Teaching pack · UAT 494

A 15-week teaching plan, 5 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.

Last updated: · 3(0-6-3) · Per week: lecture 0 h, lab 6 h, self-study 3 h; 90 contact hours per term

Coverage of the course description

The lessons fully teach 7 of 7 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.

Description topicModulesWhere it is taughtStatus
Implementation of the project continued from Capstone Project IM1Module 1: develop in increments, tracking with earned value (continuing the UAT 493 plan and RVM)Covered
Development or integration of systems and prototypesM1M2Module 1: a mass budget from real parts, the first flyable increment · Module 2: integration order, configuration control, interface testingCovered
Testing, verification and performance evaluationM3M4Module 3: verification and validation, detection results with confidence intervals, the flight time requirement · Module 4: reliability, ease of useCovered
Analysis and discussion of resultsM3M4M5Module 3: Wilson intervals and reading the flight-time requirement · Module 4: the reliability the data really supports, and SUS · Module 5: Example 1 final RVM statusCovered
System improvement based on test findingsM2M4Module 2: configuration control (change requests, review and retest) · Module 4: reviewing risk after testing (FMEA) and improving the system after a failed test (a seven-step loop, and Example 3: R4 fails in the first flight set, root cause, a new speed, retest and regression tests)Covered
Manuals or technical documentation and the final reportM5Module 5: the evidence dossier, manuals and reportsCovered
Demonstration and final presentation or defenseM5Module 5: presentation and demonstration, Example 2 overall project scoreCovered

Weekly teaching plan

WeekTopicPre-classLectureLabEvidence
1 M1Starting Project II and splitting the plan into incrementsRead module 1 'Develop in increments'; review the UAT 493 plan and RVMOrientation: assessment criteria, deadlines and fortnightly advisor meetingsWorksheet 1 part A: split the plan into at least three increments, each with a testable 'working' criterionDraft increment plan
2 M1Mass and energy budgets from real partsRead the real-parts mass budget section; run Example 1Advisor meeting 1: review the increment plan and main risksWorksheet 1 part B: weigh every real part; update mass and energy budgetsUpdated mass and energy budgets and meeting minutes
3 M1The first flyable increment; proposal dueRead the earned value section; run Example 2; take the module 1 quizSubmit the Project II proposal (increment plan, mass and energy budgets, test criteria and schedule) to the advisorWorksheet 1 part C: build increment 1, test in SITL, then fly in a permitted area; start logging work hoursSubmitted proposal and increment 1 flight log
4 M2ICD and integration orderRead module 2 'Integration order'Advisor meeting 2: increment 1 results and SPI/CPIWorksheet 2 part A: write a short ICD for every interface (signal, data format, rate, voltage, connector)Draft ICD and meeting minutes
5 M2Configuration controlRead 'Configuration control'; run Example 1Baselines, change requests and the missing-images-after-update caseWorksheet 2 part B: set baseline v1.0 of firmware, software and parameters in version controlBaseline v1.0 in version control
6 M2Interface testingRead 'Interface testing'; run Example 2; take the module 2 quizAdvisor meeting 3: integration progress reviewWorksheet 2 part C: integrate in order, test every interface with the table and log open issues with ownersInterface test table, open issues list and quiz result
7 M3Verification versus validation; RVM reviewRead module 3 'Verification and validation'Every requirement needs a verification method and pass criterionWorksheet 3 part A: review the UAT 493 RVM; prepare a held-out test image set labelled by someone who did not build the modelReviewed RVM and test set
8 M3Detection results and confidence intervalsRead the detection results section; run Example 1Advisor meeting 4: recall and precision with Wilson intervalsWorksheet 3 part B: compute recall and precision with Wilson intervals; start timed test flightsDetection results with confidence intervals
9 M3Flight-time requirement and validation with real users: mid-term progress reviewRead the flight-time requirement section; run Example 2; take the module 3 quizMid-term progress review with the committee or advisor (RVM status, SPI, CPI and open issues)Worksheet 3 part C: at least 10 timed flights with wind and mass recorded, analysis, and at least one validation session with real irrigation staffTest report, user feedback record and progress review result
10 M4Reliability from test flight hoursRead module 4 reliability section; run Example 1Advisor meeting 5: failures found and MTBFWorksheet 4 part A: total test hours and failures; compute MTBF and the rounds needed to confirm itReliability table with the level the data supports
11 M4Ease of use and effectivenessRead 'Is it easy to use?'; run Example 2SUS, short interviews and hidden time compared with the old methodWorksheet 4 part B: at least five real users try the system; run SUS, interviews and timed comparison with the old methodSUS scores, interview notes and timing table
12 M4Post-test risk review and system improvementRead the post-test risk review section; take the module 4 quizAdvisor meeting 6: updated FMEA and improvement listWorksheet 4 part C: update the FMEA with test data, raise change requests for improvements and retestUpdated FMEA, change requests, retest results and quiz result
13 M5Evidence dossier and final RVM statusRead module 5 dossier section; run Example 1Every document versioned, dated and change-logged; conclusions that include open issuesWorksheet 5 part A: assemble the dossier per Figure 1 and summarise the RVMDossier and RVM summary
14 M5User manual and final reportRead the manuals and reports section; take the module 5 quizAdvisor meeting 7: draft report check and presentation rehearsalWorksheet 5 part B: write the user manual, have a real user follow it, note confusing points and prepare a backup demo videoDraft final report, manual and quiz result
15 M5Demonstration and project defenseRead 'Presentation and demonstration'; run Example 2Project defense before the committeeWorksheet 5 part C: live demonstration, presentation and Q&A, then hand over software, configuration and documents to users or the next teamDeliverable, final report and presentation, scored with the rubric

