivity and reflected temperature. Rely mainly on comparison with similar components.
  • Inspecting electrical joints at low load. Defects may not show.
  • Surveying PV in low or unstable irradiance. A clean-looking result proves nothing.
  • Flying closer to lines than allowed. Besides collision risk, the compass may fail.
  • Inspecting a turbine before the rotor is locked. Coordinate with the turbine operator and confirm the status before every take-off.
  • Delivering thousands of images without asset positions. Tie every finding to a tower number, string ID or blade position.

Continue in the lessons

Key references

  1. Vollmer, M., & Möllmann, K.-P. (2017). Infrared thermal imaging: Fundamentals, research and applications (2nd ed.). Wiley-VCH. link
  2. Barnhart, R. K., Marshall, D. M., & Shappee, E. (Eds.). (2021). Introduction to unmanned aircraft systems (3rd ed.). CRC Press. link
  3. International Electrotechnical Commission. (2017). Photovoltaic (PV) systems – Requirements for testing, documentation and maintenance – Part 3: Photovoltaic modules and plants – Outdoor infrared thermography (IEC TS 62446-3:2017). link
  4. Jahn, U., Herz, M., Köntges, M., et al. (2018). Review on infrared and electroluminescence imaging for PV field applications (Report IEA-PVPS T13-10:2018). IEA PVPS. link
  5. Memari, M., Shakya, P., Shekaramiz, M., Seibi, A. C., & Masoum, M. A. S. (2024). Review on the advancements in wind turbine blade inspection: Integrating drone and deep learning technologies for enhanced defect detection. IEEE Access, 12, 33236–33282. link
  6. InterNational Electrical Testing Association. (2003). ANSI/NETA ATS-2003 Standard for acceptance testing specifications for electrical power equipment and systems (Table 100.18, Thermographic survey suggested actions based on temperature rise). link

Used in courses

How to cite this page

Drone Institute, Rangsit University. (2026). การตรวจสอบระบบพลังงานด้วยโดรน. In UAS Technology Knowledge Hub (B.Tech.). https://rsu-uat.pk-research.work/en/kb/new/energy-inspection/