Project governance and monitoring
KPIs used for decision-making need a definition, a denominator, a data source and an owner who tracks them. More flights do not necessarily mean the organisation is solving problems better, so work quality, delivery time and unwanted impacts should all be measured.
E03 · Exercise and case study
KPIs used for decision-making need a definition, a denominator, a data source and an owner who tracks them. More flights do not necessarily mean the organisation is solving problems better, so work quality, delivery time and unwanted impacts should all be measured.
Before you start
Use a Windows or Linux computer, read CSV files with a spreadsheet program or text editor, and save your own work files separately from the originals. The basic Python set uses the standard library; the actual AI programs and simulators have separate installation steps.
- Law and roles →
- Risk and teamwork →
- Governance and the data lifecycle →
- Life-cycle cost and acceptance →
By the end of this lesson
- Assign responsibilities, indicators and project review cycles
- Defend a project proposal with evidence and stop conditions
Task and hands-on steps
A fictitious survey project delivered 20 data sets: 15 passed first inspection, 18 were delivered on time, and 2 are still awaiting confirmed coordinates. Management must decide whether to scale up the work or fix the process first.
Unzip the file and open E03-guide.md and E03-worksheet.csv . Keep assumptions and verified results separate. A blank in the worksheet means data must be collected, not that it has passed.
- Assign the work owner, approver, reviewer and data users in the project charter
- Calculate first-pass acceptance 15/20 and on-time delivery 18/20, and define how items awaiting confirmation are counted
- Set 3 KPIs, each with a data source, review frequency and stop or re-plan condition
- Present one page so that reviewers can trace questions back to the evidence, and record the issues that cannot yet be answered
Deliverables and assessment criteria
Submit: project charter and presentation
Key criteria: at least 3 KPIs with definition/measurement source/frequency; stop criteria with rationale
Attach files that can be opened for review, the date, the data version and the reasons when no conclusion can yet be drawn. Completing the worksheet does not replace actual tests with models or equipment, or real skill assessment.
Open the model answer after completing the worksheet
75% first-pass acceptance and 90% on-time delivery are different dimensions. Work awaiting confirmation should not be counted as passed without supporting criteria. Setting targets is an organisational decision, not a standard figure from this lesson.
Instructor activity plan
Rotate the roles of executive/reviewer, add a data leak incident or a contractor delivering late, then review the charter and budget, recording the reasons
Review question: What would be the evidence that the project should stop or change direction?
| Learning set | Explain | Practise | Assess | Including equipment stations |
|---|---|---|---|---|
| Executives and policymakers | 45 min | 105 min | 30 min | 0 min |
Equipment station time is part of the total time in the plan and is not added twice. Instructors keep PC results separate from observed tasks and have each learner explain their work individually before revealing the model answer.
See the full-track activity arrangement and basic extensions →Bibliography and scope of citations
Additional sources checked 9 September B.E. 2569 (2026). Fictitious cases, figures, worksheets and activity criteria newly compiled by PK-Research
- ICAO, Safety Management Manual, Chapter 9
Used as a framework for risk management and monitoring, without replacing Thai requirements
- NASA, Requirements Verification Matrix
Used to link requirements with inspection methods; the worksheets and figures in this lesson are our own design