Worksheets and instructor guide

One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.

1Worksheet 1 The first flyable increment
Lab · About 18 h of class time · CLO1

Objective: Split the plan into testable increments, update mass and energy budgets from real parts, build the first flyable increment and track progress with earned value

Equipment

  • Plan and RVM from UAT 493
  • Prototype parts and a digital scale
  • SITL and a ground station
  • Python and the module 1 example code
  • Work-hours log sheet

Safety

  • Always test in SITL before real flight
  • Fly only in permitted areas within CAAT conditions in visual line of sight
  • Propellers off during assembly and setup; keep lithium batteries in fire-safe containers

Steps

  1. Split the plan into at least three increments, each with a testable 'working' criterion
  2. Weigh every real part; update the mass budget with Example 1 and the energy budget to match
  3. Build increment 1, test it in SITL, then fly in a permitted area
  4. Log work hours weekly; compute SPI and CPI with Example 2
  5. Meet the advisor every two weeks with progress figures

Deliverables

  • Increment plan with criteria
  • Mass and energy budgets from real parts
  • SITL and real flight logs for increment 1
  • SPI/CPI table and meeting minutes

Checklist

  • Table 1 has at least 3 increments, each with a 'working' criterion that can be measured or judged pass/fail, and states that it was tested in SITL before real flight (Prototype and integration)
  • Table 2 has every real part weighed, including wiring and connectors, every value in g, with the total and margin calculated (Prototype and integration)
  • The SITL log and the real flight log of increment 1 are attached, and their dates show SITL came first (Prototype and integration)
  • Table 3 gives PV, EV and AC in hours from the real work-hours log, SPI and CPI are correct, and the advisor meeting minutes that used these figures are attached (Project management and advisor engagement)

Instructor guide

Class timing 1080 min

  1. Assessment criteria, battery and flight safety briefing, and review of the UAT 493 plan and RVM60 min
  2. Split the plan into increments and set the 'working' criteria (Table 1)120 min
  3. Weigh the real parts and update the mass and energy budgets (Table 2)180 min
  4. Build increment 1 and test it in SITL300 min
  5. Fly increment 1 in a permitted area and keep the log240 min
  6. Compute SPI and CPI (Table 3), advisor meeting, questions and hand-in checklist180 min

Expected results

  1. Record: Table 1 Increment plan and 'working' criteriaTable 1: at least 3 increments (the lesson uses 4: increment 1 flies the canal route automatically, 2 adds image capture at the designed spacing, 3 adds onboard detection, 4 adds reporting). Every increment must fly and have a pass/fail criterion. A criterion such as 'works well' with no number or condition does not pass. Every increment states SITL before real flight.
  2. Record: Table 2 Mass budget from real partsTable 2: numbers depend on the team's parts. Each difference must equal weighed minus estimate, and the total must match the sum of the rows. With the lesson's Example 1 (11 items): estimate 1,658 g, weighed 1,811 g, difference +153 g, of which wiring and connectors are +70 g (about 46% of the increase), frame, battery and camera with gimbal +20 g each, companion computer +10 g, motors +8 g, ESC +5 g. There must be a wiring and connectors row even if the proposal had 0 g.
  3. Record: Table 3 Weekly progress (earned value)Table 3: with the lesson's Example 2 (BAC 300 h over 12 weeks) at week 6: PV 120, EV 100, AC 130 give SPI = 100/120 = 0.83 and CPI = 100/130 = 0.77. Accept ±0.01. A team using real data must have hours in every cell, and EV must not exceed BAC.
  4. Question 1: From Table 2, find the mass margin using both the proposal estimate and the weighed mass. Does the margin still reach your team's minimum? Which part changed most, and why was it missing from the proposal?Margin = (m_max − m) / m_max. With Example 1 (m_max 2,000 g, at least 10% wanted): the estimate gives (2,000 − 1,658)/2,000 = 17.1%, the weighed mass gives (2,000 − 1,811)/2,000 = 9.4%, below 10%. The part that changed most is wiring and connectors at +70 g, because the proposal did not count wiring, connectors, mounts and covers. A strong answer uses the team's own numbers and gives the reason the item was missed, not just a repeat of the figures.
  5. Question 2: If the margin is below the target, what options does the team have? Which does it choose, and which part of the energy budget and flight time must be re-checked, and why?The lesson gives three options: lighten the camera and gimbal, use a smaller battery and re-check endurance, or ask the advisor to relax the target with a justification. With Example 1 the mass must be at most 1,800 g, so at least 11 g must go; for example, cutting 20 g from the camera and gimbal gives 1,791 g and a 10.5% margin. A smaller battery carries less energy on board, so the energy budget and the time per round must be recalculated against the requirement (module 3, Example 2 uses a 2 km round of at most 15 minutes). A strong answer picks one option with its side effects and does not quietly change the target.
  6. Question 3: From the latest SPI and CPI in Table 3, how is the team behind schedule or over its planned effort? What is the estimate at completion (EAC), and which scope items would you cut first in MoSCoW order?With Example 2: SPI 0.83 means behind schedule (83% of the planned value achieved by week 6); CPI 0.77 means more effort than planned. EAC = 300/0.77 = 390 h, an overrun of 90 h (30%), and the team needs 33.3 h of planned work per week against a plan of 25. If CPI stays the same, the remaining 170 h of budget earns about 131 h of the remaining 200 h of planned work, so about 69 h (roughly 35% of the remaining work) must be cut. Cut Could items first, then consider Should, never Must, and tell the advisor.
  7. Question 4: Why must every increment be flyable and testable? If time ran out today, which increment would the team show the committee, and which of its criteria has it already proved?So that problems are found early and a working system always exists, even if time runs out. A strong answer names the latest increment that has passed its criterion in both SITL and real flight (for example, increment 1 proves the route is flown completely), and accepts that parts never flown together do not count as finished.

