Evidence-based risk assessment

Risk mitigations must explain their mechanism and evidence. For example, designating a controlled area requires a way to actually control it; merely writing the name of a mitigation in a table does not confirm its effectiveness

B02 · Exercise and case study

A team assessing the situation and reviewing options before deciding
Concept illustration created with AI

Risk mitigations must explain their mechanism and evidence. For example, designating a controlled area requires a way to actually control it; merely writing the name of a mitigation in a table does not confirm its effectiveness

Before you start

Use a Windows or Linux computer, read CSV files with a spreadsheet program or text editor, and save your working files separately from the originals. The basic Python set uses only the standard library; the actual AI programs and simulators have separate installation steps

By the end of this lesson

  • Link risks to mitigations and evidence according to a framework with a stated version
  • Identify uncertainties and items that cannot yet be assessed
Exercise sequence: risk → mitigation → evidence → gaps
Open the full-size diagram →

Task and hands-on steps

A team claims that “fitting an AI camera makes it safe” and “there is a fence on the map, so no one will enter the area”, without test results or area inspection records. Review both claims

Extract the ZIP, then open B02-guide.md and B02-worksheet.csv . Keep assumptions and verified results separate. A blank field in the worksheet means data must be collected, not that it has passed

  1. Put hazards, consequences, mitigations and evidence in separate columns
  2. Write how each mitigation works, who is responsible for it and how it can fail
  3. Label evidence as observed/documented/pending, together with the scope it covers
  4. State the version of the SORA framework studied and the items that need expert review, without guessing GRC, ARC or SAIL values

Deliverables and assessment criteria

Submit: risk evidence matrix

Key criteria: every mitigation has evidence or a gap; no risk class is assigned by guessing; the SORA worksheet must be reviewed by an expert before use

Attach files that can be opened and checked, the date, the data version and your reasoning where no conclusion can yet be drawn. Completing the worksheet does not replace actual tests with models or equipment, or a real skills assessment

Open the model answer after completing the worksheet

Neither claim is sufficient. A detection camera is not a complete aircraft avoidance system, and a fence on a map does not confirm real-time control of the area

Activity plan for instructors

Have another team of learners try to find cases where the mitigations fail, then revise the evidence or narrow the scope of the claims in a traceable way

Review question: by what mechanism does this mitigation reduce risk, and what evidence is there?

Timings are design estimates and must be adjusted based on actual trial teaching
Learning packageExplainPractiseAssessIncluding equipment stations
BVLOS and risk assessment90 minutes210 minutes60 minutes0 minutes

Equipment station time is part of the total time in the plan and is not added again. Instructors keep PC results separate from observed tasks and have each learner explain their work individually before opening the model answers

See the full activity sequence and basic extensions →

Bibliography and scope of references

Additional sources checked 9 September B.E. 2569 (2026). The hypothetical case, figures, worksheet and activity criteria were newly compiled by PK-Research

Read supporting knowledge on this topic →

Used in courses

How to cite this page

Drone Institute, Rangsit University. (2026). Evidence-based risk assessment. In UAS Technology Knowledge Hub (B.Tech.). https://rsu-uat.pk-research.work/en/kb/courses/lessons/risk-evidence/

Original from Drone-Hub: https://drone.pk-research.work/courses/lessons/risk-evidence/ · © PK-Research