Discussion questions

  • A skilled team uses the seller's masses instead of weighing parts. What does that risk for increment 1 and for the schedule?
  • If SPI is below 1 but CPI is above 1, what kind of problem is the team facing, and how should the plan change compared with both indices being low?
  • Why does reporting progress as numbers make the advisor meeting more useful than reporting by feeling?

Adapting to student background

Upper secondary (M.6)
Have them write the margin and SPI/CPI formulas and predict the example numbers by hand before running the code, linking school maths to the task. Pair them with a hands-on peer for weighing and assembling, and allow extra time for assembly.
Vocational certificate
Hand out Table 2 with the part list pre-printed so students weigh each part and fill it in, and check totals with a calculator alongside the code. Teach SPI and CPI as two simple divisions before introducing EAC.
Diploma
Extension: change CPI to 0.9 in Example 2 and find how many hours to cut (about 47 h) versus CPI 0.77 (about 69 h), then propose which items to cut in MoSCoW order, and help review a classmate's increment criteria.

Common student mistakes: Common mistakes in the module 1 lesson

2Worksheet 2 Integrate one part at a time
Lab · About 18 h of class time · CLO1

Objective: Define interfaces with an ICD, control configuration with baselines and change requests, and integrate while testing every interface

Equipment

  • Prototype from worksheet 1 and subsystems to integrate
  • Version control (e.g. Git)
  • Multimeter and signal measurement tools
  • Python and the module 2 example code

Safety

  • Propellers off during integration and bench tests
  • First power-up after rewiring through a current limiter
  • Never fly a configuration not recorded as a baseline

Steps

  1. Write a short ICD for every interface (signal, data format, rate, voltage, connector)
  2. Set baseline v1.0 of firmware, software and parameters in version control
  3. Integrate in the Figure 1 order and test every interface with an Example 2 table
  4. Route every change through request, review and retest; compare configurations with Example 1 whenever results change
  5. Log open issues with owners

Deliverables

  • ICD
  • Baseline v1.0 and change request history
  • Interface test table
  • Open issues list

Checklist

  • Table 1 covers every interface of the system; every row has signal, data format, rate, voltage, connector and owner, and the document has a version and date (Documentation, presentation and defense)
  • Table 2 tests every interface; each failure has a change request and a retest result, and each open issue has an owner and a due date (Prototype and integration)
  • Baseline v1.0 is in version control, and every later change has one change request per change (Prototype and integration)
  • Table 3 lists firmware, parameter and software versions of both runs and marks the items that changed (Prototype and integration)

Instructor guide

Class timing 1080 min

  1. Safety briefing (propellers off, first power-up through a current limiter) and review of the integration order figure60 min
  2. Write the ICD for every interface (Table 1)150 min
  3. Set baseline v1.0 in version control150 min
  4. Integrate in order and test every interface (Table 2)360 min
  5. Fix through change requests, retest and compare configurations (Table 3)210 min
  6. Log open issues with owners, answer questions and run the hand-in checklist150 min

Expected results

  1. Record: Table 1 Interface control document (ICD)Table 1: at least 6 interfaces (the lesson has 7: GCS to flight controller over MAVLink, flight controller to companion computer (camera trigger), companion computer to camera (USB), flight controller to gimbal (PWM), GNSS to flight controller (UART), companion computer to GCS (report), GCS to cloud (upload)). Every row must have values with units, such as baud rate, voltage and connector name; do not accept 'later', and both sides need an owner. With the lesson's values, the photo spacing is CAM1_TRIGG_DIST = 15 m.
  2. Record: Table 2 Interface test results and open issuesTable 2: with the lesson's Example 2 (7 interfaces): round 1 passes 5/7 = 71%, after fixes 6/7 = 86%. The one fixed is flight controller to companion computer; the one still open is companion computer to GCS (report), which needs an owner and a due date. The change request number of each fix must be shown, with the interfaces retested because they may be affected.
  3. Record: Table 3 Configuration comparison of two runs with different resultsTable 3: with the lesson's Example 1: firmware 4.7.1 the same; companion image v1.2 changed to v1.3; CAM1_TRIGG_DIST 15.0 the same; SERIAL2_BAUD 921 changed to 57 (921,600 to 57,600 bps); camera firmware 1.08 the same; SD card A32 changed to B64. That is 3 changes. Missed images went from 1 of 210 (0.5%) to 14 of 210 (6.7%). A row for the outcome (missed images) should be included.
  4. Question 1: Calculate the pass rate in round 1 and after fixes from Table 2. Which interface is still an open issue? How would you write that issue so someone who does not know the project understands it, and why must it not be hidden?Pass rate in round 1 versus after fixes (Example 2: 71.4% and 85.7%). The open one is companion computer to GCS (report). A strong answer states what does not work, the symptom seen, what was tried, the owner and the due date. Why not hide it: the committee stops trusting the whole dossier, and users may run the system beyond its ability.
  5. Question 2: From Table 3, which items changed at the same time? How would you separate which one caused the difference, and how many experiments would that need?Three items changed at once (SD card, SERIAL2_BAUD, companion image), so the cause cannot be known. Revert, then change one thing at a time through a change request: 3 single-change runs (trying every combination would need 8). The lesson says that cutting the serial port speed from 921,600 to 57,600 bps may stop the camera trigger commands arriving in time, but this must be confirmed by experiment, not guessed.
  6. Question 3: Why does this project integrate bottom-up and one part at a time? Give an example from your own build of a problem that was easy to trace because of this.Bottom-up integration means the part just added is the first suspect when something fails. The lesson's example: the camera triggers fine when connected directly to the companion computer but misses images when triggered through the flight controller, so the problem is at the interface between those two. A strong answer gives a real example from the team's build, naming the part just added and the symptom.
  7. Question 4: After fixing one interface, which other interfaces does the team retest and why? Use the ICD to see which ones share a signal, port or power source.Retest the fixed interface and every interface that shares a signal, port, power source or software with it, because a fix may break a neighbour. For example, after fixing flight controller to companion computer, retest companion computer to camera and flight controller to gimbal if the ICD shows a shared port or power. A strong answer cites rows of the team's own ICD.

Discussion questions

  • Why is a recorded 'fail' with evidence more credible than a report that says 'everything passed' with no test table?
  • If one team member updates a parameter without telling anyone, how does baseline v1.0 help the team?
  • In a student team, who should approve a change request and what should they check before approving?

Adapting to student background

Upper secondary (M.6)
Start by drawing a box diagram of the system with every link before filling in the ICD, and write why one part is connected before another. Pair them with a hands-on peer for wiring and voltage measurements.
Vocational certificate
Give an ICD template with the interface names already filled in; students measure voltage with a multimeter and read connector names from the real hardware, then work through the test table row by row, changing one thing at a time until it becomes habit.
Diploma
Extension: write a short Python script that compares the parameter files of two versions and prints the differences (like Example 1), then share it with the class for use before raising a change request.

Common student mistakes: Common mistakes in the module 2 lesson

3Worksheet 3 Execute the RVM
Lab · About 18 h of class time · CLO2

Objective: Test every requirement in the RVM, analyse detection and flight-time results with confidence intervals and validate with real users

Equipment

  • Integrated system from worksheet 2
  • RVM from UAT 493
  • Held-out test image set
  • Anemometer and scale
  • Python and the module 3 example code

Safety

  • Test-fly in permitted areas within CAAT conditions in visual line of sight
  • Do not fly when wind exceeds the agreed limit
  • Arrange validation with real users in advance, explain its purpose and do not share images of people without consent

Steps

  1. Review the RVM so every requirement has a verification method and pass criterion
  2. Prepare a held-out test set labelled by someone who did not build the model
  3. Compute recall and precision with Wilson intervals using Example 1
  4. Fly at least 10 timed rounds recording wind and mass; analyse with Example 2
  5. Validate with real irrigation staff at least once and record their feedback

Deliverables

  • RVM with results for every requirement
  • Detection results with confidence intervals
  • Flight-time analysis
  • User validation record

Checklist

  • The RVM is attached; every requirement has a verification method, a pass criterion, and a result or the reason it is not yet tested (Testing, V&V and evaluation)
  • Table 1 has TP, FN and FP counts, recall, precision, the 95% Wilson interval and the name of a labeller who did not build the model (Testing, V&V and evaluation)
  • Table 2 has at least 10 rounds, each with time, wind and take-off mass with units, and rounds outside the conditions are flagged, not silently dropped (Testing, V&V and evaluation)
  • Every conclusion stays within what the data supports (for example, 'met on this set, not yet demonstrated at 95% confidence') and the advisor meeting 4 minutes that used the recall and precision figures are attached (Project management and advisor engagement)
  • The validation record gives the user's role, date, task given, feedback and consent, with no images of people shared without consent (Testing, V&V and evaluation)

Instructor guide

Class timing 1080 min

  1. Safety briefing (flying area, wind, user consent) and review of the RVM goals60 min
  2. Review the UAT 493 RVM and prepare the test set labelled by someone else150 min
  3. Compute recall, precision and Wilson intervals (Table 1)180 min
  4. Fly at least 10 timed rounds, recording wind and mass (Table 2)360 min
  5. Validate with real irrigation staff and record their feedback210 min
  6. Analyse flight times, answer the questions and run the hand-in checklist120 min

Expected results

  1. Record: Table 1 Detection results on the held-out test set (recall and precision)Table 1: numbers depend on the team's test set. TP + FN must equal the number of labelled cracks. With the lesson's Example 1 (TP 184, FN 16, FP 21): recall = 184/200 = 0.920, 95% Wilson interval = [0.874, 0.950], precision = 184/205 = 0.898. R1 needs recall of at least 0.90. The mean passes but the lower bound 0.874 is below 0.90, so the status is 'met on the sample, not yet demonstrated at 95% confidence'. Accept ±0.001.
  2. Record: Table 2 Timed test flights (at least 10 rounds)Table 2: at least 10 rounds, each with time, wind and take-off mass. With the lesson's Example 2 data (13.2, 13.8, 12.9, 14.1, 13.5, 13.0, 14.4, 13.6, 13.3, 13.9 min): mean 13.57 min, standard deviation 0.49 min, longest round 14.4 min, no round over 15 min. Rounds with wind above the agreed limit must be flagged and reported separately, not deleted.
  3. Record: User validation record (role, date, task given, feedback, consent)Validation record: at least one real irrigation staff member (not a team member), with role, date, task given (for example, reading the canal inspection report), a summary of what they said, and consent. Good feedback is more than 'good': it says where they got stuck or what else they need. If there is no usable feedback, the team should improve its questions and repeat.
  4. Question 1: From Table 1, can requirement R1 (recall at least 0.90) be verified with 95% confidence? Write one conclusion sentence that does not claim more than the data, and say roughly how many more labelled cracks you would need if the true recall stays near your result.Using Example 1: the lower bound 0.874 < 0.90, so R1 cannot be verified at 95% confidence. A good conclusion: 'recall was 0.92 on this test set (95% Wilson interval 0.874 to 0.950); it meets the criterion on the sample but is not yet demonstrated at 95% confidence'. If the true recall stays near 0.92, about 830 labelled cracks are needed (at n = 830 the lower bound is 0.900). A team with different numbers should check them the same way.
  5. Question 2: Why must the test images never have been used to train the model and be labelled by someone who did not build it? If this is not done, will the reported recall be higher or lower than the truth, and why?A model that has seen the training images can recognise them, so recall comes out higher than the truth when it meets new images from the real canal, and a developer who labels the images may lean towards what the model finds easily. A strong answer mentions predicting unseen images (generalisation) and labeller bias.
  6. Question 3: From Table 2, find the one-sided 95% upper bound of the mean time and compare it with 15 minutes (get t for your number of rounds from the NIST table). What is the conclusion for R4, and which test conditions must be written beside it?Using Example 2 data (n = 10, t = 1.833 from the NIST table): upper bound = 13.57 + 1.833 × 0.49 / √10 = 13.85 min, below 15 min with no round over the limit, so R4 is verified under the tested conditions. The conclusion must state the wind speed during flights, take-off mass, the 2 km route and the flight settings. If the team flew fewer than 10 rounds, t must match the actual number of rounds.
  7. Question 4: In the validation record, did users mention something the RVM requirements do not yet cover? How does that differ from what verification checks, and what will the team do with that feedback?Verification checks that the product meets the requirement (built the thing right); validation checks that it meets what users need in real conditions (built the right thing). A strong answer separates feedback that checks an existing requirement from a new need. A new need must be recorded as a proposed requirement or a stated limitation (through a change request), not ignored.

Discussion questions

  • If the team has only 60 crack images, how should it report the detection results honestly?
  • If the slowest round happened on a day with wind above the agreed condition, should it be removed? How would you report it?
  • A real user says they want a report that can be read on a phone, but the RVM has no such requirement. What should the team do?

Adapting to student background

Upper secondary (M.6)
Have them compute a Wilson interval on paper with a small example before using the code, and explain in words why more samples narrow the interval. Pair them with a hands-on peer for wind measurement and weighing before flights.
Vocational certificate
Provide a code or spreadsheet template where students only enter TP, FN, FP and flight times, then read the output and check it with a calculator. Focus on fieldwork: timing, wind measurement, weighing and talking to users. Practise the one-sentence conclusion 'met on this set, but ...' before writing the real one.
Diploma
Extension: adapt the Example 1 code to find how many cracks must be labelled if the true recall is 0.95 (about 130 for the lower bound to reach 0.90) and compare with 0.92 (about 830), then explain to another team why the difference is so large.

Common student mistakes: Common mistakes in the module 3 lesson

4Worksheet 4 Post-test evaluation
Analysis activity · About 18 h of class time · CLO2

Objective: Evaluate reliability, usability and effectiveness from real data, review risk and improve the system from test findings

Equipment

  • All test flight hours and failure records
  • SUS questionnaire and interview guide
  • Stopwatch
  • FMEA from UAT 493
  • Python and the module 4 example code

Safety

  • Retest flights after improvements follow CAAT conditions in visual line of sight, after SITL first
  • Users in the evaluation are briefed and consent; data kept anonymous

Steps

  1. Total all test hours and failures; compute MTBF with Example 1
  2. Compute rounds needed to confirm reliability and state the level the data really supports
  3. Have at least five real users try the system; run SUS and short interviews
  4. Time the system against the old method, including hidden time such as preparation and report checking
  5. Update the FMEA with test data, raise change requests for improvements and retest

Deliverables

  • Reliability table with a data-supported conclusion
  • SUS scores and interview summary
  • Timing comparison table
  • Updated FMEA, change requests and retest results

Checklist

  • Every value in Table 1 has a unit, MTBF comes from the logged flight hours and failures, and the conclusion does not exceed what the data supports (Testing, V&V and evaluation)
  • Table 2 has at least 5 SUS respondents who are not on the development team, scored with even items reversed correctly, with evidence of anonymous consent (Testing, V&V and evaluation)
  • Table 3 includes hidden time (for example, permit paperwork and report checking) and states the assumption behind each value (Testing, V&V and evaluation)
  • The updated FMEA, one change request per change, the retest result and the regression test of previously passed requirements are all attached (Prototype and integration)

Instructor guide

Class timing 1080 min

  1. Briefing on user consent, safety of retest flights and anonymous data handling60 min
  2. Total flight hours and failures, compute MTBF and the rounds needed (Table 1)180 min
  3. At least 5 users try the system, take the SUS and a short interview (Table 2)240 min
  4. Time against the old method including hidden time (Table 3)180 min
  5. Review the FMEA, write the discrepancy report, raise change requests, retest and regression test300 min
  6. Answer the questions and run the hand-in checklist120 min

Expected results

  1. Record: Table 1 Reliability from the test flight dataTable 1: numbers depend on the team's flight data. With the lesson's Example 1 (42 flight hours, 2 failures, 20-minute missions): MTBF = 42/2 = 21.0 h; reliability of a 20-minute mission R = e^(−(20/60)/21) = 0.984; about 1.6 aborts per 100 missions. Failure-free missions needed to confirm: 45 (R at least 0.95 at 90%), 59 (R at least 0.95 at 95%), 299 (R at least 0.99 at 95%). Rule of three: 30 missions without failure give an upper bound on the failure rate of about 3/30 = 10%. Conclusion the data supports: an estimate of about 98% per mission, but not confirmed at 95% with 90% confidence. Accept ±0.001 on R.
  2. Record: Table 2 SUS scores of real usersTable 2: with the lesson's Example 2 (5 users): sums of odd items 14, 17, 12, 15, 12; sums of even items 16, 16, 14, 16, 13; SUS = 2.5 × (odd + even) = 75.0, 82.5, 65.0, 77.5, 62.5; mean 72.5. Two users are below 68 (65.0 and 62.5), and the interview notes must say where they got stuck. Respondents must not be members of the development team.
  3. Record: Table 3 Time of the old method compared with the new systemTable 3: with the lesson's Example 2: old method 180 min per round × 2 people = 360 person-min; new system 45 min × 2 people = 90 person-min; saving 270 person-min (75%). The lesson gives no figure for hidden time. A good table has separate rows for permit paperwork and report-checking time. If the lab assumes 60 extra person-min on the new-system side, the saving is 210 person-min (58%); the assumption must be written beside it.
  4. Question 1: From Table 1, what level of reliability does the team's data support, and what can it not claim? How many more failure-free missions are needed to confirm the level the team aimed for?With Example 1: MTBF 21.0 h and about 98.4% reliability per 20-minute mission. Two failures in 42 h is a small sample, so the team may claim only 'an estimate of about 98%', not 'highly reliable'. It cannot claim 95% at 90% confidence, because that needs 45 consecutive failure-free missions (about 15.0 flight hours). A strong answer states the extra missions needed and the real time left in the project.
  5. Question 2: From Table 2, how does the mean SUS score compare with the reference value of about 68? What should users scoring below the reference be asked, and why does a sample of 5 limit the conclusion?A mean of 72.5 is slightly above the reference of about 68, but two users (65.0 and 62.5) are below it. Ask where they got stuck and which terms or screens confused them. Five users is too few to speak for all users, and developers should not answer themselves because they know the system. A strong answer proposes adding users or fixing the points where they got stuck.
  6. Question 3: From Table 3, what percentage of time is saved when hidden time is included, compared with when it is not, and why must it be included?With Example 2: ignoring hidden time gives a 75% saving; assuming 60 person-min of hidden time gives 58%. It must be included because comparing effectiveness while dropping time that does not favour the new system makes the result look better than it is. A strong answer uses the team's own data and states assumptions.
  7. Question 4: Pick one failed test of the team and follow the seven-step loop: is it a product problem or a test problem, what is the root cause, which single change request is raised, and what must be retested and regression tested?Model answer (module 4, Example 3): R4 fails (mean 16.00 min, upper bound 16.24 min, over 15); the wind was within conditions, so it is a product problem. The survey leg takes 11.11 min (69%) because the speed is 3 m/s; the root cause is that no sub-requirement for survey speed was ever set. Choose 4 m/s (round 13.22 min, blur 0.27 px, a photo every 3.75 s, not below 3.5 s); 5 m/s is rejected because a photo every 3.00 s is too fast. One change request, then a new flight set gives 13.57 min with upper bound 13.85 min, and R1 plus the missed-image count are regression tested. The team's own answer must walk through all 7 steps with its own data, changing one item at a time.

Discussion questions

  • If the team flew 10 test hours with no failure at all, may it write 'the system is reliable'? How should it write it?
  • Who should and should not answer the SUS questionnaire, and why?
  • What does a failed test tell the committee about the team if the team handles it with a systematic loop?

Adapting to student background

Upper secondary (M.6)
Have them compute MTBF, R(t) and n by hand with a scientific calculator before running the code, then write in their own words what the data supports. Practise reversing the even SUS items on paper before using the code.
Vocational certificate
Hand out a SUS scoring grid with the even-item reversal built in, and emphasise fieldwork: timing, observing users and noting their words. Fill in the reliability table line by line with the formula next to the example.
Diploma
Extension: draw an Ishikawa fishbone diagram for one failed test of the team and run 5 Whys down to the root cause, then propose a prevention that does not require changing several things at once.

Common student mistakes: Common mistakes in the module 4 lesson

5Worksheet 5 Dossier and presentation
Analysis activity · About 18 h of class time · CLO3, CLO2

Objective: Assemble a traceable dossier, write the manual and final report, demonstrate and defend the project, and hand over to users or the next team

Equipment

  • Documents and results from worksheets 1–4
  • Prototype ready for demonstration
  • Camera for a backup demo video
  • Python and the module 5 example code

Safety

  • Flight demos only in permitted areas within CAAT conditions in visual line of sight; keep the audience clear
  • If weather or site is unsuitable, use the backup video instead of flying

Steps

  1. Assemble the dossier per Figure 1 with every document versioned, dated and change-logged
  2. Summarise the RVM with Example 1 and write conclusions that include open issues
  3. Write the user manual; have a real user follow it and note confusing points
  4. Rehearse with the advisor and prepare a backup demo video
  5. Demonstrate, present and defend, then hand over software, configuration and documents

Deliverables

  • Evidence dossier
  • Final RVM summary
  • User manual and final report
  • Slides, demo video and handover record

Checklist

  • Table 1 covers all four layers (conclusions, RVM, test reports, raw data and configuration) and every document has a code, version, date and change log (Documentation, presentation and defense)
  • Table 2 gives the status of every requirement matching the evidence, including unmet or undemonstrated ones, and the report conclusions state those open items with reasons and next steps (Testing, V&V and evaluation)
  • The user manual has been followed by at least one real user who is not a team member, and the confusing points have been fixed (Documentation, presentation and defense)
  • A backup demo video exists and the slides answer three questions: what problem is solved, how far with evidence, and what remains (Documentation, presentation and defense)
  • Software, the configuration baseline and the documents are handed over, with a handover record confirmed by the recipient (Prototype and integration)

Instructor guide

Class timing 1080 min

  1. Briefing on the defense criteria and flight demo safety (site, audience, weather)60 min
  2. Assemble the dossier by layer and fill in the index (Table 1)240 min
  3. Summarise the final RVM and write conclusions including open issues (Table 2)180 min
  4. Write the user manual, have a real user follow it and fix it from the results240 min
  5. Rehearse with the advisor and make the backup demo video240 min
  6. Demonstrate, present, hand over, answer the questions and run the hand-in checklist120 min

Expected results

  1. Record: Table 1 Evidence dossier indexTable 1: all four layers, ordered from conclusions and limitations, to the RVM, to each test report, to the raw data (logs, images, configuration). Every row has a clear code and version (lesson examples: T1 report v2, test set TS-03, FL-11..20, T3 GCP survey v1, A1 storage analysis v1, D1 walkthrough), a date and a change log entry. A row without version or date is incomplete. Any coding scheme is acceptable if it is consistent.
  2. Record: Table 2 Final RVM statusTable 2: with the lesson's Example 1 (7 requirements): R1 crack recall met on the sample, not demonstrated (T1 report v2, TS-03); R4 round at most 15 min verified (FL-11..20); R6 coordinates within 3 m verified (T3 GCP survey v1); R5a store images verified (A1); R5b send report verified (D1); R8 web dashboard not started (Could); R2 usability SUS at least 68 verified (SUS survey n=5). Anything not verified needs an open issue and a next step.
  3. Record: Notes from the user manual try-out and the presentation rehearsal (confusing points, edits, time taken)Try-out and rehearsal notes: at least one real user who is not a team member followed the manual without help; the steps where they got confused and the words they did not understand are noted; the edits to the manual are listed; and the rehearsal time (target 15 to 20 minutes) and the backup video status are recorded. A strong answer links each confusing point to one edit.
  4. Question 1: From Table 2, what percentage of requirements are verified? Which ones are open issues, and how should the conclusions in the report state them?With Example 1: 5 of 7 verified = 71%. The open items are R1 (met on the sample but not demonstrated with confidence) and R8 (not done because it is a Could). A good conclusion states both with reasons and next steps. A team with a different number of requirements should check verified count divided by total (the lesson's practice question gives 6 of 8 = 75%).
  5. Question 2: Choose one conclusion in the report and trace it layer by layer down to the raw data. Which layer lacks evidence or a version, and how will you fix it?A conclusion that cannot be traced must be removed or flagged as having no evidence. Example trace: 'R4 verified' to the RVM to test report T2 to flight log set FL-11..20 to the configuration baseline used for those flights. Every layer cites a code and version. A strong answer names the missing layer and a specific fix.
  6. Question 3: Using the course weights 20/30/50 (proposal, progress, product), estimate the team's overall score from the scores it expects. If the progress score rose by 10 points, how much would the overall score rise?Lesson Example 2: 82 × 0.20 = 16.4, 75 × 0.30 = 22.5, 88 × 0.50 = 44.0, total 82.9. If the progress score rose by 10 points, the total rises by 0.30 × 10 = 3.0 (the lesson's practice question with 70/80/90 gives 83). The team uses its own expected scores. A strong answer notes that progress carries 30% of the weight, so the fortnightly advisor meetings with progress figures (module 1) matter.
  7. Question 4: From the manual try-out notes, where did the user get confused, because the manual used what kind of terms or steps, and how was it fixed? How does the team's presentation answer the three main questions, and what is the backup plan for the demo?A good manual is written for the irrigation staff, not for the development team. A strong answer identifies the words or steps that used the developers' jargon and rewrites them so a user can follow. The presentation answers: what problem is solved, how far with evidence, and what remains. Backup plan: a demo video and logged data; if the weather or site is unsuitable, show the video instead of flying.

Discussion questions

  • If the team is about to write a result that has no evidence yet, how can it word it without losing credibility?
  • Why hand over the software and the configuration, not just the report?
  • The committee has little time. What should the first page of the dossier show?

Adapting to student background

Upper secondary (M.6)
Have them practise writing the dossier's first-page conclusion in no more than half a page, tracing each claim to evidence before writing. This suits students strong on documents and theory; pair them with a hands-on peer for the demo and system setup.
Vocational certificate
Give a dossier index template with the four layers already set, to fill in row by row from real files, and rehearse in pairs focusing on demonstrating the real system and answering 'how far, and what remains'.
Diploma
Extension: write a Python script that reads the RVM table (like Example 1) to count statuses and check that every evidence code exists in the dossier index, let another team try it before hand-in, and help review a classmate's manual.

Common student mistakes: Common mistakes in the module 5 lesson

Scoring rubric

For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.

CriterionWeightExcellent (4)Good (3)Fair (2)Needs work (1)
Prototype and integration30%Prototype delivers all planned increments, all interfaces pass, configuration under controlNearly complete, minor recorded open issuesPartly working, several interfaces failingPrototype not working
Testing, V&V and evaluation30%Every requirement tested with confidence intervals, validated with real users, conclusions within what the data supportsNearly all tested, correct analysisIncomplete testing or over-claimed conclusionsNo test evidence
Project management and advisor engagement15%Every scheduled meeting held with SPI/CPI figures and minutes; plan adjusted on evidenceNearly all meetings, progress trackedSeveral missed meetings or no progress figuresNo progress tracking
Documentation, presentation and defense25%Traceable dossier, user-tested manual, successful demo, clear answers to the committeeComplete with minor flawsKey documents missing or demo failedCannot communicate the work

Assessment map: CLOs and how they are assessed Draft

The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.

CLOWorksheetsModule quizzes
CLO1 Develop and integrate the prototypeW 1W 2M1M2
CLO2 Test, verify and evaluate the systemW 3W 4W 5M3M4M5
CLO3 Document and present the workW 5M5